This document appears to be a solicitation for the WA NP MORA 123(2), SR-123 Laughingwater Creek to Panther Creek Bridge project. The Federal Highway Administration is the agency issuing this solicitation, which has an opportunity ID of 8d1aafc043a24c378dc1785013c87444 and a solicitation number of 69056723B000008. The project involves bridge construction and rehabilitation work along State Route 123 in Washington. The solicitation provides full requirements in the attached documents. No additional details are provided in the given file.
View the file
Other files
Show all 37
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
u
SH COLUMBIA CANAD
WASHINGTON KEY MAP
TYPE OF CONSTRUCTION:
Reconstruction
DESIGN DESIGNATION:
ADT (2023)
ADT (2043)
V e (max)
SPECIFICATION:
50MPH
8%
Standard Specifications for Construction of Roads and Bridges on Federal Highway Projects, FP-14
U.S. DEPARTMENT OF TRANSPORTATION
FEDERAL HIGHWAY ADMINISTIRATION
WESTERN FEDERAL LANDS HIGHWAY DIVISION
VANCOUVER, WASHINGTON
PROJECT MANAGER
L. HIGA
N
U. S. DEPARTMENT OF THE INTERIOR
NATIONAL PARK SERVICE
MOUNT RAINIER NATIONAL PARK
PLANS FOR PROPOSED PROJECT
WA NP MORA 123(2)
NPS PMIS No. 184913
SR-123: LAUGHINGWATER CREEK
BRIDGE TO PANTHER CREEK BRIDGE
PIERCE COUNTY AND LEWIS COUNTY
WASHINGTON PROJECT
LOCATION
LENGTH 2. 79 MILES
SNOQUALMIE NATIONAL FOREST
M T R AJNI ER
N A}'I O NAL P ARK
I
See A. 3 for Vicinity Map
Bumping Lake
YAKIMA co.
SNOQUALMIE
NATIONAL
FOREST
r -�.,..c._,
• I
LEW I S CO. ,- • .._' � _, L; L.
L.
SCALE IN MILES
0 5 10 15
GJFFORD PINCHOT
NATIONAL
FOREST
GIFFORD PINCHOT
NATIONAL
FOREST
RECOMMENDED:
FOR Park Superintendent Mount Rainier National Park
I'
J
I'
Rimrock Lake
DATE
NPS PMJS No. 184913 NPS Drw . No. 105/182837
STATE PROJECT SHEET
NUMBER
A.
A.1
A.2
A.3
B.
B.1-3
C.
C.1-4 c.s
D, D.1
D.2-3
D.4-29
WA NP MORA 123(2)
S H E E T I N D EX
GENERAL INFORMATION
TITLE SHEET
PLAN SYMBOLS AND ABBREVIATIONS
VICINITY MAP
SUMMARY OF QUANTITIES
SUMMARY OF QUANTITIES
TYPICAL SECTIONS
TYPICAL SECTION
SUBEXCAVATION CONNECTION AND
UNDERDRAIN DETAIL
PLAN-PROFILE
SURVEY CONTROL
TABULATION OF QUANTITIES
PLAN AND PROFILE
E. HYDRAULICS
E.l TABULATION OF QUANTITIES
E.2 80+00 CULVERT PLAN AND PROFILE
E.3 CULVERT 80+00 ELEVATIONS
E.4 141+02 CULVERT PLAN AND PROFILE
E.S CULVERT 141+02 ELEVATIONS
E.6-16 STANDARD DRAWINGS AND DETAILS
F. SOIL EROSION AND SEDIMENT CONTROL
F.1 TABULATION OF QUANTITIES
F.2-27 SOIL EROSION AND SEDIMENT CONTROL PLAN
F.28-36 STANDARD DRAWINGS AND DETAILS
G. TEMPORARY TRAFFIC CONTROL
G.l TABULATION OF QUANTITIES
A.1
G.2 TEMPORARY TRAFFIC CONTROL ADVANCED SIGN
LAYOUT FOR ROAD CLOSURE
G.3 TEMPORARY TRAFFIC CONTROL SIGN LOCATION
MAP
G.4 TEMPORARY TRAFFIC CONTROL ROAD CLOSURE
LAYOUT
G.5-10 STANDARD DRAWINGS AND DETAILS
