This document contains questions and answers regarding a solicitation for repair and replacement of a single-ply roofing system and upgrades to HVAC and UPS systems on Building 328 at Laughlin Air Force Base. The solicitation requires furnishing all materials, labor, tools, equipment, and transportation to complete roof repairs and replacement with a new white single-ply roofing system, along with phased HVAC and UPS upgrades. The UPS upgrades include installation of remote monitoring, controls, and alarms, while HVAC upgrades are needed to adequately condition spaces containing the UPS system and externally exhaust any fumes. Pricing for an optional backup generator and automatic transfer switch can be included in the UPS/HVAC CLIN. No additional site visits or bid schedule revisions can be accommodated. The solicitation is set aside for women-owned small businesses with a NAICS code of 238160 and $16.5 million size standard. The agency is the Department of the Air Force Air Education and Training Command, and award will be a firm-fixed price contract.

View the file

Other files

File Type Posted
Solicitation Amendment FA309920R00080008 SF 30.pdf PDF
Solicitation Amendment FA309920R00080007 SF 30.pdf PDF
Solicitation Amendment FA309920R00080006 SF 30.pdf PDF
Atch 12 - Fire Alarm Panel Photos.pdf PDF
FA309920R00080005 SF 30.pdf PDF
FA309920R00080004 SF 30.pdf PDF
Atch 11. Repair Roof & Upgrade UPS HVAC Pre Proposal Q&As - C.pdf PDF
Atch 10. Repair Roof & Upgrade UPS HVAC Pre Proposal Q&As - B.pdf PDF
Solicitation Amendment FA309920R00080003 SF 30.pdf PDF
Atch 9. Repair Roof & Upgrade UPS HVAC Pre Proposal Q&As.pdf PDF
Solicitation Amendment FA309920R00080002 SF 30.pdf PDF
Solicitation Amendment FA309920R00080001 SF 30.pdf PDF
6 - Blank DD Form 1354.pdf PDF
Atch A. FAA Form 7460-1.pdf PDF
Atch D. AF IMT 3000, Material Submittal.pdf PDF
Atch 5. AETC 47.pdf PDF
Atch G. AF IMT 3064 Contract Progress Schedule.pdf PDF
Atch 7. Past Performance Questionnaire.pdf PDF
Atch E. Schedule of Submittals FLight Simulator Bldg 328.xlsx XLSX spreadsheet
Atch F. AF Form 3952-Chemical-Hazardous Material Request.pdf PDF
Atch 3. Wage Determination TX20200186.pdf PDF
Atch C. Division 01 Specifications.pdf PDF
MFR HVAC SOW Atch 5 - Blank Progress Schedule and Report.pdf PDF
2 - Design Drawings B328.pdf PDF
3 - B328 Design Specifications.pdf PDF
Atch H. AF IMT 3065 Contract Progress Report.pdf PDF
Atch I. DD Form 1354 Transfer and Acceptance of DoD Real Property.pdf PDF
Atch B. Environmental Quality Construction Specifications LAFB.pdf PDF
Atch 6. Financial Institution Reference Sheet.pdf PDF
4 - Asbestos Survey Report B328.pdf PDF
Atch J. Photographs Bldg 328 Roof.pdf PDF
Solicitation - FA309920R0008.pdf PDF
Atch 1. SOW MXDP 10-A058 Repair Roof Flight Simulator - B328.pdf PDF
Atch 8. HVAC Chiller System Justification and Approval, 7 Aug 19.pdf PDF
Atch 4. Notification of Compliance with Contract Insurance Requirements.pdf PDF
Atch 2. SOW MXDP 16-1015 Upgrade UPS-HVAC Systems Flight Sim - B328.pdf PDF
7 - Schedule of Material Submittals.xlsx XLSX spreadsheet
Show all 37

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DEPARTMENT OF THE AIR FORCE

47TH FLYING TRAINING WING (AETC)

Repair Roof and Upgrade HVAC and UPS System B328 Pre-Bid Question

FA309920R0008

31 August 2020

Q&A #4 from Q&A Attachment 10 states that the Pricing for the Generator and the ATSshould be included in the proposal as a bid option. The Section B Price Sheet onlyincludes two CLINS, one for the Roof and one for the UPS/HVAC work. Will a new bidsheet be provided in order to price the Generator and ATS as a bid option or should thecost just be included in CLIN 0002.

CEN Response: The pricing for the Generator and ATS can be included in CLIN 0002.

Q&A #10 from Q&A Attachment 10 states that due to the uncertain amount of deckreplacement needed to provide a unit cost for labor and material as a separate line item.Will the government be adding a line on the bid schedule to include this unit price cost?Ifnot, where should this information be presented?

CONF Response: Unfortunately we will not be able to add an option in the solicitation at this time, please write it in below Section B.

In light of the additional week for bid preparation I wanted to request an opportunity beprovided for a 2nd site visit. Unfortunately on the original site visit my HVAC/ Electricalcontractor did not make it as the person authorized to attend the site visit had car issues inSeguin (Yes they really had a car issue.) I would like to get this individual onsite to helpclarify some of their questions to help improve our overall bid. Is it possible tocoordinate a site visit between now and the due date? Roof access will not be required.

CONF Response: Unfortunately due to manpower and time-constraints, the Governmentcannot provide a second site visit for the project Repair Roof and Upgrade & UPS SystemB328.