This document is a Tabulation of Bids for the Federal Highway Administration contract opportunity WA NP MORA 123(2) - SR-123: Laughingwater Creek Bridge to Panther Creek Bridge. The contract was awarded for a base schedule on July 31, 2024. The Engineer's Estimate for the project was $10,383,290, and the low bid of $11,431,888 was submitted by Tucci & Sons, Inc. The contract includes mobilization, construction survey and staking, contractor quality control, contractor testing, construction scheduling, soil erosion control measures, clearing and grubbing, pipe culvert removal, paved waterway and stone masonry removal, roadway excavation, select borrow, geotextiles, geogrid stabilization, placed riprap, and asphalt concrete paving. The contract will be performed in Mt. Rainier National Park in the state of Washington.
View the file
Other files
Show all 37
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Tabulation of Bids Report Date: 08/01/24
1 out of 21
Project No: WA NP MORA 123(2)
Project Name: SR-123: Laughingwater Creek Bridge to Panther Creek Bridge
Schedule: A
Schedule Type: Base
Solcitation No: 69056723B000008
Division: Western Federal Lands
State: WA County: Lewis, Pierce
Federal Land: Mt. Rainier National Park Opened at: Vancouver, WA
Opened by: Marino Chea
Date: 07/31/24
I certify that this Bid Tabulation accurately reflects the offers received for this solicitation.
Signed: _______________________________
Title: _______________________________
Date: _______________________________
Contract Awarded to: ____________________ Award Date: ____________________
Contractor Comment Bid Amount Responsive
Tucci & Sons, Inc. $11,431,888.00 4224 Waller Road E.
Tacoma, WA 98443
Miles Resources $12,600,377.20 400 Valley Ave NE Ouyallup, WA 98372
Conway Construction Company $13,363,880.00 6620 NW Whitney Road Vancouver, WA 98665
MA DeAtley Construction Inc $13,461,140.00 829 Evans Rd.
Clarkston, WA 99403
Interwest Construction, Inc. $13,899,444.00 609 North Hill Blvd.
Burlington, WA 98233
MidMountain Contractors, Inc $16,690,800.00 Bellevue, WA 98004
Central Southern Construction Corp. $17,414,610.00 119 Sewald Street Jacksonville, FL 32204
Engineer's Estimate $10,383,290.00
2 out of 21
Project No: WA NP MORA 123(2)
Project Name: SR-123: Laughingwater Creek Bridge to Panther Creek Bridge
Schedule: A
Schedule Type: Base
Line Item Pay Item No. Description Quantity Unit Unit Price Amount
Number
A0020 15101-0000 MOBILIZATION
Tucci & Sons, Inc. Lump Sum $950,422.00 Miles Resources Lump Sum $1,250,000.00 Conway Construction Company Lump Sum $1,965,000.00 MA DeAtley Construction Inc Lump Sum $1,550,000.00 Interwest Construction, Inc. Lump Sum $1,438,000.00 MidMountain Contractors, Inc Lump Sum $1,650,000.00 Central Southern Construction Corp. Lump Sum $947,320.00 Engineer's Estimate ALL LPSM Lump Sum $945,000.00
A0040 15201-0000 CONSTRUCTION SURVEY AND STAKING
Tucci & Sons, Inc. Lump Sum $78,000.00 Miles Resources Lump Sum $296,000.00 Conway Construction Company Lump Sum $250,000.00 MA DeAtley Construction Inc Lump Sum $250,000.00 Interwest Construction, Inc. Lump Sum $260,799.00 MidMountain Contractors, Inc Lump Sum $200,000.00 Central Southern Construction Corp. Lump Sum $178,960.00 Engineer's Estimate ALL LPSM Lump Sum $178,000.00
A0060 15301-0010 CONTRACTOR QUALITY CONTROL AND ASSURANCE
Tucci & Sons, Inc. Lump Sum $250,000.00 Miles Resources Lump Sum $288,000.00 Conway Construction Company Lump Sum $300,000.00 MA DeAtley Construction Inc Lump Sum $600,000.00 Interwest Construction, Inc. Lump Sum $1,175,000.00 MidMountain Contractors, Inc Lump Sum $550,000.00 Central Southern Construction Corp. Lump Sum $190,210.00 Engineer's Estimate ALL LPSM Lump Sum $178,000.00
A0080 15401-0000 CONTRACTOR TESTING
Tucci & Sons, Inc. Lump Sum $146,000.00 Miles Resources Lump Sum $270,000.00 Conway Construction Company Lump Sum $250,000.00 MA DeAtley Construction Inc Lump Sum $300,000.00 Interwest Construction, Inc. Lump Sum $350,000.00 MidMountain Contractors, Inc Lump Sum $764,258.00 Central Southern Construction Corp. Lump Sum $216,470.00 Engineer's Estimate ALL LPSM Lump Sum $178,000.00
3 out of 21
Project No: WA NP MORA 123(2)
Project Name: SR-123: Laughingwater Creek Bridge to Panther Creek Bridge
Schedule: A
Schedule Type: Base
Line Item Pay Item No. Description Quantity Unit Unit Price Amount
Number
A0100 15501-0000 CONSTRUCTION SCHEDULE
Tucci & Sons, Inc. Lump Sum $6,000.00 Miles Resources Lump Sum $376,000.00 Conway Construction Company Lump Sum $50,000.00 MA DeAtley Construction Inc Lump Sum $50,000.00 Interwest Construction, Inc. Lump Sum $150,000.00 MidMountain Contractors, Inc Lump Sum $6,000.00 Central Southern Construction Corp. Lump Sum $20,000.00 Engineer's Estimate ALL LPSM Lump Sum $50,000.00
A0120 15705-0100 SOIL EROSION CONTROL, SILT FENCE