H. PERMANENT TRAFFIC CONTROL
H.1-2 TABULATION OF QUANTITIES
H.3-14 PERMANENT TRAFFIC CONTROL PLAN
H.15-24 STANDARD DRAWINGS AND DETAILS
5. STRUCTURES
S.1 LAUGHINGWATER CREEK BRIDGE PLAN AND
ELEVAT[ON
APPROVED:
BRENT LCOE Digitally signed by BRENT L COE Date: 2023.12.12 08:44:09 •08'00'
Chief of Engineering, DATE
Western Federal Lands Highway Divisicn
AA Ro N DOWE Digitally signed by AARON DOWE Date: 2023.12.07 19:29:46 -08'00'
Associate Regional Director, DATE
NPS Interior Regions 8, 9, 10, and 12
Sheet and Description
SECTION D SECTION E SECTION F SECTION G SECTION H SECTION S -
PLAN-PROFILE HYDRAULICS SOIL EROSION AND
SEDIMENT CONTROL
TEMPORARY TRAFFIC
CONTROL
PERMANENT TRAFFIC
CONTROL STRUCTURES ALLOWANCE Bid
Schedule
A0020 15101-0000 MOBILIZATION LPSM ALL
A0040 15201-0000 CONSTRUCTION SURVEY AND STAKING LPSM ALL
A0060 15301-0010 CONTRACTOR QUALITY CONTROL AND
ASSURANCE LPSM ALL
A0080 15401-0000 CONTRACTOR TESTING LPSM ALL
A0100 15501-0000 CONSTRUCTION SCHEDULE LPSM ALL
A0120 15705-0100 SOIL EROSION CONTROL, SILT FENCE LNFT 1,675 125 1,800
A0140 15705-1400 SOIL EROSION CONTROL, FIBER ROLL LNFT 1,150 150 1,300
A0160 15705-1800 SOIL EROSION CONTROL, TEMPORARY
DIVERSION BERM LNFT 100 100
A0180 15706-0200 SOIL EROSION CONTROL, CHECK DAM
(FIBER ROLL) EACH 151 9 160
A0200 15706-1100 SOIL EROSION CONTROL, INLET
PROTECTION TYPE A EACH 1 1 2
A0220 15706-1600 SOIL EROSION CONTROL, STABILIZED
CONSTRUCTION EXIT EACH 10 10
A0240 15802-0000 WATERING FOR DUST CONTROL LPSM All ALL
A0260 20103-0000 CLEARING AND GRUBBING SQYD 3,766 134 3,900
A0280 20220-1000 REMOVAL, INDIVIDUAL TREE EACH 10 10
A0300 20301-1900 REMOVAL OF PIPE CULVERT EACH 2 2
A0320 20301-2300 REMOVAL OF SIGN/MARKER EACH 29 29
A0340 20303-1500 REMOVAL OF PAVED WATERWAY, STONE SQYD 75 5 80
A0360 20303-3500 REMOVAL OF STONE MASONRY SQYD 41 2 43
A0380 20401-0000 ROADWAY EXCAVATION CUYD 5,990 510 6,500
A0400 20402-0000 SUBEXCAVATION CUYD 10,503 997 11,500
A0420 20410-0000 SELECT BORROW CUYD 10,503 997 11,500
A0440 20701-0100 SEPARATION-STABILIZATION
GEOTEXTILE, CLASS 1, TYPE A SQYD 117 3 120
A0460 20701-0400 SEPARATION-STABILIZATION
GEOTEXTILE, CLASS 1, TYPE D (WOVEN) SQYD 3,494 206 3,700
A0480 20701-0500 SEPARATION-STABILIZATION
GEOTEXTILE, CLASS 1, TYPE E SQYD 488 12 500
A0500 20703-2000 GEOGRID, STABILIZATION SQYD 26,924 1,376 28,300
A0520 20820-0000 DEWATERING LPSM All ALL
A0540 25101-0200 PLACED RIPRAP, METHOD A, CLASS 2 CUYD 28 22 50
A0560 25101-0400 PLACED RIPRAP, METHOD A, CLASS 4 CUYD 162 38 200
A0580 25126-0000 REMOVE AND RESET BOULDER EACH 45 45
A0600 30302-1000 DITCH RECONDITIONING LNFT 14,301 199 14,500
A0620 30801-1000 RECYCLED AGGREGATE BASE, 6-INCH
DEPTH SQYD 45,852 1,148 47,000
MileStone: 100% Report Date: 12/01/23
A M E N D
Line Item No.
