Atch 2. SOW MXDP 16-1015 Upgrade UPS-HVAC Systems Flight Sim - B328.pdf

PDF 257 KB Posted

Attached to
Repair Roof and Upgrade HVAC and UPS System B328
Solicitation number
MXDP10-A058
Issued by

About this file

This statement of work outlines requirements for upgrading the uninterruptible power supply and HVAC systems in Building 328 at Laughlin Air Force Base. The contractor shall furnish all materials, labor, tools and equipment to upgrade the UPS system controls to allow for remote monitoring and control of hazardous operating conditions. The HVAC system upgrade includes installing standalone direct expansion cooling systems, exhaust fans, humidifiers and hydrogen sensors in each pump room. Additional requirements include replacing lighting, batteries and sprinkler systems. The contractor must schedule outages with approval and avoid impacting facility operations. The work shall follow all applicable construction standards and be completed by the period of performance in the associated solicitation MXDP10-A058 for roof repair and HVAC/UPS upgrades to Building 328 at Laughlin Air Force Base. This opportunity is set aside for women-owned small businesses.

View the file

Other files

File Type Posted
Solicitation Amendment FA309920R00080008 SF 30.pdf PDF
Atch 13 Repair Roof Upgrade UPS-HVAC Pre-Proposal Questions Answers - D.pdf PDF
Solicitation Amendment FA309920R00080007 SF 30.pdf PDF
Solicitation Amendment FA309920R00080006 SF 30.pdf PDF
Atch 12 - Fire Alarm Panel Photos.pdf PDF
FA309920R00080005 SF 30.pdf PDF
FA309920R00080004 SF 30.pdf PDF
Atch 11. Repair Roof & Upgrade UPS HVAC Pre Proposal Q&As - C.pdf PDF
Atch 10. Repair Roof & Upgrade UPS HVAC Pre Proposal Q&As - B.pdf PDF
Solicitation Amendment FA309920R00080003 SF 30.pdf PDF
Atch 9. Repair Roof & Upgrade UPS HVAC Pre Proposal Q&As.pdf PDF
Solicitation Amendment FA309920R00080002 SF 30.pdf PDF
Solicitation Amendment FA309920R00080001 SF 30.pdf PDF
6 - Blank DD Form 1354.pdf PDF
Atch A. FAA Form 7460-1.pdf PDF
Atch D. AF IMT 3000, Material Submittal.pdf PDF
Atch 5. AETC 47.pdf PDF
Atch G. AF IMT 3064 Contract Progress Schedule.pdf PDF
Atch 7. Past Performance Questionnaire.pdf PDF
Atch E. Schedule of Submittals FLight Simulator Bldg 328.xlsx XLSX spreadsheet
Atch F. AF Form 3952-Chemical-Hazardous Material Request.pdf PDF
Atch 3. Wage Determination TX20200186.pdf PDF
Atch C. Division 01 Specifications.pdf PDF
MFR HVAC SOW Atch 5 - Blank Progress Schedule and Report.pdf PDF
2 - Design Drawings B328.pdf PDF
3 - B328 Design Specifications.pdf PDF
Atch H. AF IMT 3065 Contract Progress Report.pdf PDF
Atch I. DD Form 1354 Transfer and Acceptance of DoD Real Property.pdf PDF
Atch B. Environmental Quality Construction Specifications LAFB.pdf PDF
Atch 6. Financial Institution Reference Sheet.pdf PDF
4 - Asbestos Survey Report B328.pdf PDF
Atch J. Photographs Bldg 328 Roof.pdf PDF
Solicitation - FA309920R0008.pdf PDF
Atch 1. SOW MXDP 10-A058 Repair Roof Flight Simulator - B328.pdf PDF
Atch 8. HVAC Chiller System Justification and Approval, 7 Aug 19.pdf PDF
Atch 4. Notification of Compliance with Contract Insurance Requirements.pdf PDF
7 - Schedule of Material Submittals.xlsx XLSX spreadsheet
Show all 37

