Metaline Exhibit F Road Plan RFQ 26-00003.pdf
PDF 702 KB Posted
- Attached to
- Metaline Sorts
- Solicitation number
- 26-00003
- Issued by
- Adams County, Asotin County, Benton County, Chelan County, Clallam County, Clark County, Columbia County, Cowlitz County, Douglas County, Ferry County, Franklin County, Garfield County, Grant County, Grays Harbor County, Island County, Jefferson County, King County, Kitsap County, Kittitas County, Klickitat County, Lewis County, Lincoln County, Mason County, Okanogan County, Pacific County, Pend Oreille County, Pierce County, San Juan County, Skagit County, Skamania County, Snohomish County, Spokane County, Stevens County, Thurston County, Wahkiakum County, Walla Walla County, Whatcom County, Whitman County, Yakima County, Asotin City, Clarkston City, Clarkston Heights-Vineland CDP, West Clarkston-Highland CDP, Benton City, Chelan City, Chelan Falls CDP, Clallam Bay CDP, Lewisville CDP, Rock Island City, Pacific Beach CDP, Whidbey Island Station CDP, Mercer Island City, Pacific City, Bainbridge Island City, Kingston CDP, Kitsap Lake CDP, Kittitas City, Klickitat CDP, Okanogan City, Anderson Island CDP, Fort Lewis CDP, Fox Island CDP, Herron Island CDP, Ketron Island CDP, North Fort Lewis CDP, Raft Island CDP, Stevenson City, Hat Island CDP, Lake Stevens City, Snohomish City, Spokane City, Spokane Valley City, Puget Island CDP, Garfield Town, Yakima City, Washington
About this file
This Road Plan document (Exhibit F) is a specification guide issued by the Washington Department of Fish and Wildlife (WDFW) for contract harvesting operations on the Sherman Creek Wildlife Area in Pend Oreille County, Washington. The plan outlines comprehensive road construction, maintenance, and abandonment requirements for timber harvesting activities spanning approximately 122 acres, with specifications for three primary roads (Powerline Road, Upper Road, and Lower Road) and one temporary spur road. Pre-haul maintenance requirements include brushing, grading, ditch pulling, and culvert cleaning on the three primary roads, while post-haul maintenance requires grading, ditch pulling, and culvert cleaning on the same routes. Spur A is designated for temporary construction and heavy abandonment by November 30, 2026. All pre-haul road work must be completed before timber hauling begins, and contractors must provide minimum five calendar days' notice before commencing work on any designated roads. Road work equipment operations are prohibited on weekends and state-recognized holidays unless written authorization is granted by the Contract Administrator.
The Road Plan establishes detailed specifications for culvert installation, drainage construction, erosion control, and revegetation requirements to protect state resources and prevent sediment delivery to streams. Contractors must maintain all roads throughout the contract term in compliance with Forest Access Road Maintenance Specifications, including monthly culvert inspections and preventative maintenance measures. Heavy abandonment of Spur A requires surface ripping to minimum depth of 10 inches, outsloping at 30 percent minimum, embankment removal, non-drivable waterbar construction at maximum 250-foot spacing, earth barricade installation, and culvert removal. Revegetation specifications call for seed mixture application at 20 pounds per acre on approximately 3 acres of exposed soil, with grass seed meeting strict germination and purity standards. The Contract Administrator retains authority to suspend operations if wheel track rutting exceeds 6 inches, sediment delivery is observed, or surface stability problems persist, and contractors are responsible for all repair and replacement costs for damaged roadway infrastructure.
View the file
Other files
Show all 17
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
EXHIBIT F
RFQ 26-00003
Page 1 of 21 Revised March 2022 Metaline Sorts Contract No. 26-00003
STATE OF WASHINGTON
DEPARTMENT OF FISH AND WILDLIFE
METALINE ROAD PLAN
PEND OREILLE COUNTY
SHERMAN CREEK WILDLIFE AREA
FORESTER: BRIAN MIZE CONTRACT NO.: 26-00003
DATE: 11/24/2025
SECTION 0 – SCOPE OF PROJECT
0-1 ROAD PLAN SCOPE
Clauses in this road plan apply to all road related work, including landings and rock source development, unless otherwise noted.