Pay Item Number
SUMMARY OF QUANTITIES
1-
D ec
-2
:0
PM
Remarks and/or Determination of Estimated
Quantity Pay Item Description Unit
Estimated Quantities
C
U se rs \y th ao
.t ru on g\
D es kt op
\P ro je ct s\ W
A N
PS
M
O R A
3(
2) \1 su m m ar y_
2.
xl sm ]S he et
STATE PROJECT
B.1NP MORA 123(2)WA
SHEET
NUMBER
NPS PMIS No. 184913 NPS Drwg No. 105/182837
PLAN-PROFILE HYDRAULICS SOIL EROSION AND
SEDIMENT CONTROL
TEMPORARY TRAFFIC
CONTROL
PERMANENT TRAFFIC
CONTROL STRUCTURES ALLOWANCE Bid
Schedule
A0640 31303-0000 AGGREGATE-TOPSOIL COURSE CUYD 90 10 100
A0660 40101-5600 ASPHALT CONCRETE PAVEMENT, GYRATORY
MIX, 1/2-INCH OR 3/4-INCH NOMINAL
MAXIMUM SIZE AGGREGATE, 0.3 TO <3
MILLION ESAL (TYPE III PAVEMENT
ROUGHNESS) TON 9,340 160 9,500
A0720 41101-1000 PRIME COAT, METHOD 1 (GRADE CMS-2) TON 12 1 13
A0740 41105-0000 BLOTTER TON 193 17 210
A0760 41201-0000 TACK COAT TON 18.0 2.0 20.0
A0780 41301-1300 ASPHALT PAVEMENT MILLING, 6-INCH
DEPTH SQYD 45,852 1,148 47,000
A0800 57501-0000 MINOR BRIDGE WORK (THIN EPOXY
OVERLAY) LPSM All ALL
A0820 60201-0800 24-INCH PIPE CULVERT LNFT 322 18 340
A0840 60210-0800 END SECTION FOR 24-INCH PIPE CULVERT EACH 7 7
A0860 60220-0350 4 FEET SPAN, 4 FEET RISE PRECAST
REINFORCED CONCRETE BOX CULVERT LNFT 54 54
A0880 60220-2600 9 FEET SPAN, 9 FEET RISE PRECAST
REINFORCED CONCRETE BOX CULVERT LNFT 54 54
A0900 60501-0000 STANDARD UNDERDRAIN SYSTEM LNFT 5,055 255 5,310
A0920 60704-0000 CLEANING CULVERT IN PLACE EACH 4 4
A0940 60705-0000 REPAIRING DRAINAGE STRUCTURE EACH 1 1
A0960 61902-0900 GATE, METAL EACH 1 1
A0980 62002-1000 CLASS B MASONRY, ROCK FACE FINISH
(GOVERNMENT FURNISHED STONE) SQYD 100 10 110
A1000 62011-0500 STONE MASONRY HEADWALL FOR 24-INCH
PIPE CULVERT (GOVERNMENT FURNISHED
STONE) EACH 7 7
A1020 62201-0250 DUMP TRUCK, 10 CUBIC YARD MINIMUM
CAPACITY HOUR 40 40
A1040 62201-0950 WHEEL LOADER, 3 CUBIC YARD MINIMUM
RATED CAPACITY HOUR 40 40
A1060 62201-2800 MOTOR GRADER, 8 FOOT MINIMUM BLADE HOUR 40 40
A1080 62201-3150 HYDRAULIC EXCAVATOR, CRAWLER
MOUNTED, 1.0 CUBIC YARD MINIMUM
CAPACITY WITH THUMB ATTACHMENT HOUR 40 40
A1100 62301-0000 GENERAL LABOR HOUR 40 40
A1120 62405-0300 PLACING CONSERVED TOPSOIL, 4-INCH