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

STATEMENT OF WORK

MXDP 16-1015, Upgrade UPS/HVAC System Flight Simulator B328 Page 1 of 7

Project Title: Upgrade UPS/HVAC Systems Flight Simulator B328

Project Number: MXDP 16-1015

Project Location: Laughlin AFB, TX

Submission Date: 21 July 2020

1.0 INTRODUCTION

Services are required to upgrade the Uninterruptible Power Supply (UPS) and Heating, Ventilation, Air Conditioning (HVAC) systems in Building 328. Upgrades to the UPS system shall include the installation of controls to remotely monitor, control, and alarm when a hazardous operating condition is detected during UPS operation. Upgrade to the HVAC system for the rooms containing the UPS system is required to adequately condition the space and externally exhaust any produced fumes. The upgraded equipment shall provide stability and surge protection for the T-1, T-6, and T-38/T-7 flight simulators in Building 328.

This Statement of Work (SOW) is to be combined with “MXDP 10-A058 Repair Roof Flight Simulator B328” SOW. Attachments in the aforementioned SOW apply to this document.

2.0 SCOPE OF WORK

The Contractor shall furnish all materials, labor, tools, equipment, transportation, and all other incidentals necessary to complete the work outlined in this SOW and the design specifications.

Note: There is a deviation from the 100% design specifications. See Section 2.1.4.7. The Contractor shall turn over a complete and useable product to the Government. Work shall include the upgrade of the UPS and HVAC system for Building 328. All work shall comply with the Whole Building Design Guide (WBDG) and all applicable Air Force Instructions (AFIs), NFPA, IFC and Unified Facility Criteria (UFCs).

2.1 Description of Work

The Contractor shall accomplish the objectives listed below:

2.1.1 Architectural

2.1.1.1 Remove asbestos-containing acoustical panels in the pump rooms.

2.1.1.1.1 Work shall be done by a Texas Department of Safety and Health Services certified asbestos abatement contractor.

2.1.1.1.2 An asbestos consultant will be required to provide an abatement design and oversee any planned abatement project.

2.1.1.2 Implement signage compliance on the doors to the UPS room in accordance with IFC 608.7.1.

2.1.1.2.1 Signage will indicate that the room contains energized battery systems, energized electrical circuits and corrosive liquids.

MXDP 16-1015, Upgrade UPS/HVAC System Flight Simulator B328 Page 2 of 7

2.1.2 Fire Protection

2.1.2.1 Revise sprinkler system as required to meet fire suppression requirements.

2.1.2.2 Install a supervised shut-off valve, check valve, flow switch and test valve for the sprinkler lines supplying each pump room.

2.1.2.3 Contractor is responsible for recommissioning sprinkler system and associated costs

2.1.2.4 Seal openings in walls, ceilings and floor trenches for 1-hour fire rating.

2.1.2.4.1 Cap and seal the bottom of the vertical chase in each pump room.

2.1.2.5 Provide a method of acid neutralization in accordance with IFC

608.5.1.

2.1.2.5.1 Shut-off valve shall be provided with a tamper switch and flow switch.

2.1.3 Plumbing

2.1.3.1 Install condensate drains and domestic waterlines to accommodate and supply water to the humidifier units in the mechanical system.

2.1.3.2 Water lines supplying UPS HVAC systems shall be conditioned and softened to reduce system maintenance and prevent equipment damage.

2.1.4 Mechanical

2.1.4.1 Existing zones from the variable air volume (VAV) system shall be used as constant volume boxes to provide make up air to the pump rooms.

2.1.4.2 Demolish and remove all abandoned hydronic piping currently located in the rooms and over electrical equipment.

2.1.4.3 Provide each pump room with a new standalone Direct Expansion (DX) cooling system.

2.1.4.4 Install exhaust fans in accordance with the Industry Foundation Classes (IFC) and the Unified Facility Code (UFC) battery room requirement.

