This document includes a submittal register and federal contract opportunity for repair and upgrade work at Building 328 at Laughlin Air Force Base.
The submittal register outlines over 70 submittal items required under the contract, including plans, schedules, reports, product data, shop drawings, manuals, and closeout documents. It covers submittals for preconstruction activities, construction phase commissioning, demolition, asbestos abatement, firestopping, sealants, HVAC, plumbing, electrical, communications, controls, emergency power, and closeout.
The federal contract opportunity solicits offers to repair the single-ply roofing system, upgrade the HVAC serving UPS rooms, and install UPS controls and alarms. The work must be phased. This acquisition is set aside for women-owned small businesses with a NAICS code of 238160 and size standard of $16.5M. The government will award a firm-fixed price contract and registration in SAM is required to submit an offer.
View the file
Other files
Show all 37
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Table 1
| SUBMITTAL REGISTER | CONTRACT NO. | |||
| TITLE AND LOCATION | ||||
| LAFB Bldg. 328 UPS/HVAC | CONTRACTOR | |||
| A C T I V I T Y | ||||
| N O | T R A N S M I T T A L | |||
| N O | S P E C | |||
| S E C T | DESCRIPTION ITEM SUBMITTED | P A R A |
G # R A P H G O V C T L A O S R S I A F / I E C A R T E I V O W
| N R | CONTRACTOR: SCHEDULE DATES | CONTRACTOR ACTION | APPROVING AUTHORITY | MAILED TO CONTR/ | ||||||||||||||
| DATE RCD FRM APPR AUTH | REMARKS | |||||||||||||||||
| SUBMIT | APPROVAL NEEDED BY | MATERIAL NEEDED BY | A C T I O N | |||||||||||||||
| C O D E | DATE OF ACTION | DATE FWD TO APPR AUTH/ | ||||||||||||||||
| DATE RCD FROM CONTR | DATE FWD TO OTHER REVIEWER | DATE RCD FROM OTH REVIEWER | A C T I O N | |||||||||||||||
| C O D E | DATE OF ACTION | |||||||||||||||||
| (a) | (b) | (c) | (d) | (e) | (f) | (g) | (h) | (i) | (j) | (k) | (l) | (m) | (n) | (o) | (p) | (q) | (r) | |
| 01 11 00 | SD-01 Preconstruction Submittals | |||||||||||||||||
| Salvage Plan | 1.7 | G | ||||||||||||||||
| 01 14 00 | SD-01 Preconstruction Submittals | |||||||||||||||||
| List of Contact Personnel | 1.3.2.2 | G | ||||||||||||||||
| 01 32 01.00 10 | SD-01 Preconstruction Submittals | |||||||||||||||||
| Project Scheduler Qualifications | 1.3 | G | ||||||||||||||||
| Preliminary Project Schedule | 3.5.1 | G | ||||||||||||||||
| Initial Project Schedule | 3.5.2 | G | ||||||||||||||||
| Periodic Schedule Update | 3.7.2 | G | ||||||||||||||||
| 01 32 16.00 20 | SD-01 Preconstruction Submittals | |||||||||||||||||
| Construction Schedule | 1.2 | G | ||||||||||||||||
| SD-07 Certificates | ||||||||||||||||||
| Monthly Updates | 1.4 | |||||||||||||||||
| 01 33 00 | SD-01 Preconstruction Submittals | |||||||||||||||||
| Submittal Register | 1.7 | G | ||||||||||||||||
| 01 33 29 | SD-01 Preconstruction Submittals | |||||||||||||||||
| Preliminary High Performance | 1.4.3.1 | G | ||||||||||||||||
| and Sustainable Building Checkli | st | |||||||||||||||||
| Preliminary Sustainability | 1.4.3.1 | G | ||||||||||||||||
| eNotebook | ||||||||||||||||||
| SD-11 Closeout Submittals | ||||||||||||||||||
| Final High Performance and | 1.4.3.1 | G | ||||||||||||||||
| Sustainable Building Checklist | ||||||||||||||||||
