BidTab_WA NP MORA 123(2).pdf

PDF 679 KB Posted

Attached to
WA NP MORA 123(2) SR-123: Laughingwater Creek Bridge to Panther Creek Bridge
Solicitation number
69056723B000008
Issued by

About this file

This document is a Tabulation of Bids for the Federal Highway Administration contract opportunity WA NP MORA 123(2) - SR-123: Laughingwater Creek Bridge to Panther Creek Bridge. The contract was awarded for a base schedule on July 31, 2024. The Engineer's Estimate for the project was $10,383,290, and the low bid of $11,431,888 was submitted by Tucci & Sons, Inc. The contract includes mobilization, construction survey and staking, contractor quality control, contractor testing, construction scheduling, soil erosion control measures, clearing and grubbing, pipe culvert removal, paved waterway and stone masonry removal, roadway excavation, select borrow, geotextiles, geogrid stabilization, placed riprap, and asphalt concrete paving. The contract will be performed in Mt. Rainier National Park in the state of Washington.

View the file

Other files

File Type Posted
BidSum_WA NP MORA 123(2).pdf PDF
QA_07-31-2024.pdf PDF
Amendment A005.pdf PDF
QA_07-24-2024.pdf PDF
QA_07-23-2024.pdf PDF
Amendment A004.pdf PDF
QA1_07-19-2024.pdf PDF
Amendment A003.pdf PDF
QA_07-18-2024.pdf PDF
Amendment A002.pdf PDF
Amendment A001.pdf PDF
QA_07-09-2024.pdf PDF
QA_07-05-2024.pdf PDF
QA_08-24-2023.pdf PDF
mora 12302_XYZ asphalt_APPR01.xlsx XLSX spreadsheet
mora 12302_XYZ subex_MAIN01.xlsx XLSX spreadsheet
mora 12302_XYZ base_APPR01.xlsx XLSX spreadsheet
mora12302_control-points.xlsx XLSX spreadsheet
mora12302_plans.pdf PDF
WA NP MORA 123(2) - EPA_CompiledSWPPP_Final Signed.pdf PDF
mora12302_BIR_9450-020P.pdf PDF
mora12302_Earthwork_APPR 01.pdf PDF
mora 12302_XYZ asphalt_MAIN01.xlsx XLSX spreadsheet
Physical Data_WA NP MORA 123(2).zip ZIP file
mora12302_Project Name Change Memo.pdf PDF
mora12302_construction staking notes_APPR01.xlsx XLSX spreadsheet
mora12302_construction staking notes_MAIN01.xlsx XLSX spreadsheet
mora12302_Earthwork_MAIN 01.pdf PDF
mora12302_XS.pdf PDF
IFB 69056723B000008.pdf PDF
mora12302_GR09-22.pdf PDF
mora12302_proposed-alignment_MAIN01.pdf PDF
FLH Bridge oversized or overload vehicle permit request form Oct 2018.pdf PDF
mora12302_clearing limits (culverts).pdf PDF
mora12302_1992_LaughingwaterCreekBridgePlans.pdf PDF
mora12302_proposed-alignment_APPR01.pdf PDF
mora 12302_XYZ base_MAIN01.xlsx XLSX spreadsheet
Show all 37

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Tabulation of Bids Report Date: 08/01/24

1 out of 21

Project No: WA NP MORA 123(2)

Project Name: SR-123: Laughingwater Creek Bridge to Panther Creek Bridge

Schedule: A

Schedule Type: Base

Solcitation No: 69056723B000008

Division: Western Federal Lands

State: WA County: Lewis, Pierce

Federal Land: Mt. Rainier National Park Opened at: Vancouver, WA

Opened by: Marino Chea

Date: 07/31/24

I certify that this Bid Tabulation accurately reflects the offers received for this solicitation.

Signed: _______________________________

Title: _______________________________

Date: _______________________________

Contract Awarded to: ____________________ Award Date: ____________________

Contractor Comment Bid Amount Responsive

Tucci & Sons, Inc. $11,431,888.00 4224 Waller Road E.

Tacoma, WA 98443

Miles Resources $12,600,377.20 400 Valley Ave NE Ouyallup, WA 98372

Conway Construction Company $13,363,880.00 6620 NW Whitney Road Vancouver, WA 98665

MA DeAtley Construction Inc $13,461,140.00 829 Evans Rd.

Clarkston, WA 99403

Interwest Construction, Inc. $13,899,444.00 609 North Hill Blvd.

Burlington, WA 98233

MidMountain Contractors, Inc $16,690,800.00 Bellevue, WA 98004

Central Southern Construction Corp. $17,414,610.00 119 Sewald Street Jacksonville, FL 32204

Engineer's Estimate $10,383,290.00

2 out of 21

Project No: WA NP MORA 123(2)

Project Name: SR-123: Laughingwater Creek Bridge to Panther Creek Bridge

Schedule: A

Schedule Type: Base

Line Item Pay Item No. Description Quantity Unit Unit Price Amount

Number

A0020 15101-0000 MOBILIZATION

Tucci & Sons, Inc. Lump Sum $950,422.00 Miles Resources Lump Sum $1,250,000.00 Conway Construction Company Lump Sum $1,965,000.00 MA DeAtley Construction Inc Lump Sum $1,550,000.00 Interwest Construction, Inc. Lump Sum $1,438,000.00 MidMountain Contractors, Inc Lump Sum $1,650,000.00 Central Southern Construction Corp. Lump Sum $947,320.00 Engineer's Estimate ALL LPSM Lump Sum $945,000.00

A0040 15201-0000 CONSTRUCTION SURVEY AND STAKING

Tucci & Sons, Inc. Lump Sum $78,000.00 Miles Resources Lump Sum $296,000.00 Conway Construction Company Lump Sum $250,000.00 MA DeAtley Construction Inc Lump Sum $250,000.00 Interwest Construction, Inc. Lump Sum $260,799.00 MidMountain Contractors, Inc Lump Sum $200,000.00 Central Southern Construction Corp. Lump Sum $178,960.00 Engineer's Estimate ALL LPSM Lump Sum $178,000.00

A0060 15301-0010 CONTRACTOR QUALITY CONTROL AND ASSURANCE

Tucci & Sons, Inc. Lump Sum $250,000.00 Miles Resources Lump Sum $288,000.00 Conway Construction Company Lump Sum $300,000.00 MA DeAtley Construction Inc Lump Sum $600,000.00 Interwest Construction, Inc. Lump Sum $1,175,000.00 MidMountain Contractors, Inc Lump Sum $550,000.00 Central Southern Construction Corp. Lump Sum $190,210.00 Engineer's Estimate ALL LPSM Lump Sum $178,000.00

