Multi-Service Center Energy Efficiency Upgrade - City of Long Beach Bid Documents
This bid document package represents a competitive sealed bid solicitation issued by the City of Long Beach, Department of Public Works, for a multi-service center energy efficiency upgrade project (Specifications No. R-7213, Drawing Set No. B-4805). The project encompasses selective demolition and roofing work, wood rough carpentry, thermal and moisture protection with membrane roofing and sheet metal flashing, plumbing, packaged rooftop air-conditioning unit replacement, and electrical identification systems. The base bid comprises seven line items, all quoted as lump-sum (LS) contracts, with mobilization/demobilization capped at five percent of the subtotal of items one through six. The mandatory pre-bid conference was conducted on June 20, 2024, at 9:30 a.m., with an on-site job walk-through at 11:30 a.m., both required for bid eligibility. Bids were opened on July 10, 2024, at 10:00 a.m. The selected bidder, SJD&B, Inc., submitted a base bid total of $2,130,047.00 and certified completion of a mandatory site examination on June 20, 2024.
SJD&B, Inc., a California-incorporated general contractor with nine years of experience under its current name, submitted the bid as the low responsive and responsible bidder. The contractor maintains California State licensing (CSLB: 1001950) and Nevada licensing (NSCB: 0091856, 0085522), with no history of license revocation. The contractor reported estimated employment of 50 workers with total estimated wages of $1,200,000.00 distributed on a weekly basis, and identified five subcontractors exceeding the 0.5 percent threshold: Monaco Mechanical Inc. (plumbing, $20,500), Shaw Electric (electrical, $90,000), Certified Steel Fabricators (tube steel and mesh screens, $150,000), Graycon Inc. (HVAC, $250,000), and Letner Roofing Inc. (roofing, $900,000). The contractor provided a continuous bidder's bond in the amount of 10 percent ($213,004.70) issued by Nationwide Mutual Insurance Company and demonstrated compliance with workers' compensation insurance (Policy C55545431), vehicle liability insurance, prevailing wage requirements, and debarment certifications. The contractor reported a disadvantaged business (DBE) certification, minority-owned business status, and small business certification. Recent completed projects demonstrate experience with HVAC replacement, building renovations, and energy efficiency upgrades; projects in progress include work for public agencies with total contract value of $51,205,089.35.
View the file
Other files
Show all 15
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Department of Public Works C-1 R-7213 City of Long Beach Division C – Bid Documents
BIDDER'S NAME: ______________________
BID TO THE CITY OF LONG BEACH
MULTI-SERVICE CENTER ENERGY EFFICIENCY UPGRADE
In accordance with the Notice Inviting Bids for this Work in the City of Long Beach, California, to be opened on July 10, at 10:00 a.m. we offer to furnish all necessary labor, tools, materials, appliances and equipment for and perform all Work mentioned in the Notice Inviting Bids, in full compliance with Plans (Drawings Set No. B-4805) and Specifications No. 3005010145 (R-7213) at the prices listed below.
We certify that we have examined the site and that the Bid is complete. By signing the Bid, we certify that the Contractor will not submit a claim based on failure to examine the site thoroughly.
The base bid total shall be used for determining the lowest bidder.
BASE BID – MULTI-SERVICE CENTER ENERGY EFFICIENCY UPGRADE
ITEM
NO.
ITEM DESCRIPTION
ESTIMATED
QUANTITY
UNIT
UNIT PRICE
(IN
FIGURES)
ITEM
TOTAL
(IN
FIGURES)
1. Division 2 – Existing Conditions
Selective Demolition - Roofing
1 LS
2. Division 6 – Wood
Rough Carpentry
1 LS
3. Division 7 – Thermal and Moisture Protection
Membrane Roofing, Sheet Metal Flashing
1 LS
4. Division 22 - Plumbing 1 LS
5. Division 23 – Mechanical
Packaged, Roof Top Air- Conditioning Units
1 LS
6. Division 26 – Electrical
Identification for Electrical Systems
1 LS
7. Mobilization/Demobilization (No more than 5% of subtotal of 1-6 above)
1 LS
BASE BID TOTAL _______________________________________________
DO NOT SUBMIT THIS FORM AS YOUR BID. BIDS ARE TO BE SUBMITTED
ELECTRONICALLY AS DESCRIBED IN DIVISION B.
SJD&B, Inc.
$182,450.97
$168,416.28
$1,020,462.31
$25,683.48
$527,474.17
$104,128.98
$101,430.81
$2,130,047.00
Department of Public Works C-2 R-7234 City of Long Beach Division C – Bid Documents
The following information will be used for statistical analysis only.
Is the Bidder a Disadvantaged Business (DBE)?___ If yes, certification No. _________ Is the Bidder a Minority-Owned Business? ______ Which racial minority? ___________ Is the Bidder a Women-Owned Business? _______ Is the Bidder a certified Small Business?_____ If yes, certification No._________
Where did your company first hear about this City of Long Beach Public Works project?