DEPTH SQYD 3,766 234 4,000
A1140 62901-0000 ROLLED EROSION CONTROL PRODUCT SQYD 2,260 140 2,400
1- D ec -2
:0
PM
MileStone: 100% Report Date: 12/01/23
C
U se rs \y th ao
.t ru on g\
D es kt op
\P ro je ct s\ W
A N
PS
M
O R A
3(
2) \1 su m m ar y_
2.
xl sm ]S he et
2)
SUMMARY OF QUANTITIES
A M E N D
Line Item No.
Pay Item Number Pay Item Description Unit
Estimated Quantities
Remarks and/or Determination of Estimated
Quantity
STATE PROJECT
B.2NP MORA 123(2)WA
SHEET
NUMBER
PLAN-PROFILE HYDRAULICS SOIL EROSION AND
SEDIMENT CONTROL
TEMPORARY TRAFFIC
CONTROL
PERMANENT
TRAFFIC CONTROL STRUCTURES ALLOWANCE Bid
Schedule
A1160 63302-0000 SIGN SYSTEM SQFT 97.31 12.69 110.00
A1180 63308-3000 OBJECT MARKER, TYPE 3 EACH 8 8
A1200 63316-1000 REMOVE AND RESET SIGN EACH 2 2
A1220 63401-0300 PAVEMENT MARKINGS, TYPE B, SOLID LNFT 147,150 1,850 149,000
A1240 63401-0400 PAVEMENT MARKINGS, TYPE B, BROKEN
(YELLOW) LNFT 9,320 180 9,500
A1260 63403-0900 PAVEMENT MARKINGS, TYPE I SQFT 44 6 50
A1280 63405-0050 PAVEMENT MARKINGS, SYMBOLS EACH 1 1
A1300 63502-0600 TEMPORARY TRAFFIC CONTROL,
BARRICADE TYPE 3 (8 FEET WIDE) EACH 6 6
A1320 63502-1050 TEMPORARY TRAFFIC CONTROL, TUBULAR
MARKER EACH 100 100
A1340 63502-2000 TEMPORARY TRAFFIC CONTROL, PORTABLE
CHANGEABLE MESSAGE SIGN EACH 2 2
A1360 63503-0400 TEMPORARY TRAFFIC CONTROL, CONCRETE
BARRIER LNFT 10 10
A1380 63503-0700 TEMPORARY TRAFFIC CONTROL, PAVEMENT
MARKINGS LNFT 4,300 300 4,600
A1400 63503-1000 TEMPORARY TRAFFIC CONTROL, PLASTIC
FENCE LNFT 490 210 700
A1420 63504-1000 TEMPORARY TRAFFIC CONTROL,
CONSTRUCTION SIGN SQFT 10.5 903.8 55.7 970.0
A1440 63506-0500 TEMPORARY TRAFFIC CONTROL, FLAGGER HOUR 8,900 8,900
A1460 63507-0600 TEMPORARY TRAFFIC CONTROL, PILOT CAR DAY 215 215
A1480 63507-0700 TEMPORARY TRAFFIC CONTROL, TRAFFIC
CONTROL SUPERVISOR DAY 300 300
A1500 63601-6000 SYSTEM INSTALLATION, TRAFFIC
DETECTOR SYSTEM LPSM All ALL
A1520 63701-0000 FIELD OFFICE EACH 1
A1540 64704-1600 MITIGATION, STREAMBED CHANNEL
RECONSTRUCTION CUYD 260 15 275
1- D ec -2
:0
PM
MileStone: 100% Report Date: 12/01/23
C
U se rs \y th ao
.t ru on g\
D es kt op
\P ro je ct s\ W
A N
PS
M
O R A
3(
2) \1 su m m ar y_
2.