A0080 15401-0000 CONTRACTOR TESTING

Tucci & Sons, Inc. Lump Sum $146,000.00 Miles Resources Lump Sum $270,000.00 Conway Construction Company Lump Sum $250,000.00 MA DeAtley Construction Inc Lump Sum $300,000.00 Interwest Construction, Inc. Lump Sum $350,000.00 MidMountain Contractors, Inc Lump Sum $764,258.00 Central Southern Construction Corp. Lump Sum $216,470.00 Engineer's Estimate ALL LPSM Lump Sum $178,000.00

3 out of 21

Project No: WA NP MORA 123(2)

Project Name: SR-123: Laughingwater Creek Bridge to Panther Creek Bridge

Schedule: A

Schedule Type: Base

Line Item Pay Item No. Description Quantity Unit Unit Price Amount

Number

A0100 15501-0000 CONSTRUCTION SCHEDULE

Tucci & Sons, Inc. Lump Sum $6,000.00 Miles Resources Lump Sum $376,000.00 Conway Construction Company Lump Sum $50,000.00 MA DeAtley Construction Inc Lump Sum $50,000.00 Interwest Construction, Inc. Lump Sum $150,000.00 MidMountain Contractors, Inc Lump Sum $6,000.00 Central Southern Construction Corp. Lump Sum $20,000.00 Engineer's Estimate ALL LPSM Lump Sum $50,000.00

A0120 15705-0100 SOIL EROSION CONTROL, SILT FENCE

Tucci & Sons, Inc. $10.00 $18,000.00 Miles Resources $7.11 $12,798.00 Conway Construction Company $8.00 $14,400.00 MA DeAtley Construction Inc $7.00 $12,600.00 Interwest Construction, Inc. $10.00 $18,000.00 MidMountain Contractors, Inc $18.00 $32,400.00 Central Southern Construction Corp. $15.00 $27,000.00 Engineer's Estimate 1,800 LNFT $9.30 $16,740.00

A0140 15705-1400 SOIL EROSION CONTROL, FIBER ROLL

Tucci & Sons, Inc. $10.00 $13,000.00 Miles Resources $8.13 $10,569.00 Conway Construction Company $6.00 $7,800.00 MA DeAtley Construction Inc $6.00 $7,800.00 Interwest Construction, Inc. $35.00 $45,500.00 MidMountain Contractors, Inc $18.00 $23,400.00 Central Southern Construction Corp. $10.00 $13,000.00 Engineer's Estimate 1,300 LNFT $7.50 $9,750.00

A0160 15705-1800 SOIL EROSION CONTROL, TEMPORARY DIVERSION BERM

Tucci & Sons, Inc. $550.00 $55,000.00 Miles Resources $187.50 $18,750.00 Conway Construction Company $285.00 $28,500.00 MA DeAtley Construction Inc $300.00 $30,000.00 Interwest Construction, Inc. $205.00 $20,500.00 MidMountain Contractors, Inc $510.00 $51,000.00 Central Southern Construction Corp. $500.00 $50,000.00 Engineer's Estimate 100 LNFT $170.00 $17,000.00

4 out of 21

Project No: WA NP MORA 123(2)

Project Name: SR-123: Laughingwater Creek Bridge to Panther Creek Bridge

Schedule: A

Schedule Type: Base

Line Item Pay Item No. Description Quantity Unit Unit Price Amount

Number

A0180 15706-0200 SOIL EROSION CONTROL, CHECK DAM (FIBER ROLL)

Tucci & Sons, Inc. $240.00 $38,400.00 Miles Resources $187.50 $30,000.00 Conway Construction Company $100.00 $16,000.00 MA DeAtley Construction Inc $150.00 $24,000.00 Interwest Construction, Inc. $275.00 $44,000.00 MidMountain Contractors, Inc $215.00 $34,400.00 Central Southern Construction Corp. $25.00 $4,000.00 Engineer's Estimate 160 EACH $85.00 $13,600.00

A0200 15706-1100 SOIL EROSION CONTROL, INLET PROTECTION TYPE A

Tucci & Sons, Inc. $450.00 $900.00 Miles Resources $147.85 $295.70 Conway Construction Company $200.00 $400.00 MA DeAtley Construction Inc $150.00 $300.00 Interwest Construction, Inc. $300.00 $600.00 MidMountain Contractors, Inc $850.00 $1,700.00 Central Southern Construction Corp. $500.00 $1,000.00 Engineer's Estimate 2 EACH $230.00 $460.00

A0220 15706-1600 SOIL EROSION CONTROL, STABILIZED CONSTRUCTION EXIT

Tucci & Sons, Inc. $8,200.00 $82,000.00 Miles Resources $11,250.00 $112,500.00 Conway Construction Company $5,000.00 $50,000.00 MA DeAtley Construction Inc $3,200.00 $32,000.00 Interwest Construction, Inc. $9,000.00 $90,000.00 MidMountain Contractors, Inc $3,650.00 $36,500.00 Central Southern Construction Corp. $1,000.00 $10,000.00 Engineer's Estimate 10 EACH $4,000.00 $40,000.00

A0240 15802-0000 WATERING FOR DUST CONTROL

Tucci & Sons, Inc. Lump Sum $500.00 Miles Resources Lump Sum $80,760.00 Conway Construction Company Lump Sum $350,000.00 MA DeAtley Construction Inc Lump Sum $400,000.00 Interwest Construction, Inc. Lump Sum $640,000.00 MidMountain Contractors, Inc Lump Sum $280,000.00 Central Southern Construction Corp. Lump Sum $65,000.00 Engineer's Estimate ALL LPSM Lump Sum $20,000.00

5 out of 21

Project No: WA NP MORA 123(2)

Project Name: SR-123: Laughingwater Creek Bridge to Panther Creek Bridge

Schedule: A

Schedule Type: Base

Line Item Pay Item No. Description Quantity Unit Unit Price Amount

Number

A0260 20103-0000 CLEARING AND GRUBBING

Tucci & Sons, Inc. $4.75 $18,525.00 Miles Resources $2.69 $10,491.00 Conway Construction Company $30.00 $117,000.00 MA DeAtley Construction Inc $28.00 $109,200.00 Interwest Construction, Inc. $14.00 $54,600.00 MidMountain Contractors, Inc $60.00 $234,000.00 Central Southern Construction Corp. $50.00 $195,000.00 Engineer's Estimate 3,900 SQYD $5.20 $20,280.00

A0280 20220-1000 REMOVAL, INDIVIDUAL TREE

Tucci & Sons, Inc. $925.00 $9,250.00 Miles Resources $212.50 $2,125.00 Conway Construction Company $3,000.00 $30,000.00 MA DeAtley Construction Inc $900.00 $9,000.00 Interwest Construction, Inc. $1,500.00 $15,000.00 MidMountain Contractors, Inc $2,500.00 $25,000.00 Central Southern Construction Corp. $5,000.00 $50,000.00 Engineer's Estimate 10 EACH $2,200.00 $22,000.00