0-2 REQUIRED ROADS
The specified work on the following roads is required.
Road Stations Type
Powerline Road 0+00 to 184+27 Pre & Post-Haul Maintenance
Upper Road 0+00 to 30+62 Pre & Post-Haul Maintenance
Lower Road 0+00 to 15+37 Pre & Post-Haul Maintenance
Spur A 0+00 to 2+50 Temporary Construction & Light Abandonment
0-4 CONSTRUCTION
This project includes, but is not limited to the following construction requirements:
New construction will require end hauling of material on Slopes >=60%.
Road <Stations> Requirements
Spur A 0+00 to 2+50 Temporary Construction & Heavy Abandonment by 11/30/2026
Page 2 of 21 Revised March 2022 Metaline Sorts Contract No. 26-00003
0-6 PRE-HAUL MAINTENANCE
This project includes, but is not limited to the following pre-haul maintenance requirements:
Road <Stations> Requirements
Powerline Road
0+00 to 184+27 Brushing, grading, ditch pulling, and culvert cleaning
Upper Road 0+00 to 30+62 Brushing, grading, ditch pulling, and culvert cleaning
Lower Road 0+00 to 15+37 Brushing, grading, ditch pulling, and culvert cleaning
0-7 POST-HAUL MAINTENANCE
This project includes, but is not limited to the following post-haul maintenance requirements:
Road <Stations> Requirements
Powerline Road
0+00 to 184+27 Grading, ditch pulling, and culvert cleaning
Upper Road 0+00 to 30+62 Grading, ditch pulling, and culvert cleaning
Lower Road 0+00 to 15+37 Grading, ditch pulling, and culvert cleaning
0-10 ABANDONMENT
This project includes abandonment listed in Clause 9-21 ROAD ABANDONMENT.
SECTION 1 – GENERAL
1-1 ROAD PLAN CHANGES
If the Contractor desires a change from this road plan including, but not limited to, relocation, extension, change in design, or adding roads; a revised road plan must be submitted in writing to the Contract Administrator for consideration. Before work begins, Contractor shall obtain approval from the State for any submitted plan that changes the scope of work or environmental condition from the original road plan.
1-8 REPAIR OR REPLACEMENT OF DAMAGED MATERIALS
Contractor shall repair or replace all materials, roadway infrastructure, and road components damaged during road work or operation activities. The Contract Administrator will direct repairs and replacements. Repairs to structural materials must
Page 3 of 21 Revised March 2022 Metaline Sorts Contract No. 26-00003 be made in accordance with the manufacturer’s recommendation and may not begin without written approval from the Contract Administrator.
1-20 COMPLETE BY DATE
Contractor shall complete pre-haul road work before the start of timber haul.
1-21 HAUL APPROVAL
Contractor shall not use roads under this road plan for any activities not associated with harvest operations without written approval from the Contract Administrator.
1-22 WORK NOTIFICATIONS
On the following road(s), Contractor shall notify the Contract Administrator a minimum of 5 calendar days before work begins.
Road Stations
Powerline Road 0+00 to 184+27
Upper Road 0+00 to 30+62
Lower Road 0+00 to 15+37
Spur A 0+00 to 2+50
1-25 ACTIVITY TIMING RESTRICTION
On all road(s), the operation of road construction equipment is not allowed on weekends or state recognized holidays, unless authorized in writing by the Contract Administrator.
1-26 OPERATING DURING CLOSURE PERIOD
IF PERMISSION IS GRANTED TO OPERATE DURING A CLOSURE PERIOD
Contractor shall provide a maintenance plan to include further protection of state resources. Contractor shall obtain written approval from the Contract Administrator for the maintenance plan, and shall put preventative measures in place before operating during the closure period. Contractor is required to maintain all haul roads at their own expense. If other operators are using, or desire to use these roads, a joint operating plan must be developed. All parties shall follow this plan.