xl sm ]S he et
3)
SUMMARY OF QUANTITIES
A M E N D
Line Item No.
Pay Item Number Pay Item Description Unit
Estimated Quantities
Remarks and/or Determination of Estimated
Quantity
STATE PROJECT
B.3NP MORA 123(2)WA
SHEET
NUMBER
NO SCALE
PLAN VIEW
SUBEXCAVATION AREA
S u b e x c a v a ti o n l im it
S u b e x c a v a ti o n l im it o r e m b a n k m e n t
C u lv e r t o u tl e t, d it c h
P r o f il e g r a d e
Bottom of subexcavation
15"
Subgrade shoulder
Select borrow
Granular backfill perforated collector pipeØ 6"
2.0% (typ. )
2.0% (typ.) slope
NOTE:
6" Ø Solid outlet drain pipe
4.
3.
2.
1.
DETAIL
COLLECTOR PIPE TRENCH
1:5 1:5
TYPICAL SUBEXCAVATION PROFILE
pavement
Saw cut Subexcavation
Bottom of subexcavation class 1, type D, (woven)
Separation-stabilization geotextile, station limits geotextile, class 1, type D (woven)
Separation-stabilization pipe is specified.
necting outlet pipes to collector pipes when more than one outlet
Use T connections or manufacturers recommendation for con-
Provide outlet pipes according to Section 605 and 708.
with no less than one outlet per subexcavation.
Provide one outlet spaced every 200-feet (max.) of collector pipe
See D-Sheets for Collector and Outlet Pipe Quantites.
COLLECTOR AND OUTLET PIPE PLAN
Finished grade
Saw cut pavement
Outlet pipe
Hose clamp
Wire mesh
2"
Filter rock
OUTLET PIPE END DETAIL
drain pipe
Solid outletØ 6"
3"
3"
(min.)
6"
15"
PIPE WRAP DETAIL
6" PERFORATED COLLECTOR
class 1, non-woven, type A
Geotextile filter, Granular backfill
6" Ø Solid outlet drain pipe
See Note 4
0.75% (min.)
6" Ø Perforated collector pipe or Outlet pipe
Standard underdrain system
12"
[1]
[1], [2]
[2] Provide a minimum 0.75% slope to drain at the low point(s) of the subexcavation.
[1] Locate outlet pipes to intercept outlet catch basins, culverts, or daylight to ditch ahead or back on the line where applicable.
FOOTNOTE:1
:4
P
M
D e c e m b e r
S T
A N
D A
R D
U N
D E
R D
R A
IN
S
Y S
T E
M d e ta il c p w w o r k \d
\m o r a C
.5 U n d e r d r a in d e ta il s .d g n
DETAIL
STANDARD UNDERDRAIN SYSTEM
STATE PROJECT
NUMBER
SHEET
WA NP MORA 123(2) C.5
NPS Drwg. No. 105/182837 NPS PMIS No. 184913
STATE PLANE COORDINATES GEO COORDINATES
POINT
NUMBER NORTH EAST ELEVATION LATITUDE LONGITUDE ELLIPSOID
HEIGHT
COMBINED
FACTOR DESCRIPTION NOTE:
20101 531861.991 1376239.042 2314.582 46°47'13.123713"N 121°33'16.719882"W 2251.8638 0.999813223 5/8" IR w/FHWA alum cap 1.