Yes
No
Long Beach Buys email notification
Rev 02/09/17
LIST OF SUBCONTRACTORS
In accordance with the requirements provided in the "Subletting and Subcontracting Fair Practices Act" Division 2 Part 1, Chapter 4 of the California Public Contract Code, the Bidder shall set forth hereon the name, the location of the place of business, Department of Industrial Relations registration number, and the California contractor license number of each subcontractor who will perform work or labor or render service to the prime contractor in or about the construction of the work or improvement, or a subcontractor licensed by the State of California who, under subcontract to the prime contractor, specially fabricates and installs a portion of the work or improvement according to detailed drawings contained in the plans and specifications, in an amount in excess of one‐half of 1 percent of the prime contractor's total bid or, in the case of bids or offers for the construction of streets or highways, including bridges, in excess of one‐ half of 1 percent of the prime contractor's total bid or ten thousand dollars ($10,000), whichever is greater. The prime contractor shall set forth thereon the portion of the work (type and dollar value) that will be done by each subcontractor. The prime contractor shall list only one subcontractor for each portion as defined by the prime contractor in his or her bid. Information requested, other than the sub contractor's name, location of business, contractor license number and the portion of work that will be done by each subcontractor may be submitted by the prime contractor within 24 hours after the deadline for submission of bids.
Name Type of Work
Address
City Dollar Value of Subcontract $
Phone No.
License No. DIR Registration No. ___________________________________
License No. DIR Registration No. __________________________________
Monaco Mechanical Inc
5742 Venice Blvd
Plumbing
Los Angeles, CA 90019 20,500.00
323-939-9990
904020 1000008443
Shaw Electric
1552 W Embassy St
Electrical
Anaheim CA 92802 90,000.00
714-503-6160
357950 1000060268
Certified Steel Fabricators
2032 W Cris Ave
Tube Steel and Mesh Screens
Anaheim, CA 92804 150,000.00
562-522-7632
1073091 1001012658
Graycon Inc.
232 8th Ave
HVAC
City of Industry, CA 91746 250,000.00
626-961-9640
255068 1000002937
Letner Roofing Inc
1490 N Glassell St
Roofing
Orange, CA 92867 900,000.00
714-633-0030
689961 1000002763
BIDDER’S QUALIFICATIONS
MULTI-SERVICE CENTER ENERGY EFFICIENCY UPGRADE
1. ORGANIZATION
1.1 How many years has your organization been in business as a licensed
Contractor?
1.2 How many years has your organization been in business under its present name?
1.2.1 Under what other names has
your organization operated?
1.3 If your organization is a corporation, answer the following:
1.3.1 Date of incorporation:
1.3.2 State of incorporation:
1.3.3 Corporate ID number:
1.3.4 President's name:
1.3.5 Agent for Service of Process:
1.4 If your organization is a partnership, answer the following:
1.4.1 Date of organization:
1.4.2 Type of partnership (if applicable):
1.4.3 Name(s) of general partner(s):
1.5 If your organization is individually owned, answer the following:
1.5.1 Date of organization:
1.5.1 Name of owner:
2. LICENSING
2.1 List jurisdictions and trade categories in which your organization is legally qualified to do business and indicate registration or license numbers, if applicable.
2.2 In the last 10 years, has your contractor’s license been revoked at any time? ____
N/A
01/28/15
California
Simon Jeon
Simon Jeon
California - Secretary of State ID: 3751174; CSLB: 1001950
Nevada - Business ID: E0391972018-1; NSCB: 0091856, 0085522
No
3. FINANCIAL RESOURCES
3.1 In the past five years, has a bonding company completed a contract on your behalf, or paid for completion because your firm was terminated or found in default? ________________________________________________________
4. EXPERIENCE
4.1 List classifications of work your organization typically performs with its own forces.
4.2 Claims and Suits (If the answer to any of the questions below is yes, please attach specifics.)
4.2.1 Has your organization ever failed to complete any work awarded to it?
4.2.2 Are there any judgments, claims, suits or arbitration proceedings pending against your organization or its officers within the last five (5) years, or such actions related to labor compliance, prevailing wages, or the Department of Industrial Relations within said period?
4.2.3 Has your organization filed any law suits or requested arbitration related to construction within the last five (5) years?
4.3 Has your firm, or any firm with which any of your company’s owners, officers, partners, or employees was associated, been debarred from bidding on, accepting, or performing any government agency or public works project(s), either as a prime contractor or subcontractor? ___________________________________________________
4.4 On a separate sheet, list major construction projects your organization has in progress.
Indicate name of the project, project description, Contract amount, owner, architect/engineer, percent complete and scheduled completion.