1-29 SEDIMENT RESTRICTION
Contractor shall not allow silt-bearing runoff to enter any streams. . If sediment delivery is observed log hauling operations will be suspended until road drys out or mitigation measures, approved by the CA, are in place.
1-30 CLOSURE TO PREVENT DAMAGE
In accordance with Contract Clause G-220 STATE SUSPENDS OPERATION, the Contract Administrator will suspend road work or hauling right-of-way timber, forest products, or rock under the following conditions:
Page 4 of 21 Revised March 2022 Metaline Sorts Contract No. 26-00003
▪ Wheel track rutting exceeds 6 inches on access roads.
▪ Surface or base stability problems persist.
▪ Weather is such that satisfactory results cannot be obtained in an area of operations.
▪ When, in the opinion of the Contract Administrator excessive road damage or rutting may occur.
Operations must stop unless authority to continue working or hauling is granted in writing by the Contract Administrator. In the event that surface or base stability problems persist, Contractor shall cease operations, or perform corrective maintenance or repairs, subject to specifications within this road plan. Before and during any suspension, Contractor shall protect the work from damage or deterioration.
SECTION 2 – MAINTENANCE
2-1 GENERAL ROAD MAINTENANCE
Contractor shall maintain all roads used under this contract in accordance with the FOREST ACCESS ROAD MAINTENANCE SPECIFICATIONS for the entire term of this contract. Maintenance is required even during periods of inactivity.
2-4 PASSAGE OF LIGHT VEHICLES
Contractor shall maintain the following road(s) in a condition that will allow the passage of light administrative vehicles.
Road Stations
Powerline Road 0+00 to 184+27
Upper Road 0+00 to 30+62
2-5 MAINTENANCE GRADING – EXISTING ROAD
On the following road(s), Contractor shall use a grader to shape the existing surface as needed or as required by the Contract Administrator.
Road Stations Requirements
Powerline Road 0+00 to 184+27 Blade and grade
Upper Road 0+00 to 30+62 Blade and grade
Lower Road 0+00 to 15+37 Blade and grade
Page 5 of 21 Revised March 2022 Metaline Sorts Contract No. 26-00003
2-6 CLEANING CULVERTS
On the following road(s), Contractor shall clean the inlets and outlets of all culverts.
Road Stations
Powerline Road 0+00 to 184+27
Upper Road 0+00 to 30+62
Lower Road 0+00 to 15+37
2-7 CLEANING DITCHES, HEADWALLS, AND CATCH BASINS
On the following road(s), Contractor shall clean ditches, headwalls, and catchbasins.
Work must be completed before log haul begins and as part of the final maintenance.
Road Stations
Powerline Road 0+00 to 184+27
Upper Road 0+00 to 30+62
Lower Road 0+00 to 15+37
SECTION 3 – CLEARING, GRUBBING, AND DISPOSAL
SUBSECTION BRUSHING
3-1 BRUSHING
Harvester shall not deck right-of-way timber in the following areas:
▪ Within the grubbing limits.
▪ Within 50 feet of any stream.
▪ In locations that interfere with the construction of the road prism.
▪ In locations that impede drainage.
▪ On slopes greater than 40%.
Against standing trees unless approved by the Contract Administrator.
SUBSECTION CLEARING
3-8 PROHIBITED DECKING AREAS
Contractor shall not deck right-of-way timber in the following areas:
▪ Within the grubbing limits.
▪ Within 50 feet of any stream.
▪ In locations that interfere with the construction of the road prism.
▪ In locations that impede drainage.
▪ On slopes greater than 40%.
▪ Against standing trees unless approved by the Contract Administrator.
Page 6 of 21 Revised March 2022 Metaline Sorts Contract No. 26-00003
SUBSECTION ORGANIC DEBRIS
3-20 ORGANIC DEBRIS DEFINITION
Organic debris is defined as all vegetative material not eligible for removal by Contract Clause G-010 PRODUCTS SOLD AND SALE AREA or G-011 RIGHT TO REMOVE FOREST PRODUCTS AND CONTRACT AREA, that is larger than one cubic foot in volume within the brushing area as shown on the BRUSHING DETAIL.