| Final Sustainability eNotebook | 1.4.3.1 | G | ||||||||||||||||
| Amended Final Sustainability | 1.4.3.1 | G | ||||||||||||||||
| eNotebook | ||||||||||||||||||
| 01 33 29 | Amended Final High | 1.4.3.1 | G | |||||||||||||||
| Performance and Sustainable | ||||||||||||||||||
| Building Checklist | ||||||||||||||||||
| 01 35 26 | SD-01 Preconstruction Submittals | |||||||||||||||||
| Accident Prevention Plan (APP) | 1.10 | G | ||||||||||||||||
| SD-06 Test Reports | ||||||||||||||||||
| Monthly Exposure Reports | 1.4 | |||||||||||||||||
| Notifications and Reports | 1.16 | |||||||||||||||||
| Accident Reports | 1.16.2 | G | ||||||||||||||||
| SD-07 Certificates | ||||||||||||||||||
| Activity Hazard Analysis (AHA) | 1.12 | |||||||||||||||||
| Confined Space Entry Permit | 1.13.1 | |||||||||||||||||
| Hot Work Permit | 1.13.1 | |||||||||||||||||
| 01 45 00.00 10 | SD-01 Preconstruction Submittals | |||||||||||||||||
| Contractor Quality Control (CQC) | 3.2 | G | ||||||||||||||||
| Plan | ||||||||||||||||||
| SD-06 Test Reports | ||||||||||||||||||
| Verification Statement | 3.9.2 | |||||||||||||||||
| 01 50 00 | SD-01 Preconstruction Submittals | |||||||||||||||||
| Construction Site Plan | 1.3 | G | ||||||||||||||||
| Traffic Control Plan | 3.7.1 | G | ||||||||||||||||
| SD-06 Test Reports | ||||||||||||||||||
| Backflow Preventer Tests | ||||||||||||||||||
| SD-07 Certificates | ||||||||||||||||||
| Backflow Tester | ||||||||||||||||||
| Backflow Preventers | ||||||||||||||||||
| 01 57 19 | SD-01 Preconstruction Submittals | |||||||||||||||||
| Preconstruction Survey | 1.8.1 | |||||||||||||||||
| Solid Waste Management Permit | 1.12 | G | ||||||||||||||||
| Regulatory Notifications | 1.8.2 | G | ||||||||||||||||
| Environmental Protection Plan | 1.9 | G | ||||||||||||||||
| Dirt and Dust Control Plan | 1.9.9.1 | G | ||||||||||||||||
| Employee Training Records | 1.8.5 | G | ||||||||||||||||
| Environmental Manager | 1.8.4 | G | ||||||||||||||||
| Qualifications | ||||||||||||||||||
| SD-06 Test Reports | ||||||||||||||||||
| Laboratory Analysis | 3.6.1.1.2 | |||||||||||||||||
| Solid Waste Management Report | 3.6.2.1 | G | ||||||||||||||||
| SD-07 Certificates | ||||||||||||||||||
| Employee Training Records | 1.8.5 | G | ||||||||||||||||
| SD-11 Closeout Submittals | ||||||||||||||||||
| Waste Determination | 3.6.1 | G | ||||||||||||||||
| Documentation | ||||||||||||||||||
| Disposal Documentation for | 3.6.3.6 | G | ||||||||||||||||
| Hazardous and Regulated Waste | ||||||||||||||||||
| Assembled Employee Training | 1.8.5 | G | ||||||||||||||||
| Records | ||||||||||||||||||
| Solid Waste Management Permit | 1.12 | G | ||||||||||||||||
| Solid Waste Management Report | 3.6.2.1 | G | ||||||||||||||||
| Hazardous Waste/Debris | 3.6.3.1 | G | ||||||||||||||||
| Management | ||||||||||||||||||
| Regulatory Notifications | 1.8.2 | G | ||||||||||||||||
| 01 57 19 | Sales Documentation | 3.6.2.1 | G | |||||||||||||||
| 01 78 00 | SD-03 Product Data | |||||||||||||||||
| Warranty Management Plan | 1.6.2 | |||||||||||||||||
| Warranty Tags | 1.6.5 | |||||||||||||||||
| Spare Parts Data | 1.5 | |||||||||||||||||
| SD-08 Manufacturer’s Instructions | ||||||||||||||||||
| Instructions | 1.6.2 | |||||||||||||||||
| SD-10 Operation and Maintenance | ||||||||||||||||||
