MCA South Kitchen HVAC Plans 18Jun25 - Sealed.pdf

PDF 3 MB Posted

Attached to
MCA South- Kitchen HVAC Renovations
Solicitation number
CRFQ-0603-ADJ2600000002-3
Issued by
Monongalia County, West Virginia

About this file

These construction documents outline the HVAC, mechanical, electrical, and plumbing upgrades for the Challenge Academy South Kitchen at the WV Army National Guard facility. The project involves selective demolition and renovation of the second floor, including removing and replacing ductwork, mechanical equipment, electrical systems, and ceiling infrastructure. The design is prepared by Miller Engineering, Inc. and covers comprehensive system upgrades including a new Carrier RTU-1 air handling unit, modifications to existing pumps and piping, electrical panel and circuit adjustments, and reinstallation of lighting, fire alarm, and security systems.

The project appears to be funded by the WV Army National Guard and involves precise mechanical and electrical system replacements to modernize the kitchen and surrounding spaces. The drawings indicate careful coordination between disciplines, with specific notes about maintaining existing infrastructure while upgrading critical systems. The mechanical schedules detail equipment specifications like the RTU-1 with 8,700 CFM air flow, 15 HP fan, and associated heating and cooling coils. Electrical plans show reusing existing electrical panels and carefully routing new conduits and receptacles, suggesting a cost-conscious approach to system upgrades that minimizes new infrastructure while improving overall building performance.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PENNSYLVANIA OFFICE

429 LAUREL RUN ROAD

CARMICHAELS, PA 15320

PHONE: (724) 966 - 5655

WEST VIRGINIA OFFICE

54 WEST RUN RD

MORGANTOWN, WV 26508

PHONE: (304) 291 - 2234

CHALLENGE ACADEMY SOUTH KITCHEN HVAC

UPGRADES

MEI PROJECT #24014

DWG TITLE

COVER

G000 COVER PAGE

G001 PROJECT GENERAL NOTES, ABBREVATIONS, AND SYMBOLS

G002 PROJECT SITE

ARCHITECTURAL

A011 DEMO RCP

A101 SECOND FLOOR PLAN

A111 NEW RCP

FIRE PROTECTION

F101 FIRE PROTECTION PLAN

PLUMBING

P000 PLUMBING ABBREVIATIONS

P101 PLUMBING PLAN

P102 PLUMBING PLAN - TEMPORARY FACILITIES - ALT #1

MECHANICAL

M000 MECHANICAL ABBREVIATIONS

M001 MECHANICAL DEMO PLAN

M002 MECHANICAL DEMO PLAN

M003 MECHANICAL PIPING DEMO PLAN

M101 MECHANICAL PLAN

M102 MECHANICAL PIPING PLAN

M201 MECHANICAL PLAN

M501 MECHANICAL DETAILS

M502 MECHANICAL DETAILS

M601 MECHANICAL SCHEDULES

ELECTRICAL

E000 ELECTRICAL ABBREVIATIONS

E001 ELECTRICAL DEMO PLAN

E002 ELECTRICAL DEMO PLAN

E003 ELECTRICAL CEILING DEMO PLAN

E101 ELECTRICAL PLAN

E102 ELECTRICAL CEILING PLAN

E103 ELECTRICAL PLAN - TEMPORARY FACILITIES - ALT #1

E501 ELECTRICAL SCHEDULES & DETAILS

CONCRETE

CLAY UNIT MASONRY

CONCRETE UNIT MASONRY

WOOD FRAMING

PLYWOOD

FINISHED WOOD

BATT INSULATION

RIGID INSULATION

GYPSUM BOARD

SOIL

CRUSHED STONE

MATERIAL HATCH DESCRIPTION

CENTER LINE

HIDDEN LINE

VIEW TITLE

ELEVATION MARKER

SECTION MARKER

DETAIL CALLOUT

ROOM TAG

GRID LINE MARKER

ELEVATION DATUM

SPOT ELEVATION MARK

WALL TAG

DOOR TAG

WINDOW TAG

CALL-OUT SYMBOL DESCRIPTION

View Name 1/8" = 1'-0"

A101

ROOM

NAME

A101

4 2

A101

A101

SIM

Montum Architecture, LLC

55 ER Path

Keyser, WV 26726

304-276-7151 www.montumarch.com

PA OFFICE:

429 LAUREL RUN ROAD

CARMICHAELS, PA 15320

PH: (724) 966-5655

WV OFFICE:

54 WEST RUN RD.

MORGANTOWN, WV 26508

PH: (304) 291-2234

SHEET NAME:

MILLER ENGINEERING INC.

COPY RIGHT:

CHECKED BY:

DRAWN BY:

DESIGNED BY:

BCM

SEAL:

CONSULTANT:

PROJECT NAME:

PROJECT OWNER:

PROJECT STATUS:

PROJECT NUMBER:

ORIGINAL PAGE SIZE: 22x34

G001

PROJECT GENERAL

NOTES,

ABBREVATIONS, AND

SYMBOLS

18 JUNE, 2025

TWT

TWT

24014

CONSTRUCTION

DOCUMENTS

WV ARMY NATIONAL

GUARD

CHALLENGE

ACADEMY SOUTH

KITCHEN HVAC

UPGRADES

DEFINITIONS

PROVIDE: FURNISH AND INSTALL, COMPLETE AND READY FOR THE INTENDED USE.

FURNISH: SUPPLY AND DELIVER TO PROJECT SITE, READY FOR UNLOADING, UNPACKING, ASSEMBLY, INSTALLATION, AND SIMILAR OPERATIONS.

INSTALL: UNLOAD, TEMPORARILY STORE, UNPACK, ASSEMBLE, ERECT, PLACE, ANCHOR, APPLY, WORK TO DIMENSION, FINISH, CURE, PROTECT, CLEAN, AND SIMILAR

OPERATIONS AT PROJECT SITE.

EXISTING TO REMAIN (OR EXISTING) (OR EX.): LEAVE EXISTING ITEMS THAT ARE NOT TO BE REMOVED AND THAT ARE NOT OTHERWISE INDICATED TO BE SALVAGED OR

REINSTALLED.

REMOVE (OR DEMOLISH) (OR DEMO): DETACH ITEMS FROM EXISTING CONSTRUCTION AND DISPOSE OF THEM OFF-SITE UNLESS INDICATED TO BE SALVAGED OR

REINSTALLED.

REMOVE AND SALVAGE: DETACH ITEMS FROM EXISTING CONSTRUCTION, IN A MANNER TO PREVENT DAMAGE, AND DELIVER TO OWNER READY FOR REUSE.

REMOVE AND REINSTALL (OR REMOVE AND REUSE): DETACH ITEMS FROM EXISTING CONSTRUCTION, IN A MANNER TO PREVENT DAMAGE, PREPARE FOR REUSE, AND

REINSTALL WHERE INDICATED.

DISMANTLE: TO REMOVE BY DISASSEMBLING OR DETACHING AN ITEM FROM A SURFACE, USING GENTLE METHODS AND EQUIPMENT TO PREVENT DAMAGE TO THE ITEM

AND SURFACES; DISPOSING OF ITEMS UNLESS INDICATED TO BE SALVAGED OR REINSTALLED.

DISPOSE: REMOVAL OFF-SITE OF DEMOLITION AND CONSTRUCTION WASTE AND SUBSEQUENT SALE, RECYCLING, REUSE, OR DEPOSIT IN LANDFILL OR INCINERATOR ACCEPTABLE TO AUTHORITIES HAVING JURISDICTION AND IN ACCORDANCE WITH PROJECT REQUIREMENTS.

# Number & And " Inch ' Foot @ At +/- Approximately

ABV Above ACM Aluminum Composite Material ACM Asbestos Containing Material ACT Acoustic Ceiling Tile AD Area Drain ADA Americans with Disabilities Act ADAAG Americans with Disabilities Act Architectural Guidelines ADD Addendum ADJ Adjustable AFF Above Finished Floor AHJ Authority Having Jurisdiction (Code Official, Fire Marshal, Etc.)