Tucci & Sons, Inc. $10.00 $18,000.00 Miles Resources $7.11 $12,798.00 Conway Construction Company $8.00 $14,400.00 MA DeAtley Construction Inc $7.00 $12,600.00 Interwest Construction, Inc. $10.00 $18,000.00 MidMountain Contractors, Inc $18.00 $32,400.00 Central Southern Construction Corp. $15.00 $27,000.00 Engineer's Estimate 1,800 LNFT $9.30 $16,740.00
A0140 15705-1400 SOIL EROSION CONTROL, FIBER ROLL
Tucci & Sons, Inc. $10.00 $13,000.00 Miles Resources $8.13 $10,569.00 Conway Construction Company $6.00 $7,800.00 MA DeAtley Construction Inc $6.00 $7,800.00 Interwest Construction, Inc. $35.00 $45,500.00 MidMountain Contractors, Inc $18.00 $23,400.00 Central Southern Construction Corp. $10.00 $13,000.00 Engineer's Estimate 1,300 LNFT $7.50 $9,750.00
A0160 15705-1800 SOIL EROSION CONTROL, TEMPORARY DIVERSION BERM
Tucci & Sons, Inc. $550.00 $55,000.00 Miles Resources $187.50 $18,750.00 Conway Construction Company $285.00 $28,500.00 MA DeAtley Construction Inc $300.00 $30,000.00 Interwest Construction, Inc. $205.00 $20,500.00 MidMountain Contractors, Inc $510.00 $51,000.00 Central Southern Construction Corp. $500.00 $50,000.00 Engineer's Estimate 100 LNFT $170.00 $17,000.00
4 out of 21
Project No: WA NP MORA 123(2)
Project Name: SR-123: Laughingwater Creek Bridge to Panther Creek Bridge
Schedule: A
Schedule Type: Base
Line Item Pay Item No. Description Quantity Unit Unit Price Amount
Number
A0180 15706-0200 SOIL EROSION CONTROL, CHECK DAM (FIBER ROLL)
Tucci & Sons, Inc. $240.00 $38,400.00 Miles Resources $187.50 $30,000.00 Conway Construction Company $100.00 $16,000.00 MA DeAtley Construction Inc $150.00 $24,000.00 Interwest Construction, Inc. $275.00 $44,000.00 MidMountain Contractors, Inc $215.00 $34,400.00 Central Southern Construction Corp. $25.00 $4,000.00 Engineer's Estimate 160 EACH $85.00 $13,600.00
A0200 15706-1100 SOIL EROSION CONTROL, INLET PROTECTION TYPE A
Tucci & Sons, Inc. $450.00 $900.00 Miles Resources $147.85 $295.70 Conway Construction Company $200.00 $400.00 MA DeAtley Construction Inc $150.00 $300.00 Interwest Construction, Inc. $300.00 $600.00 MidMountain Contractors, Inc $850.00 $1,700.00 Central Southern Construction Corp. $500.00 $1,000.00 Engineer's Estimate 2 EACH $230.00 $460.00
A0220 15706-1600 SOIL EROSION CONTROL, STABILIZED CONSTRUCTION EXIT
Tucci & Sons, Inc. $8,200.00 $82,000.00 Miles Resources $11,250.00 $112,500.00 Conway Construction Company $5,000.00 $50,000.00 MA DeAtley Construction Inc $3,200.00 $32,000.00 Interwest Construction, Inc. $9,000.00 $90,000.00 MidMountain Contractors, Inc $3,650.00 $36,500.00 Central Southern Construction Corp. $1,000.00 $10,000.00 Engineer's Estimate 10 EACH $4,000.00 $40,000.00
A0240 15802-0000 WATERING FOR DUST CONTROL
Tucci & Sons, Inc. Lump Sum $500.00 Miles Resources Lump Sum $80,760.00 Conway Construction Company Lump Sum $350,000.00 MA DeAtley Construction Inc Lump Sum $400,000.00 Interwest Construction, Inc. Lump Sum $640,000.00 MidMountain Contractors, Inc Lump Sum $280,000.00 Central Southern Construction Corp. Lump Sum $65,000.00 Engineer's Estimate ALL LPSM Lump Sum $20,000.00
5 out of 21
Project No: WA NP MORA 123(2)
Project Name: SR-123: Laughingwater Creek Bridge to Panther Creek Bridge
Schedule: A
Schedule Type: Base
Line Item Pay Item No. Description Quantity Unit Unit Price Amount
Number
A0260 20103-0000 CLEARING AND GRUBBING
Tucci & Sons, Inc. $4.75 $18,525.00 Miles Resources $2.69 $10,491.00 Conway Construction Company $30.00 $117,000.00 MA DeAtley Construction Inc $28.00 $109,200.00 Interwest Construction, Inc. $14.00 $54,600.00 MidMountain Contractors, Inc $60.00 $234,000.00 Central Southern Construction Corp. $50.00 $195,000.00 Engineer's Estimate 3,900 SQYD $5.20 $20,280.00
A0280 20220-1000 REMOVAL, INDIVIDUAL TREE
Tucci & Sons, Inc. $925.00 $9,250.00 Miles Resources $212.50 $2,125.00 Conway Construction Company $3,000.00 $30,000.00 MA DeAtley Construction Inc $900.00 $9,000.00 Interwest Construction, Inc. $1,500.00 $15,000.00 MidMountain Contractors, Inc $2,500.00 $25,000.00 Central Southern Construction Corp. $5,000.00 $50,000.00 Engineer's Estimate 10 EACH $2,200.00 $22,000.00
A0300 20301-1900 REMOVAL OF PIPE CULVERT
Tucci & Sons, Inc. $830.00 $1,660.00 Miles Resources $8,281.00 $16,562.00 Conway Construction Company $2,000.00 $4,000.00 MA DeAtley Construction Inc $5,500.00 $11,000.00 Interwest Construction, Inc. $10,000.00 $20,000.00 MidMountain Contractors, Inc $1,500.00 $3,000.00 Central Southern Construction Corp. $15,000.00 $30,000.00 Engineer's Estimate 2 EACH $2,200.00 $4,400.00
A0320 20301-2300 REMOVAL OF SIGN/MARKER
Tucci & Sons, Inc. $135.00 $3,915.00 Miles Resources $612.00 $17,748.00 Conway Construction Company $150.00 $4,350.00 MA DeAtley Construction Inc $165.00 $4,785.00 Interwest Construction, Inc. $240.00 $6,960.00 MidMountain Contractors, Inc $200.00 $5,800.00 Central Southern Construction Corp. $50.00 $1,450.00 Engineer's Estimate 29 EACH $100.00 $2,900.00