2.1.4.4.1 Each fan shall be connected to all pump rooms to provide continuous exhaust to the building’s exterior.

2.1.4.5 Install humidifiers to prevent an excessively dry and static prone environment.

2.1.4.6 Install hydrogen sensors and alarms in the pump rooms to detect hydrogen gas in the air.

2.1.4.7 The Contractor shall be responsible for the design of the controls system. All mention of Lonworks in Attachment 2, Design Drawing, B328, and Attachment 3, B328 Design Specifications, shall be disregarded. The Contractor shall submit a controls design proposal to the CO for approval. The controls installed shall be Johnson Controls Metasys Extended Architecture. Controls installed for the new equipment shall be fully controlled and monitored by the existing

MXDP 16-1015, Upgrade UPS/HVAC System Flight Simulator B328 Page 3 of 7

Johnson Controls Metasys Extended Architecture building control system. The facility’s fire alarm system is a separate standalone system with no interfacing to the Johnson Controls Metasys Extended Architecture system.

2.1.4.7.1 Functionality shall include, but is not limited to, data base viewing and editing, graphic viewing, commanding and editing, scheduling of control functionality, central alarm monitoring, information collection and trend logging and analysis.

2.1.4.8 Install drip/drain pans under existing pipes that are not feasible to remove and relocate.

2.1.4.8.1 Pans shall contain a float switch that will be tied to the building control system to detect any water.

2.1.4.9 Trane HVAC System

The Contractor shall install a Trane brand HVAC system. Trane brand name air conditioning is the only approved HVAC system to be used for the project.

2.1.5 Electrical

2.1.5.1 Examine UPS system battery breaker for the ability to shunt-trip.

2.1.5.1.1 If not, a shunt-trip type breaker shall be provided to replace the non-shunt-trip battery breaker or field installation of a shunt-trip mechanism must be provided.

2.1.5.1.2 Provide remote battery system shunt-trip buttons outside of the pump rooms.

2.1.5.2 Install a battery temperature monitoring system per UPS system requirements.

2.1.5.2.1 Battery temperature monitoring system shall offer a feature to remotely shunt-trip the battery breakers manually.

2.1.5.3 Verify signage compliance for interior and exterior of battery cabinets.

2.1.5.4 Replace batteries for all UPS systems. New batteries shall be maintenance free batteries. The Contractor shall be responsible for handling, transporting and disposal of old batteries off-base.

2.1.5.4.1 Battery selection shall be in adherence with the UPS equipment manufacturers and shall be sized for the run-time that was originally provided for the UPS system.

2.1.5.4.2 A maintenance plan to inspect the UPS system annually shall be provided.

2.1.5.5 Replace current lighting with explosion proof lighting as prescribed in

UFC 3-520-05.

MXDP 16-1015, Upgrade UPS/HVAC System Flight Simulator B328 Page 4 of 7

2.2 Additional Information

2.2.1 The Contractor is responsible for conducting a thorough site inspection in order to obtain the information necessary to complete the project. The CO will schedule a pre-construction meeting prior to issuance of NTP 1. At this point in the process, the Contractor shall have a full understanding of the scope of work. This meeting will be an opportunity for the Contractor to meet with stakeholders, end users and maintainers and to present any minor details or questions that the Contractor may have. The Government will notify the Contractor when these meetings are to be held.

2.2.2 The Contractor shall avoid any outages to the facility. However, if absolutely required, outage(s) must be approved by the Contracting Officer (CO) as dictated by the user’s mission requirements and can only be conducted during weekends due to the intense simulator training schedule during the work week. Requests for outages shall be submitted to the CO no fewer than 30 days in advance of the requested outage date.

2.2.3 The Government shall furnish copies of available records as necessary to aid in the completion of this project. However, use of Government furnished data does not relieve the Contractor from performing a thorough site investigation in order to obtain the information necessary to properly complete this project.

2.2.4 All work shall be performed during normal duty hours, which are 0730 to 1630, Monday to Friday. Contractor must leave the worksite weather tight at the end of each work day. Work shall not be performed during Federal holidays and AETC Family Days. Requests to work outside of normal duty hours shall be submitted to the CO no fewer than 3 days in advance. The contractor shall be aware that requests may not be approved.

2.2.5 Base Security Forces requires all contractors to submit background checks for each employee prior to obtaining base access. The Contractor shall submit fully completed background check forms to the CO a minimum of 5 days in advance of the Contractor’s need for access.