ALT Alternate ALUM Aluminum ANOD Anodized APPROX Approximately

BFF Below Finished Floor BIT Bituminous BL Borrowed Lite, Hollow Metal BSMT Basement BYND Beyond BOT Bottom BUR Built-up Roof

C/C Center to Center CB Chalkboard CF Cubic Foot CFCI Contractor Furnished, Contractor Installed CFOI Contractor Furnished, Owner Installed CIP Cast In Place CIRC Circumference or Circulating CJ Control Joint CL Column Line CLG Ceiling CLR Clear CMU Concrete Masonry Unit COL Column COMPRCompressible CONC Concrete CONT Continuous CPT Carpet CT Ceramic Tile

D Deep DBL Double DEG Degree DEMO Demolish or Demolition DIA Diameter DIM Dimension DIMS Dimensions DN Down DS Down Spout DWG Drawing

EA Each EJ Expansion Joint EL Elevation ELEC Electrical ELEV Elevator or Elevation EOS Edge of Slab EPDM Ethylene Propylene Diene Monomer Membrane EQ Equal EX Existing EXIST Existing EXP JT Expansion Joint EXT Exterior EXT GDExterior Grade

FD Floor Drain or Fire Department FE Fire Extinguisher FEC Fire Extinguisher Cabinet FIXT Fixture FLR Floor FO Face Of FR Fire Retardant Treated FRP Fiberglass Reinforced Plastic FT Foot

GA Gauge GALV Galvanized GC General Contractor GFCI Ground Fault Circuit Interrupter GL Glass GWB Gypsum Wall Board

HC Hollow Core HM Hollow Metal HORIZ Horizontal HP High Point HR Hour HVAC Heating, Ventilating, And Air Conditioning

ID Inside Diameter IRGWB Impact Resistant Gypsum Wall Board ILO In Lieu Of INSUL Insulated or Insulation INT Interior JB Junction Box

L Long LAV Lavatory LBS Pounds

MAX Maximum MB Markerboard MO Masonry Opening MECH Mechanical MEMBR Membrane MEZZ Mezzanine MIN Minimum MISC Miscellaneous MRGWB Moisture-Resistant Gypsum Wall Board MTL Metal

NA Not Applicable NIC Not In Contract (See OFOI) NO Number NOM Nominal NTS Not to Scale

OC On Center OD Outside Diameter OFCI Owner Furnished, Contractor Installed OFOI Owner Furnished, Owner Installed OH Overhand OPP Opposite or Opposite Hand OZ Ounce

PCC Pre-Cast Concrete PLAM Plastic Laminate PLUMB Plumbing PLYD Plywood PT Pressure Treated PNT Paint or Painted PVC Polyvinyl Chloride

RBR Rubber RCP Reflected Ceiling Plan RB Rubber (Vinyl) Wall Base RD Roof Drain REBAR Reinforcing Bar REINF Reinforce REQD Required REV Revision RO Rough Opening RM Room

SB Splash Block SD Supplemental Document (Drawing Revision) SFM State Fire Marshal SQFT Square Foot SF Aluminum Storefront Framing SIM Similar SPEC Specified OR Specification SPK Speaker SSTL Stainless Steel STC Sound Transmission Coefficient STL Steel STRUC Structure or Structural

T Tall T&B Top and Bottom T&G Tongue and Groove TB Tackboard TELE Telephone TLT Toilet TME To Match Existing TO Top Of TOC Top Of Concrete TOS Top Of Steel TOW Top Of Wall T/D Telephone/Data TYP Typical

UL Underwriters Laboratory UNO Unless Noted Otherwise U/S Underside

VERT Vertical VIF Verify In Field VP Vision Panel

W Wide W/ With W/o Without WD Wood WP Weatherproof or Waterproof

GENERAL DRAWING SET NOTES

1. WRITTEN SPECIFICATIONS FOR THE PROJECT ARE PROVIDED IN THE PROJECT MANUAL AND REQUIREMENTS ARE COMPLEMENTARY.

2. CONTRACTOR SHALL BE RESPONSIBLE FOR ALL CONSTRUCTION METHODS, PROCEDURES AND SEQUENCES TO MAINTAIN AND PROTECT THE STRUCTURAL INTEGRITY OF ALL NEW AND EXISTING CONSTRUCTION AT ALL STAGES.

3. THE CONTRACTOR SHALL ABIDE BY ALL SAFETY RULES AND REGULATIONS IMPOSED BY OSHA AND THE OWNER AT ALL TIMES. IF THERE IS A CONFLICT BETWEEN THE TWO, THE STRICTER REGULATION SHALL APPLY.

4. SPECIFIC REQUIREMENTS SHALL SUPERSEDE GENERAL/GENERIC REQUIREMENTS.

5. DIMENSIONS SHALL SUPERSEDE DRAWINGS. DO NOT SCALE DRAWINGS. WHERE A MISSING OR CONFLICTING DIMENSION OCCURS, THE ARCHITECT SHALL BE CONTACTED IMMEDIATELY TO OBTAIN THE NECESSARY CLARIFICATION.

6. THE CONTRACTOR SHALL NOTIFY THE ARCHITECT OF ANY AND ALL DISCREPANCIES BETWEEN THE DRAWINGS AND ACTUAL FIELD CONDITIONS IMMEDIATELY UPON DISCOVERY.

7. COMMENCEMENT OF THE WORK SHALL SIGNIFY THE CONTRACTOR IS FAMILIAR WITH AND AGREES TO THE SCOPE OF WORK AS OUTLINED IN THE CONTRACT DOCUMENTS.

8. THE CONTRACTOR SHALL BE RESPONSIBLE FOR PROPER DISPOSAL OF ALL MATERIALS RESULTING FROM THE WORK OF THIS PROJECT.

WORK REQUIRING GRAVITY DRAINAGE WILL HAVE REASONABLE PRIORITY OF PLACEMENT. TRADES WILL COORDINATE PLACEMENT OF THEIR WORK TO AVOID CONFLICT WITH DRAINAGE LINES.

ABBREVATIONS AND SYMBOLS

N O

D

E S

C R

IP

T

IO

N

D A

T E

07/09/2025 8:01:40 AM

Montum Architecture, LLC

55 ER Path

Keyser, WV 26726

304-276-7151 www.montumarch.com

PA OFFICE:

429 LAUREL RUN ROAD

CARMICHAELS, PA 15320

PH: (724) 966-5655

WV OFFICE:

54 WEST RUN RD.

MORGANTOWN, WV 26508

PH: (304) 291-2234

SHEET NAME:

MILLER ENGINEERING INC.

COPY RIGHT:

CHECKED BY:

DRAWN BY:

DESIGNED BY:

BCM

SEAL:

CONSULTANT:

PROJECT NAME:

PROJECT OWNER:

PROJECT STATUS:

PROJECT NUMBER:

ORIGINAL PAGE SIZE: 22x34

G002

PROJECT SITE

18 JUNE, 2025

TWT

TWT

24014

CONSTRUCTION

DOCUMENTS

WV ARMY NATIONAL

GUARD

CHALLENGE

ACADEMY SOUTH

KITCHEN HVAC

UPGRADES

N O

D

E S

C R

IP

T

IO

N

D A

T E

1" = 40'-0"

OVERALL PROJECT SITE

MACLIN HALL

TECH CENTER

07/09/2025 8:01:53 AM

C

D

E

F

G

1 2 3 4 5 6

DEMO CEILING TYP

3 3

6 6 6

AREA OF CEILING TILE, GRID, AND BULKHEAD DEMOLITION

AREA OF EXISTING CEILING TILE AND GRID TO REMAIN

AREA OF BULKHEAD, WALL, KITCHEN HOOD, OR DRYWALL CEILINGS TO REMAIN

REMOVE EXISTING CEILING GRID AND TILE AND PREP FOR NEW CEILING1

REMOVE EXISTING DRYWALL LIGHTING COVE BULKHEAD AND PREP FOR NEW CEILING2

REMOVE EXISTING SUSPENDED CLOUD CEILING GRID AND TILE AND PREP FOR NEW CEILING3

REMOVE EXISTING DRYWALL PARTITION AND PREP FOR NEW CEILING4

CUT OPENING ABOVE CEILING IN BULKHEAD IN THIS AREA FOR DUCTWORK AND PATCH5

EXISTING ACOUSTIC CEILING TO REMAIN6

KITCHEN HOOD7

EXISTING COOLER/FREEZER CEILING8

EXISTING KITCHEN HOOD TO BE REMOVED, SEE MEP9

EXISTING STAIRWELL10

Montum Architecture, LLC

55 ER Path

Keyser, WV 26726

304-276-7151 www.montumarch.com

PA OFFICE:

429 LAUREL RUN ROAD

CARMICHAELS, PA 15320

PH: (724) 966-5655

WV OFFICE:

54 WEST RUN RD.

MORGANTOWN, WV 26508

PH: (304) 291-2234

SHEET NAME:

MILLER ENGINEERING INC.