4.4.1 Indicate total value of work in progress and under Contract:
4.5 On a separate sheet, list all projects your organization has completed in the past five years. Indicate name of project, project description, Contract amount, owner, owner's phone number, project manager, completion date, and percentage of the cost of the work performed with your own forces. (’None’, ‘N/A’ or its equivalent is not an acceptable response and will be a basis for disqualifying your bid as non-responsive.)
4.5.1 Indicate average annual value of construction work performed during the past five years:
No
General building and general engineering construction - building improvements renovations, tenant improvements, grading, trenching, site preparation, earthwork
No
No
No
No
Attached
$51,205,089.35
Attached
5. MINIMUM QUALIFICATIONS
5.1 The minimum acceptable experience to be qualified for this project is as follows:
5.1.1 The Contractor must have completed at least one (1) project of similar scope to this project with a minimum value of $500,000, within the last five calendar years (from the date of the bid opening) and for a public agency. For a project to be qualified as having a similar scope, it should include at least one major type of related improvements: HVAC replacement
5.2 List project(s) to satisfy minimum qualifications noted above. ’None’, ‘N/A’ or its equivalent is not an acceptable response and will be a basis for disqualifying your bid as non-responsive.:
Project Name:
Agency/Owner:
Project Manager:
Phone Number:
Contract Amount:
Scope of Work:
Name of Project:
Project Manager:
Phone Number:
Name of Project:
Project Manager:
Phone Number:
$10,466,695.00
County Operations Center (COC) Bldg B HVAC Upgrade & Refurbishment
Orange County Public Works
Randy Quillman
714-514-2417
$1,610,070.97
HVAC refurbishment, demo, framing, t-bar ceiling installation, new ADA doors/hardware, fire alarm, bathroom fixtures, electrical
Renovate Dorms 13120-13123
Vandenberg Space Force Base
Albert Thompson Jr.
805-605-0496
$1,683,418.00
Fan coil units demo & replacement, new cabinetry, plumbing, bathroom fixtures, new flooring, windows & openings, painting
Hall of Administration Rm 140 Tenant Improvement
County of Los Angeles Public Works
Loni Valle
626-300-2629
$1,388,334.22
Mechanical and electrical upgrades, HVAC duct system install, operable partitions, lighting, flooring, ceiling, AV equipment
CITY OF LONG BEACH
CERTIFICATION OF SITE EXAMINATION
Each bidder shall be fully informed of the conditions relating to the construction of the work and the employment of labor thereon. Failure to do so will not relieve Contractor of the obligation to furnish all material and labor necessary to carry out the provisions of the Contract Documents.
Each bidder shall examine the site for the work described herein. Bidders shall attend a mandatory pre-bid inspection of the building and site, conducted by the City, if specified by the Special Provisions. Failure to attend the mandatory pre-bid inspection shall be cause for rejection of the bid.
This is to certify that I have examined the site and the bid is complete and there will be no additional payment for failure to examine the site thoroughly.
Date of Site Examination Company
Printed Name of Company Representative
Signature of Representative
Date
06/20/24 SJD&B, Inc.
Kanishq Patel
07/10/24
INFORMATION TO COMPLY WITH LABOR CODE SEC. 2810
To comply with Labor Code Sec. 2810, Contractor shall complete and submit this Information Sheet which shall be incorporated into and be a part of the Contract:
1)
A.
B.
C.
D.
2)
A.
B.
C.
D.
E.
3)
4)
5)
6)
7)
8)
Workers’ Compensation Insurance:
Policy Number: ______________________________________________
Name of Insurer (NOT Broker): _________________________________
Address of Insurer: __________________________________________
Telephone Number of Insurer: __________________________________
For vehicles owned by Contractor and used in performing work under this Contract:
VIN (Vehicle Identification Number): ______________________________
Automobile Liability Insurance Policy Number: ______________________
Name of Insurer (NOT Broker): _________________________________
Address of Insurer: ___________________________________________
Telephone Number of Insurer: __________________________________
Address of Property used to house workers on this Contract, if any: __________
Estimated total number of workers to be employed on this Contract: __________
Estimated total wages to be paid those workers: __________________________
Dates (or schedule) when those wages will be paid: _______________________
(Describe schedule: For example, weekly or every other week or monthly)
Estimated total number of independent contractors to be used on this Contract:_
Taxpayer’s Identification Number: ___________________________
C55545431
Ace American Insurance Company
436 Walnut St, Philadelphia, PA 19106
800-352-4462
2GCRCPECXK1106828
GMI-0326-02
National Specialty Insurance Company
1900 L. Don Dodson Dr, Bedford, TX 96021
817-265-2000
SJD&B, Inc. Office: 20451 Valley Blvd, Walnut, CA 91789
$1,200,000.00
Weekly
Rev 10-24-13
CERTIFICATION OF COMPLIANCE WITH THE
EQUAL BENEFITS ORDINANCE
Section 1. CONTRACTOR/VENDOR INFORMATION
Name: _____________________________ Federal Tax ID No.: __
Address: ________________________________________________________
City:________________________________State: _______ZIP: ____________
Contact Person: ______________________Telephone: ___________________
Email: ______________________________Fax: ________________________
Section 2. COMPLIANCE QUESTIONS
A. The EBO is inapplicable to this Contract because the Contractor/Vendor has no employees. _____Yes _____No
B. Does your company provide (or make available at the employees’ expense) any employee benefits? _____Yes _____No
(If “yes,” proceed to Question C. If “no,” proceed to section 5, as the EBO does not apply to you.)
