This document appears to be a Cross Section Gradebook report related to a federal contract opportunity. The report provides details on the proposed shoulder and clearing areas for a transportation project on SR-123 in Washington state, including specific station locations, northing/easting coordinates, elevations, and existing ground slopes.

The related federal contract opportunity is for the WA NP MORA 123(2) project, which involves the construction of a bridge on SR-123 between Laughingwater Creek and Panther Creek. The solicitation is being issued by the Department of Transportation Federal Highway Administration. No additional details are provided about the project requirements, response dates, pricing, or set asides.

View the file

Other files

File Type Posted
BidTab_WA NP MORA 123(2).pdf PDF
BidSum_WA NP MORA 123(2).pdf PDF
QA_07-31-2024.pdf PDF
Amendment A005.pdf PDF
QA_07-24-2024.pdf PDF
QA_07-23-2024.pdf PDF
Amendment A004.pdf PDF
QA1_07-19-2024.pdf PDF
Amendment A003.pdf PDF
QA_07-18-2024.pdf PDF
Amendment A002.pdf PDF
Amendment A001.pdf PDF
QA_07-09-2024.pdf PDF
QA_07-05-2024.pdf PDF
QA_08-24-2023.pdf PDF
mora 12302_XYZ subex_MAIN01.xlsx XLSX spreadsheet
mora 12302_XYZ base_APPR01.xlsx XLSX spreadsheet
mora12302_control-points.xlsx XLSX spreadsheet
mora12302_plans.pdf PDF
WA NP MORA 123(2) - EPA_CompiledSWPPP_Final Signed.pdf PDF
mora12302_BIR_9450-020P.pdf PDF
mora12302_Earthwork_APPR 01.pdf PDF
mora 12302_XYZ asphalt_MAIN01.xlsx XLSX spreadsheet
Physical Data_WA NP MORA 123(2).zip ZIP file
mora12302_Project Name Change Memo.pdf PDF
mora12302_construction staking notes_APPR01.xlsx XLSX spreadsheet
mora12302_construction staking notes_MAIN01.xlsx XLSX spreadsheet
mora12302_Earthwork_MAIN 01.pdf PDF
mora12302_XS.pdf PDF
IFB 69056723B000008.pdf PDF
mora12302_GR09-22.pdf PDF
mora12302_proposed-alignment_MAIN01.pdf PDF
FLH Bridge oversized or overload vehicle permit request form Oct 2018.pdf PDF
mora12302_clearing limits (culverts).pdf PDF
mora12302_1992_LaughingwaterCreekBridgePlans.pdf PDF
mora12302_proposed-alignment_APPR01.pdf PDF
mora 12302_XYZ base_MAIN01.xlsx XLSX spreadsheet
Show all 37

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

RPTiahpewj3 Cross Section Gradebook with Northing/Easting Report

Report Created: Monday, April 1, 2024
Time: 8:38:31 AM
Set Name:APPR 01
Alignment Name:APPR 01
Input Grid Factor:Note: All units in this report are in feet unless specified otherwise.
Surface:Prop Shoulder7
Station:125
FeatureShdr_Outside_Layer1
Offset-34.416
Elevation2185.282
Northing520074.069
Easting1375498.312
Existing Ground2185.664
Slope
Station:140
FeatureShdr_Outside_Layer1
Offset-21.713
Elevation2184.865
Northing520092.613
Easting1375491.794
Existing Ground2185.236
Slope
Station:160
FeatureShdr_Outside_Layer1
Offset-16.901
Elevation2184.272
Northing520106.878
Easting1375476.973
Existing Ground2184.55
Slope
Surface:Prop Shoulder6
Station:125
FeatureShdr_Outside_Layer1
Offset69.86
Elevation2183.413
Northing520164.033
Easting1375551.038
Existing Ground2183.691
Slope
Station:140
FeatureShdr_Outside_Layer1
Offset38.864
Elevation2183.876
Northing520144.876
Easting1375522.424
Existing Ground2184.329
Slope
Station:160
FeatureShdr_Outside_Layer1
Offset23.163
Elevation2183.777
Northing520141.443
Easting1375497.23
Existing Ground2183.892
Slope
Station:180
FeatureShdr_Outside_Layer1
Offset16.679
Elevation2183.415
Northing520145.961
Easting1375476.696
Existing Ground2183.679
Slope
Surface:Prop Clearing
Station:180
FeatureShdr_Outside_Layer1
Offset-17.052
Elevation2183.643
Northing520116.86
Easting1375459.641
Existing Ground2183.82
Slope
Surface:Stevens Canyon Rd Entrance Station
Station:200
FeatureShdr_Outside_Layer1_LPavt_CL_Layer1Shdr_Outside_Layer1_R
Offset-17.212015.805
Elevation2183.1912183.2412182.868
Northing520126.834520141.684520155.32
Easting1375442.3051375451.0081375459
Existing Ground2183.3772183.5742183.112
Slope0.003-0.024
Station:220
FeatureShdr_Outside_Layer1_LPavt_CL_Layer1Shdr_Outside_Layer1_R
Offset-17.441020.888
Elevation2182.6992182.7542182.106
Northing520136.75520151.797520169.818
Easting1375424.9341375433.7531375444.315
Existing Ground2182.7742183.0872182.457
Slope0.003-0.031
Station:240
FeatureShdr_Outside_Layer1_LPavt_CL_Layer1Shdr_Outside_Layer1_R
Offset-17.857026.012
Elevation2182.2272182.2482181.518
Northing520146.504520161.909520184.351
Easting1375407.4691375416.4981375429.651
Existing Ground2182.5632182.5822181.805
Slope0.001-0.028
Station:260
FeatureShdr_Outside_Layer1_LPavt_CL_Layer1Shdr_Outside_Layer1_R
Offset-18.496032.382
Elevation2182.1612181.9012181.101
Northing520156.064520172.022520199.96
Easting1375389.8911375399.2431375415.617
Existing Ground2182.3672182.2342181.201
Slope-0.014-0.025
Station:267
FeatureShdr_Outside_Layer1_LPavt_CL_Layer1
Offset-18.7280
Elevation2182.0932181.79
Northing520159.404520175.561
Easting1375383.7341375393.204
Existing Ground2182.2932182.123
Slope-0.016