COPY RIGHT:

CHECKED BY:

DRAWN BY:

DESIGNED BY:

BCM

SEAL:

CONSULTANT:

PROJECT NAME:

PROJECT OWNER:

PROJECT STATUS:

PROJECT NUMBER:

ORIGINAL PAGE SIZE: 22x34

A011

DEMO RCP

18 JUNE, 2025

JAH

TFP

24014

CONSTRUCTION

DOCUMENTS

WV ARMY NATIONAL

GUARD

CHALLENGE

ACADEMY SOUTH

KITCHEN HVAC

UPGRADES

1/8" = 1'-0"

LEVEL 2 DEMO - RCP

N O

D

E S

C R

IP

T

IO

N

D A

T E

REFLECTED CEILING DEMOLITION PLAN KEY

UP

UP

UP

UP

UPUP

UP

S

DD

A

B

C

D

E

F

G

1 2 3 4 5 6 7

A101

4,000 PSI, 6"

CONCRETE PAD

A101

A101

DEMO WALL BETWEEN COLUMNS ABOVE

BACKSPLASH HEIGHT CAP & RE-FINISH

WALL. PAINT TO MATCH EXISTING.

A101

NEW COUNTER OVER

EXISTING WALL

RETAINING WALL

MIN

4' - 0"

4" PERF FOOTING DRAIN, CONT.

TO DAYLIGHT OR STORM DRAIN

#57 STONE, WRAPPED

IN FILTER FABRIC

4,000 PSI, 6" CONCRETE PAD

6" MAX

TO NOT EXCEED 4' TALL

GRAVEL FILL

CORE AND DOWEL

ADHERED CAP STONES

REMOVE GLASS AND MULLION FROM

CURTAIN WALL AND INFILL. TURN

WINDOW HARDWARE & FRAME OVER

TO OWNER. SEE MECHANICAL.

LEVEL 2

21' - 0"

DRYWALL BULKHEAD

WIDTH OF WINDOW

DRYWALL INFILL

LEVEL 2

21' - 0"

LEVEL 2

21' - 0"

2' - 1"

DEMO WALL BETWEEN COLUMNS

ABOVE BACKSPLASH HEIGHT CAP &

RE-FINISH WALL. PAINT TO MATCH

EXISTING.

REMAINING WALL TO BE

FASTENED TO THE BASE

CABINETS FROM WITHIN

THE CABINETS.4

10" COUNTER

SUPPORTS @ 12" O.C.

Montum Architecture, LLC

55 ER Path

Keyser, WV 26726

304-276-7151 www.montumarch.com

PA OFFICE:

429 LAUREL RUN ROAD

CARMICHAELS, PA 15320

PH: (724) 966-5655

WV OFFICE:

54 WEST RUN RD.

MORGANTOWN, WV 26508

PH: (304) 291-2234

SHEET NAME:

MILLER ENGINEERING INC.

COPY RIGHT:

CHECKED BY:

DRAWN BY:

DESIGNED BY:

BCM

SEAL:

CONSULTANT:

PROJECT NAME:

PROJECT OWNER:

PROJECT STATUS:

PROJECT NUMBER:

ORIGINAL PAGE SIZE: 22x34

A101

SECOND FLOOR

PLAN

18 JUNE, 2025

JAH

TFP

24014

CONSTRUCTION

DOCUMENTS

WV ARMY NATIONAL

GUARD

CHALLENGE

ACADEMY SOUTH

KITCHEN HVAC

UPGRADES

1/8" = 1'-0"

02 - LEVEL 2 NEW PLAN

N O

D

E S

C R

IP

T

IO

N

D A

T E

1/8" = 1'-0"

KEY STONE WALL SECTION

1/4" = 1'-0"

CURTIAN WALL

1/4" = 1'-0"

RETURN GRILLE BULKHEAD

1/4" = 1'-0"

WALL TERMINATION SECTION

E

F

G

1 2 3 4 5 6

A.F.F.

NEW 2' x 2' ACT

8' - 0"

A.F.F.

NEW 2' x 2' ACT

8' - 0"

A.F.F.

NEW 2' x 2' ACT

8' - 6"A.F.F.

NEW 2' x 2' ACT

8' - 0"

A.F.F.

EXISTING 2' x 2' ACT

7' - 6"

A.F.F.

EXISTING 2' x 2' ACT

8' - 0"

A.F.F.

EXISTING 2' x 2' ACT

8' - 0"

A.F.F.

EXISTING 2' x 2' ACT

8' - 0"

A.F.F.

EXISTING 2' x 2' ACT

7' - 6" A.F.F.

NEW 2' x 2' ACT

8' - 0"

A.F.F.

NEW 2' x 2' ACT

8' - 6"

A.F.F.

EXISTING 2' x 2' ACT

7' - 6"

A.F.F.

MOISTURE RESISTANT 2' x 2' ACT

8' - 0"

A.F.F.

NEW 2' x 2' ACT

8' - 0"

A.F.F.

NEW 2' x 2' ACT

8' - 6"

A.F.F.

MOISTURE RESISTANT 2' x 2' ACT

8' - 0"

SUPPLY DIFFUSER

RETURN GRILLE

EXHAUST GRILLE

2X2 RECESSED LIGHT FIXTURE

EXIT SIGN

SURFACE MOUNTED ROUND LIGHT FIXTURE

FIRE PROTECTION HEAD

Montum Architecture, LLC

55 ER Path

Keyser, WV 26726

304-276-7151 www.montumarch.com

PA OFFICE:

429 LAUREL RUN ROAD

CARMICHAELS, PA 15320

PH: (724) 966-5655

WV OFFICE:

54 WEST RUN RD.

MORGANTOWN, WV 26508

PH: (304) 291-2234

SHEET NAME:

MILLER ENGINEERING INC.

COPY RIGHT:

CHECKED BY:

DRAWN BY:

DESIGNED BY:

BCM

SEAL:

CONSULTANT:

PROJECT NAME:

PROJECT OWNER:

PROJECT STATUS:

PROJECT NUMBER:

ORIGINAL PAGE SIZE: 22x34

A111

NEW RCP

18 JUNE, 2025

JAH

TFP

24014

CONSTRUCTION

DOCUMENTS

WV ARMY NATIONAL

GUARD

CHALLENGE

ACADEMY SOUTH

KITCHEN HVAC

UPGRADES

1/8" = 1'-0"

LEVEL 2 - RCP

N O

D

E S

C R

IP

T

IO

N

D A

T E

REFLECTED CEILING LEGEND

GENERAL NOTES:

• 2' X 2' ACT CEILING INSTALL NEW TRACK AND

CEILING TILE, CEILING TILE SUPPLIED BY OWNER.

• MOLD RESISTANT 2' X 2' ACT CEILING INSTALL

NEW TRACK AND CEILING TILE.

E

F

G

1 2 3 4 5 6

MAKE SAFE EXISTING FIRE PROTECTION HEADS FOR INSTALLTION IN NEW CEILING. ADJUST HEIGHTS OF HEADS IN DINING AREA FOR NEW CEILING HEIGHT. MAKE ADJUSTMENTS TO FIRE PROTECTION PIPING TO AVOID

CONFLICTS W/ NEW DUCTWORK.

1. PROVIDE FIRE PROTECTION SYSTEM DESIGN AND INSTALLATION

AS NECESSARY TO MEET CODES, STANDARDS, AND

REQUIREMENTS OF ALL AUTHORITIES HAVING JURISDICTION

(AHJ) AND INSURANCE UNDERWRITERS.

2. COORDINATE ALL WORK w/ OTHER TRADES PRIOR TO THE

FABRICATION OR INSTALLATION OF ANY PIPING.

3. PROVIDE SYSTEM DEVICES, PIPING, AND COMPONENTS AS

NECESSARY TO INSTALL A COMPLETE FIRE PROTECTION

SYSTEM. THE EXISTING SYSTEM COMPONENTS AND PIPING MAY

BE REUSED w/ THE APPROVAL OF THE AHJ.

4. RETAIN THE SERVICES OF A NICET LEVEL 4 SYSTEM DESIGNER

TO DESIGN AND LAYOUT THE FULL SYSTEM AS NECESSARY TO

MEET THE CURRENT NFPA, STATE, AND LOCAL REQUIREMENTS.

ZONE THE FIRE PROTECTION SYSTEM AS NECESSARY. PROVIDE

ALL DEVICES AS REQUIRED FOR THE INSTALLATION OF A

COMPLETE, TEST INSPECTED, CODE COMPLIANT SYSTEM.

OBTAIN ALL NECESSARY APPROVALS PRIOR TO INSTALLATION

OF SYSTEM. OBTAIN FINAL INSPECTION AS REQUIRED BY AHJ.