3-21 DISPOSAL COMPLETION
Contractor shall remove organic debris from the road surface, ditchlines, and culvert inlets and outlets. Contractor shall complete all disposal of organic debris, before the contract termination date.
3-23 PROHIBITED DISPOSAL AREAS
Contractor shall not place organic debris in the following areas:
▪ Within 50 feet of a cross drain culvert.
▪ Within 100 feet of a live stream, or wetland ,unless used to comply with the specifications detailed in the Riparian Strategy, Clause Error! Reference source not found., and Clause Error! Reference source not found. On road subgrades, or excavation and embankment slopes.
▪ Against standing timber.
3-24 BURYING ORGANIC DEBRIS RESTRICTED
Contractor shall not bury organic debris unless otherwise stated in this plan.
SUBSECTION PILE
3-31 PILING
Contractor shall pile organic debris at landing sites no closer than 20 feet from standing timber and no higher than 10 feet. Piles must be free of rock and soil.
SECTION 4 – EXCAVATION
4-28 DITCH DRAINAGE
Ditches must drain to cross-drain culverts or ditchouts.
4-29 DITCHOUTS
On the following road(s), Contractor shall construct ditchouts as needed and as directed by the Contract Administrator. Ditchouts must be constructed in a manner that diverts
Page 7 of 21 Revised March 2022 Metaline Sorts Contract No. 26-00003 ditch water onto the forest floor and must have excavation backslopes no steeper than a 1:1 ratio. L or R denotes ditchout left or ditchout right.
Road Stations L or R
Powerline Road As Needed As Needed
Upper Road As Needed As Needed
Lower Road As Needed As Needed
SUBSECTION SHAPING
4-55 ROAD SHAPING
Contractor shall shape the subgrade and surface as shown on the TYPICAL SECTION SHEET. The subgrade and surface shape must ensure runoff in an even, un-concentrated manner, and must be uniform, firm, and rut-free.
4-56 DRY WEATHER SHAPING
At any time of year, the Contract Administrator may require the application of water to facilitate shaping activities. The method of water application is subject to written approval by the Contract Administrator.
SUBSECTION CULVERTS
5-5 CULVERTS
Harvester shall install culverts as part of this contract. Culverts must be installed concurrently with subgrade work. Culvert locations and the minimum requirements for culvert length and diameter are designated on the attached culvert list. Culvert, downspout, and flume lengths may be adjusted to fit as-built conditions and may not terminate directly on unprotected soil. Harvester shall obtain approval from the Contract Administrator for the quality of used culverts before installation.
5-6 USED CULVERT MATERIAL
Harvester may install used culverts on the following roads. All other roads must have new culverts installed.
Road Stations
All As Needed
5-7 TEMPORARY STREAM CULVERT INSTALLATION
Harvester shall install temporary culverts as shown on list below. Temporary stream culverts must be located in the natural channel of the stream. Temporary culverts must be removed within 30 days following completion of timber harvesting and site cleanup.
And as directed by the Contract Administrator
Page 8 of 21 Revised March 2022 Metaline Sorts Contract No. 26-00003
Road Stations
All As Needed
SUBSECTION CULVERT INSTALLATION
5-15 CULVERT INSTALLATION
Culvert installation must be in accordance with the CULVERT AND DRAINAGE SPECIFICATION DETAIL and must be installed in a manner consistent with the manufacturer’s recommendations.
5-16 APPROVAL FOR LARGER CULVERT INSTALLATION
Harvester shall obtain written approval from the Contract Administrator for the installation of culverts 30 inches in diameter and over before backfilling.
5-17 CROSS DRAIN SKEW AND SLOPE
Cross drains, on road grades in excess of 3%, must be skewed at least 30 degrees from perpendicular to the road centerline, except where the cross drain is at the low point in the road waterbars will not be skewed. Cross drain drivable waterbars must be installed at a slope steeper than the incoming ditch grade, but not less than 3% or more than 10%.