2.2.6 All work on this project shall be accomplished in accordance with the SOW and attachments. Should the Contractor encounter any conflicting specifications, they shall bring it to the attention of the CO for final determination.

2.2.7 Use of existing condition data provided by the Air Force conveys acceptance and does not relieve the Contractor of liability associated with performance. The Contractor shall be solely responsible for verification and validation of existing

MXDP 16-1015, Upgrade UPS/HVAC System Flight Simulator B328 Page 5 of 7 conditions, coordination of existing conditions in parallel with proposed requirements, and above- and below-grade condition assessment.

2.2.8 All base provided drawings are considered approximations and the contractor is required to verify all measurements before material is purchased or cut.

2.2.9 All as-built drawings: Refer to SOW MXDP 10-A058 for As-Built drawing requirements.

2.2.10 Anti-terrorism requirements: All HVAC work shall follow the specifications under UFC 4-010-01 DoD AT Standards for Buildings. Contractor shall comply with Sections 2-3.5, B-4.1 and B-4.3 specifically when upgrading the HVAC system in B328.

2.2.11 The Contractor shall complete OPSEC training IAW AFI 10-701. Proof of completed training shall be provided to the OPSEC Signature Manager, or if appointed, OPSEC Coordinator prior to accessing critical information.

2.3 Period of Performance

Refer to SOW MXDP 10-A058 for PoP information under the prime contract.

2.4 Submittal and Order & Delivery Phase

Refer to SOW MXDP 10-A058 for submittal order and delivery information under the prime contract.

2.5 Construction Phase

Refer to SOW MXDP 10-A058 for construction start information under the prime contract.

2.6 Pre-Construction Meeting

Refer to SOW MXDP 10-A058 for construction start information under the prime contract.

3.0 REFERENCES

Work under this contract shall comply with all federal, state, local, Air Force and all other current applicable requirements. All work accomplished by the Contractor shall comply with these criteria unless a written waiver is obtained from the Air Force when conditions warrant such consideration. The Contractor shall conform to all standards and specifications in the Unified Facilities Guide Specifications (UFGS) and common construction practices. The Contractor shall thoroughly review these specifications and follow them accordingly.

MXDP 16-1015, Upgrade UPS/HVAC System Flight Simulator B328 Page 6 of 7

4.0 DELIVERABLES

4.1 Contract Progress Schedule

Refer to SOW MXDP 10-A058 for information under the prime contract.

4.2 Contract Progress Report

4.3 Transfer and Acceptance of Real Property (DD Form 1354)

4.4 Project Deliverables

Project deliverables shall be as shown in the Table of Deliverables on page 10 of MXDP Repair Roof Flight Simulator, B328 SOW.

5.0 PRE-FINAL INSPECTION

6.0 FINAL INSPECTION

7.0 DELIVERY

The Contractor shall complete all inspection and commissioning requirements prior to final inspection. The Contractor shall also prepare and submit a draft DD 1354, Transfer and Acceptance of DOD Real Property, at least 14 days prior to requesting a pre-final inspection.

The Contractor shall incorporate Government comments from the draft DD 1354 and submit a final DD 1354 at the final inspection.

8.0 CONTRACT ADMINSTRATION / POINTS OF CONTACT

The term “Contracting Officer” or “CO”, does not include any representative not acting within the scope of his/her authority. Notwithstanding any of the provisions of this contract, the CO shall be the only individual authorized to, in any way, amend or modify the terms of this contract.

MXDP 16-1015, Upgrade UPS/HVAC System Flight Simulator B328 Page 7 of 7

8.1 Contracting Officer (CO)

Mr. Kurt Armbruster

47 CONF/PKA

171 Alabama Ave Bldg. 7, Room 125 Laughlin AFB TX 78843-5102 kurt.armbruster@us.af.mil

9.0 ATTACHMENTS

1. SOW – MXDP 16-1015 Upgrade UPS-HVAC Systems Flight Sim B328

2. Design Drawings, B328

3. B328 Design Specifications

4. Asbestos Survey Report, B328

5. Blank Progress Schedule and Progress Report

6. Blank DD Form 1354

7. Schedule of Material Submittals mailto:kurt.armbruster@us.af.mil