A0300 20301-1900 REMOVAL OF PIPE CULVERT

Tucci & Sons, Inc. $830.00 $1,660.00 Miles Resources $8,281.00 $16,562.00 Conway Construction Company $2,000.00 $4,000.00 MA DeAtley Construction Inc $5,500.00 $11,000.00 Interwest Construction, Inc. $10,000.00 $20,000.00 MidMountain Contractors, Inc $1,500.00 $3,000.00 Central Southern Construction Corp. $15,000.00 $30,000.00 Engineer's Estimate 2 EACH $2,200.00 $4,400.00

A0320 20301-2300 REMOVAL OF SIGN/MARKER

Tucci & Sons, Inc. $135.00 $3,915.00 Miles Resources $612.00 $17,748.00 Conway Construction Company $150.00 $4,350.00 MA DeAtley Construction Inc $165.00 $4,785.00 Interwest Construction, Inc. $240.00 $6,960.00 MidMountain Contractors, Inc $200.00 $5,800.00 Central Southern Construction Corp. $50.00 $1,450.00 Engineer's Estimate 29 EACH $100.00 $2,900.00

6 out of 21

Project No: WA NP MORA 123(2)

Project Name: SR-123: Laughingwater Creek Bridge to Panther Creek Bridge

Schedule: A

Schedule Type: Base

Line Item Pay Item No. Description Quantity Unit Unit Price Amount

Number

A0340 20303-1500 REMOVAL OF PAVED WATERWAY, STONE

Tucci & Sons, Inc. $1,300.00 $104,000.00 Miles Resources $1,320.00 $105,600.00 Conway Construction Company $125.00 $10,000.00 MA DeAtley Construction Inc $1,450.00 $116,000.00 Interwest Construction, Inc. $345.00 $27,600.00 MidMountain Contractors, Inc $1,900.00 $152,000.00 Central Southern Construction Corp. $500.00 $40,000.00 Engineer's Estimate 80 SQYD $55.00 $4,400.00

A0360 20303-3500 REMOVAL OF STONE MASONRY

Tucci & Sons, Inc. $1,700.00 $73,100.00 Miles Resources $6,916.00 $297,388.00 Conway Construction Company $250.00 $10,750.00 MA DeAtley Construction Inc $1,700.00 $73,100.00 Interwest Construction, Inc. $1,020.00 $43,860.00 MidMountain Contractors, Inc $2,240.00 $96,320.00 Central Southern Construction Corp. $500.00 $21,500.00 Engineer's Estimate 43 SQYD $400.00 $17,200.00

A0380 20401-0000 ROADWAY EXCAVATION

Tucci & Sons, Inc. $140.00 $910,000.00 Miles Resources $74.80 $486,200.00 Conway Construction Company $100.00 $650,000.00 MA DeAtley Construction Inc $105.00 $682,500.00 Interwest Construction, Inc. $37.00 $240,500.00 MidMountain Contractors, Inc $131.00 $851,500.00 Central Southern Construction Corp. $65.00 $422,500.00 Engineer's Estimate 6,500 CUYD $100.00 $650,000.00

A0400 20402-0000 SUBEXCAVATION

Tucci & Sons, Inc. $85.00 $977,500.00 Miles Resources $66.80 $768,200.00 Conway Construction Company $110.00 $1,265,000.00 MA DeAtley Construction Inc $105.00 $1,207,500.00 Interwest Construction, Inc. $117.00 $1,345,500.00 MidMountain Contractors, Inc $150.00 $1,725,000.00 Central Southern Construction Corp. $75.00 $862,500.00 Engineer's Estimate 11,500 CUYD $80.00 $920,000.00

7 out of 21

Project No: WA NP MORA 123(2)

Project Name: SR-123: Laughingwater Creek Bridge to Panther Creek Bridge

Schedule: A

Schedule Type: Base

Line Item Pay Item No. Description Quantity Unit Unit Price Amount

Number

A0420 20410-0000 SELECT BORROW

Tucci & Sons, Inc. $108.00 $702,000.00 Miles Resources $130.00 $845,000.00 Conway Construction Company $95.00 $617,500.00 MA DeAtley Construction Inc $150.00 $975,000.00 Interwest Construction, Inc. $82.00 $533,000.00 MidMountain Contractors, Inc $205.00 $1,332,500.00 Central Southern Construction Corp. $45.00 $292,500.00 Engineer's Estimate 6,500 CUYD $120.00 $780,000.00

A0440 20701-0100 SEPARATION-STABILIZATION GEOTEXTILE, CLASS 1, TYPE A

Tucci & Sons, Inc. $7.50 $900.00 Miles Resources $56.25 $6,750.00 Conway Construction Company $5.00 $600.00 MA DeAtley Construction Inc $77.00 $9,240.00 Interwest Construction, Inc. $18.00 $2,160.00 MidMountain Contractors, Inc $15.00 $1,800.00 Central Southern Construction Corp. $20.00 $2,400.00 Engineer's Estimate 120 SQYD $6.75 $810.00

A0460 20701-0400 SEPARATION-STABILIZATION GEOTEXTILE, CLASS 1, TYPE D (WOVEN)

Tucci & Sons, Inc. $4.00 $14,800.00 Miles Resources $14.00 $51,800.00 Conway Construction Company $5.00 $18,500.00 MA DeAtley Construction Inc $13.00 $48,100.00 Interwest Construction, Inc. $9.00 $33,300.00 MidMountain Contractors, Inc $7.50 $27,750.00 Central Southern Construction Corp. $25.00 $92,500.00 Engineer's Estimate 3,700 SQYD $3.65 $13,505.00

A0480 20701-0500 SEPARATION-STABILIZATION GEOTEXTILE, CLASS 1, TYPE E

Tucci & Sons, Inc. $3.75 $1,875.00 Miles Resources $37.50 $18,750.00 Conway Construction Company $5.00 $2,500.00 MA DeAtley Construction Inc $31.00 $15,500.00 Interwest Construction, Inc. $7.00 $3,500.00 MidMountain Contractors, Inc $15.50 $7,750.00 Central Southern Construction Corp. $25.00 $12,500.00 Engineer's Estimate 500 SQYD $3.65 $1,825.00

8 out of 21

Project No: WA NP MORA 123(2)

Project Name: SR-123: Laughingwater Creek Bridge to Panther Creek Bridge

Schedule: A

Schedule Type: Base

Line Item Pay Item No. Description Quantity Unit Unit Price Amount

Number

A0500 20703-2000 GEOGRID, STABILIZATION

Tucci & Sons, Inc. $3.00 $84,900.00 Miles Resources $6.40 $181,120.00 Conway Construction Company $5.00 $141,500.00 MA DeAtley Construction Inc $5.00 $141,500.00 Interwest Construction, Inc. $8.75 $247,625.00 MidMountain Contractors, Inc $7.00 $198,100.00 Central Southern Construction Corp. $15.00 $424,500.00 Engineer's Estimate 28,300 SQYD $3.10 $87,730.00