SUBSECTION ENERGY DISSIPATERS
5-20 ENERGY DISSIPATERS
Contractor shall install energy dissipaters if deemed necessary by the Contract Administrator.
Energy dissipaters must extend a minimum of 1 foot to each side of the culvert at the outlet and a minimum of 2 feet beyond the outlet. No placement by end dumping or dropping of rock is allowed
5-21 DOWNSPOUTS AND FLUMES
Downspouts and flumes longer than 10 feet must be staked on both sides at maximum intervals of 10 feet with 6-foot heavy-duty steel posts, and fastened securely to the posts with No. 10 galvanized smooth wire 1/2-inch bolts in accordance with the
CULVERT AND DRAINAGE SPECIFICATION DETAIL.
SUBSECTION CATCH BASINS, HEADWALLS, AND ARMORING
5-26 HEADWALLS FOR CROSS DRAIN CULVERTS
Contractor shall construct headwalls in accordance with the CULVERT AND DRAINAGE SPECIFICATION DETAIL. Rock used for headwalls must be approved by the Contract
Page 9 of 21 Revised March 2022 Metaline Sorts Contract No. 26-00003
Administrator. Rock must be placed on shoulders, slopes, and around culvert inlets and outlets. Minimum specifications require that rock be placed at a width of one culvert diameter on each side of the culvert opening, and to a height of one culvert diameter above the top of the culvert. Rock may not restrict the flow of water into culvert inlets or catch basins.
SUBSECTION SURFACE DRAINAGE
5-30 DRIVABLE WATERBAR CONSTRUCTION
Contractor shall construct drivable waterbars in accordance with the DRIVABLE WATERBAR DETAIL and as directed by the Contract Administrator. Drivable waterbars must be installed concurrently with construction of the subgrade and must be maintained in an operable condition.
5-31 ROLLING DIP CONSTRUCTION
Contractor shall construct rolling dips in accordance with the ROLLING DIP DETAIL and as directed by the Contract Administrator. Rolling dips must be installed concurrently with construction of the subgrade and must be maintained in an operable condition.
5-33 NATIVE SURFACE ROADS
If overwintered, native surface roads must be waterbarred (drivable or non-drivable) at the discretion of the Contract Administrator by November 1. Contractor shall construct waterbars at a maximum spacing that will produce a vertical distance of no more than 10 feet between waterbars or between natural drainage paths, and with a maximum spacing of 300 feet.
SUBSECTION DUST ABATEMENT
6-80 WATERING FOR DUST ABATEMENT
Contractor shall use water for dust abatement on the following roads as directed by the Contract Administrator.
Road Stations
Powerline Road As Needed
Upper Road As Needed
Lower Road As Needed
Page 10 of 21 Revised March 2022 Metaline Sorts Contract No. 26-00003
SUBSECTION REVEGETATION
8-15 REVEGETATION
On the following road(s), Harvester shall supply seed mixture previously approved by the Sherman Creek Wildlife Area Manager for all exposed soils resulting from road work activities as directed by the Contract Administrator. Required seed not spread by the termination of this contract will become the property of the state.
Road Qty (lbs)* Type Comments
All Roads to be Abandoned
20lbs/acre See 8-25 See 8-25
All Landings to be Abandoned
20lbs/acre See 8-25 See 8-25
*Quantities are estimates only. Actual quantities may vary and are the responsibility of the Harvester.
8-16 REVEGETATION SUPPLY
The Harvester shall provide the seed mixture as specified by the Sherman Creek Wildlife Area Manager.