6 out of 21
Project No: WA NP MORA 123(2)
Project Name: SR-123: Laughingwater Creek Bridge to Panther Creek Bridge
Schedule: A
Schedule Type: Base
Line Item Pay Item No. Description Quantity Unit Unit Price Amount
Number
A0340 20303-1500 REMOVAL OF PAVED WATERWAY, STONE
Tucci & Sons, Inc. $1,300.00 $104,000.00 Miles Resources $1,320.00 $105,600.00 Conway Construction Company $125.00 $10,000.00 MA DeAtley Construction Inc $1,450.00 $116,000.00 Interwest Construction, Inc. $345.00 $27,600.00 MidMountain Contractors, Inc $1,900.00 $152,000.00 Central Southern Construction Corp. $500.00 $40,000.00 Engineer's Estimate 80 SQYD $55.00 $4,400.00
A0360 20303-3500 REMOVAL OF STONE MASONRY
Tucci & Sons, Inc. $1,700.00 $73,100.00 Miles Resources $6,916.00 $297,388.00 Conway Construction Company $250.00 $10,750.00 MA DeAtley Construction Inc $1,700.00 $73,100.00 Interwest Construction, Inc. $1,020.00 $43,860.00 MidMountain Contractors, Inc $2,240.00 $96,320.00 Central Southern Construction Corp. $500.00 $21,500.00 Engineer's Estimate 43 SQYD $400.00 $17,200.00
A0380 20401-0000 ROADWAY EXCAVATION
Tucci & Sons, Inc. $140.00 $910,000.00 Miles Resources $74.80 $486,200.00 Conway Construction Company $100.00 $650,000.00 MA DeAtley Construction Inc $105.00 $682,500.00 Interwest Construction, Inc. $37.00 $240,500.00 MidMountain Contractors, Inc $131.00 $851,500.00 Central Southern Construction Corp. $65.00 $422,500.00 Engineer's Estimate 6,500 CUYD $100.00 $650,000.00
A0400 20402-0000 SUBEXCAVATION
Tucci & Sons, Inc. $85.00 $977,500.00 Miles Resources $66.80 $768,200.00 Conway Construction Company $110.00 $1,265,000.00 MA DeAtley Construction Inc $105.00 $1,207,500.00 Interwest Construction, Inc. $117.00 $1,345,500.00 MidMountain Contractors, Inc $150.00 $1,725,000.00 Central Southern Construction Corp. $75.00 $862,500.00 Engineer's Estimate 11,500 CUYD $80.00 $920,000.00
7 out of 21
Project No: WA NP MORA 123(2)
Project Name: SR-123: Laughingwater Creek Bridge to Panther Creek Bridge
Schedule: A
Schedule Type: Base
Line Item Pay Item No. Description Quantity Unit Unit Price Amount
Number
A0420 20410-0000 SELECT BORROW
Tucci & Sons, Inc. $108.00 $702,000.00 Miles Resources $130.00 $845,000.00 Conway Construction Company $95.00 $617,500.00 MA DeAtley Construction Inc $150.00 $975,000.00 Interwest Construction, Inc. $82.00 $533,000.00 MidMountain Contractors, Inc $205.00 $1,332,500.00 Central Southern Construction Corp. $45.00 $292,500.00 Engineer's Estimate 6,500 CUYD $120.00 $780,000.00
A0440 20701-0100 SEPARATION-STABILIZATION GEOTEXTILE, CLASS 1, TYPE A
Tucci & Sons, Inc. $7.50 $900.00 Miles Resources $56.25 $6,750.00 Conway Construction Company $5.00 $600.00 MA DeAtley Construction Inc $77.00 $9,240.00 Interwest Construction, Inc. $18.00 $2,160.00 MidMountain Contractors, Inc $15.00 $1,800.00 Central Southern Construction Corp. $20.00 $2,400.00 Engineer's Estimate 120 SQYD $6.75 $810.00
A0460 20701-0400 SEPARATION-STABILIZATION GEOTEXTILE, CLASS 1, TYPE D (WOVEN)
Tucci & Sons, Inc. $4.00 $14,800.00 Miles Resources $14.00 $51,800.00 Conway Construction Company $5.00 $18,500.00 MA DeAtley Construction Inc $13.00 $48,100.00 Interwest Construction, Inc. $9.00 $33,300.00 MidMountain Contractors, Inc $7.50 $27,750.00 Central Southern Construction Corp. $25.00 $92,500.00 Engineer's Estimate 3,700 SQYD $3.65 $13,505.00
A0480 20701-0500 SEPARATION-STABILIZATION GEOTEXTILE, CLASS 1, TYPE E
Tucci & Sons, Inc. $3.75 $1,875.00 Miles Resources $37.50 $18,750.00 Conway Construction Company $5.00 $2,500.00 MA DeAtley Construction Inc $31.00 $15,500.00 Interwest Construction, Inc. $7.00 $3,500.00 MidMountain Contractors, Inc $15.50 $7,750.00 Central Southern Construction Corp. $25.00 $12,500.00 Engineer's Estimate 500 SQYD $3.65 $1,825.00
8 out of 21
Project No: WA NP MORA 123(2)
Project Name: SR-123: Laughingwater Creek Bridge to Panther Creek Bridge
Schedule: A
Schedule Type: Base
Line Item Pay Item No. Description Quantity Unit Unit Price Amount
Number
A0500 20703-2000 GEOGRID, STABILIZATION
Tucci & Sons, Inc. $3.00 $84,900.00 Miles Resources $6.40 $181,120.00 Conway Construction Company $5.00 $141,500.00 MA DeAtley Construction Inc $5.00 $141,500.00 Interwest Construction, Inc. $8.75 $247,625.00 MidMountain Contractors, Inc $7.00 $198,100.00 Central Southern Construction Corp. $15.00 $424,500.00 Engineer's Estimate 28,300 SQYD $3.10 $87,730.00
A0520 20820-0000 DEWATERING
Tucci & Sons, Inc. Lump Sum $474,000.00 Miles Resources Lump Sum $34,375.00 Conway Construction Company Lump Sum $150,000.00 MA DeAtley Construction Inc Lump Sum $100,000.00 Interwest Construction, Inc. Lump Sum $40,000.00 MidMountain Contractors, Inc Lump Sum $5,000.00 Central Southern Construction Corp. Lump Sum $150,000.00 Engineer's Estimate ALL LPSM Lump Sum $25,000.00
A0540 25101-0200 PLACED RIPRAP, METHOD A, CLASS 2