A0520 20820-0000 DEWATERING

Tucci & Sons, Inc. Lump Sum $474,000.00 Miles Resources Lump Sum $34,375.00 Conway Construction Company Lump Sum $150,000.00 MA DeAtley Construction Inc Lump Sum $100,000.00 Interwest Construction, Inc. Lump Sum $40,000.00 MidMountain Contractors, Inc Lump Sum $5,000.00 Central Southern Construction Corp. Lump Sum $150,000.00 Engineer's Estimate ALL LPSM Lump Sum $25,000.00

A0540 25101-0200 PLACED RIPRAP, METHOD A, CLASS 2

Tucci & Sons, Inc. $255.00 $12,750.00 Miles Resources $300.00 $15,000.00 Conway Construction Company $350.00 $17,500.00 MA DeAtley Construction Inc $470.00 $23,500.00 Interwest Construction, Inc. $375.00 $18,750.00 MidMountain Contractors, Inc $580.00 $29,000.00 Central Southern Construction Corp. $250.00 $12,500.00 Engineer's Estimate 50 CUYD $185.00 $9,250.00

A0560 25101-0400 PLACED RIPRAP, METHOD A, CLASS 4

Tucci & Sons, Inc. $151.00 $30,200.00 Miles Resources $325.00 $65,000.00 Conway Construction Company $270.00 $54,000.00 MA DeAtley Construction Inc $470.00 $94,000.00 Interwest Construction, Inc. $260.00 $52,000.00 MidMountain Contractors, Inc $230.00 $46,000.00 Central Southern Construction Corp. $400.00 $80,000.00 Engineer's Estimate 200 CUYD $205.00 $41,000.00

9 out of 21

Project No: WA NP MORA 123(2)

Project Name: SR-123: Laughingwater Creek Bridge to Panther Creek Bridge

Schedule: A

Schedule Type: Base

Line Item Pay Item No. Description Quantity Unit Unit Price Amount

Number

A0580 25126-0000 REMOVE AND RESET BOULDER

Tucci & Sons, Inc. $275.00 $12,375.00 Miles Resources $375.00 $16,875.00 Conway Construction Company $75.00 $3,375.00 MA DeAtley Construction Inc $1,200.00 $54,000.00 Interwest Construction, Inc. $200.00 $9,000.00 MidMountain Contractors, Inc $2,700.00 $121,500.00 Central Southern Construction Corp. $200.00 $9,000.00 Engineer's Estimate 45 EACH $260.00 $11,700.00

A0600 30302-1000 DITCH RECONDITIONING

Tucci & Sons, Inc. $9.00 $130,500.00 Miles Resources $5.62 $81,490.00 Conway Construction Company $9.00 $130,500.00 MA DeAtley Construction Inc $5.50 $79,750.00 Interwest Construction, Inc. $14.00 $203,000.00 MidMountain Contractors, Inc $18.00 $261,000.00 Central Southern Construction Corp. $15.00 $217,500.00 Engineer's Estimate 14,500 LNFT $6.20 $89,900.00

A0620 30801-1000 RECYCLED AGGREGATE BASE, 6-INCH DEPTH

Tucci & Sons, Inc. $13.75 $646,250.00 Miles Resources $8.55 $401,850.00 Conway Construction Company $13.00 $611,000.00 MA DeAtley Construction Inc $10.00 $470,000.00 Interwest Construction, Inc. $10.50 $493,500.00 MidMountain Contractors, Inc $17.00 $799,000.00 Central Southern Construction Corp. $25.00 $1,175,000.00 Engineer's Estimate 47,000 SQYD $13.00 $611,000.00

A0640 31303-0000 AGGREGATE-TOPSOIL COURSE

Tucci & Sons, Inc. $189.00 $18,900.00 Miles Resources $390.00 $39,000.00 Conway Construction Company $200.00 $20,000.00 MA DeAtley Construction Inc $1,150.00 $115,000.00 Interwest Construction, Inc. $550.00 $55,000.00 MidMountain Contractors, Inc $785.00 $78,500.00 Central Southern Construction Corp. $75.00 $7,500.00 Engineer's Estimate 100 CUYD $165.00 $16,500.00

10 out of 21

Project No: WA NP MORA 123(2)

Project Name: SR-123: Laughingwater Creek Bridge to Panther Creek Bridge

Schedule: A

Schedule Type: Base

Line Item Pay Item No. Description Quantity Unit Unit Price Amount

Number

A0660 40101-5600 ASPHALT CONCRETE PAVEMENT, GYRATORY MIX, 1/2-INCH OR 3/4-INCH NOMINAL MAXIMUM SIZE

AGGREGATE, 0.3 TO <3 MILLION ESAL (TYPE III PAVEMENT ROUGHNESS)

Tucci & Sons, Inc. $208.00 $1,976,000.00 Miles Resources $150.00 $1,425,000.00 Conway Construction Company $190.00 $1,805,000.00 MA DeAtley Construction Inc $175.00 $1,662,500.00 Interwest Construction, Inc. $232.00 $2,204,000.00 MidMountain Contractors, Inc $200.00 $1,900,000.00 Central Southern Construction Corp. $325.00 $3,087,500.00 Engineer's Estimate 9,500 TON $200.00 $1,900,000.00

A0720 41101-1000 PRIME COAT, METHOD 1 (GRADE CMS-2)

Tucci & Sons, Inc. $975.00 $34,125.00 Miles Resources $2,255.00 $78,925.00 Conway Construction Company $1,850.00 $64,750.00 MA DeAtley Construction Inc $600.00 $21,000.00 Interwest Construction, Inc. $2,140.00 $74,900.00 MidMountain Contractors, Inc $600.00 $21,000.00 Central Southern Construction Corp. $1,200.00 $42,000.00 Engineer's Estimate 35 TON $2,000.00 $70,000.00

A0740 41105-0000 BLOTTER

Tucci & Sons, Inc. $184.00 $110,400.00 Miles Resources $187.50 $112,500.00 Conway Construction Company $155.00 $93,000.00 MA DeAtley Construction Inc $175.00 $105,000.00 Interwest Construction, Inc. $178.00 $106,800.00 MidMountain Contractors, Inc $122.00 $73,200.00 Central Southern Construction Corp. $1,200.00 $720,000.00 Engineer's Estimate 600 TON $145.00 $87,000.00