20102 531547.552 1376299.747 2312.286 46°47'10.028053"N 121°33'15.787138"W 2249.564 0.99981328 Mag nail & Washer
20103 531050.421 1376406.804 2301.246 46°47'05.135242"N 121°33'14.153280"W 2238.5183 0.999813725 5/8" IR w/FHWA alum cap
20104 530331.009 1376541.306 2271.189 46°46'58.052013"N 121°33'12.082486"W 2208.4533 0.999815042 5/8" IR w/FHWA alum cap
20105 529848.853 1376513.308 2279.521 46°46'53.289193"N 121°33'12.392256"W 2216.7807 0.999814565 5/8" IR w/FHWA alum cap
20106 529370.740 1376642.406 2296.213 46°46'48.586985"N 121°33'10.445580"W 2233.4682 0.99981369 5/8" IR w/FHWA alum cap
20107 528922.923 1376919.092 2289.626 46°46'44.203235"N 121°33'06.384260"W 2226.8799 0.999813932 5/8" IR w/FHWA alum cap
20108 528190.231 1377109.754 2246.134 46°46'36.996264"N 121°33'03.504549"W 2183.3818 0.999815893 5/8" IR w/FHWA alum cap
20109 527358.741 1377283.491 2211.725 46°46'28.811856"N 121°33'00.849312"W 2148.9652 0.999817405 5/8" IR w/FHWA alum cap
20110 526458.152 1377584.030 2220.191 46°46'19.962031"N 121°32'56.359421"W 2157.4262 0.99981686 5/8" IR w/FHWA alum cap
20111 526009.165 1377739.499 2212.250 46°46'15.550687"N 121°32'54.040183"W 2149.4833 0.99981717 5/8" IR w/FHWA alum cap
20112 525511.842 1377747.119 2199.697 46°46'10.642834"N 121°32'53.835757"W 2136.9232 0.999817693 5/8" IR w/FHWA alum cap
20113 524820.761 1377661.671 2195.329 46°46'03.810270"N 121°32'54.931276"W 2132.5373 0.999817796 5/8" IR w/FHWA alum cap
20114 524214.506 1377636.099 2192.363 46°45'57.822838"N 121°32'55.182828"W 2129.5615 0.999817846 5/8" IR w/FHWA alum cap
20115 523229.330 1377544.977 2198.706 46°45'48.086636"N 121°32'56.303547"W 2135.8877 0.999817396 5/8" IR w/FHWA alum cap
20116 522832.900 1377363.956 2204.824 46°45'44.149876"N 121°32'58.827929"W 2141.9948 0.999817046 5/8" IR w/FHWA alum cap
20117 522327.906 1376823.846 2217.501 46°45'39.094276"N 121°33'06.489116"W 2154.6501 0.999816366 5/8" IR w/FHWA alum cap
20118 521912.023 1376629.631 2217.792 46°45'34.963701"N 121°33'09.198952"W 2154.9305 0.999816291 5/8" IR w/FHWA alum cap
20119 521177.302 1376241.327 2214.867 46°45'27.660401"N 121°33'14.635096"W 2151.9863 0.999816325 5/8" IR w/FHWA alum cap
20120 520771.963 1375983.743 2198.326 46°45'23.625479"N 121°33'18.256736"W 2135.4341 0.999817057 5/8" IR w/FHWA alum cap
20121 520077.736 1375489.579 2185.434 46°45'16.707753"N 121°33'25.220330"W 2122.521 0.999817574 5/8" IR w/FHWA alum cap
20122 519740.198 1375461.814 2184.918 46°45'13.372386"N 121°33'25.554108"W 2121.9994 0.999817551 Mag nail & Washer
20123 519263.902 1375512.067 2172.697 46°45'08.677718"N 121°33'24.740751"W 2109.7723 0.999818068 5/8" IR w/FHWA alum cap
20124 518651.565 1375226.866 2152.609 46°45'02.595856"N 121°33'28.718554"W 2089.6701 0.999818943 5/8" IR w/FHWA alum cap
20125 518443.404 1375250.766 2146.061 46°45'00.544350"N 121°33'28.335244"W 2083.1195 0.999819227 5/8" IR w/FHWA alum cap
20126 517972.477 1375484.473 2131.974 46°44'55.926952"N 121°33'24.888503"W 2069.0311 0.999819836 5/8" IR w/FHWA alum cap
20127 517584.719 1375539.143 2121.753 46°44'52.106784"N 121°33'24.028842"W 2058.8064 0.999820272 5/8" IR w/FHWA alum cap
PROJECT : SR123 Laughingwater creek bridge to Panther Creek Bridge DATE OF FIELD WORK : multiple entries DATE OF FINAL ADJUSTMENT : June 2020
PROJECT UNITS : US SURVEY FOOT
COORDINATE SYSTEM : Washington South SPCS NAD83 2011
EPOCH DATE : 2010.000
VERTICAL DATUM : Orthometric elevations based on the NAVD88 GEOID18
To precisely check distances between points as measured on the ground, inverse the state plane coordinates and divide the computed distance by a mean combined factor of the two points.