SUBSECTION SEED AND MULCH
8-25 GRASS SEED
Harvester shall supply the seed mixture listed below for all exposed soil as specified by the Contract Administrator at a rate of 20 pounds per acre with an estimation of 3 acres in total of exposed soil including all abandonments and landings. Grass seed must meet the following specifications:
1. Weed seed may not exceed 0.5% by weight.
2. All seed species must have a minimum 90% germination rate, unless otherwise specified.
3. Seed must be certified.
4. Seed must be furnished in standard containers showing the following information:
a. Common name of seed
b. Net weight
c. Percent of purity
d. Percentage of germination
e. Percentage of weed seed and inert material
5. Seed must conform to the following mixture unless a comparable mix is approved in writing by the Contract Administrator.
Page 11 of 21 Revised March 2022 Metaline Sorts Contract No. 26-00003
Kind and Variety of Seed in Mixture % by Weight Minimum % germination
Mountain Brome – Bromar Mtn 45% 90%
Blue Wildrye 25% 90%
Bluebunch Wheatgrass – Anatone 25% 90%
Idaho Fescue 5% 90%
SECTION 9 – POST-HAUL ROAD WORK
SUBSECTION POST-HAUL MAINTENANCE
9-5 POST-HAUL MAINTENANCE
Harvester shall perform post-haul maintenance in accordance with the FOREST ACCESS ROAD MAINTENANCE SPECIFICATIONS and as specified below.
Road Stations Additional Requirements
Powerline Road
0+00 to 184+27 Grade & Shape/restablish any ditch and ditch outs, cleanout all culverts
Upper Road
0+00 to 30+62 Grade & Shape/restablish any ditch and ditch outs, cleanout all culverts
Lower Road
0+00 to 15+37 Grade & Shape/restablish any ditch and ditch outs, cleanout all culverts
SUBSECTION CLOSURE
9-21 ROAD ABANDONMENT
Contractor shall abandon the following roads before the termination of this contract.
Work must be in accordance with the ROAD ABANDONMENT CROSS SECTIONS DETAIL.
Road Stations Type Date
Spur A 0+00 to 2+50 Heavy Abandonment 11/30/2026
9-22 LIGHT/MEDIUM DECOMMISSIONING AND ABANDONMENT
▪ Remove road shoulder berms except as directed by Contract Administrator.
▪ Construct drivable waterbars according to the attached DRIVABLE WATERBAR
DETAIL at a maximum spacing that will produce a vertical drop of no more than 6 inches between waterbars or between natural drainage paths and with a maximum spacing of 500 feet, or as directed by the Contract Administrator.
▪ Skew waterbars at least 30 degrees from perpendicular to the road centerline on roads in excess of 3 percent grade.
Page 12 of 21 Revised March 2022 Metaline Sorts Contract No. 26-00003
▪ Key waterbars into the cut-slope to intercept the ditch. Waterbars must be outsloped to provide positive drainage. Outlets must be on stable locations.
▪ Apply grass seed at discretion of CA and in accordance with Section 8 EROSION CONTROL. If scenario for grass seed germinatation is not present during contract term then contractor shall supply grass seed to Wildlife Area Manager.
▪ Cover, concurrently with abandonment, all exposed soils within 100 feet of any live stream, with a 8 inch deep layer of straw. See engineered design for culvert removal.
▪ Provide and evenly spread a 6-inch layer of straw to all exposed soils associated with stream culvert removals. See engineered design for culvert removal.
9-24 HEAVY DECOMMISSIONING AND ABANDONMENT
▪ Fill in ditches.
▪ Rip the surface to a minimum depth of 10 inches.
▪ Outslope the surface at a minimum of 30 percent.
▪ Remove embankments, sidecast fill, and place material into cut-banks and shape banks to conform to the natural ground.
▪ Remove road shoulder berms except as directed.
▪ Construct non-drivable waterbars in accordance with the attached NON-DRIVABLE
WATERBAR DETAIL at a maximum spacing that will produce a vertical drop of no more than 10 feet between waterbars or between natural drainage paths and with a maximum spacing of 250 feet, or as marked in the field.
▪ Skew waterbars at least 30 degrees from perpendicular to the road centerline on roads in excess of 3 percent grade.
▪ Key waterbars into the cut-slope to intercept the ditch. Waterbars must be outsloped to provide positive drainage. Outlets must be on stable locations.