A0760 41201-0000 TACK COAT

Tucci & Sons, Inc. $830.00 $16,600.00 Miles Resources $1,265.00 $25,300.00 Conway Construction Company $500.00 $10,000.00 MA DeAtley Construction Inc $1,590.00 $31,800.00 Interwest Construction, Inc. $1,500.00 $30,000.00 MidMountain Contractors, Inc $2,000.00 $40,000.00 Central Southern Construction Corp. $1,200.00 $24,000.00 Engineer's Estimate 20.0 TON $830.00 $16,600.00

11 out of 21

Project No: WA NP MORA 123(2)

Project Name: SR-123: Laughingwater Creek Bridge to Panther Creek Bridge

Schedule: A

Schedule Type: Base

Line Item Pay Item No. Description Quantity Unit Unit Price Amount

Number

A0780 41301-1300 ASPHALT PAVEMENT MILLING, 6-INCH DEPTH

Tucci & Sons, Inc. $5.30 $249,100.00 Miles Resources $7.41 $348,270.00 Conway Construction Company $7.00 $329,000.00 MA DeAtley Construction Inc $10.00 $470,000.00 Interwest Construction, Inc. $9.25 $434,750.00 MidMountain Contractors, Inc $17.00 $799,000.00 Central Southern Construction Corp. $10.00 $470,000.00 Engineer's Estimate 47,000 SQYD $6.00 $282,000.00

A0800 57501-0000 MINOR BRIDGE WORK (THIN EPOXY OVERLAY)

Tucci & Sons, Inc. Lump Sum $124,000.00 Miles Resources Lump Sum $126,500.00 Conway Construction Company Lump Sum $150,000.00 MA DeAtley Construction Inc Lump Sum $110,000.00 Interwest Construction, Inc. Lump Sum $150,000.00 MidMountain Contractors, Inc Lump Sum $125,000.00 Central Southern Construction Corp. Lump Sum $50,000.00 Engineer's Estimate ALL LPSM Lump Sum $125,000.00

A0820 60201-0800 24-INCH PIPE CULVERT

Tucci & Sons, Inc. $450.00 $153,000.00 Miles Resources $425.00 $144,500.00 Conway Construction Company $600.00 $204,000.00 MA DeAtley Construction Inc $400.00 $136,000.00 Interwest Construction, Inc. $355.00 $120,700.00 MidMountain Contractors, Inc $525.00 $178,500.00 Central Southern Construction Corp. $350.00 $119,000.00 Engineer's Estimate 340 LNFT $205.00 $69,700.00

A0840 60210-0800 END SECTION FOR 24-INCH PIPE CULVERT

Tucci & Sons, Inc. $4,000.00 $28,000.00 Miles Resources $2,625.00 $18,375.00 Conway Construction Company $2,000.00 $14,000.00 MA DeAtley Construction Inc $2,500.00 $17,500.00 Interwest Construction, Inc. $1,750.00 $12,250.00 MidMountain Contractors, Inc $2,750.00 $19,250.00 Central Southern Construction Corp. $3,500.00 $24,500.00 Engineer's Estimate 7 EACH $760.00 $5,320.00

12 out of 21

Project No: WA NP MORA 123(2)

Project Name: SR-123: Laughingwater Creek Bridge to Panther Creek Bridge

Schedule: A

Schedule Type: Base

Line Item Pay Item No. Description Quantity Unit Unit Price Amount

Number

A0860 60220-0350 4 FEET SPAN, 4 FEET RISE PRECAST REINFORCED CONCRETE BOX CULVERT

Tucci & Sons, Inc. $4,500.00 $243,000.00 Miles Resources $4,344.00 $234,576.00 Conway Construction Company $7,500.00 $405,000.00 MA DeAtley Construction Inc $4,000.00 $216,000.00 Interwest Construction, Inc. $3,700.00 $199,800.00 MidMountain Contractors, Inc $6,000.00 $324,000.00 Central Southern Construction Corp. $10,000.00 $540,000.00 Engineer's Estimate 54 LNFT $2,100.00 $113,400.00

A0880 60220-2600 9 FEET SPAN, 9 FEET RISE PRECAST REINFORCED CONCRETE BOX CULVERT

Tucci & Sons, Inc. $7,800.00 $421,200.00 Miles Resources $8,625.00 $465,750.00 Conway Construction Company $15,000.00 $810,000.00 MA DeAtley Construction Inc $8,500.00 $459,000.00 Interwest Construction, Inc. $10,100.00 $545,400.00 MidMountain Contractors, Inc $11,150.00 $602,100.00 Central Southern Construction Corp. $23,000.00 $1,242,000.00 Engineer's Estimate 54 LNFT $7,000.00 $378,000.00

A0900 60501-0000 STANDARD UNDERDRAIN SYSTEM

Tucci & Sons, Inc. $13.50 $71,685.00 Miles Resources $33.65 $178,681.50 Conway Construction Company $33.00 $175,230.00 MA DeAtley Construction Inc $49.00 $260,190.00 Interwest Construction, Inc. $27.00 $143,370.00 MidMountain Contractors, Inc $27.00 $143,370.00 Central Southern Construction Corp. $200.00 $1,062,000.00 Engineer's Estimate 5,310 LNFT $55.00 $292,050.00

A0920 60704-0000 CLEANING CULVERT IN PLACE

Tucci & Sons, Inc. $2,000.00 $8,000.00 Miles Resources $1,875.00 $7,500.00 Conway Construction Company $1,500.00 $6,000.00 MA DeAtley Construction Inc $3,400.00 $13,600.00 Interwest Construction, Inc. $5,000.00 $20,000.00 MidMountain Contractors, Inc $2,550.00 $10,200.00 Central Southern Construction Corp. $10,000.00 $40,000.00 Engineer's Estimate 4 EACH $1,700.00 $6,800.00

13 out of 21

Project No: WA NP MORA 123(2)

Project Name: SR-123: Laughingwater Creek Bridge to Panther Creek Bridge

Schedule: A

Schedule Type: Base

Line Item Pay Item No. Description Quantity Unit Unit Price Amount

Number

A0940 60705-0000 REPAIRING DRAINAGE STRUCTURE

Tucci & Sons, Inc. $5,400.00 $5,400.00 Miles Resources $2,250.00 $2,250.00 Conway Construction Company $1,500.00 $1,500.00 MA DeAtley Construction Inc $3,500.00 $3,500.00 Interwest Construction, Inc. $2,500.00 $2,500.00 MidMountain Contractors, Inc $2,800.00 $2,800.00 Central Southern Construction Corp. $7,500.00 $7,500.00 Engineer's Estimate 1 EACH $2,500.00 $2,500.00

A0960 62002-1000 CLASS B MASONRY, ROCK FACE FINISH (GOVERNMENT FURNISHED STONE)