C. Does your company provide (or make available at the employees’ expense) any benefits to the spouse of an employee?
_____Yes _____No
D. Does your company provide (or make available at the employees’ expense) any benefits to the domestic partner of an employee?
______Yes _____No (If you answered “no” to both questions C and D, proceed to section 5, as the EBO is not applicable to this contract. If you answered “yes” to both Questions C and D, please continue to Question E. If you answered “yes” to Question C and “no” to Question D, please continue to section 3.)
E. Are the benefits that are available to the spouse of an employee identical to the benefits that are available to the domestic partner of an employee?
_____Yes ____No
(If “yes,” proceed to section 4, as you are in compliance with the EBO. If “no,” continue to section 3.)
SJD&B, Inc.
20451 Valley Blvd
Walnut CA 91789 Simon Jeon 909-481-0001 info@sjdandb.com N/A
X
X
X
X
EBO Disclosure Form (1/10) 1
EQUAL BENEFITS ORDINANCE DISCLOSURE FORM
As a condition of being awarded a contract with the City of Long Beach (“City”), the selected Contractor/Vendor (“Contractor”) may be required during the performance of the Contract, to comply with the City’s nondiscrimination provisions of the Equal Benefits Ordinance (“EBO”) set forth in the Long Beach Municipal Code section 2.73 et seq. The EBO requires that during the performance of the contract, the Contractor shall provide equal benefits to its employees with spouses and employees with domestic partners. Benefits include but are not limited to, health benefits, bereavement leave, family medical leave, membership and membership discounts, moving expenses, retirement benefits and travel benefits. A cash equivalent payment is permitted if an employer has made all reasonable efforts to provide domestic partners with access to benefits but is unable to do so. A situation in which a cash equivalent payment might be used if where the employer has difficulty finding an insurance provider that is willing to provide domestic partner benefits.
The EBO is applicable to the following employers:
For-profit employers that have a contract with the City for the purchase of goods, services, public works or improvements and other construction projects in the amount of $100,000 or more
For-profit entities that generate $350,000 or more in annual gross receipts leasing City property pursuant to a written agreement for a term exceeding 29 days in any calendar year
Contractors who are subject to the EBO must certify to the City before execution of the contract that they are in compliance with the EBO by completing the EBO Certification Form, attached, or that they have been issued a waiver by the City.
Contractors must also allow authorized City representatives access to records so the City can verify compliance with the EBO.
The EBO includes provisions that address difficulties associated with implementing procedures to comply with the EBO. Contractors can delay implementation of procedures to comply with the EBO in the following circumstances:
1) By the first effective date after the first open enrollment process following the contract start date, not to exceed two years, if the Contractor/Vendor submits evidence of taking reasonable measures to comply with the EBO; or
Iran Contracting Act prohibited companies:
https://www.dgs.ca.gov/en/PD/Resources/SCM/TOC/6/6-4
R-7213 Addendum 1
June 3rd, 2024
ADDENDUM NO. 1
PLANS AND SPECIFICATIONS NO. R-7213
MULTI SERVICE CENTER ENERGY EFFICIENCY UPGRADE
IN THE CITY OF LONG BEACH, CALIFORNIA
NOTICE TO HOLDERS OF PLANS AND SPECIFICATIONS
Please note the following changes, clarifications and additions:
1. SPECIFICATIONS:
Division A
• Mandatory Pre-bid Conference: Pre-bid conference rescheduled to 9:30 a.m. June 18th, 2024.