| Data | ||||||||||||||||||
| Operation and Maintenance | 3.3 | G | ||||||||||||||||
| Manuals | ||||||||||||||||||
| SD-11 Closeout Submittals | ||||||||||||||||||
| As-Built Drawings | 3.1 | G | ||||||||||||||||
| Record Drawings | 3.2 | G | ||||||||||||||||
| Final Approved Shop Drawings | ||||||||||||||||||
| Construction Contract | ||||||||||||||||||
| Specifications | ||||||||||||||||||
| Certification of EPA Designated | 2.1 | G | ||||||||||||||||
| Items | ||||||||||||||||||
| 01 78 23 | SD-10 Operation and Maintenance | |||||||||||||||||
| Data | ||||||||||||||||||
| O&M Database | 1.4 | G | ||||||||||||||||
| Training Plan | 3.1.1 | G | ||||||||||||||||
| Training Outline | 3.1.3 | G | ||||||||||||||||
| Training Content | 3.1.2 | G | ||||||||||||||||
| SD-11 Closeout Submittals | ||||||||||||||||||
| 01 78 23 | Training Video Recording | 3.1.4 | G | |||||||||||||||
| Validation of Training Completion | 3.1.6 | G | ||||||||||||||||
| 01 86 12.07 40 | SD-01 Preconstruction Submittals | |||||||||||||||||
| Quality Control Plan | 1.3 | G | ||||||||||||||||
| Material, Equipment, and Fixture | 2.2 | G | ||||||||||||||||
| Lists | ||||||||||||||||||
| SD-02 Shop Drawings | ||||||||||||||||||
| Connection Diagrams | 3.2 | G | ||||||||||||||||
| Fabrication Drawings | 2.2.1 | G | ||||||||||||||||
| Installation Drawings | 3.2 | G | ||||||||||||||||
| SD-03 Product Data | ||||||||||||||||||
| Manufacturer's Catalog Data | 2.2.1 | G | ||||||||||||||||
| Equipment Foundation Data | 2.2.1 | G | ||||||||||||||||
| Specific Equipment Data | 2.2.2 | G | ||||||||||||||||
| Spare Parts List | 2.2.3 | G | ||||||||||||||||
| Warranty | 1.4 | G | ||||||||||||||||
| SD-08 Manufacturer’s Instructions | ||||||||||||||||||
| Manufacturer's Instructions | 3.2 | G | ||||||||||||||||
| SD-10 Operation and Maintenance | ||||||||||||||||||
| Data | ||||||||||||||||||
| Operations and Maintenance | 3.4 | G | ||||||||||||||||
| Manuals | ||||||||||||||||||
| SD-11 Closeout Submittals | ||||||||||||||||||
| Record Drawings | 3.2 | G | ||||||||||||||||
| Acceptance Documentation | 3.5 | G | ||||||||||||||||
| 01 91 00.15 | SD-01 Preconstruction Submittals | |||||||||||||||||
| 01 91 00.15 | Commissioning Firm | 1.7 | G | |||||||||||||||
| Lead Commissioning Specialist | 1.7.1 | G | ||||||||||||||||
| Technical Commissioning | 1.7.2 | G | ||||||||||||||||
| Specialists | ||||||||||||||||||
| Commissioning Firm's Contract | G | |||||||||||||||||
| SD-06 Test Reports | ||||||||||||||||||
| Design Review Report | 3.1.4 | G | ||||||||||||||||
| Interim Construction Phase | 3.1.3.1 | G | ||||||||||||||||
| Commissioning Plan | ||||||||||||||||||
| Final Construction Phase | 3.1.3.2 | G | ||||||||||||||||
| Commissioning Plan | ||||||||||||||||||
| Pre-Functional Checklists | 3.1.6.2 | G | ||||||||||||||||
| Issues Log | 1.9 | |||||||||||||||||
| Commissioning Report | 3.2 | G | ||||||||||||||||
| Post-Construction Trend Log | 3.3.1 | G | ||||||||||||||||
| Report | ||||||||||||||||||
| SD-07 Certificates | ||||||||||||||||||
| Certificate of Readiness | 1.10 | G | ||||||||||||||||
| SD-10 Operation and Maintenance | ||||||||||||||||||
| Data | ||||||||||||||||||
| Training Plan | 3.1.7 | G | ||||||||||||||||
| Training Attendance Rosters | 3.1.7 | G | ||||||||||||||||