Tucci & Sons, Inc. $1,900.00 $209,000.00 Miles Resources $8,285.00 $911,350.00 Conway Construction Company $1,200.00 $132,000.00 MA DeAtley Construction Inc $2,850.00 $313,500.00 Interwest Construction, Inc. $1,790.00 $196,900.00 MidMountain Contractors, Inc $4,000.00 $440,000.00 Central Southern Construction Corp. $400.00 $44,000.00 Engineer's Estimate 110 SQYD $2,400.00 $264,000.00

A0980 62011-0500 STONE MASONRY HEADWALL FOR 24-INCH PIPE CULVERT (GOVERNMENT FURNISHED STONE)

Tucci & Sons, Inc. $20,000.00 $140,000.00 Miles Resources $51,450.00 $360,150.00 Conway Construction Company $6,000.00 $42,000.00 MA DeAtley Construction Inc $9,000.00 $63,000.00 Interwest Construction, Inc. $14,000.00 $98,000.00 MidMountain Contractors, Inc $23,000.00 $161,000.00 Central Southern Construction Corp. $650.00 $4,550.00 Engineer's Estimate 7 EACH $21,000.00 $147,000.00

A1000 62201-0250 DUMP TRUCK, 10 CUBIC YARD MINIMUM CAPACITY

Tucci & Sons, Inc. $200.00 $8,000.00 Miles Resources $224.00 $8,960.00 Conway Construction Company $200.00 $8,000.00 MA DeAtley Construction Inc $275.00 $11,000.00 Interwest Construction, Inc. $295.00 $11,800.00 MidMountain Contractors, Inc $175.00 $7,000.00 Central Southern Construction Corp. $200.00 $8,000.00 Engineer's Estimate 40 HOUR $235.00 $9,400.00

14 out of 21

Project No: WA NP MORA 123(2)

Project Name: SR-123: Laughingwater Creek Bridge to Panther Creek Bridge

Schedule: A

Schedule Type: Base

Line Item Pay Item No. Description Quantity Unit Unit Price Amount

Number

A1020 62201-0950 WHEEL LOADER, 3 CUBIC YARD MINIMUM RATED CAPACITY

Tucci & Sons, Inc. $192.00 $7,680.00 Miles Resources $355.00 $14,200.00 Conway Construction Company $175.00 $7,000.00 MA DeAtley Construction Inc $350.00 $14,000.00 Interwest Construction, Inc. $255.00 $10,200.00 MidMountain Contractors, Inc $220.00 $8,800.00 Central Southern Construction Corp. $200.00 $8,000.00 Engineer's Estimate 40 HOUR $195.00 $7,800.00

A1040 62201-2800 MOTOR GRADER, 8 FOOT MINIMUM BLADE

Tucci & Sons, Inc. $200.00 $8,000.00 Miles Resources $284.00 $11,360.00 Conway Construction Company $210.00 $8,400.00 MA DeAtley Construction Inc $420.00 $16,800.00 Interwest Construction, Inc. $305.00 $12,200.00 MidMountain Contractors, Inc $280.00 $11,200.00 Central Southern Construction Corp. $300.00 $12,000.00 Engineer's Estimate 40 HOUR $235.00 $9,400.00

A1060 62201-3150 HYDRAULIC EXCAVATOR, CRAWLER MOUNTED, 1.0 CUBIC YARD MINIMUM CAPACITY WITH THUMB

ATTACHMENT

Tucci & Sons, Inc. $270.00 $10,800.00 Miles Resources $283.00 $11,320.00 Conway Construction Company $220.00 $8,800.00 MA DeAtley Construction Inc $400.00 $16,000.00 Interwest Construction, Inc. $305.00 $12,200.00 MidMountain Contractors, Inc $230.00 $9,200.00 Central Southern Construction Corp. $300.00 $12,000.00 Engineer's Estimate 40 HOUR $240.00 $9,600.00

A1080 62301-0000 GENERAL LABOR

Tucci & Sons, Inc. $88.00 $3,520.00 Miles Resources $95.50 $3,820.00 Conway Construction Company $90.00 $3,600.00 MA DeAtley Construction Inc $160.00 $6,400.00 Interwest Construction, Inc. $110.00 $4,400.00 MidMountain Contractors, Inc $104.00 $4,160.00 Central Southern Construction Corp. $50.00 $2,000.00 Engineer's Estimate 40 HOUR $90.00 $3,600.00

15 out of 21

Project No: WA NP MORA 123(2)

Project Name: SR-123: Laughingwater Creek Bridge to Panther Creek Bridge

Schedule: A

Schedule Type: Base

Line Item Pay Item No. Description Quantity Unit Unit Price Amount

Number

A1100 62405-0300 PLACING CONSERVED TOPSOIL, 4-INCH DEPTH

Tucci & Sons, Inc. $12.00 $48,000.00 Miles Resources $10.63 $42,520.00 Conway Construction Company $5.00 $20,000.00 MA DeAtley Construction Inc $14.00 $56,000.00 Interwest Construction, Inc. $9.00 $36,000.00 MidMountain Contractors, Inc $24.00 $96,000.00 Central Southern Construction Corp. $30.00 $120,000.00 Engineer's Estimate 4,000 SQYD $5.25 $21,000.00

A1120 62901-0000 ROLLED EROSION CONTROL PRODUCT

Tucci & Sons, Inc. $11.00 $26,400.00 Miles Resources $6.65 $15,960.00 Conway Construction Company $10.00 $24,000.00 MA DeAtley Construction Inc $5.00 $12,000.00 Interwest Construction, Inc. $5.00 $12,000.00 MidMountain Contractors, Inc $15.00 $36,000.00 Central Southern Construction Corp. $20.00 $48,000.00 Engineer's Estimate 2,400 SQYD $15.00 $36,000.00

A1140 63302-0000 SIGN SYSTEM

Tucci & Sons, Inc. $700.00 $77,000.00 Miles Resources $525.00 $57,750.00 Conway Construction Company $300.00 $33,000.00 MA DeAtley Construction Inc $250.00 $27,500.00 Interwest Construction, Inc. $150.00 $16,500.00 MidMountain Contractors, Inc $150.00 $16,500.00 Central Southern Construction Corp. $200.00 $22,000.00 Engineer's Estimate 110.00 SQFT $165.00 $18,150.00

A1160 63308-3000 OBJECT MARKER, TYPE 3

Tucci & Sons, Inc. $950.00 $7,600.00 Miles Resources $869.00 $6,952.00 Conway Construction Company $250.00 $2,000.00 MA DeAtley Construction Inc $1,000.00 $8,000.00 Interwest Construction, Inc. $800.00 $6,400.00 MidMountain Contractors, Inc $360.00 $2,880.00 Central Southern Construction Corp. $100.00 $800.00 Engineer's Estimate 8 EACH $415.00 $3,320.00

16 out of 21

Project No: WA NP MORA 123(2)