Tucci & Sons, Inc. $255.00 $12,750.00 Miles Resources $300.00 $15,000.00 Conway Construction Company $350.00 $17,500.00 MA DeAtley Construction Inc $470.00 $23,500.00 Interwest Construction, Inc. $375.00 $18,750.00 MidMountain Contractors, Inc $580.00 $29,000.00 Central Southern Construction Corp. $250.00 $12,500.00 Engineer's Estimate 50 CUYD $185.00 $9,250.00
A0560 25101-0400 PLACED RIPRAP, METHOD A, CLASS 4
Tucci & Sons, Inc. $151.00 $30,200.00 Miles Resources $325.00 $65,000.00 Conway Construction Company $270.00 $54,000.00 MA DeAtley Construction Inc $470.00 $94,000.00 Interwest Construction, Inc. $260.00 $52,000.00 MidMountain Contractors, Inc $230.00 $46,000.00 Central Southern Construction Corp. $400.00 $80,000.00 Engineer's Estimate 200 CUYD $205.00 $41,000.00
9 out of 21
Project No: WA NP MORA 123(2)
Project Name: SR-123: Laughingwater Creek Bridge to Panther Creek Bridge
Schedule: A
Schedule Type: Base
Line Item Pay Item No. Description Quantity Unit Unit Price Amount
Number
A0580 25126-0000 REMOVE AND RESET BOULDER
Tucci & Sons, Inc. $275.00 $12,375.00 Miles Resources $375.00 $16,875.00 Conway Construction Company $75.00 $3,375.00 MA DeAtley Construction Inc $1,200.00 $54,000.00 Interwest Construction, Inc. $200.00 $9,000.00 MidMountain Contractors, Inc $2,700.00 $121,500.00 Central Southern Construction Corp. $200.00 $9,000.00 Engineer's Estimate 45 EACH $260.00 $11,700.00
A0600 30302-1000 DITCH RECONDITIONING
Tucci & Sons, Inc. $9.00 $130,500.00 Miles Resources $5.62 $81,490.00 Conway Construction Company $9.00 $130,500.00 MA DeAtley Construction Inc $5.50 $79,750.00 Interwest Construction, Inc. $14.00 $203,000.00 MidMountain Contractors, Inc $18.00 $261,000.00 Central Southern Construction Corp. $15.00 $217,500.00 Engineer's Estimate 14,500 LNFT $6.20 $89,900.00
A0620 30801-1000 RECYCLED AGGREGATE BASE, 6-INCH DEPTH
Tucci & Sons, Inc. $13.75 $646,250.00 Miles Resources $8.55 $401,850.00 Conway Construction Company $13.00 $611,000.00 MA DeAtley Construction Inc $10.00 $470,000.00 Interwest Construction, Inc. $10.50 $493,500.00 MidMountain Contractors, Inc $17.00 $799,000.00 Central Southern Construction Corp. $25.00 $1,175,000.00 Engineer's Estimate 47,000 SQYD $13.00 $611,000.00
A0640 31303-0000 AGGREGATE-TOPSOIL COURSE
Tucci & Sons, Inc. $189.00 $18,900.00 Miles Resources $390.00 $39,000.00 Conway Construction Company $200.00 $20,000.00 MA DeAtley Construction Inc $1,150.00 $115,000.00 Interwest Construction, Inc. $550.00 $55,000.00 MidMountain Contractors, Inc $785.00 $78,500.00 Central Southern Construction Corp. $75.00 $7,500.00 Engineer's Estimate 100 CUYD $165.00 $16,500.00
10 out of 21
Project No: WA NP MORA 123(2)
Project Name: SR-123: Laughingwater Creek Bridge to Panther Creek Bridge
Schedule: A
Schedule Type: Base
Line Item Pay Item No. Description Quantity Unit Unit Price Amount
Number
A0660 40101-5600 ASPHALT CONCRETE PAVEMENT, GYRATORY MIX, 1/2-INCH OR 3/4-INCH NOMINAL MAXIMUM SIZE
AGGREGATE, 0.3 TO <3 MILLION ESAL (TYPE III PAVEMENT ROUGHNESS)
Tucci & Sons, Inc. $208.00 $1,976,000.00 Miles Resources $150.00 $1,425,000.00 Conway Construction Company $190.00 $1,805,000.00 MA DeAtley Construction Inc $175.00 $1,662,500.00 Interwest Construction, Inc. $232.00 $2,204,000.00 MidMountain Contractors, Inc $200.00 $1,900,000.00 Central Southern Construction Corp. $325.00 $3,087,500.00 Engineer's Estimate 9,500 TON $200.00 $1,900,000.00
A0720 41101-1000 PRIME COAT, METHOD 1 (GRADE CMS-2)
Tucci & Sons, Inc. $975.00 $34,125.00 Miles Resources $2,255.00 $78,925.00 Conway Construction Company $1,850.00 $64,750.00 MA DeAtley Construction Inc $600.00 $21,000.00 Interwest Construction, Inc. $2,140.00 $74,900.00 MidMountain Contractors, Inc $600.00 $21,000.00 Central Southern Construction Corp. $1,200.00 $42,000.00 Engineer's Estimate 35 TON $2,000.00 $70,000.00
A0740 41105-0000 BLOTTER
Tucci & Sons, Inc. $184.00 $110,400.00 Miles Resources $187.50 $112,500.00 Conway Construction Company $155.00 $93,000.00 MA DeAtley Construction Inc $175.00 $105,000.00 Interwest Construction, Inc. $178.00 $106,800.00 MidMountain Contractors, Inc $122.00 $73,200.00 Central Southern Construction Corp. $1,200.00 $720,000.00 Engineer's Estimate 600 TON $145.00 $87,000.00
A0760 41201-0000 TACK COAT
Tucci & Sons, Inc. $830.00 $16,600.00 Miles Resources $1,265.00 $25,300.00 Conway Construction Company $500.00 $10,000.00 MA DeAtley Construction Inc $1,590.00 $31,800.00 Interwest Construction, Inc. $1,500.00 $30,000.00 MidMountain Contractors, Inc $2,000.00 $40,000.00 Central Southern Construction Corp. $1,200.00 $24,000.00 Engineer's Estimate 20.0 TON $830.00 $16,600.00
11 out of 21
Project No: WA NP MORA 123(2)
Project Name: SR-123: Laughingwater Creek Bridge to Panther Creek Bridge
Schedule: A
Schedule Type: Base
Line Item Pay Item No. Description Quantity Unit Unit Price Amount
Number
