mora12302_proposed-alignment_APPR01.pdf

PDF 94 KB Posted

Attached to
WA NP MORA 123(2) SR-123: Laughingwater Creek Bridge to Panther Creek Bridge
Solicitation number
69056723B000008
Issued by

About this file

This document is a Horizontal Alignment Review Report and Vertical Alignment Review Report for APPR 01 under Federal Highway Administration (FHWA) Western Federal Lands Highway Division Project WA NP MORA 123(2) SR-123: Laughing Water Creek Bridge to Panther Creek Bridge.

The reports provide detailed information on the horizontal and vertical alignment of the proposed roadway. Key details include the starting and ending stations, tangential direction and length, vertical grades, and curve specifications. The reports cover the technical engineering aspects of the roadway design and do not contain information on the overall contract requirements, solicitation details, or procurement process. This appears to be a technical document related to the FHWA project referenced in the attached Federal Contract Opportunity information.

View the file

Other files

File Type Posted
BidTab_WA NP MORA 123(2).pdf PDF
BidSum_WA NP MORA 123(2).pdf PDF
QA_07-31-2024.pdf PDF
Amendment A005.pdf PDF
QA_07-24-2024.pdf PDF
QA_07-23-2024.pdf PDF
Amendment A004.pdf PDF
QA1_07-19-2024.pdf PDF
Amendment A003.pdf PDF
QA_07-18-2024.pdf PDF
Amendment A002.pdf PDF
Amendment A001.pdf PDF
QA_07-09-2024.pdf PDF
QA_07-05-2024.pdf PDF
QA_08-24-2023.pdf PDF
mora 12302_XYZ asphalt_APPR01.xlsx XLSX spreadsheet
mora 12302_XYZ subex_MAIN01.xlsx XLSX spreadsheet
mora 12302_XYZ base_APPR01.xlsx XLSX spreadsheet
mora12302_control-points.xlsx XLSX spreadsheet
mora12302_plans.pdf PDF
WA NP MORA 123(2) - EPA_CompiledSWPPP_Final Signed.pdf PDF
mora12302_BIR_9450-020P.pdf PDF
mora12302_Earthwork_APPR 01.pdf PDF
mora 12302_XYZ asphalt_MAIN01.xlsx XLSX spreadsheet
Physical Data_WA NP MORA 123(2).zip ZIP file
mora12302_Project Name Change Memo.pdf PDF
mora12302_construction staking notes_APPR01.xlsx XLSX spreadsheet
mora12302_construction staking notes_MAIN01.xlsx XLSX spreadsheet
mora12302_Earthwork_MAIN 01.pdf PDF
mora12302_XS.pdf PDF
IFB 69056723B000008.pdf PDF
mora12302_GR09-22.pdf PDF
mora12302_proposed-alignment_MAIN01.pdf PDF
FLH Bridge oversized or overload vehicle permit request form Oct 2018.pdf PDF
mora12302_clearing limits (culverts).pdf PDF
mora12302_1992_LaughingwaterCreekBridgePlans.pdf PDF
mora 12302_XYZ base_MAIN01.xlsx XLSX spreadsheet
Show all 37

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Horizontal Alignment Review Report for APPR 01 for

FEDERAL HIGHWAY ADMINISTRATION

WESTERN FEDERAL LANDS HIGHWAY DIVISION

PROJECT

WA NP MORA 123(2)

SR-123: Laughing Water Creek Bridge to Panther Creek Bridge

Horizontal Alignment Review Report Report Created: Monday, October 2, 2023

Time: 3:28:40 PM

Project: Default Description:

File Name: c:\pw-work\d0434116\mora12302_ALI.dgn Last Revised: 10/2/2023 15:25:57

Note: All units in this report are in feet unless specified otherwise.

Alignment Name: APPR 01 Alignment Description:

Alignment Style: Alignment\Baseline Station Northing Easting

Element: Linear

START ( ) 100.000 520091.121 1375537.283

END ( ) 300.000 520192.247 1375364.733

Tangential Direction: N59.627°W

Tangential Length: 200.000

Vertical Alignment Review Report for APPR 01

FEDERAL HIGHWAY ADMINISTRATION

WESTERN FEDERAL LANDS HIGHWAY DIVISION

PROJECT

WA NP MORA 123(2)

SR-123: Laughing Water Creek Bridge to Panther Creek Bridge

Vertical Alignment Review Report Report Created: Monday, October 2, 2023

Time: 3:30:21 PM

Project: Default Description:

File Name: c:\pw-work\d0434116\mora12302_ALI.dgn Last Revised: 10/2/2023 15:30:15

Note: All units in this report are in feet unless specified otherwise.

Horizontal Alignment: APPR 01 Horizontal Description:

Horizontal Style: Alignment\Baseline

Vertical Alignment: APPR 01 Vertical Description:

Vertical Style: Alignment\Baseline Station Elevation

Element: Linear

START 100.000 2184.754

VPC 119.000 2185.229

Tangent Grade: 0.025 Tangent Length: 19.000

Element: Symmetrical Parabola

VPC 119.000 2185.229

VPI 129.000 2185.479

VPT 139.000 2185.179

VHP 128.091 2185.342

Length: 20.000 Entrance Grade: 0.025

Exit Grade: -0.030 r = 100 * (g2 - g1) / L: -27.500

K = l / (g2 - g1): 3.636 Middle Ordinate: -0.138

Element: Linear

VPT 139.000 2185.179

VPC 161.523 2184.503

Tangent Grade: -0.030 Tangent Length: 22.523

Element: Symmetrical Parabola

VPC 161.523 2184.503

VPI 166.523 2184.353

Horizontal Alignment: APPR 01 Horizontal Description:

Horizontal Style: Alignment\Baseline

VPT 171.523 2184.233

Length: 10.000 Entrance Grade: -0.030

Exit Grade: -0.024 r = 100 * (g2 - g1) / L: 6.000

K = l / (g2 - g1): 16.667 Middle Ordinate: 0.008

Element: Linear

VPT 171.523 2184.233

VPC 238.799 2182.619

Tangent Grade: -0.024 Tangent Length: 67.276

Element: Symmetrical Parabola

VPC 238.799 2182.619

VPI 243.799 2182.499

VPT 248.799 2182.418

Length: 10.000

Entrance Grade: -0.024 Exit Grade: -0.016 r = 100 * (g2 - g1) / L: 7.818 K = l / (g2 - g1): 12.791

Middle Ordinate: 0.010

Element: Linear

VPT 248.799 2182.418

END 267.667 2182.112

Tangent Grade: -0.016 Tangent Length: 18.867

File details come from the government source that posted it. Updated .