5. SUBMIT DETAILED FIRE PROTECTION DRAWINGS, HYDRAULIC

CALCULATIONS, & ALL ITEMS STATED ON THE ICC CHECKLIST TO

THE CODE REVIEW OFFICIAL. AFTER THE APPROVAL OF THE

CODE REVIEW OFFICIAL, SEND THE FIRE PROTECTION

DRAWINGS & HYDRAULIC CALCULATIONS TO THE ARCHITECT &

ENGINEER FOR APPROVAL.

6. DRAWINGS ARE DIAGRAMMATIC IN NATURE. THE CONTRACTOR

MUST FIELD VERIFY ACTUAL CONDITIONS AT THE SITE PRIOR TO

PRECEDING w/ THE WORK.

7. LOCAL UTILITY BOARD PRIOR TO THE START OF DESIGN. COPY

DESIGN BASIS FLOW TEST DATA TO THE OWNER.

8. PROVIDE DEVICES AND INTERCONNECTION TO THE FIRE ALARM

SYSTEM FOR ALL ZONING, NOTIFICATION, AND ALARM AS

REQUIRED. COORDINATE w/ FIRE ALARM CONTRACTOR PRIOR TO

BIDDING.

9. SEE ARCHITECTURAL DRAWINGS FOR EXACT LOCATION OF FIRE

EXTINGUISHER CABINETS, FIRE HOSE CABINETS, AND SIAMESE

CONNECTIONS.

10. CENTER HEADS IN CEILING TILES. VERIFY BEFORE INSTALLATION

THE EXACT CEILING TYPE & PATTERN.

11. COORDINATE FINAL LOCATIONS OF SPRINKLER HEADS, PIPING, &

ALL NEW WORK w/ LIGHT FIXTURES, DIFFUSERS, GRILLES, SMOKE DETECTORS, SPEAKERS, & OTHER CEILING MOUNTED

DEVICES. MAKE MINOR MODIFICATIONS TO SUIT.

12. PROVIDE SLEEVES & FIRESTOP SEALANTS WHERE PIPES

PENETRATE FIRE RATED FLOORS & WALLS. COMPLY w/ ASTM

E-814 & UL 1479.

13. CONFORM TO ICC, FM, NFPA REQUIREMENTS AND/OR OWNER'S

INSURANCE UNDERWRITER. OBTAIN PERMITS & REVIEW STAMPS

FROM THE A.H.J.

14. SPRINKLER MAIN SIZES SHOWN ARE SIZED FOR FUTURE

CONNECTIONS

15. PIPING SHOWN IS ABOVE CEILING UNLESS OTHERWISE NOTED.

16. ALL CONTROL VALVES SHALL BE MONITORED.

17. THE SPRINKLER SYSTEM SHALL BE DESIGNED & SIZED BY THE

SPRINKLER CONTRACTOR. THESE DOCUMENTS SHALL BE USED

AS A GUIDE FOR INTENT ONLY. THE SPRINKLER HEAD TYPES

SHOWN ON THE DOCUMENTS SHALL BE CONFORMED TO.

SPRINKLER CONTRACTOR SHALL INFORM & COORDINATE ALL

ELECTRICAL & FIRE ALARM DEVICES w/ THE ELECTRICAL

CONTRACTOR.

18. INSPECTOR'S TEST VALVES SHALL NOT DRAIN ONTO CONCRETE

SIDEWALKS, PADS, OR CONCRETE PLAZA'S DUE TO STAINING. IF

DRAINING TO GRASS AREA PROVIDE MEANS TO ELIMINATE MUD

OF THEIR DEBRIS FROM SPLASHING ONTO BUILDING.

FIRE PROTECTION NOTES

Montum Architecture, LLC

55 ER Path

Keyser, WV 26726

304-276-7151 www.montumarch.com

PA OFFICE:

429 LAUREL RUN ROAD

CARMICHAELS, PA 15320

PH: (724) 966-5655

WV OFFICE:

54 WEST RUN RD.

MORGANTOWN, WV 26508

PH: (304) 291-2234

SHEET NAME:

MILLER ENGINEERING INC.

COPY RIGHT:

CHECKED BY:

DRAWN BY:

DESIGNED BY:

BCM

SEAL:

CONSULTANT:

PROJECT NAME:

PROJECT OWNER:

PROJECT STATUS:

PROJECT NUMBER:

ORIGINAL PAGE SIZE: 22x34

F101

FIRE PROTECTION

PLAN

18 JUNE, 2025

TRT

TWT

24014

CONSTRUCTION

DOCUMENTS

WV ARMY NATIONAL

GUARD

CHALLENGE

ACADEMY SOUTH

KITCHEN HVAC

UPGRADES

1/8" = 1'-0"

FIRE PROTECTION PLAN

N O

D

E S

C R

IP

T

IO

N

D A

T

1. PROVIDE ALL MATERIALS AND EQUIPMENT AND PERFORM ALL

LABOR REQUIRED TO INSTALL COMPLETE AND OPERABLE

PLUMBING SYSTEMS AS INDICATED ON THE DRAWING, AS

SPECIFIED, AND REQUIRED BY CODE.

2. RUN ALL SOIL WASTE AND VENT PIPING WITH 2% MIN. GRADE

UNLESS OTHERWISE NOTED. HORIZONTAL VENT PIPING SHALL

BE GRADED TO DRIP BACK TO THE SOIL OR WASTE PIPE BY

GRAVITY.

3. PROVIDE SHUTOFF VALVES IN ALL DOMESTIC WATER PIPING

SYSTEMS AT ALL SERVICE POINTS AND AT BRANCHES IN WHICH

PIPING SERVES TWO OR MORE FIXTURES.

4. UNLESS OTHERWISE NOTED, ALL DOMESTIC COLD AND HOT

WATER PIPING SHALL BE A MIN. OF 1/2" SIZE.

5. UNLESS OTHERWISE NOTED, ALL PIPING IS OVERHEAD, TIGHT TO

UNDERSIDE OF SLAB w/ SPACE FOR INSULATION IF REQUIRED.

PIPING IS TO BE "TOP DOWN".

6. INSTALL PIPING SO THAT ALL VALVES, STRAINERS, UNIONS,

TRAPS, FLANGES, AND OTHER APPURTENANCES REQUIRING

ACCESS ARE ACCESSIBLE.

7. ALL PIPING SHALL CLEAR DOORS AND WINDOWS.

8. ALL PIPING SHALL GRADE TO LOW POINTS. PROVIDE HOSE END

DRAINS VALVES AT THE BOTTOM OF ALL RISERS AND LOW

POINTS.

9. UNIONS AND/OR FLANGES SHALL BE INSTALLED AT EACH PIECE

OF EQUIPMENT, IN BYPASSES, AND IN LONG PIPING RUNS

(GREATER THAN 100 FEET) TO PERMIT DISASSEMBLY FOR

ALTERATIONS AND REPAIRS.

10. ALL VALVES SHALL BE ADJUSTED FOR SMOOTH AND EASY

OPERATION.

11. PROVIDE ALL PLUMBING FIXTURES AND EQUIPMENT w/

ACCESSIBLE STOPS.

12. PROVIDE CLEANOUTS IN SANITARY AND STORM DRAINAGE

SYSTEMS AT ENDS OF RUNS, AT CHANGES IN DIRECTIONS, NEAR

THE BASE OF STACKS, EVERY 50'-0" IN HORIZONTAL RUN AND

ELSEWHERE AS INDICATED.

13. ALL CLEANOUTS SHALL BE FULL SIZE OF PIPE FOR PIPE SIZES 4

INCHES AND SMALLER AND SHALL BE 4 INCHES FOR PIPE SIZES

LARGER THAN 4 INCHES.

14. ALL BALANCING VALVES AND BUTTERFLY VALVES SHALL BE

PROVIDED w/ POSITION INDICATORS AND MAXIMUM ADJUSTABLE

STOP (MEMORY STOPS).

15. ALL VALVES SHALL BE INSTALLED SO THAT THE VALVE REMAINS

IN SERVICE WHEN EQUIPMENT OR PIPING ON EQUIPMENT SIDE

OF VALVE IS REMOVED.

16. ALL PIPING WORK SHALL BE COORDINATED w/ ALL TRADES

INVOLVED. OFFSETS IN PIPING AROUND OBSTRUCTIONS SHALL

BE PROVIDED AT NO ADDITIONAL COST TO THE OWNER.