A0780 41301-1300 ASPHALT PAVEMENT MILLING, 6-INCH DEPTH
Tucci & Sons, Inc. $5.30 $249,100.00 Miles Resources $7.41 $348,270.00 Conway Construction Company $7.00 $329,000.00 MA DeAtley Construction Inc $10.00 $470,000.00 Interwest Construction, Inc. $9.25 $434,750.00 MidMountain Contractors, Inc $17.00 $799,000.00 Central Southern Construction Corp. $10.00 $470,000.00 Engineer's Estimate 47,000 SQYD $6.00 $282,000.00
A0800 57501-0000 MINOR BRIDGE WORK (THIN EPOXY OVERLAY)
Tucci & Sons, Inc. Lump Sum $124,000.00 Miles Resources Lump Sum $126,500.00 Conway Construction Company Lump Sum $150,000.00 MA DeAtley Construction Inc Lump Sum $110,000.00 Interwest Construction, Inc. Lump Sum $150,000.00 MidMountain Contractors, Inc Lump Sum $125,000.00 Central Southern Construction Corp. Lump Sum $50,000.00 Engineer's Estimate ALL LPSM Lump Sum $125,000.00
A0820 60201-0800 24-INCH PIPE CULVERT
Tucci & Sons, Inc. $450.00 $153,000.00 Miles Resources $425.00 $144,500.00 Conway Construction Company $600.00 $204,000.00 MA DeAtley Construction Inc $400.00 $136,000.00 Interwest Construction, Inc. $355.00 $120,700.00 MidMountain Contractors, Inc $525.00 $178,500.00 Central Southern Construction Corp. $350.00 $119,000.00 Engineer's Estimate 340 LNFT $205.00 $69,700.00
A0840 60210-0800 END SECTION FOR 24-INCH PIPE CULVERT
Tucci & Sons, Inc. $4,000.00 $28,000.00 Miles Resources $2,625.00 $18,375.00 Conway Construction Company $2,000.00 $14,000.00 MA DeAtley Construction Inc $2,500.00 $17,500.00 Interwest Construction, Inc. $1,750.00 $12,250.00 MidMountain Contractors, Inc $2,750.00 $19,250.00 Central Southern Construction Corp. $3,500.00 $24,500.00 Engineer's Estimate 7 EACH $760.00 $5,320.00
12 out of 21
Project No: WA NP MORA 123(2)
Project Name: SR-123: Laughingwater Creek Bridge to Panther Creek Bridge
Schedule: A
Schedule Type: Base
Line Item Pay Item No. Description Quantity Unit Unit Price Amount
Number
A0860 60220-0350 4 FEET SPAN, 4 FEET RISE PRECAST REINFORCED CONCRETE BOX CULVERT
Tucci & Sons, Inc. $4,500.00 $243,000.00 Miles Resources $4,344.00 $234,576.00 Conway Construction Company $7,500.00 $405,000.00 MA DeAtley Construction Inc $4,000.00 $216,000.00 Interwest Construction, Inc. $3,700.00 $199,800.00 MidMountain Contractors, Inc $6,000.00 $324,000.00 Central Southern Construction Corp. $10,000.00 $540,000.00 Engineer's Estimate 54 LNFT $2,100.00 $113,400.00
A0880 60220-2600 9 FEET SPAN, 9 FEET RISE PRECAST REINFORCED CONCRETE BOX CULVERT
Tucci & Sons, Inc. $7,800.00 $421,200.00 Miles Resources $8,625.00 $465,750.00 Conway Construction Company $15,000.00 $810,000.00 MA DeAtley Construction Inc $8,500.00 $459,000.00 Interwest Construction, Inc. $10,100.00 $545,400.00 MidMountain Contractors, Inc $11,150.00 $602,100.00 Central Southern Construction Corp. $23,000.00 $1,242,000.00 Engineer's Estimate 54 LNFT $7,000.00 $378,000.00
A0900 60501-0000 STANDARD UNDERDRAIN SYSTEM
Tucci & Sons, Inc. $13.50 $71,685.00 Miles Resources $33.65 $178,681.50 Conway Construction Company $33.00 $175,230.00 MA DeAtley Construction Inc $49.00 $260,190.00 Interwest Construction, Inc. $27.00 $143,370.00 MidMountain Contractors, Inc $27.00 $143,370.00 Central Southern Construction Corp. $200.00 $1,062,000.00 Engineer's Estimate 5,310 LNFT $55.00 $292,050.00
A0920 60704-0000 CLEANING CULVERT IN PLACE
Tucci & Sons, Inc. $2,000.00 $8,000.00 Miles Resources $1,875.00 $7,500.00 Conway Construction Company $1,500.00 $6,000.00 MA DeAtley Construction Inc $3,400.00 $13,600.00 Interwest Construction, Inc. $5,000.00 $20,000.00 MidMountain Contractors, Inc $2,550.00 $10,200.00 Central Southern Construction Corp. $10,000.00 $40,000.00 Engineer's Estimate 4 EACH $1,700.00 $6,800.00
13 out of 21
Project No: WA NP MORA 123(2)
Project Name: SR-123: Laughingwater Creek Bridge to Panther Creek Bridge
Schedule: A
Schedule Type: Base
Line Item Pay Item No. Description Quantity Unit Unit Price Amount
Number
A0940 60705-0000 REPAIRING DRAINAGE STRUCTURE
Tucci & Sons, Inc. $5,400.00 $5,400.00 Miles Resources $2,250.00 $2,250.00 Conway Construction Company $1,500.00 $1,500.00 MA DeAtley Construction Inc $3,500.00 $3,500.00 Interwest Construction, Inc. $2,500.00 $2,500.00 MidMountain Contractors, Inc $2,800.00 $2,800.00 Central Southern Construction Corp. $7,500.00 $7,500.00 Engineer's Estimate 1 EACH $2,500.00 $2,500.00
A0960 62002-1000 CLASS B MASONRY, ROCK FACE FINISH (GOVERNMENT FURNISHED STONE)
Tucci & Sons, Inc. $1,900.00 $209,000.00 Miles Resources $8,285.00 $911,350.00 Conway Construction Company $1,200.00 $132,000.00 MA DeAtley Construction Inc $2,850.00 $313,500.00 Interwest Construction, Inc. $1,790.00 $196,900.00 MidMountain Contractors, Inc $4,000.00 $440,000.00 Central Southern Construction Corp. $400.00 $44,000.00 Engineer's Estimate 110 SQYD $2,400.00 $264,000.00
A0980 62011-0500 STONE MASONRY HEADWALL FOR 24-INCH PIPE CULVERT (GOVERNMENT FURNISHED STONE)