Project Name: SR-123: Laughingwater Creek Bridge to Panther Creek Bridge

Schedule: A

Schedule Type: Base

Line Item Pay Item No. Description Quantity Unit Unit Price Amount

Number

A1180 63316-1000 REMOVE AND RESET SIGN

Tucci & Sons, Inc. $800.00 $1,600.00 Miles Resources $312.50 $625.00 Conway Construction Company $450.00 $900.00 MA DeAtley Construction Inc $1,400.00 $2,800.00 Interwest Construction, Inc. $750.00 $1,500.00 MidMountain Contractors, Inc $900.00 $1,800.00 Central Southern Construction Corp. $200.00 $400.00 Engineer's Estimate 2 EACH $375.00 $750.00

A1200 63401-0300 PAVEMENT MARKINGS, TYPE B, SOLID

Tucci & Sons, Inc. $0.25 $37,250.00 Miles Resources $0.30 $44,700.00 Conway Construction Company $0.30 $44,700.00 MA DeAtley Construction Inc $0.25 $37,250.00 Interwest Construction, Inc. $0.29 $43,210.00 MidMountain Contractors, Inc $0.50 $74,500.00 Central Southern Construction Corp. $2.00 $298,000.00 Engineer's Estimate 149,000 LNFT $0.25 $37,250.00

A1220 63401-0400 PAVEMENT MARKINGS, TYPE B, BROKEN (YELLOW)

Tucci & Sons, Inc. $0.20 $1,900.00 Miles Resources $0.20 $1,900.00 Conway Construction Company $0.25 $2,375.00 MA DeAtley Construction Inc $0.35 $3,325.00 Interwest Construction, Inc. $0.19 $1,805.00 MidMountain Contractors, Inc $0.20 $1,900.00 Central Southern Construction Corp. $1.50 $14,250.00 Engineer's Estimate 9,500 LNFT $0.50 $4,750.00

A1240 63403-0900 PAVEMENT MARKINGS, TYPE I

Tucci & Sons, Inc. $40.00 $2,000.00 Miles Resources $43.85 $2,192.50 Conway Construction Company $10.00 $500.00 MA DeAtley Construction Inc $35.00 $1,750.00 Interwest Construction, Inc. $42.00 $2,100.00 MidMountain Contractors, Inc $45.00 $2,250.00 Central Southern Construction Corp. $250.00 $12,500.00 Engineer's Estimate 50 SQFT $6.50 $325.00

17 out of 21

Project No: WA NP MORA 123(2)

Project Name: SR-123: Laughingwater Creek Bridge to Panther Creek Bridge

Schedule: A

Schedule Type: Base

Line Item Pay Item No. Description Quantity Unit Unit Price Amount

Number

A1260 63405-0050 PAVEMENT MARKINGS, SYMBOLS

Tucci & Sons, Inc. $1,100.00 $1,100.00 Miles Resources $1,190.00 $1,190.00 Conway Construction Company $500.00 $500.00 MA DeAtley Construction Inc $500.00 $500.00 Interwest Construction, Inc. $1,130.00 $1,130.00 MidMountain Contractors, Inc $1,000.00 $1,000.00 Central Southern Construction Corp. $300.00 $300.00 Engineer's Estimate 1 EACH $620.00 $620.00

A1280 63502-0600 TEMPORARY TRAFFIC CONTROL, BARRICADE TYPE 3 (8 FEET WIDE)

Tucci & Sons, Inc. $185.00 $1,110.00 Miles Resources $410.00 $2,460.00 Conway Construction Company $300.00 $1,800.00 MA DeAtley Construction Inc $750.00 $4,500.00 Interwest Construction, Inc. $500.00 $3,000.00 MidMountain Contractors, Inc $265.00 $1,590.00 Central Southern Construction Corp. $200.00 $1,200.00 Engineer's Estimate 6 EACH $175.00 $1,050.00

A1300 63502-1050 TEMPORARY TRAFFIC CONTROL, TUBULAR MARKER

Tucci & Sons, Inc. $22.00 $2,200.00 Miles Resources $43.75 $4,375.00 Conway Construction Company $20.00 $2,000.00 MA DeAtley Construction Inc $70.00 $7,000.00 Interwest Construction, Inc. $52.00 $5,200.00 MidMountain Contractors, Inc $67.00 $6,700.00 Central Southern Construction Corp. $50.00 $5,000.00 Engineer's Estimate 100 EACH $30.00 $3,000.00

A1320 63502-1600 TEMPORARY TRAFFIC CONTROL, WARNING LIGHT TYPE B

Tucci & Sons, Inc. $95.00 $570.00 Miles Resources $62.50 $375.00 Conway Construction Company $150.00 $900.00 MA DeAtley Construction Inc $200.00 $1,200.00 Interwest Construction, Inc. $400.00 $2,400.00 MidMountain Contractors, Inc $33.00 $198.00 Central Southern Construction Corp. $100.00 $600.00 Engineer's Estimate 6 EACH $135.00 $810.00

18 out of 21

Project No: WA NP MORA 123(2)

Project Name: SR-123: Laughingwater Creek Bridge to Panther Creek Bridge

Schedule: A

Schedule Type: Base

Line Item Pay Item No. Description Quantity Unit Unit Price Amount

Number

A1340 63502-1700 TEMPORARY TRAFFIC CONTROL, WARNING LIGHT TYPE C

Tucci & Sons, Inc. $107.00 $856.00 Miles Resources $62.50 $500.00 Conway Construction Company $100.00 $800.00 MA DeAtley Construction Inc $200.00 $1,600.00 Interwest Construction, Inc. $450.00 $3,600.00 MidMountain Contractors, Inc $33.00 $264.00 Central Southern Construction Corp. $150.00 $1,200.00 Engineer's Estimate 8 EACH $115.00 $920.00

A1360 63502-2000 TEMPORARY TRAFFIC CONTROL, PORTABLE CHANGEABLE MESSAGE SIGN

Tucci & Sons, Inc. $17,000.00 $51,000.00 Miles Resources $16,500.00 $49,500.00 Conway Construction Company $35,000.00 $105,000.00 MA DeAtley Construction Inc $20,000.00 $60,000.00 Interwest Construction, Inc. $18,500.00 $55,500.00 MidMountain Contractors, Inc $1,600.00 $4,800.00 Central Southern Construction Corp. $12,000.00 $36,000.00 Engineer's Estimate 3 EACH $17,000.00 $51,000.00

A1380 63503-0400 TEMPORARY TRAFFIC CONTROL, CONCRETE BARRIER (WITH GATE, CHAIN)

Tucci & Sons, Inc. $160.00 $3,200.00 Miles Resources $72.00 $1,440.00 Conway Construction Company $200.00 $4,000.00 MA DeAtley Construction Inc $400.00 $8,000.00 Interwest Construction, Inc. $150.00 $3,000.00 MidMountain Contractors, Inc $150.00 $3,000.00 Central Southern Construction Corp. $150.00 $3,000.00 Engineer's Estimate 20 LNFT $250.00 $5,000.00