• Job Site Walk Through rescheduled to 11:30 a.m. June 18th, 2024
CONTACT: Before the Bid opening, prospective Bidders shall direct any communications regarding this Work to:
City of Long Beach, Department of Public Works Project Management Bureau 5th Floor, City Hall 411 W. Ocean Boulevard Long Beach, CA 90802 Attention: Kimvy Nguyen / Jennifer Magajes E-mail: Kimvy.Nguyen@psomas.com /Jennifer.Magajes@longbeach.gov
Department of Public Works 411 West Ocean Boulevard, 5th Floor Long Beach, CA 90802
(562) 570-6383
Addendum 2
June 11th, 2024
ADDENDUM NO. 2
Please note the following changes, clarifications, and additions:
Microsoft Teams:
https://teams.microsoft.com/l/meetup-join/19%3ameeting_Y2M3MmRmNTktNWIzOS00ZGUwLWI3YWUtZTYwM2UxMGY4Mzcz% 40thread.v2/0?context=%7b%22Tid%22%3a%22da3c8f56-f9af-471e-aeb5-f3d0cdc4b303%22%2c%22Oid%22%3a%228ea2c0a7-3061-4ed2-8d6a-d1501df388df%22%7d
Meeting ID: 232 381 139 285 Passcode: qpNLNr
Dial in by phone +1 951-344-4988 Phone conference ID: 175 211 477#
CONTACT: Before the Bid opening, prospective Bidders shall direct any communications regarding this Work to:
City of Long Beach, Department of Public Works Project Management Bureau 5th Floor, City Hall 411 W. Ocean Boulevard Long Beach, CA 90802 Attention: Kimvy Nguyen / Jennifer Magajes E-mail: Kimvy.Nguyen@psomas.com /Jennifer.Magajes@longbeach.gov
Department of Public Works
Addendum 3
June 18th, 2024
ADDENDUM NO. 3
MANDATORY ONLINE PRE-BID CONFERENCE AND JOB-SITE WALK-THROUGH: The City will conduct a mandatory pre-bid conference to review Bidding processes, Project Labor Agreement (PLA) on June 20th, 2024 at 9:30 a.m. Prospective Bidders must attend this meeting.
Microsoft Teams:
MSC Virtual Pre-bid Meeting
OR
https://teams.microsoft.com/l/meetup-join/19%3ameeting_Y2M3MmRmNTktNWIzOS00ZGUwLWI3YWUtZTYwM2UxMGY4Mzcz% 40thread.v2/0?context=%7b%22Tid%22%3a%22da3c8f56-f9af-471e-aeb5-f3d0cdc4b303%22%2c%22Oid%22%3a%228ea2c0a7-3061-4ed2-8d6a-d1501df388df%22%7d
Meeting ID: 232 381 139 285 Passcode: qpNLNr
Dial in by phone +1 951-344-4988 Phone conference ID: 175 211 477#
Department of Public Works
(562) 570-6383 https://teams.microsoft.com/l/meetup-join/19%3ameeting_Y2M3MmRmNTktNWIzOS00ZGUwLWI3YWUtZTYwM2UxMGY4Mzcz%40thread.v2/0?context=%7b%22Tid%22%3a%22da3c8f56-f9af-471e-aeb5-f3d0cdc4b303%22%2c%22Oid%22%3a%228ea2c0a7-3061-4ed2-8d6a-d1501df388df%22%7d https://teams.microsoft.com/l/meetup-join/19%3ameeting_Y2M3MmRmNTktNWIzOS00ZGUwLWI3YWUtZTYwM2UxMGY4Mzcz%40thread.v2/0?context=%7b%22Tid%22%3a%22da3c8f56-f9af-471e-aeb5-f3d0cdc4b303%22%2c%22Oid%22%3a%228ea2c0a7-3061-4ed2-8d6a-d1501df388df%22%7d
Addendum 4
June 28th, 2024
ADDENDUM NO. 4
Division C:
5. MINIMUM QUALIFICATIONS
5.1 The minimum acceptable experience to be qualified for this project is as follows:
5.1.1 The Contractor must have completed at least one (1) project of similar scope to this project with a minimum value of $500,000, within the last five calendar years (from the date of the bid opening) and for a public agency. For a project to be qualified as having a similar scope, it should include at least one major type of related improvements: HVAC replacement and/or building renovations.
2. QUESTIONS AND ANSWERS
Question 1: Please provide a job duty/responsibility list for the “Jobs Coordinator” as required by the project bid documents. Will this be a role that is maintained throughout the project lifecycle?
Answer: Refer to Job Coordinator Duty/Responsibility document.
Question 2: Whose responsibility is it to provide a labor compliant monitoring company?
There will be a Labor Compliance consultant on the City’s project team to assist with tasks such as LCP tracker registration, and CPR uploads.
Department of Public Works
Addendum 4
Department of Public Works
Question 3: Is the job coordinator required to be on site? And do they have to be a separate 3rd party company?
It is not a requirement for job coordinator to be on site. However, they can be on site if they choose to for closer coordination. Contractor may select one of their own employees to take on the role of a project coordinator. The employee’s resume needs to be submitted to the City for approval. Previous experience performing duties of a jobs coordinator will be required.
Question 4: When will pre-job conferences occur?
Pre-job conferences occur after the project has been awarded to a contractor.
Question 5: Will there be allocated space for construction laydown and parking?
Yes, NW corner of existing parking lot will be blocked off for duration of construction.
Question 6: Can construction crew start earlier prior to facility opening time?