| SD-11 Closeout Submittals | ||||||||||||||||||
| Construction Phase | 3.1.3.1 | S | ||||||||||||||||
| Commissioning Plan | ||||||||||||||||||
| Final Commissioning Report | 3.2 | S | ||||||||||||||||
| 02 41 00 | SD-01 Preconstruction Submittals | |||||||||||||||||
| Demolition Plan | 1.2.1 | G | ||||||||||||||||
| Existing Conditions | 1.10 | |||||||||||||||||
| SD-07 Certificates | ||||||||||||||||||
| Notification | 1.6 | G | ||||||||||||||||
| SD-11 Closeout Submittals | ||||||||||||||||||
| Receipts | 3.3.4 | |||||||||||||||||
| 02 82 13.00 10 | SD-02 Shop Drawings | |||||||||||||||||
| Detailed Drawings | 1.4 | G | ||||||||||||||||
| SD-03 Product Data | ||||||||||||||||||
| Asbestos Waste Shipment | 3.9.3.1 | G | ||||||||||||||||
| Records | ||||||||||||||||||
| Weight Bills and Delivery Tickets | 1.1 | |||||||||||||||||
| Encapsulants | 2.1 | G | ||||||||||||||||
| Respiratory Protection Program | 1.9.1 | G | ||||||||||||||||
| Cleanup and Disposal | 3.9 | G | ||||||||||||||||
| Qualifications | 1.6.1 | G | ||||||||||||||||
| Training Program | 1.10 | |||||||||||||||||
| Licenses, Permits and | 1.8.1 | |||||||||||||||||
| Notifications | ||||||||||||||||||
| Asbestos Management Plan | 3.9.3.2 | G | ||||||||||||||||
| SD-06 Test Reports | ||||||||||||||||||
| Exposure Assessment and Air | 3.7 | |||||||||||||||||
| Monitoring | ||||||||||||||||||
| SD-07 Certificates | ||||||||||||||||||
| Encapsulants | 2.1 | G | ||||||||||||||||
| 02 82 13.00 10 | Medical Surveillance | 1.9 | ||||||||||||||||
| Requirements | ||||||||||||||||||
| 07 84 00 | SD-02 Shop Drawings | |||||||||||||||||
| Firestopping System | 2.1 | G | ||||||||||||||||
| SD-03 Product Data | ||||||||||||||||||
| Firestopping Materials | 2.2 | G | ||||||||||||||||
| SD-06 Test Reports | ||||||||||||||||||
| Inspection | 3.3 | G | ||||||||||||||||
| SD-07 Certificates | ||||||||||||||||||
| Inspector Qualifications | 1.5.2 | |||||||||||||||||
| Firestopping Materials | 2.2 | |||||||||||||||||
| Installer Qualifications | 1.5.1 | G | ||||||||||||||||
| 07 92 00 | SD-03 Product Data | |||||||||||||||||
| Sealants | 2.2 | G | ||||||||||||||||
| Primers | 2.3 | G | ||||||||||||||||
| Bond Breakers | 2.4 | G | ||||||||||||||||
| Backstops | 2.5 | G | ||||||||||||||||
| Field Adhesion | 3.1 | G | ||||||||||||||||
| SD-07 Certificates | ||||||||||||||||||
| Indoor Air Quality | 1.4.1 | G | ||||||||||||||||
| SD-11 Closeout Submittals | ||||||||||||||||||
| Indoor Air Quality For Interior | 2.2.1 | S | ||||||||||||||||
| Sealants | ||||||||||||||||||
| Indoor Air Quality For Interior | 2.2.3 | S | ||||||||||||||||
| Floor Joint Sealants |
| 07 92 00 | Indoor Air Quality For Interior | 2.6 | S |
| Caulking | |||
| 21 13 13.00 10 | SD-02 Shop Drawings | ||
| Shop Drawings | 1.4.3 | G | |
| As-Built Drawings | 3.8 | ||
| SD-03 Product Data | |||
| Fire Protection Related | 1.4.1 | ||
| Submittals | |||
| Materials and Equipment | 2.3 | G | |
| Spare Parts | 1.6 | ||
| Preliminary Tests | 3.7 | G | |
| Final Acceptance Test | 3.8 | G | |
| Onsite Training | 3.9 | G | |
| Fire Protection Specialist | 1.4.1 | G | |
| Sprinkler System Installer | 1.4.2 | G | |
| SD-05 Design Data | |||
| Sway Bracing | 1.4.3 | G | |
| Hydraulic Calculations | 1.2.1.2 | G | |
| SD-06 Test Reports | |||