17. PROVIDE FLEXIBLE CONNECTIONS IN ALL PIPING SYSTEMS

CONNECTED TO PUMPS AND OTHER EQUIPMENT WHICH

REQUIRE VIBRATION ISOLATION. FLEXIBLE CONNECTIONS SHALL

BE PROVIDED AS CLOSE TO THE EQUIPMENT AS POSSIBLE OR AS

INDICATED ON THE DRAWINGS.

18. DOMESTIC WATER PIPING TO BE TYPE "L" COPPER w/ SOLDERED

OR MECHANICALLY PRESSED FITTINGS.

19. WASTE PIPING TO BE CAST IRON NO-HUB (EXPOSED).

20. COORDINATE ALL STUB-UPS, EXACT FIXTURE TYPE AND SIZES,

ETC. w/ GENERAL CONTRACTOR AND FOR FIT w GENERAL

CONTRACTOR INSTALLED CABINETRY, ETC. AND FOR FINAL WALL

LOCATIONS. FIELD ADJUST LOCATIONS FOR COORDINATION AS

NECESSARY. AVOID EXCESSIVE ADDITIONAL PIPE FITTINGS.

PRESSURE TEST ALL SUBGRADE PIPING AND MAINTAIN

PRESSURE TESTING DURING CONCRETE POURS.

21. FINAL COORDINATION OF SCOPE OF WORK, DIMENSIONS,

FIXTURE PLACEMENT, ROUTING, ETC. IS THE RESPONSIBILITY OF

THE GENERAL CONTRACTOR AND ALL SUB-CONTRACTORS

PRIOR TO BIDDING. VERIFY ALL FIELD CONDITIONS AND

MEASUREMENTS PRIOR TO BIDDING. COORDINATE ALL WORK w/ OTHER TRADES. COORDINATE ALL MOUNTED DEVICES w/ ALL

OTHER TRADES PRIOR TO INSTALLATION. FIRESTOP ALL

PENETRATIONS OF FIRE WALL (SEE ARCH. PLANS) AND FLOORS.

22. ALL WORK TO MEET REQUIREMENTS OF CURRENT

INTERVENTIONAL PLUMBING CODE, INTERNATIONAL

MECHANICAL CODE, STATE AND LOCAL CODES AND

REQUIREMENTS AND INTERNATIONAL FUEL GAS CODE.

PLUMBING NOTES

L

--------------------A------------------------------------------------------------------------------------

AAV AUTOMATIC AIR VENT

ABV ABOVE

AD ACCESS DOOR

ADA AMERICANS WITH DISABLITIES ACT

AFF ABOVE FINISHED FLOOR

AFG ABOVE FINISHED GRADE

AHU AIR HANDLING UNIT

ALT ALTERNATE

ALUM ALUMINUM

AP ACCESS PANEL

APPROX APPROXIMATELY

ASSOC ASSOCIATED

ASSY ASSEMBLY

ATC AUTOMATIC TEMPERATURE CONTROL

AUTO AUTOMATIC

AUX AUXILIARY

AV AIR VENT

AVG AVERAGE

AWT AVERAGE WATER TEMPERATURE

---------------B----------------------------------------------------------------------------------------

BB BASEBOARD

BC BALANCING COCK

BD BLOW DOWN

BFF BELOW FINISHED FLOOR

BFG BELOW FINISHED GRADE

BFP BACKFLOW PREVENTER

BFV BUTTERFLY VALVE

BHP BRAKE HORESPOWER

BLDG BUILDING

BLR BOILER

BLW BELOW

BO BLOW OFF

BTM BOTTOM

BOP BOTTOM OF PIPE

BTUH BRITISH THERMAL UNIT PER HOUR

BV BALL VALVE

---------------C---------------------------------------------------------------------------------------

CA COMPRESSED AIR

CAP CAPACITY

CCW COUNTER CLOCKWISE

CDL CONDENSATE DRAIN LINE

CFH CUBIC FEET PER HOUR

CFM CUBIC FEET PER MINUTE

CFS CUBIC FEET PER SECOND

CHKV CHECK VALVE

CHWR CHILLED & HOT WATER RETURN

CHWS CHILLED & HOT WATER SUPPLY

CHWS&R CHILLED & HOT WATER SUPPLY AND RETURN

CIRC CIRCULATING

CI CAST IRON

CIRC CIRCULATING

CKT CIRCUIT

CLG CEILING

CL CENTER LINE

CMU CONCRETE MASONRY UNIT

C/O CLEAN OUT

COL COLUMN

COMB COMBINATION

COMP COMPRESSOR

CONC CONCRETE

COND CONDENSATE

CONN CONNECTION

CONT CONTINUATION

CONST CONSTRUCTION

COP COEFFICIENT OF PERFORMANCE

CORR CORRIDOR

CT COOLING TOWER

CU CONDENSING UNIT

CUH CABINET UNIT HEATER

Cv COEFFICIENT, VALVE FLOW

CW COLD WATER/CLOCKWISE

CWFT CONDENSER WATER FROM TOWER

CWR CHILLED WATER RETURN

CWS CHILLED WATER SUPPLY

CWS&R CHILLED WATER SUPPLY AND RETURN

CWTT CONDENSER WATER TO TOWER

---------------D----------------------------------------------------------------------

D DEEP

Db DRY BULB TEMPERATURE(ºF)

DCO DOUBLE CLEAN OUT

DEMO DEMOLISH

DEPT DEPARTMENT

DIA DIAMETER

DIAG DIAGRAM

DISCH DISCHARGE

DCW DOMESTIC COLD WATER

DHW DOMESTIC HOT WATER

DHWR DOMESTIC HOT WATER RETURN

DN DOWN

DP DIFFERENTIAL PRESSURE

DPT DEW POINT TEMPERATURE(ºF)

DR DRAIN

DWG DRAWING

DWH DOMESTIC WATER HEATER

DX DIRECT EXPANSION

----------------E----------------------------------------------------------------------

EA EACH

EC ELECTRICAL CONTRACTOR

EFF EFFICIENCY

ELEC ELECTRIC

ELEV ELEVATION

ENCL ENCLOSURE

ENT ENTERING

EP END PANEL/EXPLOSION PROOF

EQUIP EQUIPMENT

ER ECCENTRIC REDUCER(BOTTOMS FLAT)

ESP EXTERNAL STATIC PRESSURE

EXH EXHAUST

EXIST EXISTING

EXP EXPANSION

EWC ELECTRIC WATER COOLER

EWT ENTERING WATER TEMPERATUR(ºF)

----------------F----------------------------------------------------------------------

ºF FAHRENHEIT

FA FREE AREA

FB FREE BLOW

F&T FLOAT AND THERMOSTATIC TRAP

FC FLEXIBLE CONNECTION

FCD FLOW CONTROL DEVICE

FCO FLOOR CLEAN OUT

FCU FAN COIL UNIT

FD FIRE DAMPER/FLOOR DRAIN

FDN FOUNDATION

FF FOULING FACTOR

FIN FINISHED

FLA FULL LOAD AMPS

FLG FLANGE

FLR FLOOR

FNL FUNNEL

FOR FUEL OIL RETURN

FOS FUEL OIL SUPPLY

FOS&R FUEL OIL SUPPLY AND RETURN

FOV FUEL OIL VENT

FPB FAN POWERED BOX

FPM FEET PER MINUTE

FPS FEET PER SECOND

FT FIN-TUBE/FEET

FTG FITTING

FURN FURNISH

FV FACE VELOCITY

FW FEED WATER

----------------G----------------------------------------------------------------------

G GAS

GALV GALVANIZED

GA GAUGE, GAGE

GC GENERAL CONTRACTOR

GCWR GLYCOL CHILLED WATER RETURN

GCWS GLYCOL CHILLED WATER SUPPLY

GHWR GLYCOL HOT WATER RETURN

GHWS GLYCOL HOT WATER SUPPLY

GLV GLOBE VALVE

GPH GALLONS PER HOUR

GPM GALLONS PER MINUTE

GRAV GRAVITY

GRV GRAVITY ROOF VENTILATOR

GV GATE VALVE

----------------H----------------------------------------------------------------------

H HEIGHT

HB HOSE BIBB

HC HEATING CONTRACTOR;