C
M yF ile s\
Pr oj ec ts
_2
3\ M is c\
[S R
3_ m p3 -5
_c on tr ol sh ee t.
xl sx ]S he et
5- Ju l-
:0
PM
W
FL
H
D S ur ve y
W
FL
H
D S ur ve y
D es ig ne d by
C he ck ed b y:
STATE PROJECT
D.1
SHEET
NUMBER
NP MORA 123(2)WA
NPS PMIS No.184913 NPS Drwg. No.105/182837
SURVEY CONTROL
10.4 x 16 20301 -1900
20303 -1500
20303 -3500
20701 -0100
20701 -0500
25101 -0200
25101 -0400
60201 -0800
60210 -0800
60220 -0350
60220 -2600
60704 -0000
60705 -0000
62002 -1000
62011 -0500
64704 -1600
Station
ES
TI
M
A
TE
D M
A X
IM
U M
C O
V
ER
S
TR
U C
TU
R A L
EX
C A V A
TI
O N
R
EM
O V A L
O F
PI
PE
C U
LV
ER
T
R
EM
O V A L
O F
PA
V
ED
W
A
TE
R W
A Y, S
TO
N E
R
EM
O V A L
O F
S
TO
N E
M A S O
N R Y
S
EP
A R A
TI
O N
-S
TA
B
IL
IZ
A
TI
O N
G
EO
TE
X
TI
LE
C
LA
S S
TY
PE
A
S
EP
A R A
TI
O N
-S
TA
B
IL
IZ
A
TI
N
G
EO
TE
X
TI
LE
C
LA
S S
TY
PE
E
PL
A C
ED
R
IP
R A P, M
ET
H O
D A
C
LA
S S
PL
A C
ED
R
IP
R A P, M
ET
H O
D A
C
LA
S S
-I
N C H
P
IP
E C U
LV
ER
T
EN
D
S
EC
TI
O
N F
O R
4-
IN
C H
PI
PE
C
U
LV
ER
T
FE
ET
S
PA
N
FE
ET
R
IS
E
PR
EC
A S T
R
EI
N
FO
R
N C R
ET
E B O
X C
U
LV
ER
T
FE
ET
S
PA
N
FE
ET
R
IS
E
PR
EC
A S T
R
EI
N
FO
R
N C R
ET
E B O
X C
U
LV
ER
T
C
LE
A N
IN
G
C U
LV
ER
T
IN
P
LA
C E
R
EP
A
IR
IN
G
D R A
IN
A G
E S
TR
U C
TU
R E
C
LA
S S B
M A S O
N R Y, R O
C K F
A C E
FI
N
IS
H
G
O V
ER
N M
EN
T
FU
R N
IS
H
ED
S
TO
N
E)
S
TO
N E
M A S O
N R Y
H
EA
D W
A
LL
FO
R
4-
IN
C H
P
IP
E C U
LV
ER
T (G
O V
ER
N M
EN
T
FU
R N
IS
S
TO
N E)
M
IT
IG
A
TI
O N
S
TR
EA
M
B
A N
N
EL
R
EC
O N
S
TR
U C
TI
O N
S K
EW
A N
G
LE
A llo w ab le P ip e
M at er ia l (S ee k ey b el ow
B
EV
EL
S
1V :n
H
B
EV
EL
S
1V :n
H
REMARKS
See below for numbered notes
FEET CUYD EACH SQYD SQYD SQYD SQYD CUYD CUYD LNFT EACH LNFT LNFT EACH EACH SQYD EACH CUYD Lt Rt 17+07 6 120 3 13 4 55 1 1 0°20'51" LT C 18" ex. CMP, 52 LNFT 20+57 4 74 3 13 4 48 1 1 2°34'03" LT C 18" ex. CMP, 41 LNFT 74+26 13 4 18" ex. Concrete, 64 LNFT 80+00 1800 75 20 231 79 54 76 70 4°50'55" LT 36" ex. Concrete, 53 LNFT 87+31 1 18" ex. Concrete, 44 LNFT