Answer: Yes, contractor will be provided with separate key for access through the front gate. Please follow all rules and comply with City Construction Noise Ordinance. COLB
Construction Noise Ordinance
Question 7: Will we be working from below or are they expecting all of the work to be completed from the roof? The joist member that needs to be sistered are too long and cannot be worked from the roof opening. The blocking for the new post for the screens also cannot be accessed from the top as there is T-Bar ceiling which does not provide a landing platform to walk on.
Answer: The means and methods of construction fall within the contractor’s expertise and discretion. The City will not dictate how the work should be performed. Contractor to determine the most appropriate methods to complete the project efficiently, safely, and economically. Contractor to ensure that all work complies with the contract specifications and industry standards.
Question 8: Can we get a set of the MEP As Builts so I can determine the amount pipes/ducts/conduit that will be in the way if we are working from below.
Answer: There are construction drawings available from facility renovations project in 2013.
Question 9: Will we be able to phase the work in areas large enough so we won’t have to spend 2-3 hours a night moving/protecting existing fixtures and clean up? This would apply to the acoustical ceiling as well.
Answer: Yes. Detailed planning/coordination and phasing will be discussed with City project team and on site staff to optimize construction progress while maintaining facility operations.
Question 10: Can you confirm the height to the bottom of the roofs?
Answer: Refer to existing construction drawings.
Question 11: Can the t bar be removed and replaces at locations where the new framing needs to happen as framing work needs to happen from the bottom?
20451 Valley Blvd, Walnut CA 91789 • Info@sjdandb.com • O: 909-481-0001 • CSLB# 1001950 • DIR# 1000030237
Contracts in Progress Question 4.4
20451 Valley Blvd, Walnut CA 91789 • Info@sjdandb.com • O: 909-481-0001 • CSLB# 1001950 • DIR# 1000030237
#4.4 Contracts in Progress
East County Regional Center – Bus Duct Replacement
Project Description: Replacement of existing emergency feeder, bus duct replacement
Owner: Judicial Council of California Architect/Engineer: Leaf Engineers
Contract Amount: $659,357.15 % Complete: 13%
Scheduled Completion: February 2025
Stanley Mosk Courthouse Electrical Emergency Generator #1 Replacement
Project Description: Replacement of existing emergency generator
Owner: Judicial Council of California Architect/Engineer: Judicial Council of California
Contract Amount: $204,450.00 % Complete: 30%
Scheduled Completion: September 2024
Santa Maria Courthouse Server Room
Project Description: Server room upgrades; HVAC replacement, electrical, new server room racks
Owner: Judicial Council of California Architect/Engineer: Judicial Council of California
Contract Amount: $340,018.18 % Complete: 2%
Scheduled Completion: TBD
Pasadena Courthouse Emergency Generator Replacement
Project Description: Removal and replacement of existing emergency generator
Owner: Judicial Council of California Architect/Engineer: Moore Ruble Yudell
Contract Amount: $674,303.30 % Complete: 12%
Scheduled Completion: June 2024
Yorba Regional Park Restrooms 2, 3, 4 & 6 Replacement
Project Description: Demo and site prep for construction of 4 ADA compliant restroom facilities
Owner: Orange County Public Works Architect/Engineer: Archetype International
Contract Amount: $2,248,218.22 % Complete: 90%
Scheduled Completion: September 2024
Irvine Park Falcon Flats Shade Structure
Project Description: Construction of new park shade structure, water basin, and concrete removal
Owner: Orange County Public Works Architect/Engineer: DKY Architects
Contract Amount: $586,109.05 % Complete: 99%
Scheduled Completion: May 2024
20451 Valley Blvd, Walnut CA 91789 • Info@sjdandb.com • O: 909-481-0001 • CSLB# 1001950 • DIR# 1000030237
Donald C. Tillman Water Reclamation Plant Japanese Garden ADA Compliance
Project Description: Construction of ADA compliant restroom, sitework, landscaping
Owner: City of Los Angeles Architect/Engineer: City of LA Engineering
Contract Amount: $1,096,692.00 % Complete: 88%
South El Monte’s Assessor’s Office Refurbishment
Project Description: County facility office remodel; demo, exterior repairs, tenant improvement
Owner: County of Los Angeles Architect/Engineer: NAC Architects
Contract Amount: $3,229,896.53 % Complete: 29%
Scheduled Completion: October 2024
Roybal Clinic Elevator Modernization
Project Description: Elevator modernization
Owner: County of Los Angeles Architect/Engineer: JTC Architects, Inc.
Contract Amount: $1,422,420.59 % Complete: 28%
Scheduled Completion: November 2024
Hubert H. Humphrey Elevator Modernization
Project Description: Elevator modernization
Owner: County of Los Angeles Architect/Engineer: JTC Architects, Inc.