HANICAPPED

HD HEAD/HUB DRAIN

HG MERCURY

HGR HANGER

HP HORSEPOWER/HEAT PUMP

HORIZ HORIZONTAL

HPD HIGH PRESSURE DRIP

HPR HIGH PRESSURE RETURN

HPS HIGH PRESSURE STEAM

HR HOUR

HTG HEATING

HTR HEATER

HUH HORIZONTAL UNIT HEATER

HV HIGH VELOCITY

HVAC HEATING, VENTILATING, AND AIR

CONDITIONING

HW HOT WATER

HWBG HOT WATER BELOW GRADE

HWOH HOT WATER OVER HEAD

HWR HOT WATER RETURN

HWS HOT WATER SUPPLY

HWS&R HOT WATER SUPPLY AND

RETURN

----------------I----------------------------------------------------------------------

ID INSIDE DIAMETER

IE INVERT ELEVATION

IN INCHES

INV INVERT

IN-WG INCHES-WATER GAGE

INSUL INSULATION

IPS IRON PIPE SIZE

IVS ISOLATION VALVE STATION

IW INDIRECT WASTE

----------------J----------------------------------------------------------------------

JT JOINT

----------------K ---------------------------------------------------------------------

KS KITCHEN SINK

----------------L----------------------------------------------------------------------

L LENGTH

LAV LAVATORY

LBS POUNDS

LBS/HR POUNDS PER HOUR

LF LINEAR FEET

LP LOW PRESSURE

LPD LOW PRESSURE DRIP

LPR LOW PRESSURE RETURN

LPG LOW PETROLEUM GAS

LPS LOW PRESSURE STEAM

LV LOW VELOCITY

LVG LEAVING

LWCO LOW WATER CUTOFF

LWT LEAVING WATER

TEMPERATURE(ºF)

----------------M----------------------------------------------------------------------

MAU MAKE-UP AIR UNIT

MAV MANUAL AIR VENT

MAX MAXIMUM

MBH THOUSAND BTUH

MC MECHANICAL CONTRACTOR

MCC MOTOR CONTROL CENTER

MECH MECHANICAL

MFG MANUFACTURER

MH MANHOLE

MIN MINIMUM

MISC MISCELLANEOUS

MPD MEDIUM PRESSURE DRIP

MPR MEDIUM PRESSURE RETURN

MPS MEDIUM PRESSURE STEAM

MS MINI-SPLIT SYSTEM

MTD MOUNTED

MTG MOUNTING

MTL METAL

MTR MOTOR

MWT MEAN WATER TEMPERATURE(ºF)

----------------N----------------------------------------------------------------------

N NORTH

N/A NOT APPLICABLE

NC NORMALLY CLOSED; NOISE CRITERIA

NEG NEGATIVE

NIC NOT IN CONTRACT

NM NONMETALLIC

NMAG NONMAGNETIC

NO NORMALLY OPEN

No NUMBER

NOM NOMINAL

NORM NORMAL

NPW NON POTABLE WATER

NTS NOT TO SCALE

NWL NORMAL WATER LEVEL

----------------O----------------------------------------------------------------------

OA OVERALL; OUTSIDE AIR

OC ON CENTER

OCC OCCUPANCY

OCPD OVERCURRENT PROTECTION DEVICE

OD OUTSIDE DIAMETER; OUTSIDE DIMENSION

ODS OXYGEN DEPRIVATION SENSOR

OF/CI OWNER FURNISHED / CONTRACTOR INSTALLED

OF/OI OWNER FURNISHED / OWNER INSTALLED

OFD OVER FLOW DRAIN

OH OVERHEAD

OPER OPERATED

OPP OPPOSITE

OPT OPTIONAL; OPTIMUM

OSHA OCCUPATIONAL SAFETY AND HEALTH

ADMINISTRATION

OSV OIL SAFETY VALVE

OUT OUTLET

OVC OVERCURRENT

OVF OVERFLOW

OZ OUNCE

----------------P----------------------------------------------------------------------

P PUMP

PC PLUMBING CONTRACTOR

PD PRESSURE DROP/PUMP

PE PNEUMATIC - ELECTRIC

PG PRESSURE DROP/PUMP DISCHARGE

PH PHASE

PLBG PLUMBING

PNL PANEL

PR PANEL RADIATOR

PRESS PRESSURE

PRV POWER ROOF VENTILATOR/PRESSURE REDUCING

VALVE

PS PIPE SUPPORT

PSI POUND PER SQUARE INCH

PSIA POUNDS PER SQUARE INCH ABSOLUTE

PSIG POUNDS PER SQUARE INCH GAGE

PT PRESSURE/TEMPERATURE TAP

PTAC PACKAGED TERMINAL AIR CONDITIONER

PVC POLYVINYL CHLORIDE

----------------Q----------------------------------------------------------------------

QTY QUANTITY

----------------R----------------------------------------------------------------------

RA RELIEF/RETURN AIR

RAD RADIATOR

RAF RETURN AIR FIXTURES

RCP RADIANT CEILING PANEL

RD ROOF DRAIN

REC RECESSED/RECEIVED

REFRIG REFRIGERANT

REG REGISTER

REINF REINFORCED

REQD REQUIRED

RET RETURN

REV REVISION

RF RETURN/RELIEF FAN

RH REHEAT COIL

RHG REFRIGERANT HOT

RL REFRIGERANT LIQUID

RM ROOM

RPM REVOLUTIONS PER MINUTE

RS REFRIGERANT SUCTION

RV RELIEF VALVE

RWC RAIN WATER CONDUCTOR

----------------S----------------------------------------------------------------------

SA SUPPLY AIR

SCH SCHEDULE

SDPR SMOKE DAMPER

SENS SENSIBLE

SEP SEPARATOR

SF SUPPLY FAN

SHT SHEET

SK SINK

SP STATIC PRESSURE (INCHES OF WATER)

SPEC SPECIFICATION

SPGR SPECIFIC GRAVITY

SQ SQUARE

SQFT SQUARE FOOT

SS STAINLESS STEEL UNIT

STAT STATIC

STD STANDARD

STL STEEL

STR STRAINER

SUP SUPPLY

SV SAFETY VALVE

SW SWITCH

----------------T----------------------------------------------------------------------

TA THROW AWAY

TCV TEMPERATURE CONTROL VALVE

TD TEMPERATURE DIFFERENCE

TDV TRIPLE DUTY VALVE

TEMP TEMPERATURE

TH THERMOMETER

THK THICK

TK TANK

TMV THRTMOSTATIC MIXING VALVE

TOT TOTAL

TP TRAP PRIMER/TRAP PRIMER SUPPLY

TRANS TRANSITION

TSP TOTAL STATIC PRESSURE

TSTAT THERMOSTAT

TYP TYPICAL

----------------U----------------------------------------------------------------------

UC UNDERCUT

UF UNDER FLOOR

UG UNDERGROUND

UH UNIT HEATER

UR URINAL

----------------V----------------------------------------------------------------------

V VOLTAGE/VALVE/VENT

VAC VACUUM

VEL VELOCITY

VERT VERTICAL

VFD VARIABLE FREQUENCY DRIVE

VFS VENTURI FLOW STATION

VOL VOLUME

VRF VARIABLE REFRIGERANT FLOW

VTR VENT THROUGH ROOF

----------------W----------------------------------------------------------------------

W WIDTH

W/ WITH

W/O WITHOUT

WA WATER HAMMER ARRESTER

Wb WET BULB TEMPERATURE(ºF)

WC WATER COLUMN/WATER CLOSET

WCO WALL CLEANOUT

WG WATER GAUGE

WH WALL HEATER

WL WATER LEVEL

WP WEATHERPROOF

WT WEIGHT

----------------Y----------------------------------------------------------------------

YCO YARD CLEANOUT

----------------Z----------------------------------------------------------------------

Z ZONE

ZCV ZONE CONTROL VALVE

Montum Architecture, LLC

55 ER Path

Keyser, WV 26726

304-276-7151 www.montumarch.com

PA OFFICE:

429 LAUREL RUN ROAD

CARMICHAELS, PA 15320

PH: (724) 966-5655

WV OFFICE:

54 WEST RUN RD.

MORGANTOWN, WV 26508

PH: (304) 291-2234

SHEET NAME:

MILLER ENGINEERING INC.

COPY RIGHT:

CHECKED BY:

DRAWN BY:

DESIGNED BY:

BCM

SEAL:

CONSULTANT:

PROJECT NAME:

PROJECT OWNER:

PROJECT STATUS:

PROJECT NUMBER:

ORIGINAL PAGE SIZE: 22x34

P000

PLUMBING

ABBREVIATIONS

18 JUNE, 2025

TRT

TWT

24014

CONSTRUCTION

DOCUMENTS

WV ARMY NATIONAL

GUARD

CHALLENGE

ACADEMY SOUTH

KITCHEN HVAC

UPGRADES

PLUMBING ABBREVIATIONS

PLUMBING SYSTEM LEGEND

ABBREVIATION SYSTEM TYPE

CON CONDENSATE

DCW DOMESTIC COLD WATER

DHW DOMESTIC HOT WATER

SAN SANITARY

N O

D

E S

C R

IP

T

IO

N

D A

E

F

G

1 2 3 4 5 6

ADJUST ELEVATION OF VRF CONDENSATE PIPING

TO AVOID CONFLICT W/ NEW DUCTWORK.