| Preliminary Test Report | 3.7 | ||
| Final Acceptance Test Report | 3.8 | ||
| SD-07 Certificates | |||
| Inspection by Fire Protection | 3.3 | ||
| Specialist | |||
| SD-10 Operation and Maintenance | |||
| Data | |||
| 21 13 13.00 10 | Operating and Maintenance | 3.9 | G |
| Manuals | |||
| 22 00 00 | SD-02 Shop Drawings | ||
| Plumbing System | 3.6.1 | ||
| SD-03 Product Data | |||
| Fixtures | 2.5 | ||
| Welding | 1.5.1 | ||
| Plumbing System | 3.6.1 | ||
| SD-06 Test Reports | |||
| Tests, Flushing and Disinfection | 3.6 | ||
| Test Of Backflow Prevention | 3.6.1.1 | ||
| Assemblies | |||
| SD-07 Certificates | |||
| Materials and Equipment | 1.3 | ||
| Bolts | 2.2.1 | ||
| SD-10 Operation and Maintenance | |||
| Data | |||
| Plumbing System | 3.6.1 | ||
| SD-11 Closeout Submittals | |||
| Water-Efficient Products | 2.1.1 | S | |
| 23 00 00 | SD-02 Shop Drawings | ||
| Detail Drawings | 1.4.5 | G | |
| SD-03 Product Data | |||
| Metallic Flexible Duct | 2.11.1.1 | ||
| Insulated Nonmetallic Flexible | 2.11.1.2 | ||
| Duct Runouts | |||
| 23 00 00 | Duct Connectors | 2.11.1.2 | |
| Duct Access Doors | 2.11.2 | G | |
| Fire Dampers | 2.11.3 | ||
| Manual Balancing Dampers | 2.11.4 | G | |
| Diffusers | 2.11.12.1 | ||
| Registers and Grilles | 2.11.12.2 | ||
| Air Vents, Penthouses, and | 2.11.13 | ||
| Goosenecks | |||
| Centrifugal Type Power Roof | 2.12.1.1 | ||
| Ventilators | |||
| Constant Volume, Single Duct | 2.13.1.1 | G | |
| Terminal Units | |||
| Variable Volume, Single Duct | 2.13.1.2 | G | |
| Terminal Units | |||
| Test Procedures | 1.4.6 | ||
| Diagrams | 1.2.1.2 | G | |
| SD-06 Test Reports | |||
| Performance Tests | 3.13 | G | |
| Damper Acceptance Test | 3.11 | G | |
| SD-07 Certificates | |||
| Ozone Depleting Substances | 1.4.3 | ||
| SD-08 Manufacturer’s Instructions | |||
| Manufacturer's Installation | 3.3 | ||
| Instructions | |||
| Operation and Maintenance | 3.15.2 | ||
| Training | |||
| 23 00 00 | SD-10 Operation and Maintenance | ||
| Data | |||
| Operation and Maintenance | 3.15.1 | G | |
| Manuals | |||
| Fire Dampers | 2.11.3 | G | |
| Manual Balancing Dampers | 2.11.4 | G | |
| Constant Volume, Single Duct | 2.13.1.1 | G | |
| Terminal Units | |||
| Variable Volume, Single Duct | 2.13.1.2 | G | |
| Terminal Units | |||
| SD-11 Closeout Submittals | |||
| Energy Efficient Equipment | 2.1.1 | S | |
| Reduce Volatile Organic | 2.1.2 | S | |
| Compounds (VOC) | |||
| Indoor Air Quality During | 3.1 | S | |
| Construction | |||
| Ozone Depleting Substances for | 2.1.3 | S | |
| Refrigerants | |||
| 23 03 00.00 20 | SD-11 Closeout Submittals | ||
| Energy Efficient Equipment for | 2.1.1 | S | |
| Motors | |||
| Reduce Volatile Organic | 2.1.2 | S | |
| Compounds (VOC) | |||
| 23 05 93 | SD-01 Preconstruction Submittals | ||
| Records of Existing Conditions | G | ||
| SD-02 Shop Drawings | |||
| 23 05 93 | TAB Schematic Drawings and | 1.3.3 | G |
| Report Forms | |||
| SD-03 Product Data | |||
| Equipment and Performance | 1.3 | G | |
| Data | |||
| SD-06 Test Reports | |||
| Completed Pre-Final DALT | G | ||
| Report | |||
| Certified Final DALT Report | G | ||
| SD-07 Certificates | |||
| Independent TAB Agency and | 1.5.1 | G | |
| Personnel Qualifications | |||
| DALT and TAB Submittal and | G | ||
| Work Schedule | |||