Contract Amount: $1,356,467.66 % Complete: 29%
ARMC Chain Link Fence Enclosure
Project Description: Addition of 10’ security fence enclosure on exterior 2nd floor balcony of a hospital
Owner: San Bernardino County Architect/Engineer: Savely Healthcare Architects
Contract Amount: $993,144.32 % Complete: 99%
Valley High School Auditorium Renovation
Project Description: Site demo, earthwork and asphalt paving for auditorium modernization
Owner: Santa Ana Unified School District Architect/Engineer: SWS Engineering, Inc.
Contract Amount: $1,200,000.00 % Complete: 70%
20451 Valley Blvd, Walnut CA 91789 • Info@sjdandb.com • O: 909-481-0001 • CSLB# 1001950 • DIR# 1000030237
Navigation & Shelter
Project Description: Homeless shelter building conversion; tenant improvement
Owner: City of Long Beach Architect/Engineer: Kardent Design
Contract Amount: $3,870,744.41 % Complete: 57%
Scheduled Completion: January 2025
Asilomar Blvd Stabilization
Project Description: Slope/roadway slide area stabilization, earthwork, excavation
Owner: City of Los Angeles Architect/Engineer: Moffatt & Nichol
Contract Amount: $468,575.05 % Complete: 56%
Scheduled Completion: August 2024
King Hall Selective Ceiling, Cove Base Demolition, Painting of Walls
Project Description: Building renovation, selective demo, drywall and patch, painting, lighting
Owner: California State University, Los Angeles Architect/Engineer: CA Dept of Public Works
Contract Amount: $2,422,070.53 % Complete: 63%
Scheduled Completion: August 2024
20451 Valley Blvd, Walnut CA 91789 • Info@sjdandb.com • O: 909-481-0001 • CSLB# 1001950 • DIR# 1000030237
Completed Contracts Question 4.5
20451 Valley Blvd, Walnut CA 91789 • Info@sjdandb.com • O: 909-481-0001 • CSLB# 1001950 • DIR# 1000030237
#4.5 Completed Contracts
Athletic Complex East Phase 1 – Demo & Earthwork (Bid No. 3100)
Project Description: Athletic complex site work; AC removal, excavation, grading, backfill
Owner: Mt. San Antonio College Owner Contact Number: 951‐684‐5901
Project Manager: Tracy Ellis Contract Amount: $5,491,453.40
Contract Dates: 4/10/17 – 7/16/20 % Work Performed: 100%
General Contracting JOC (MA‐080‐18010881)
Project Description: Dock refurbishment, landfill culvert repair, library remodel, structural repairs
Owner: Orange County Public Work Owner Contact Number: 714‐514‐2417
Project Manager: Randy Quillman Contract Amount: $4,640,000.00
Contract Dates: 12/13/17 – 11/18/20 % Work Performed: 20%
General Engineering JOC 09 (GEJOC09)
Project Description: Electrical upgrades, water tank replacement, erosion repairs, concrete/asphalt
Owner: San Bernardino County Owner Contact Number: 909‐531‐1582
Project Manager: Marian Michael Contract Amount: $3,000,000.00
Contract Dates: 5/22/18 – 5/21/19 % Work Performed: 80%
Silverwood Lake State Recreation Area Accessible Trail Improvements
Project Description: Trail modifications for accessibility and ADA compliance; concrete and grading
Owner: Dept. of Parks and Recreation Owner Contact Number: 916‐997‐7198
Project Manager: Steve Nawrath Contract Amount: $880,049.77
Contract Dates: 8/13/18 – 8/12/20 % Work Performed: 95%
General Engineering JOC (MA‐080‐19010196)
Project Description: Channel rehabilitation, concrete repairs, site preparation, earthwork
Owner: Orange County Public Work Owner Contact Number: 714‐448‐9529
Project Manager: Michael Hatch Contract Amount: $4,824,000.00
Contract Dates: 10/25/18 – 10/24/19 % Work Performed: 90%
General Contracting JOC (MA‐080‐19010590)
Project Description: HVAC refurbishment, structural repairs, elevator modernization, concrete work
Owner: Orange County Public Work Owner Contact Number: 714‐514‐2417
Project Manager: Randy Quillman Contract Amount: $4,600,000.00
Contract Dates: 12/12/18 – 5/3/21 % Work Performed: 20%
20451 Valley Blvd, Walnut CA 91789 • Info@sjdandb.com • O: 909-481-0001 • CSLB# 1001950 • DIR# 1000030237
General Building JOC 13 (GBJOC13)
Project Description: Generator replacement, CCTV upgrades, tenant improvements, ADA restrooms
Owner: San Bernardino County Owner Contact Number: 909‐708‐6463
Project Manager: Kenneth Hylin Contract Amount: $4,600,000.00
Contract Dates: 4/30/19 – 4/29/20 % Work Performed: 30%