ADJUST PIPING IN THIS AREA AS NECESSARY TO

AVOID ANY CONFLICTS WITH NEW DUCTWORK.

S A

N

DHW

DCW

C O

N

1. PROVIDE ALL MATERIALS AND EQUIPMENT AND PERFORM ALL

LABOR REQUIRED TO INSTALL COMPLETE AND OPERABLE

PLUMBING SYSTEMS AS INDICATED ON THE DRAWING, AS

SPECIFIED, AND REQUIRED BY CODE.

2. RUN ALL SOIL WASTE AND VENT PIPING WITH 2% MIN. GRADE

UNLESS OTHERWISE NOTED. HORIZONTAL VENT PIPING SHALL

BE GRADED TO DRIP BACK TO THE SOIL OR WASTE PIPE BY

GRAVITY.

3. PROVIDE SHUTOFF VALVES IN ALL DOMESTIC WATER PIPING

SYSTEMS AT ALL SERVICE POINTS AND AT BRANCHES IN WHICH

PIPING SERVES TWO OR MORE FIXTURES.

4. UNLESS OTHERWISE NOTED, ALL DOMESTIC COLD AND HOT

WATER PIPING SHALL BE A MIN. OF 1/2" SIZE.

5. UNLESS OTHERWISE NOTED, ALL PIPING IS OVERHEAD, TIGHT TO

UNDERSIDE OF SLAB w/ SPACE FOR INSULATION IF REQUIRED.

PIPING IS TO BE "TOP DOWN".

6. INSTALL PIPING SO THAT ALL VALVES, STRAINERS, UNIONS,

TRAPS, FLANGES, AND OTHER APPURTENANCES REQUIRING

ACCESS ARE ACCESSIBLE.

7. ALL PIPING SHALL CLEAR DOORS AND WINDOWS.

8. ALL PIPING SHALL GRADE TO LOW POINTS. PROVIDE HOSE END

DRAINS VALVES AT THE BOTTOM OF ALL RISERS AND LOW

POINTS.

9. UNIONS AND/OR FLANGES SHALL BE INSTALLED AT EACH PIECE

OF EQUIPMENT, IN BYPASSES, AND IN LONG PIPING RUNS

(GREATER THAN 100 FEET) TO PERMIT DISASSEMBLY FOR

ALTERATIONS AND REPAIRS.

10. ALL VALVES SHALL BE ADJUSTED FOR SMOOTH AND EASY

OPERATION.

11. PROVIDE ALL PLUMBING FIXTURES AND EQUIPMENT w/

ACCESSIBLE STOPS.

12. PROVIDE CLEANOUTS IN SANITARY AND STORM DRAINAGE

SYSTEMS AT ENDS OF RUNS, AT CHANGES IN DIRECTIONS, NEAR

THE BASE OF STACKS, EVERY 50'-0" IN HORIZONTAL RUN AND

ELSEWHERE AS INDICATED.

13. ALL CLEANOUTS SHALL BE FULL SIZE OF PIPE FOR PIPE SIZES 4

INCHES AND SMALLER AND SHALL BE 4 INCHES FOR PIPE SIZES

LARGER THAN 4 INCHES.

14. ALL BALANCING VALVES AND BUTTERFLY VALVES SHALL BE

PROVIDED w/ POSITION INDICATORS AND MAXIMUM ADJUSTABLE

STOP (MEMORY STOPS).

15. ALL VALVES SHALL BE INSTALLED SO THAT THE VALVE REMAINS

IN SERVICE WHEN EQUIPMENT OR PIPING ON EQUIPMENT SIDE

OF VALVE IS REMOVED.

16. ALL PIPING WORK SHALL BE COORDINATED w/ ALL TRADES

INVOLVED. OFFSETS IN PIPING AROUND OBSTRUCTIONS SHALL

BE PROVIDED AT NO ADDITIONAL COST TO THE OWNER.

17. PROVIDE FLEXIBLE CONNECTIONS IN ALL PIPING SYSTEMS

CONNECTED TO PUMPS AND OTHER EQUIPMENT WHICH

REQUIRE VIBRATION ISOLATION. FLEXIBLE CONNECTIONS SHALL

BE PROVIDED AS CLOSE TO THE EQUIPMENT AS POSSIBLE OR AS

INDICATED ON THE DRAWINGS.

18. DOMESTIC WATER PIPING TO BE TYPE "L" COPPER w/ SOLDERED

OR MECHANICALLY PRESSED FITTINGS.

19. WASTE PIPING TO BE CAST IRON NO-HUB (EXPOSED).

20. COORDINATE ALL STUB-UPS, EXACT FIXTURE TYPE AND SIZES,

ETC. w/ GENERAL CONTRACTOR AND FOR FIT w GENERAL

CONTRACTOR INSTALLED CABINETRY, ETC. AND FOR FINAL WALL

LOCATIONS. FIELD ADJUST LOCATIONS FOR COORDINATION AS

NECESSARY. AVOID EXCESSIVE ADDITIONAL PIPE FITTINGS.

PRESSURE TEST ALL SUBGRADE PIPING AND MAINTAIN

PRESSURE TESTING DURING CONCRETE POURS.

21. FINAL COORDINATION OF SCOPE OF WORK, DIMENSIONS,

FIXTURE PLACEMENT, ROUTING, ETC. IS THE RESPONSIBILITY OF

THE GENERAL CONTRACTOR AND ALL SUB-CONTRACTORS

PRIOR TO BIDDING. VERIFY ALL FIELD CONDITIONS AND

MEASUREMENTS PRIOR TO BIDDING. COORDINATE ALL WORK w/ OTHER TRADES. COORDINATE ALL MOUNTED DEVICES w/ ALL

OTHER TRADES PRIOR TO INSTALLATION. FIRESTOP ALL

PENETRATIONS OF FIRE WALL (SEE ARCH. PLANS) AND FLOORS.

22. ALL WORK TO MEET REQUIREMENTS OF CURRENT

INTERVENTIONAL PLUMBING CODE, INTERNATIONAL

MECHANICAL CODE, STATE AND LOCAL CODES AND

REQUIREMENTS AND INTERNATIONAL FUEL GAS CODE.

PLUMBING NOTES

Montum Architecture, LLC

55 ER Path

Keyser, WV 26726

304-276-7151 www.montumarch.com

PA OFFICE:

429 LAUREL RUN ROAD

CARMICHAELS, PA 15320

PH: (724) 966-5655

WV OFFICE:

54 WEST RUN RD.

MORGANTOWN, WV 26508

PH: (304) 291-2234

SHEET NAME:

MILLER ENGINEERING INC.

COPY RIGHT:

CHECKED BY:

DRAWN BY:

DESIGNED BY:

BCM

SEAL:

CONSULTANT:

PROJECT NAME:

PROJECT OWNER:

PROJECT STATUS:

PROJECT NUMBER:

ORIGINAL PAGE SIZE: 22x34

P101

PLUMBING PLAN

18 JUNE, 2025

TRT

TWT

24014

CONSTRUCTION

DOCUMENTS

WV ARMY NATIONAL

GUARD

CHALLENGE

ACADEMY SOUTH

KITCHEN HVAC

UPGRADES

1/8" = 1'-0"

SECOND FLOOR PLUMBING PLAN

PLUMBING SYSTEM LEGEND

ABBREVIATION SYSTEM TYPE

CON CONDENSATE

DCW DOMESTIC COLD WATER

DHW DOMESTIC HOT WATER

SAN SANITARY

N O

D

E S

C R

IP

T

IO

N

D A

LABOR REQUIRED TO INSTALL, COMPLETE, AND OPERATE AS

INDICATED ON THE DRAWINGS, SPECIFICATIONS, AND

REQUIRED BY CODE.

2. SEPARATE BALANCE DAMPERS WILL BE INSTALLED AT ALL

TAKE-OFFS FROM MAIN DUCTS. FIRE DAMPERS WILL BE

INSTALLED AT LOCATIONS SHOWN OR WHERE ANY DUCT

PENETRATES A FIRE RATED WALL. REFER TO ARCHITECTURAL

SHEETS FOR RATED WALLS. FIRE DAMPERS ARE TO MATCH THE

RATING OF THE WALL OR CEILING BEING PENETRATED.

