MSC Bid Tabulation.pdf
PDF 72 KB Posted
- Solicitation number
- PW-24-451
- Issued by
- California
About this file
This document is a Bid Results summary from the City of Long Beach for project PW-24-451, R-7213 Multi-Service Center Energy Efficiency Upgrade. The project involves seven line items encompassing selective roofing demolition, wood rough carpentry, thermal and moisture protection with membrane roofing and sheet metal flashing, plumbing work, mechanical packaged roof-top air conditioning units, electrical identification for electrical systems, and mobilization/demobilization services. All items are priced on a lump sum (LS) basis with a quantity of one each. The bid was due on July 10, 2024, at 10:00 a.m.
Two contractors submitted bids for this project: SJD&B, Inc. with a total bid of $2,130,047.00 and Cornerstone Construction Group with a total bid of $2,985,246.00. SJD&B, Inc. submitted the lower bid, representing a cost difference of $855,199.00 between the two proposals. The mobilization/demobilization line item for each contractor was required to not exceed 5 percent of the subtotal of items 1-6. Notable bid variations between the two contractors appear across multiple divisions, with SJD&B, Inc. generally providing lower pricing on most line items, particularly for the Division 7 roofing work and Division 26 electrical work.
View the file
Other files
Show all 15
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
City of Long Beach Bid Results for PW-24-451 R-7213 Multi-Service Center Energy Efficiency Upgrade Bid Due Date: 7/10/2024 10:00 a.m.
SJD&B, Inc. Cornerstone Construction Group Item # Print Sequence Description UOM Quantity Item Total Item Total 1 1 Division 2 - Existing Conditions. Selective Demolition - Roofing LS 1.0 182,450.97 691,776 2 2 Division 6 - Wood Rough Carpentry LS 1.0 168,416.28 367,500 3 3 Division 7 - Thermal and Moisture Protection. Membrane Roofing, Sheet Metal Flashing LS 1.0 1,020,462.31 947,850 4 4 Division 22 - Plumbing LS 1.0 25,683.48 26,250 5 5 Division 23 - Mechanical Packaged, Roof Top Air Conditioning Units LS 1.0 527,474.17 509,161 6 6 Division 26 - Electrical Identification for Electrical Systems LS 1.0 104,128.98 325,098 7 7 Mobilization/Demobilization (No more than 5% of subtotal of 1-6 above). LS 1.0 101,430.81 117,611
2,130,047.00 2,985,246
File details come from the government source that posted it. Updated .