| TAB Pre-Field Engineering | G | ||
| Report | |||
| 23 07 00 | SD-02 Shop Drawings | ||
| MICA Plates | 3.2.2.4 | G | |
| Pipe Insulation Systems | 2.4 | ||
| Pipe Insulation Systems | 3.2 | ||
| Duct Insulation Systems | 3.3 | ||
| Equipment Insulation Systems | 3.4 | ||
| SD-03 Product Data | |||
| Pipe Insulation Systems | 2.4 | G | |
| Pipe Insulation Systems | 3.2 | G | |
| Duct Insulation Systems | 3.3 | G | |
| 23 07 00 | Equipment Insulation Systems | 3.4 | G |
| SD-04 Samples | |||
| Thermal Insulation | 2.3.1.3 | G | |
| Display Samples | 3.1.1 | G | |
| SD-08 Manufacturer’s Instructions | |||
| Pipe Insulation Systems | 2.4 | G | |
| Pipe Insulation Systems | 3.2 | G | |
| Duct Insulation Systems | 3.3 | G | |
| Equipment Insulation Systems | 3.4 | G | |
| SD-11 Closeout Submittals | |||
| Reduce Volatile Organic | 2.1.1 | S | |
| Compounds (VOC) | |||
| Recycled Content | 2.1.2 | S | |
| 23 09 00 | SD-02 Shop Drawings | ||
| DDC Contractor Design Drawings | 3.3 | G | |
| Draft As-Built Drawings | 3.3 | G | |
| Final As-Built Drawings | 3.3 | G | |
| SD-03 Product Data | |||
| Programming Software | 1.8.1 | G | |
| Controller Application Programs | 1.8.2 | G | |
| Manufacturer's Product Data | 2.2 | G | |
| XIF files | 2.2.1 | G | |
| Draft LNS Database | 3.5.3 | G | |
| Final LNS Database | 3.6.4 | G | |
| LNS Plug-ins | 1.8.3 | G | |
| SD-06 Test Reports | |||
| 23 09 00 | Existing Conditions Report | 3.1.1 | |
| Start-Up Testing Report | 3.5.2 | G | |
| PVT Procedures | 3.6.1 | G | |
| PVT Report | 3.6.3 | G | |
| Pre-Construction Quality Control | 1.9.1 | G | |
| (QC) Checklist | |||
| Post-Construction Quality Control | 1.9.2 | G | |
| (QC) Checklist | |||
| SD-10 Operation and Maintenance | |||
| Data | |||
| Operation and Maintenance | 3.7 | G | |
| (O&M) Instructions | |||
| Training Documentation | 3.9.1 | G | |
| SD-11 Closeout Submittals | |||
| Enclosure Keys | 2.5 | G | |
| Password Summary Report | 3.2.6.1 | G | |
| Closeout Quality Control (QC) | 1.9.3 | G | |
| Checklist | |||
| 23 23 00 | SD-02 Shop Drawings | ||
| Refrigerant Piping System | 2.3 | G | |
| SD-03 Product Data | |||
| Refrigerant Piping System | 2.3 | ||
| Spare Parts | 1.5.2 | ||
| Qualifications | 1.3.1 | ||
| Refrigerant Piping Tests | 3.5 | ||
| Verification of Dimensions | 3.1 | ||
| 23 23 00 | SD-06 Test Reports | ||
| Refrigerant Piping Tests | 3.5 | ||
| SD-07 Certificates | |||
| Service Organization | 2.1 | ||
| SD-10 Operation and Maintenance | |||
| Data | |||
| Maintenance | 1.5 | G | |
| Operation and Maintenance | 3.4 | G | |
| Manuals | |||
| Demonstrations | 3.4 | G | |
| 23 31 13.00 40 | SD-01 Preconstruction Submittals | ||
| Material, Equipment, and Fixture | Part 2 | G | |
| Lists | |||
| Records of Existing Conditions | 2.1.1 | G | |
| SD-02 Shop Drawings | |||
| Connection Diagrams | 2.1 | G | |
| Offset Fitting Configurations | 2.2.1 | G | |
| SD-03 Product Data | |||
| Equipment and Performance | 2.1.1 | ||
| Data | |||
| Galvanized Steel Ductwork | 2.3.1 | G | |
| Materials | |||
| Brazing Materials | 2.3.2 | ||
| Mill-Rolled Reinforcing and | 2.3.3 | ||
| Supporting Materials | |||
| Round Sheet Metal Duct Fittings | 2.2.1 | G | |
| 23 31 13.00 40 | Round, High-Pressure, | 2.2.2 | G |
| Double-Wall Sheet Metal Ducts | |||
| Turning Vanes | 2.2.5 | G | |