▪ Block roads with earth barricades in accordance with the attached EARTH
BARRICADE DETAIL.
▪ Remove culverts.
▪ Remove ditch cross drain culverts and leave the resulting trench open.
▪ Apply grass seed concurrently with abandonment and in accordance with Section 8
EROSION CONTROL.
▪ Cover, concurrently with abandonment, all exposed soils within 100 feet of any live stream, with a 8-inch deep layer of straw.
▪ Provide and evenly spread a 6-inch layer of straw to all exposed soils associated with stream culvert and puncheon removals, as well as all waste material generated by fill removal that are within 30 feet of excavation limits.
▪ Scatter woody debris onto abandoned road surfaces within line of site from starting station.
Page 13 of 21 Revised March 2022 Metaline Sorts Contract No. 26-00003
Page 14 of 21 Revised March 2022 Metaline Sorts
Page 15 of 21 Revised March 2022 Metaline Sorts
Page 16 of 21 Revised March 2022 Metaline Sorts
Page 17 of 21 Revised March 2022 Metaline Sorts Contract No. 26-00003
CULVERT
* BEGIN 2:1 SLOPE AT FIVE FEET FROM
BANK FULL WIDTH
2:1 BACKSLOPE
2:1 BACKSLOPE
ROAD SURFACE
BANK FULL
WIDTH
BANK FULL
WIDTH
*2 LAYERS OF
GEOTEXTILE
FABRIC
TEMPORARY CULVERT DETAIL
FILL TO
BE REMOVED
Page 18 of 21 Revised March 2022 Metaline Sorts
Page 19 of 21 Revised March 2022 Metaline Sorts Contract No. 26-00003
5 FEET MIN
BEYOND DITCH
15 FEET MIN
ABOVE ROAD
CENTERLINE5 FEET MIN
BEYOND
ROAD EDGE
BRUSHING DETAIL
(OR EDGE OF
ROAD IF NO
DITCH)
Page 20 of 21 Revised March 2022 Metaline Sorts Contract No. 26-00003
FOREST ACCESS ROAD MAINTENANCE SPECIFICATIONS
Surface
▪ Grade and shape road surfaces, turnouts, and shoulders to the original shape to provide a smooth, rut-free traveled surface and maintain surface water runoff in an even, unconcentrated manner.
▪ Blading shall not undercut the backslope.
▪ If required by the Contract Administrator, water shall be applied as necessary to control dust and retain fine surface rock.
▪ Surface material shall not be bladed off the roadway. Replace surface material as directed by the Contract Administrator.
▪ Remove shoulder berms, created by grading, to facilitate drainage, except as marked or directed by the Contract Administrator.
Drainage
▪ Prevent silt bearing road surface and ditch runoff from delivering sediment to any streams or wetlands.
▪ Maintain rolling dips and drivable waterbars as needed to keep them functioning as intended.
▪ Maintain headwalls to the road shoulder level with material that will resist erosion.
▪ Maintain energy dissipaters at culvert outlets with non-erodible material or rock.
▪ Keep ditches, culverts, and other drainage structures clear of obstructions and functioning as intended.
▪ Inspect and clean culverts at least monthly, with additional inspections during storms and periods of high runoff. This shall be done even during periods of inactivity.
Preventative Maintenance
▪ Perform preventative maintenance work to safeguard against storm damage, such as blading to ensure correct runoff, ditch and culvert cleaning, and waterbar maintenance.
Termination of Use or End of Season
▪ At the conclusion of logging operations, ensure all conditions of these specifications have been met.
Page 21 of 21 Revised March 2022 Metaline Sorts Contract No. 26-00003
Debris
▪ Remove fallen timber, limbs, and stumps from the slopes, roadway, ditchlines, and culvert inlets.
Do not undercut backslope
Keep clear of obstructions
Keep ditches open and free of debris to ensure water drainage away from road.
Add stable material or flume
No berms except as directed
File details come from the government source that posted it. Updated .