Tucci & Sons, Inc. $20,000.00 $140,000.00 Miles Resources $51,450.00 $360,150.00 Conway Construction Company $6,000.00 $42,000.00 MA DeAtley Construction Inc $9,000.00 $63,000.00 Interwest Construction, Inc. $14,000.00 $98,000.00 MidMountain Contractors, Inc $23,000.00 $161,000.00 Central Southern Construction Corp. $650.00 $4,550.00 Engineer's Estimate 7 EACH $21,000.00 $147,000.00
A1000 62201-0250 DUMP TRUCK, 10 CUBIC YARD MINIMUM CAPACITY
Tucci & Sons, Inc. $200.00 $8,000.00 Miles Resources $224.00 $8,960.00 Conway Construction Company $200.00 $8,000.00 MA DeAtley Construction Inc $275.00 $11,000.00 Interwest Construction, Inc. $295.00 $11,800.00 MidMountain Contractors, Inc $175.00 $7,000.00 Central Southern Construction Corp. $200.00 $8,000.00 Engineer's Estimate 40 HOUR $235.00 $9,400.00
14 out of 21
Project No: WA NP MORA 123(2)
Project Name: SR-123: Laughingwater Creek Bridge to Panther Creek Bridge
Schedule: A
Schedule Type: Base
Line Item Pay Item No. Description Quantity Unit Unit Price Amount
Number
A1020 62201-0950 WHEEL LOADER, 3 CUBIC YARD MINIMUM RATED CAPACITY
Tucci & Sons, Inc. $192.00 $7,680.00 Miles Resources $355.00 $14,200.00 Conway Construction Company $175.00 $7,000.00 MA DeAtley Construction Inc $350.00 $14,000.00 Interwest Construction, Inc. $255.00 $10,200.00 MidMountain Contractors, Inc $220.00 $8,800.00 Central Southern Construction Corp. $200.00 $8,000.00 Engineer's Estimate 40 HOUR $195.00 $7,800.00
A1040 62201-2800 MOTOR GRADER, 8 FOOT MINIMUM BLADE
Tucci & Sons, Inc. $200.00 $8,000.00 Miles Resources $284.00 $11,360.00 Conway Construction Company $210.00 $8,400.00 MA DeAtley Construction Inc $420.00 $16,800.00 Interwest Construction, Inc. $305.00 $12,200.00 MidMountain Contractors, Inc $280.00 $11,200.00 Central Southern Construction Corp. $300.00 $12,000.00 Engineer's Estimate 40 HOUR $235.00 $9,400.00
A1060 62201-3150 HYDRAULIC EXCAVATOR, CRAWLER MOUNTED, 1.0 CUBIC YARD MINIMUM CAPACITY WITH THUMB
ATTACHMENT
Tucci & Sons, Inc. $270.00 $10,800.00 Miles Resources $283.00 $11,320.00 Conway Construction Company $220.00 $8,800.00 MA DeAtley Construction Inc $400.00 $16,000.00 Interwest Construction, Inc. $305.00 $12,200.00 MidMountain Contractors, Inc $230.00 $9,200.00 Central Southern Construction Corp. $300.00 $12,000.00 Engineer's Estimate 40 HOUR $240.00 $9,600.00
A1080 62301-0000 GENERAL LABOR
Tucci & Sons, Inc. $88.00 $3,520.00 Miles Resources $95.50 $3,820.00 Conway Construction Company $90.00 $3,600.00 MA DeAtley Construction Inc $160.00 $6,400.00 Interwest Construction, Inc. $110.00 $4,400.00 MidMountain Contractors, Inc $104.00 $4,160.00 Central Southern Construction Corp. $50.00 $2,000.00 Engineer's Estimate 40 HOUR $90.00 $3,600.00
15 out of 21
Project No: WA NP MORA 123(2)
Project Name: SR-123: Laughingwater Creek Bridge to Panther Creek Bridge
Schedule: A
Schedule Type: Base
Line Item Pay Item No. Description Quantity Unit Unit Price Amount
Number
A1100 62405-0300 PLACING CONSERVED TOPSOIL, 4-INCH DEPTH
Tucci & Sons, Inc. $12.00 $48,000.00 Miles Resources $10.63 $42,520.00 Conway Construction Company $5.00 $20,000.00 MA DeAtley Construction Inc $14.00 $56,000.00 Interwest Construction, Inc. $9.00 $36,000.00 MidMountain Contractors, Inc $24.00 $96,000.00 Central Southern Construction Corp. $30.00 $120,000.00 Engineer's Estimate 4,000 SQYD $5.25 $21,000.00
A1120 62901-0000 ROLLED EROSION CONTROL PRODUCT
Tucci & Sons, Inc. $11.00 $26,400.00 Miles Resources $6.65 $15,960.00 Conway Construction Company $10.00 $24,000.00 MA DeAtley Construction Inc $5.00 $12,000.00 Interwest Construction, Inc. $5.00 $12,000.00 MidMountain Contractors, Inc $15.00 $36,000.00 Central Southern Construction Corp. $20.00 $48,000.00 Engineer's Estimate 2,400 SQYD $15.00 $36,000.00
A1140 63302-0000 SIGN SYSTEM
Tucci & Sons, Inc. $700.00 $77,000.00 Miles Resources $525.00 $57,750.00 Conway Construction Company $300.00 $33,000.00 MA DeAtley Construction Inc $250.00 $27,500.00 Interwest Construction, Inc. $150.00 $16,500.00 MidMountain Contractors, Inc $150.00 $16,500.00 Central Southern Construction Corp. $200.00 $22,000.00 Engineer's Estimate 110.00 SQFT $165.00 $18,150.00
A1160 63308-3000 OBJECT MARKER, TYPE 3
Tucci & Sons, Inc. $950.00 $7,600.00 Miles Resources $869.00 $6,952.00 Conway Construction Company $250.00 $2,000.00 MA DeAtley Construction Inc $1,000.00 $8,000.00 Interwest Construction, Inc. $800.00 $6,400.00 MidMountain Contractors, Inc $360.00 $2,880.00 Central Southern Construction Corp. $100.00 $800.00 Engineer's Estimate 8 EACH $415.00 $3,320.00
16 out of 21
Project No: WA NP MORA 123(2)
Project Name: SR-123: Laughingwater Creek Bridge to Panther Creek Bridge
Schedule: A
Schedule Type: Base
Line Item Pay Item No. Description Quantity Unit Unit Price Amount
Number
A1180 63316-1000 REMOVE AND RESET SIGN