| Flexible Connectors | 2.2.7 | G | |
| Flexible Duct Materials | 2.2.10 | ||
| Power Operated Dampers | 2.2.13 | G | |
| Fire Dampers and Wall Collars | 2.2.14 | G | |
| Gravity Backdraft and Relief | 2.2.12 | G | |
| Dampers | |||
| Manual Volume Dampers | 2.2.11 | G | |
| SD-05 Design Data | |||
| Design Analysis and Calculations | 2.1.1 | G | |
| SD-06 Test Reports | |||
| Ductwork Leakage Tests | 3.4.2 | G | |
| Operational Tests | 3.4.1 | G | |
| SD-07 Certificates | |||
| Listing of Product Installations | 1.3 | ||
| Galvanized Steel Ductwork | 2.3.1 | ||
| Materials | |||
| Brazing Materials | 2.3.2 | ||
| Mill-Rolled Reinforcing and | 2.3.3 | ||
| Supporting Materials | |||
| Round Sheet Metal Duct Fittings | 2.2.1 | ||
| Round, High-Pressure, | 2.2.2 | ||
| Double-Wall Sheet Metal Ducts | |||
| Turning Vanes | 2.2.5 | ||
| 23 31 13.00 40 | Dampers | 2.2.6 | |
| Flexible Connectors | 2.2.7 | ||
| SD-10 Operation and Maintenance | |||
| Data | |||
| Operation and Maintenance | 3.5.1 | G | |
| Manuals | |||
| Power Operated Dampers | 2.2.13 | G | |
| Fire Dampers and Wall Collars | 2.2.14 | G | |
| SD-11 Closeout Submittals | |||
| Record Drawings | 3.5.2 | G | |
| 23 81 23.00 20 | SD-03 Product Data | ||
| Computer room air conditioning | 2.2 | G | |
| units | |||
| Space temperature control | 2.3.2 | G | |
| system drawings | |||
| Filters | 2.2.4 | ||
| Refrigerants | 1.4 | ||
| SD-06 Test Reports | |||
| Field Test Schedule | 3.4.2 | G | |
| Manufacturer's Field Test Plans | 3.4.1 | G | |
| Field Test Reports | 3.4.6 | G | |
| Aquatic Toxicity | 2.2.2 | ||
| SD-07 Certificates | |||
| Credentials of the Manufacturer's | 3.4.3 | G | |
| Field Test Representative | |||
| SD-08 Manufacturer’s Instructions | |||
| 23 81 23.00 20 | Installation Manual for Each Type | 3.2.2 | |
| of CRACU | |||
| SD-10 Operation and Maintenance | |||
| Data | |||
| Computer Room Air Conditioning | 2.2 | G | |
| Units | |||
| SD-11 Closeout Submittals | |||
| Energy Efficient Equipment for | 2.1.1 | S | |
| Computer Room Air Conditioning | |||
| Units | |||
| Ozone Depleting Substances | 2.1.2 | S | |
| Indoor Air Quality During | 3.1.1 | S | |
| Construction | |||
| 25 10 10 | SD-02 Shop Drawings | ||
| UMCS Contractor Design | 3.2.2 | ||
| Drawings | |||
| Draft As-Built Drawings | 3.2.3 | ||
| Final As-Built Drawings | 3.2.3 | ||
| SD-03 Product Data | |||
| Product Data Sheets | 2.1.5 | ||
| Computer Software | 2.4 | ||
| Enclosure Keys | 2.6.1 | ||
| SD-05 Design Data | |||
| UMCS IP Network Bandwidth | 3.2.1 | ||
| Usage Estimate | |||
| SD-06 Test Reports | |||
| 25 10 10 | Pre-Construction QC Checklist | 1.6 | |
| Post-Construction QC Checklist | 1.6 | ||
| Existing Conditions Report | 3.1 | ||
| Start-Up and Start-Up Testing | 3.6 | G | |
| Report | |||
| PVT Phase I Procedures | 3.7.1 | ||
| PVT Phase I Report | 3.7.2 | G | |
| PVT Phase II Report | 3.7.3 | G | |
| SD-10 Operation and Maintenance | |||
| Data | |||
| Operation and Maintenance | 1.7 | ||
| (O&M) Instructions | |||
| Preventive Maintenance Work | 3.8.8.1 | ||
| Plan | |||
| Basic Training Documentation | 3.9.1 | ||
| Advanced Training | 3.9.1 | ||
| Documentation | |||
| Refresher Training | 3.9.1 | ||
| Documentation | |||
| SD-11 Closeout Submittals | |||