95+82 2 209 13 4 52 1 1 27°13'50" LT C
95+93 1 3 18" ex. CMP, 41 LNFT 97+40 2 183 13 4 44 1 1 No skew C 98+15 1 3 18" ex. CMP, 38 LNFT 102+61 1 24" ex. Concrete, 38 LNFT 105+70 1 18" ex. CMP, 37 LNFT 109+40 1 30" ex. Concrete, 49 LNFT 117+65 2 177 3 13 4 43 1 1 21°27'20" LT C 18" ex. CMP, 37 LNFT 119+12 2 149 3 13 4 40 1 1 9°01'16" LT C 18" ex. CMP, 35 LNFT 131+82 3 166 3 13 4 40 1 1 5°38'12" RT C 18" ex. CMP, 36 LNFT
141+02 190 257 75 54 24 190 14°51'16" LT
142+53 13 4 1 18" ex. Concrete, 60 LNFT;
Repair of disjointed end section
PROJECT TOTAL 3068 2 75 41 117 488 28 162 322 7 54 54 4 1 100 7 260
Allowable Pipe Material
NOTE: A Aluminum
1. See Std. 602-7 for acceptable concrete class. 3. Skew angle diangram AS Aluminized steel
2. Conserve stone masonry that was removed to use under Section 620. C Concrete
GS Galvanized steel P Plastic (blank) Any appropriate material x/__ Any appropriate material except __
PAY ITEM NUMBER
TABULATION OF DRAINAGE QUANTITIES
c:
\p w
-w or k\ d0
M O
R A
2_ dr ai na ge
Ta bs
.x ls x] S he et 1-
D ec
-2
:1
PM
T.
T ru on g
7/
D es ig ne d by
C he ck ed b y:
STATE PROJECT
E.1
SHEET
NUMBER
NP MORA 123(2)WA
NPS PMIS No. 184913 NPS Drwg. No. 105/182837
Note: The quantities shown hereon are approximate and are subject to field adjustments.
WA NP MORA 123(2) E.14
NPS PMIS NO. 184913
NPS DRWG. NO. 105/182837
WA NP MORA 123(2) E.15
WA NP MORA 123(2) E.16
WA NP MORA 123(2) F.30
WA NP MORA 123(2) F.31
WA NP MORA 123(2) F.32
WA NP MORA 123(2) F.33
WA NP MORA 123(2) F.34
WA NP MORA 123(2) F.35
WA NP MORA 123(2) G.6
WA NP MORA 123(2) G.7
WA NP MORA 123(2) G.8
WA NP MORA 123(2) G.9
WA NP MORA 123(2) G.10
WA NP MORA 123(2) H.20
WA NP MORA 123(2) H.21
File details come from the government source that posted it. Updated .