Tucci & Sons, Inc. $800.00 $1,600.00 Miles Resources $312.50 $625.00 Conway Construction Company $450.00 $900.00 MA DeAtley Construction Inc $1,400.00 $2,800.00 Interwest Construction, Inc. $750.00 $1,500.00 MidMountain Contractors, Inc $900.00 $1,800.00 Central Southern Construction Corp. $200.00 $400.00 Engineer's Estimate 2 EACH $375.00 $750.00
A1200 63401-0300 PAVEMENT MARKINGS, TYPE B, SOLID
Tucci & Sons, Inc. $0.25 $37,250.00 Miles Resources $0.30 $44,700.00 Conway Construction Company $0.30 $44,700.00 MA DeAtley Construction Inc $0.25 $37,250.00 Interwest Construction, Inc. $0.29 $43,210.00 MidMountain Contractors, Inc $0.50 $74,500.00 Central Southern Construction Corp. $2.00 $298,000.00 Engineer's Estimate 149,000 LNFT $0.25 $37,250.00
A1220 63401-0400 PAVEMENT MARKINGS, TYPE B, BROKEN (YELLOW)
Tucci & Sons, Inc. $0.20 $1,900.00 Miles Resources $0.20 $1,900.00 Conway Construction Company $0.25 $2,375.00 MA DeAtley Construction Inc $0.35 $3,325.00 Interwest Construction, Inc. $0.19 $1,805.00 MidMountain Contractors, Inc $0.20 $1,900.00 Central Southern Construction Corp. $1.50 $14,250.00 Engineer's Estimate 9,500 LNFT $0.50 $4,750.00
A1240 63403-0900 PAVEMENT MARKINGS, TYPE I
Tucci & Sons, Inc. $40.00 $2,000.00 Miles Resources $43.85 $2,192.50 Conway Construction Company $10.00 $500.00 MA DeAtley Construction Inc $35.00 $1,750.00 Interwest Construction, Inc. $42.00 $2,100.00 MidMountain Contractors, Inc $45.00 $2,250.00 Central Southern Construction Corp. $250.00 $12,500.00 Engineer's Estimate 50 SQFT $6.50 $325.00
17 out of 21
Project No: WA NP MORA 123(2)
Project Name: SR-123: Laughingwater Creek Bridge to Panther Creek Bridge
Schedule: A
Schedule Type: Base
Line Item Pay Item No. Description Quantity Unit Unit Price Amount
Number
A1260 63405-0050 PAVEMENT MARKINGS, SYMBOLS
Tucci & Sons, Inc. $1,100.00 $1,100.00 Miles Resources $1,190.00 $1,190.00 Conway Construction Company $500.00 $500.00 MA DeAtley Construction Inc $500.00 $500.00 Interwest Construction, Inc. $1,130.00 $1,130.00 MidMountain Contractors, Inc $1,000.00 $1,000.00 Central Southern Construction Corp. $300.00 $300.00 Engineer's Estimate 1 EACH $620.00 $620.00
A1280 63502-0600 TEMPORARY TRAFFIC CONTROL, BARRICADE TYPE 3 (8 FEET WIDE)
Tucci & Sons, Inc. $185.00 $1,110.00 Miles Resources $410.00 $2,460.00 Conway Construction Company $300.00 $1,800.00 MA DeAtley Construction Inc $750.00 $4,500.00 Interwest Construction, Inc. $500.00 $3,000.00 MidMountain Contractors, Inc $265.00 $1,590.00 Central Southern Construction Corp. $200.00 $1,200.00 Engineer's Estimate 6 EACH $175.00 $1,050.00
A1300 63502-1050 TEMPORARY TRAFFIC CONTROL, TUBULAR MARKER
Tucci & Sons, Inc. $22.00 $2,200.00 Miles Resources $43.75 $4,375.00 Conway Construction Company $20.00 $2,000.00 MA DeAtley Construction Inc $70.00 $7,000.00 Interwest Construction, Inc. $52.00 $5,200.00 MidMountain Contractors, Inc $67.00 $6,700.00 Central Southern Construction Corp. $50.00 $5,000.00 Engineer's Estimate 100 EACH $30.00 $3,000.00
A1320 63502-1600 TEMPORARY TRAFFIC CONTROL, WARNING LIGHT TYPE B
Tucci & Sons, Inc. $95.00 $570.00 Miles Resources $62.50 $375.00 Conway Construction Company $150.00 $900.00 MA DeAtley Construction Inc $200.00 $1,200.00 Interwest Construction, Inc. $400.00 $2,400.00 MidMountain Contractors, Inc $33.00 $198.00 Central Southern Construction Corp. $100.00 $600.00 Engineer's Estimate 6 EACH $135.00 $810.00
18 out of 21
Project No: WA NP MORA 123(2)
Project Name: SR-123: Laughingwater Creek Bridge to Panther Creek Bridge
Schedule: A
Schedule Type: Base
Line Item Pay Item No. Description Quantity Unit Unit Price Amount
Number
A1340 63502-1700 TEMPORARY TRAFFIC CONTROL, WARNING LIGHT TYPE C
Tucci & Sons, Inc. $107.00 $856.00 Miles Resources $62.50 $500.00 Conway Construction Company $100.00 $800.00 MA DeAtley Construction Inc $200.00 $1,600.00 Interwest Construction, Inc. $450.00 $3,600.00 MidMountain Contractors, Inc $33.00 $264.00 Central Southern Construction Corp. $150.00 $1,200.00 Engineer's Estimate 8 EACH $115.00 $920.00
A1360 63502-2000 TEMPORARY TRAFFIC CONTROL, PORTABLE CHANGEABLE MESSAGE SIGN
Tucci & Sons, Inc. $17,000.00 $51,000.00 Miles Resources $16,500.00 $49,500.00 Conway Construction Company $35,000.00 $105,000.00 MA DeAtley Construction Inc $20,000.00 $60,000.00 Interwest Construction, Inc. $18,500.00 $55,500.00 MidMountain Contractors, Inc $1,600.00 $4,800.00 Central Southern Construction Corp. $12,000.00 $36,000.00 Engineer's Estimate 3 EACH $17,000.00 $51,000.00
A1380 63503-0400 TEMPORARY TRAFFIC CONTROL, CONCRETE BARRIER (WITH GATE, CHAIN)
Tucci & Sons, Inc. $160.00 $3,200.00 Miles Resources $72.00 $1,440.00 Conway Construction Company $200.00 $4,000.00 MA DeAtley Construction Inc $400.00 $8,000.00 Interwest Construction, Inc. $150.00 $3,000.00 MidMountain Contractors, Inc $150.00 $3,000.00 Central Southern Construction Corp. $150.00 $3,000.00 Engineer's Estimate 20 LNFT $250.00 $5,000.00