| Closeout QC Checklist | 1.6 | ||
| 26 20 00 | SD-02 Shop Drawings | ||
| Panelboards | 2.12 | G | |
| Transformers | 2.14 | G | |
| Busway | 2.3 | G | |
| Cable trays | G | ||
| 26 20 00 | SD-03 Product Data | ||
| Receptacles | 2.11 | G | |
| Circuit breakers | 2.12.3 | G | |
| Switches | 2.9 | G | |
| Transformers | 2.14 | G | |
| Enclosed circuit breakers | 2.13 | G | |
| Surge protective devices | 2.23 | G | |
| SD-06 Test Reports | |||
| 600-volt wiring test | 3.5.2 | G | |
| Grounding system test | 3.5.5 | G | |
| Transformer tests | 3.5.3 | G | |
| Ground-fault receptacle test | 3.5.4 | G | |
| SD-07 Certificates | |||
| Fuses | 2.10 | G | |
| 26 28 21.00 40 | SD-02 Shop Drawings | ||
| Connection Diagrams | 2.1 | G | |
| Fabrication Drawings | 2.1 | G | |
| Installation Drawings | 2.1 | G | |
| SD-03 Product Data | |||
| Equipment and Performance | 2.1 | G | |
| Data | |||
| Contacts | 2.2.1 | G | |
| Indicating Lights | 2.2.2 | G | |
| Terminal Board | 2.2.3 | G | |
| Enclosures | 2.2.5 | G | |
| SD-06 Test Reports | |||
| 26 28 21.00 40 | Qualification Testing | 2.3.1 | G |
| Operation Tests | 2.3.1 | G | |
| SD-07 Certificates | |||
| Listing of Product Installations | 1.3.1 | G | |
| SD-08 Manufacturer’s Instructions | |||
| Manufacturer's Instructions | 3.1 | ||
| 26 32 14.00 10 | SD-02 Shop Drawings | ||
| Detailed Drawings | 1.4.5 | G | |
| Acceptance | 3.11 | G | |
| SD-03 Product Data | |||
| Manufacturer's Catalog | 2.4 | ||
| Instructions | 3.10 | G | |
| Experience | 1.4.3 | ||
| Field Engineer | 1.4.4 | ||
| Site Welding | 1.4.2 | ||
| General Installation | 3.2 | ||
| Site Visit | 3.1 | ||
| SD-05 Design Data | |||
| Sound Limitations | 2.8 | G | |
| Generator | 2.14 | ||
| Integral Main Fuel Storage Tank | 2.5.4 | ||
| Day Tank | |||
| Power Factor | 3.6.2.2 | ||
| Heat Exchanger | 2.7.2 | ||
| Time-Delay on Alarms | 2.18.5 | ||
| Cooling System | 2.7 | ||
| 26 32 14.00 10 | Vibration Isolation | 1.2.5 | |
| SD-06 Test Reports | |||
| Performance Tests | 3.6.6 | ||
| Onsite Inspection and Tests | 3.6 | G | |
| SD-07 Certificates | |||
| Vibration Isolation | 1.2.5 | ||
| Prototype Tests | 3.4 | ||
| Reliability and Durability | 1.2.6 | ||
| Emissions | 2.11 | ||
| Sound limitations | 2.8 | ||
| Current Balance | 2.14.1 | ||
| Materials and Equipment | 2.3 | ||
| Factory Inspection and Tests | 2.27 | ||
| Inspections | 3.6.4 | ||
| Cooling System | 2.7 | ||
| SD-10 Operation and Maintenance | |||
| Data | |||
| Operation Manual | 1.6.1 | G | |
| Maintenance Manual | 1.6.2 | G | |
| Extra Materials | 1.6.3 | ||
| 26 33 53.00 20 | SD-02 Shop Drawings | ||
| UPS Drawings | G | ||
| UPS Installation | G | ||
| SD-03 Product Data | |||
| BATTERY Module | G | ||
| Factory Testing | 2.10 | ||
| 26 33 53.00 20 | BATTERY System | ||
| SD-06 Test Reports | |||
| Work Plan | 1.6.3 | G | |
| Factory Test Plan | 1.6.4 | G | |
| Performance Test Plan | 1.6.5 | G | |
| Factory Tests | G | ||
| Performance Tests Report | 1.6.7 | G | |
| Factory Tests Report | 1.6.6 | G | |
| SD-09 Manufacturer’s Field | |||
| Reports | |||
| Initial Inspection and Tests | 3.2.2 | G | |
| Performance Tests | 3.2.3 | G | |
| SD-10 Operation and Maintenance | |||
| Data | |||
| UPS Operation and Maintenance | 1.10.1 | G | |
| SD-11 Closeout Submittals | |||
| Installation | 3.1 |