Roy’s Desert Springs Tenant Improvement (FM08410008267)
Project Description: Site demolition, rough and fine grading, backfill
Owner: County of Riverside Owner Contact Number: 951‐377‐5009
Project Manager: Bryant Ismerio Contract Amount: $583,000.00
Contract Dates: 5/22/19 – 12/15/20 % Work Performed: 95%
General Contracting JOC (MA‐080‐20010458)
Project Description: Tenant improvements, finishes, office alterations, hydraulic jacks replacement
Owner: Orange County Public Work Owner Contact Number: 714‐667‐1609
Project Manager: Erik Nelson Contract Amount: $4,900,000.00
Contract Dates: 12/12/19 – 12/11/20 % Work Performed: 20%
General Building JOC 14 (GBJOC14)
Project Description: Roof replacement, security camera install, plumbing repairs, openings/hardware
Owner: San Bernardino County Owner Contact Number: 909‐501‐5847
Project Manager: Darylnn Wissert Contract Amount: $4,600,000.00
Contract Dates: 12/17/19 – 1/9/24 % Work Performed: 30%
JOC 1915
Project Description: Landscape renovation, hiking trail refurbishment, pool leak repairs, fence install
Owner: County of Los Angeles Owner Contact Number: 626‐588‐5325
Project Manager: Jorge Gutierrez Contract Amount: $5,100,000.00
Contract Dates: 3/17/20 – 3/16/21 % Work Performed: 30%
Job Order Contract No. 52 (PW20010)
Project Description: Campus room renovations, seismic reinforcements for suspended ceilings
Owner: California State University, Fullerton Owner Contact Number: 657‐278‐3421
Project Manager: Felipe Meza Contract Amount: $3,000,000.00
Contract Dates: 7/20/20 – 7/19/21 % Work Performed: 15%
20451 Valley Blvd, Walnut CA 91789 • Info@sjdandb.com • O: 909-481-0001 • CSLB# 1001950 • DIR# 1000030237
Construct MAFFS Infrastructure (W50S75‐20‐C‐0002)
Project Description: Concrete containment pad, exterior electrical transformer, hot tap water lines
Owner: California Air National Guard 146th Airlift Wing (ANG)
Owner Contact Number: 805‐986‐7883
Project Manager: Randy Von Otten Contract Amount: $699,337.75
Contract Dates: 9/30/20 – 2/27/22 % Work Performed: 80%
Great Park Palm Court Stockpile Relocation (CIP 361812)
Project Description: Stockpile relocation, clear and grub, storm drain construction, rip rap, earthwork
Owner: City of Irvine Owner Contact Number: 949‐724‐7372
Project Manager: Gregg Gipe Contract Amount: $1,213,862.00
Contract Dates: 9/20/21 – 3/18/22 % Work Performed: 100%
Silverado Fire Damaged Toll Plaza Building Repair (K001413)
Project Description: Exterior building replacement, AC paving, striping, sheet metal, EIFS, signage
Owner: Foothill/Eastern Transportation Corridor Agency
Owner Contact Number: 626‐922‐5131
Project Manager: Dagher Dagher Contract Amount: $344,680.73
Contract Dates: 5/4/22 – 12/27/22 % Work Performed: 50%
Silverado Fire Damaged Toll Plaza Stair Repair (K001414)
Project Description: Toll plaza median stairs replacement, earthwork, concrete, BMPs
Owner: Foothill/Eastern Transportation Corridor Agency
Owner Contact Number: 626‐922‐5131
Project Manager: Dagher Dagher Contract Amount: $307,382.30
Contract Dates: 1/4/22 – 11/18/22 % Work Performed: 20%
Crystal Cove State Park Reef Point & Pelican Point Parking Lot Improvements
Project Description: Parking lot repairs, AC paving, BMPs, ADA improvements, bridge replacements
Owner: Dept. of Parks and Recreation Owner Contact Number: 619‐206‐0489
Project Manager: Roger Cooper Contract Amount: $1,373,000.00
Contract Dates: 9/14/21 – 1/26/23 % Work Performed: 65%
Rancho Cucamonga HS 2 Story Classroom Building V (00310)
Project Description: Abatement, site demo, excavation, rough and fine grading, site hardscapes
Owner: Chaffey Joint Union High School District Owner Contact Number: 909‐460‐5689
Project Manager: Michelle Prokop Contract Amount: $546,700.00
Contract Dates: 7/6/22 – 9/8/23 % Work Performed: 100%
20451 Valley Blvd, Walnut CA 91789 • Info@sjdandb.com • O: 909-481-0001 • CSLB# 1001950 • DIR# 1000030237
General Engineering JOC 14 (GEJOC14)
Project Description: Parking lot resurfacing, curb replacement, grading, landscaping, ADA striping
Owner: San Bernardino County Owner Contact Number: 909‐708‐6463
Project Manager: Kenneth Hylin Contract Amount: $3,000,000.00
Contract Dates: 10/25/22 – 3/5/24 % Work Performed: 25%