A1400 63503-0700 TEMPORARY TRAFFIC CONTROL, PAVEMENT MARKINGS
Tucci & Sons, Inc. $1.30 $13,650.00 Miles Resources $1.06 $11,130.00 Conway Construction Company $1.00 $10,500.00 MA DeAtley Construction Inc $0.50 $5,250.00 Interwest Construction, Inc. $1.60 $16,800.00 MidMountain Contractors, Inc $7.00 $73,500.00 Central Southern Construction Corp. $2.00 $21,000.00 Engineer's Estimate 10,500 LNFT $1.00 $10,500.00
19 out of 21
Project No: WA NP MORA 123(2)
Project Name: SR-123: Laughingwater Creek Bridge to Panther Creek Bridge
Schedule: A
Schedule Type: Base
Line Item Pay Item No. Description Quantity Unit Unit Price Amount
Number
A1420 63503-1000 TEMPORARY TRAFFIC CONTROL, PLASTIC FENCE
Tucci & Sons, Inc. $20.00 $14,000.00 Miles Resources $7.11 $4,977.00 Conway Construction Company $5.00 $3,500.00 MA DeAtley Construction Inc $11.00 $7,700.00 Interwest Construction, Inc. $12.00 $8,400.00 MidMountain Contractors, Inc $11.00 $7,700.00 Central Southern Construction Corp. $15.00 $10,500.00 Engineer's Estimate 700 LNFT $5.50 $3,850.00
A1440 63504-1000 TEMPORARY TRAFFIC CONTROL, CONSTRUCTION SIGN
Tucci & Sons, Inc. $29.00 $26,970.00 Miles Resources $49.25 $45,802.50 Conway Construction Company $40.00 $37,200.00 MA DeAtley Construction Inc $60.00 $55,800.00 Interwest Construction, Inc. $95.00 $88,350.00 MidMountain Contractors, Inc $57.00 $53,010.00 Central Southern Construction Corp. $25.00 $23,250.00 Engineer's Estimate 930.0 SQFT $40.00 $37,200.00
A1460 63506-0500 TEMPORARY TRAFFIC CONTROL, FLAGGER
Tucci & Sons, Inc. $76.25 $571,875.00 Miles Resources $110.75 $830,625.00 Conway Construction Company $90.00 $675,000.00 MA DeAtley Construction Inc $95.00 $712,500.00 Interwest Construction, Inc. $80.50 $603,750.00 MidMountain Contractors, Inc $105.00 $787,500.00 Central Southern Construction Corp. $50.00 $375,000.00 Engineer's Estimate 7,500 HOUR $85.00 $637,500.00
A1480 63507-0600 TEMPORARY TRAFFIC CONTROL, PILOT CAR
Tucci & Sons, Inc. $1,025.00 $220,375.00 Miles Resources $126.60 $27,219.00 Conway Construction Company $1,500.00 $322,500.00 MA DeAtley Construction Inc $1,100.00 $236,500.00 Interwest Construction, Inc. $1,200.00 $258,000.00 MidMountain Contractors, Inc $1,600.00 $344,000.00 Central Southern Construction Corp. $300.00 $64,500.00 Engineer's Estimate 215 DAY $1,250.00 $268,750.00
20 out of 21
Project No: WA NP MORA 123(2)
Project Name: SR-123: Laughingwater Creek Bridge to Panther Creek Bridge
Schedule: A
Schedule Type: Base
Line Item Pay Item No. Description Quantity Unit Unit Price Amount
Number
A1500 63507-0700 TEMPORARY TRAFFIC CONTROL, TRAFFIC CONTROL SUPERVISOR
Tucci & Sons, Inc. $1,500.00 $450,000.00 Miles Resources $1,163.00 $348,900.00 Conway Construction Company $1,600.00 $480,000.00 MA DeAtley Construction Inc $1,400.00 $420,000.00 Interwest Construction, Inc. $1,475.00 $442,500.00 MidMountain Contractors, Inc $1,500.00 $450,000.00 Central Southern Construction Corp. $1,000.00 $300,000.00 Engineer's Estimate 300 DAY $1,150.00 $345,000.00
A1520 63601-6000 SYSTEM INSTALLATION, TRAFFIC DETECTOR SYSTEM
Tucci & Sons, Inc. Lump Sum $28,000.00 Miles Resources Lump Sum $93,750.00 Conway Construction Company Lump Sum $30,000.00 MA DeAtley Construction Inc Lump Sum $28,000.00 Interwest Construction, Inc. Lump Sum $29,000.00 MidMountain Contractors, Inc Lump Sum $30,000.00 Central Southern Construction Corp. Lump Sum $20,000.00 Engineer's Estimate ALL LPSM Lump Sum $15,000.00
A1540 63701-0000 FIELD OFFICE
Tucci & Sons, Inc. $3,100.00 $80,600.00 Miles Resources $9,250.00 $240,500.00 Conway Construction Company $4,000.00 $104,000.00 MA DeAtley Construction Inc $4,300.00 $111,800.00 Interwest Construction, Inc. $5,000.00 $130,000.00 MidMountain Contractors, Inc $4,500.00 $117,000.00 Central Southern Construction Corp. $100,000.00 $2,600,000.00 Engineer's Estimate 26 EACH $3,300.00 $85,800.00
A1560 64704-1600 MITIGATION, STREAMBED CHANNEL RECONSTRUCTION
Tucci & Sons, Inc. $260.00 $71,500.00 Miles Resources $250.00 $68,750.00 Conway Construction Company $150.00 $41,250.00 MA DeAtley Construction Inc $400.00 $110,000.00 Interwest Construction, Inc. $225.00 $61,875.00 MidMountain Contractors, Inc $250.00 $68,750.00 Central Southern Construction Corp. $350.00 $96,250.00 Engineer's Estimate 275 CUYD $75.00 $20,625.00
21 out of 21
Project No: WA NP MORA 123(2)
Project Name: SR-123: Laughingwater Creek Bridge to Panther Creek Bridge
Schedule: A
Schedule Type: Base
Line Item Pay Item No. Description Quantity Unit Unit Price Amount
Number
Total Schedule - All Items
Tucci & Sons, Inc. $11,431,888.00 Miles Resources $12,600,377.20 Conway Construction Company $13,363,880.00 MA DeAtley Construction Inc $13,461,140.00 Interwest Construction, Inc. $13,899,444.00 MidMountain Contractors, Inc $16,690,800.00 Central Southern Construction Corp. $17,414,610.00 Engineer's Estimate $10,383,290.00