Atch 9. Repair Roof & Upgrade UPS HVAC Pre Proposal Q&As.pdf

PDF 105 KB Posted

Attached to
Repair Roof and Upgrade HVAC and UPS System B328
Solicitation number
MXDP10-A058
Issued by

About this file

This document includes pre-proposal questions and answers regarding a federal contract solicitation to repair the roof and upgrade HVAC and UPS systems at Building 328 at Laughlin Air Force Base. The scope of work involves repairing and replacing the single-ply roofing system covering approximately 45,000 square feet with a new white colored single-ply roof. It also includes upgrading the HVAC and UPS systems in rooms containing UPS equipment to adequately condition the space and externally exhaust any fumes produced. Acid resistant flooring is required in all four pump rooms. Acoustic panels in these rooms must be removed according to asbestos abatement specifications. Adjacent concrete masonry walls must be repainted where infill work is conducted. Pricing is required for a new generator to connect mechanical equipment to emergency power. This is a women-owned small business set-aside contract with a firm fixed price and a NAICS code of 238160 and size standard of $16.5 million.

View the file

Other files

File Type Posted
Solicitation Amendment FA309920R00080008 SF 30.pdf PDF
Atch 13 Repair Roof Upgrade UPS-HVAC Pre-Proposal Questions Answers - D.pdf PDF
Solicitation Amendment FA309920R00080007 SF 30.pdf PDF
Solicitation Amendment FA309920R00080006 SF 30.pdf PDF
Atch 12 - Fire Alarm Panel Photos.pdf PDF
FA309920R00080005 SF 30.pdf PDF
FA309920R00080004 SF 30.pdf PDF
Atch 11. Repair Roof & Upgrade UPS HVAC Pre Proposal Q&As - C.pdf PDF
Atch 10. Repair Roof & Upgrade UPS HVAC Pre Proposal Q&As - B.pdf PDF
Solicitation Amendment FA309920R00080003 SF 30.pdf PDF
Solicitation Amendment FA309920R00080002 SF 30.pdf PDF
Solicitation Amendment FA309920R00080001 SF 30.pdf PDF
6 - Blank DD Form 1354.pdf PDF
Atch A. FAA Form 7460-1.pdf PDF
Atch D. AF IMT 3000, Material Submittal.pdf PDF
Atch 5. AETC 47.pdf PDF
Atch G. AF IMT 3064 Contract Progress Schedule.pdf PDF
Atch 7. Past Performance Questionnaire.pdf PDF
Atch E. Schedule of Submittals FLight Simulator Bldg 328.xlsx XLSX spreadsheet
Atch F. AF Form 3952-Chemical-Hazardous Material Request.pdf PDF
Atch 3. Wage Determination TX20200186.pdf PDF
Atch C. Division 01 Specifications.pdf PDF
MFR HVAC SOW Atch 5 - Blank Progress Schedule and Report.pdf PDF
2 - Design Drawings B328.pdf PDF
3 - B328 Design Specifications.pdf PDF
Atch H. AF IMT 3065 Contract Progress Report.pdf PDF
Atch I. DD Form 1354 Transfer and Acceptance of DoD Real Property.pdf PDF
Atch B. Environmental Quality Construction Specifications LAFB.pdf PDF
Atch 6. Financial Institution Reference Sheet.pdf PDF
4 - Asbestos Survey Report B328.pdf PDF
Atch J. Photographs Bldg 328 Roof.pdf PDF
Solicitation - FA309920R0008.pdf PDF
Atch 1. SOW MXDP 10-A058 Repair Roof Flight Simulator - B328.pdf PDF
Atch 8. HVAC Chiller System Justification and Approval, 7 Aug 19.pdf PDF
Atch 4. Notification of Compliance with Contract Insurance Requirements.pdf PDF
Atch 2. SOW MXDP 16-1015 Upgrade UPS-HVAC Systems Flight Sim - B328.pdf PDF
7 - Schedule of Material Submittals.xlsx XLSX spreadsheet
Show all 37

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Repair Roof and Upgrade HVAC and UPS System B328

Pre‐Proposal Questions

FA309920R0008

Question

G‐002/M‐101: Acid Resistant Floor Covering is mentioned. Is this in the scope of work? If so, is it required over the floor in the entire space?

Answer

CE: Yes. According to the design drawings sheet M‐101, all four pump rooms shall receive acid resistant floor covering. Sheet G‐002 listed the requirements for the acid resistant floor covering under

Architectural Notes as stated on sheet M‐101.

Question

MD‐100: States to remove all acoustic panels in room on walls and ceiling and to refer to asbestos abatement specification. Per Asbestos report there is one area in one room that requires abatement.

Nowhere else in scope does it indicate removal of all the panels. Please confirm if this is in scope with the exception of the one area in the asbestos report.

Answer

CE: All acoustic panels in the four pump rooms shall be removed according to what is being shown on

MD‐100. The note simply says they need to be handled according to the asbestos abatement specification where asbestos is present as stated in the report.

Question

MD‐401/MD‐402: Photos showing scope that is not mentioned in SOW. Are all photos on this sheet expected to be included in the scope of work?

Answer

CE: The photos on sheets MD‐401 & MD‐402 are being used to clarify what kind of work is needed at a particular spot. The Design Drawings are part of the contract and the photos are part of the design drawings. Not all required work is necessarily stated in the SOW. Therefore, everything that’s stipulated in the SOW, the specifications and the drawings are considered to be within scope and should be included in the pricing.

Question

M‐101/EP101: Lists a Generator bid option. This is not shown in the scope. Are we to price a generator?

Answer

CE: The Design Drawings are part of the contract. If it’s in the drawings, it’s considered to be in scope.

Yes, include pricing for the generator.

Question

M‐600: Several pieces of mechanical equipment are indicated to connect to the emergency power from the bid option generator. Is this generator already there or are we to price?

Answer

CE: Sheet M‐101 stated that it’s a new generator. It needs to be priced. See comments above.

Question

M‐401: Calls for Re‐Paint of two walls in each of the 4 rooms. Is this in scope?

Answer

CE: It’s in scope because it’s being called out in the design drawings. Refer to sheet G‐002 Architectural

Notes. Under painting, it explains the new CMU infills shall be painted. Then, adjacent CMU walls shall also be repainted (to match). For all new CMU infill, it needs to follow the instructions accordingly. It does not matter whether it’s inside or outside a room. The intent is to repaint where work has been done in order to blend in with the surroundings.

Question

Are there peaks and valleys in the existing roof?

Answer

CE: Yes, there are peaks and valleys directing water flow to the roof drains.

Question

Does the contract include all roof levels?

Answer

CE: Yes, the roof includes all roof levels for a total of about 45,000 SF.

Question

Is there ponding on the roofs?

Answer

Yes, there has been some ponding because some of the roof drains are clogged.