A1400 63503-0700 TEMPORARY TRAFFIC CONTROL, PAVEMENT MARKINGS

Tucci & Sons, Inc. $1.30 $13,650.00 Miles Resources $1.06 $11,130.00 Conway Construction Company $1.00 $10,500.00 MA DeAtley Construction Inc $0.50 $5,250.00 Interwest Construction, Inc. $1.60 $16,800.00 MidMountain Contractors, Inc $7.00 $73,500.00 Central Southern Construction Corp. $2.00 $21,000.00 Engineer's Estimate 10,500 LNFT $1.00 $10,500.00

19 out of 21

Project No: WA NP MORA 123(2)

Project Name: SR-123: Laughingwater Creek Bridge to Panther Creek Bridge

Schedule: A

Schedule Type: Base

Line Item Pay Item No. Description Quantity Unit Unit Price Amount

Number

A1420 63503-1000 TEMPORARY TRAFFIC CONTROL, PLASTIC FENCE

Tucci & Sons, Inc. $20.00 $14,000.00 Miles Resources $7.11 $4,977.00 Conway Construction Company $5.00 $3,500.00 MA DeAtley Construction Inc $11.00 $7,700.00 Interwest Construction, Inc. $12.00 $8,400.00 MidMountain Contractors, Inc $11.00 $7,700.00 Central Southern Construction Corp. $15.00 $10,500.00 Engineer's Estimate 700 LNFT $5.50 $3,850.00

A1440 63504-1000 TEMPORARY TRAFFIC CONTROL, CONSTRUCTION SIGN

Tucci & Sons, Inc. $29.00 $26,970.00 Miles Resources $49.25 $45,802.50 Conway Construction Company $40.00 $37,200.00 MA DeAtley Construction Inc $60.00 $55,800.00 Interwest Construction, Inc. $95.00 $88,350.00 MidMountain Contractors, Inc $57.00 $53,010.00 Central Southern Construction Corp. $25.00 $23,250.00 Engineer's Estimate 930.0 SQFT $40.00 $37,200.00

A1460 63506-0500 TEMPORARY TRAFFIC CONTROL, FLAGGER

Tucci & Sons, Inc. $76.25 $571,875.00 Miles Resources $110.75 $830,625.00 Conway Construction Company $90.00 $675,000.00 MA DeAtley Construction Inc $95.00 $712,500.00 Interwest Construction, Inc. $80.50 $603,750.00 MidMountain Contractors, Inc $105.00 $787,500.00 Central Southern Construction Corp. $50.00 $375,000.00 Engineer's Estimate 7,500 HOUR $85.00 $637,500.00

A1480 63507-0600 TEMPORARY TRAFFIC CONTROL, PILOT CAR

Tucci & Sons, Inc. $1,025.00 $220,375.00 Miles Resources $126.60 $27,219.00 Conway Construction Company $1,500.00 $322,500.00 MA DeAtley Construction Inc $1,100.00 $236,500.00 Interwest Construction, Inc. $1,200.00 $258,000.00 MidMountain Contractors, Inc $1,600.00 $344,000.00 Central Southern Construction Corp. $300.00 $64,500.00 Engineer's Estimate 215 DAY $1,250.00 $268,750.00

20 out of 21

Project No: WA NP MORA 123(2)

Project Name: SR-123: Laughingwater Creek Bridge to Panther Creek Bridge

Schedule: A

Schedule Type: Base

Line Item Pay Item No. Description Quantity Unit Unit Price Amount

Number

A1500 63507-0700 TEMPORARY TRAFFIC CONTROL, TRAFFIC CONTROL SUPERVISOR

Tucci & Sons, Inc. $1,500.00 $450,000.00 Miles Resources $1,163.00 $348,900.00 Conway Construction Company $1,600.00 $480,000.00 MA DeAtley Construction Inc $1,400.00 $420,000.00 Interwest Construction, Inc. $1,475.00 $442,500.00 MidMountain Contractors, Inc $1,500.00 $450,000.00 Central Southern Construction Corp. $1,000.00 $300,000.00 Engineer's Estimate 300 DAY $1,150.00 $345,000.00

A1520 63601-6000 SYSTEM INSTALLATION, TRAFFIC DETECTOR SYSTEM

Tucci & Sons, Inc. Lump Sum $28,000.00 Miles Resources Lump Sum $93,750.00 Conway Construction Company Lump Sum $30,000.00 MA DeAtley Construction Inc Lump Sum $28,000.00 Interwest Construction, Inc. Lump Sum $29,000.00 MidMountain Contractors, Inc Lump Sum $30,000.00 Central Southern Construction Corp. Lump Sum $20,000.00 Engineer's Estimate ALL LPSM Lump Sum $15,000.00

A1540 63701-0000 FIELD OFFICE

Tucci & Sons, Inc. $3,100.00 $80,600.00 Miles Resources $9,250.00 $240,500.00 Conway Construction Company $4,000.00 $104,000.00 MA DeAtley Construction Inc $4,300.00 $111,800.00 Interwest Construction, Inc. $5,000.00 $130,000.00 MidMountain Contractors, Inc $4,500.00 $117,000.00 Central Southern Construction Corp. $100,000.00 $2,600,000.00 Engineer's Estimate 26 EACH $3,300.00 $85,800.00

A1560 64704-1600 MITIGATION, STREAMBED CHANNEL RECONSTRUCTION

Tucci & Sons, Inc. $260.00 $71,500.00 Miles Resources $250.00 $68,750.00 Conway Construction Company $150.00 $41,250.00 MA DeAtley Construction Inc $400.00 $110,000.00 Interwest Construction, Inc. $225.00 $61,875.00 MidMountain Contractors, Inc $250.00 $68,750.00 Central Southern Construction Corp. $350.00 $96,250.00 Engineer's Estimate 275 CUYD $75.00 $20,625.00

21 out of 21

Project No: WA NP MORA 123(2)

Project Name: SR-123: Laughingwater Creek Bridge to Panther Creek Bridge

Schedule: A

Schedule Type: Base

Line Item Pay Item No. Description Quantity Unit Unit Price Amount

Number

Total Schedule - All Items

Tucci & Sons, Inc. $11,431,888.00 Miles Resources $12,600,377.20 Conway Construction Company $13,363,880.00 MA DeAtley Construction Inc $13,461,140.00 Interwest Construction, Inc. $13,899,444.00 MidMountain Contractors, Inc $16,690,800.00 Central Southern Construction Corp. $17,414,610.00 Engineer's Estimate $10,383,290.00

2024-08-01T11:28:50-0700
MARINO CHEA