3. ALL DUCT TAKE-OFFS AND TRANSITIONS WILL BE TAPERED.

ELBOWS AND TURNS SHALL BE CONSTRUCTED w/ A SMOOTH

RADIUSED FITTING MIN 1.5 TIMES THE WIDTH OF THE DUCT.

TURNING VANES ARE NOT PERMITTED, UNLESS APPROVED BY

ENGINEER OR INDICATED ON DRAWINGS.

4. CERTAIN ITEMS SUCH AS RISERS AND DROPS IN DUCTWORK,

ACCESS DOORS, VOLUME DAMPERS, ETC. ARE INDICATED ON

THE CONTRACT DOCUMENT DRAWINGS FOR CLARITY FOR A

SPECIFIC LOCATION REQUIREMENT AND SHALL NOT BE

INTERPRETED AS THE EXTENT OF THE REQUIREMENTS FOR

THOSE ITEMS.

5. ALL DUCTWORK IS TO BE EXTERNALLY INSULATED. INTERIOR

MOUNTED DUCTWORK SHALL HAVE FOIL FACED 1-1/2 TO 2"

FIBERGLASS INSULATION AND SEALED w/ FIBERGLASS

REINFORCED FOIL TAPE.

6. CONSTRUCT ALL DUCTWORK PER SMACNA STANDARDS FOR

LOW PRESSURE DUCTWORK (2.0" STATIC). ALL JOINTS ARE TO

BE SEALED w/ MASTIC.

7. PROVIDE AIR LOUVERS w/ GRAVITY BACKDRAFT DAMPERS. ALL

EXTERIOR LOUVERS WILL HAVE 60% MIN. OPEN AREA AND BUG

SCREENS. INSTALL ALL w/ BIRD SCREEN. COLORS BY OWNER/ARCHITECT. COORDINATE LOCATIONS w/ GENERAL

CONTRACTOR.

8. PROVIDE FULLY ADHERED VELOCITY DUCT LINER FROM UNIT

DISCHARGE AND RETURN TO 10'-0" BEYOND UNIT. PROVIDE

NOSING AT THE BEGINNING AND END OF THE DUCT LINER.

9. UNLESS OTHERWISE SHOWN, LOCATE ALL ROOM

THERMOSTATS AND HUMIDISTATS AT 5'-0" ABOVE FINISHED

FLOOR. FINAL THERMOSTAT LOCATION BY OWNER/ARCHITECT.

10. ALL DUCTWORK SHALL CLEAR DOORS AND WINDOWS.

11. ALL DUCTWORK DIMENSIONS, AS SHOWN ON THE DRAWINGS,

ARE INTERNAL CLEAR DIMENSIONS AND DUCT SIZE SHALL BE

INCREASED TO COMPENSATE FOR DUCT LINING WHERE

APPLICABLE.

12. COORDINATE DIFFUSERS, REGISTER, AND GRILLE LOCATIONS

w/ ARCHITECTURAL REFLECTED CEILING PLANS, LIGHTING, AND

OTHER CEILING ITEMS. MAKE MINOR DUCT MODIFICATIONS TO

SUIT.

13. LOCATE ALL MECHANICAL EQUIPMENT FOR UN-OBSTRUCTED

ACCESS TO UNIT ACCESS PANELS, CONTROL, AND VALVING.

14. PROVIDE FLEXIBLE CONNECTIONS IN ALL DUCTWORK SYSTEMS

CONNECTED TO AIR HANDLING UNITS, FANS, AND OTHER

EQUIPMENT WHICH REQUIRE VIBRATION ISOLATION.

OTHERWISE NOTED, ALL DUCTWORK IS OVERHEAD, TIGHT TO

THE UNDERSIDE OF THE STRUCTURAL, WITH SPACE FOR

INSULATION.

15. RUNS OF FLEXIBLE DUCT SHALL NOT EXCEED 3'-0". FLEXIBLE

DUCT IS TO BE USED FOR FINAL CONNECTIONS TO GRILLES

AND DIFFUSER ONLY.

16. ALL DUCTWORK SHALL BE COORDINATED w/ ALL TRADES

INVOLVED. OFFSETS IN DUCTS, INCLUDING DIVIDED DUCTS AND

TRANSITIONS AROUND OBSTRUCTIONS, SHALL BE PROVIDED AT

NO ADDITIONAL COST TO THE OWNER.

17. PROVIDE ACCESS DOORS IN DUCTWORK TO PROVIDE ACCESS

FOR ALL SMOKE DETECTORS, FIRE DAMPERS, SMOKE

DAMPERS, HUMIDIFIERS, COILS AND OTHER ITEMS LOCATED IN

DUCTWORK WHICH REQUIRE SERVICE OR INSPECTION.

18. SEE SPEC FOR DUCTWORK GAUGES, BRACING, HANGERS, AND

OTHER REQUIREMENTS.

19. EXTERIOR LOUVERS ARE INDICATED FOR INFORMATION ONLY.

DETAILED DESCRIPTIONS ARE PROVIDED IN THE

ARCHITECTURAL SPECIFICATIONS. LOUVER SIZES, LOCATIONS,

MOUNTING, AND DETAILS SHALL BE COORDINATED w/ OTHER

TRADES INVOLVED.

20. PERFORM WORK IN ACCORDANCE w/ CURRENT INTERNATIONAL

MECHANICAL CODE, FUEL GAS CODE, ASHRAE, SMACNA, STATE,

AND LOCAL CODES AND REQUIREMENTS.

21. VERIFY ALL FIELD CONDITIONS AND MEASUREMENTS PRIOR TO

BIDDING. COORDINATE ALL WORK w/ OTHER TRADES.

COORDINATE ALL CEILING MOUNTED DEVICES w/ ALL OTHER

TRADES PRIOR TO INSTALLATION. FINAL COORDINATION OF

SCOPE OF WORK, DIMENSIONS, FIXTURE PLACEMENT, ROUTING

ETC. IS THE RESPONSIBILITY OF THE GENERAL CONTRACTOR

AND ALL SUB-CONTRACTORS PRIOR TO BIDDING.

MECHANICAL NOTES

1. PROVIDE ALL MATERIALS AND EQUIPMENT AND PERFORM ALL

LABOR REQUIRED TO INSTALL COMPLETE AND OPERABLE

PIPING SYSTEMS AS INDICATED ON THE DRAWINGS,

SPECIFICATIONS, AND REQUIRED BY CODE.

2. MAINTAIN A MIN. OF 3'-0" OF GROUND COVER OVER ALL

UNDERGROUND HAVC PIPING, UNLESS OTHERWISE NOTED.

3. NATURAL GAS PIPING IS TO BE P40 STEEL w/ BLACK IRON

FITTINGS. PROVIDED WELD GAS PIPING BY SIZE AS REQUIRED

BY FUEL GAS CODE.

4. PROVIDE BALL VALVE STOPS AT ALL FIXTURES. PROVIDE

UNIONS, DIRT LEGS, AND REGULATORS ON ALL EQUIPMENT.

5. COORDINATE ALL STUB-UPS AND FIELD ADJUST LOCATIONS FOR

COORDINATION AS NECESSARY. AVOID EXCESSIVE ADDITIONAL

PIPE FITTINGS.

6. PROVIDE AN AIR VENT AT THE HIGH POINT OF EACH DROP IN

THE HEATING WATER, CHILLED WATER, AND OTHER CLOSED

WATER PIPING SYSTEMS. ALL PIPING SHALL GRADE TO LOW

POINTS. PROVIDE HOSE END DRAIN VALVES AT BOTTOM OF

RISERS AND LOW POINTS.

7. UNLESS OTHERWISE NOTED, ALL PIPING IS TO OVERHEAD,

TIGHT TO UNDERSIDE OF STRUCTURE OR DECK w/ SPACE FOR

INSULATION.

8. INSTALL PIPING SO THAT ALL VALVES, STRAINERS, UNIONS,

TRAPS, FLANGES, ETC. ARE ACCESSIBLE.

9. ALL BALANCING VALVES AND BUTTERFLY VALVES SHALL BE

PROVIDED w/ POSITION INDICATORS AND MANUAL ADJUSTABLE

STOPS.

10. ALL VALVES (EXCEPT CONTROL VALVES) AND STRAINERS SHALL

BE FULL SIZE OF PIPE BEFORE REDUCING SIZE TO MAKE

CONNECTIONS TO EQUIPMENT AND CONTROLS.

11. UNIONS AND/OR FLANGES SHALL BE INSTALLED AT EACH PIECE

OF EQUIPMENT, IN BYPASSES, AND IN LONG PIPING RUNS O

PERMIT DISASSEMBLY FOR ALTERATIONS AND REPAIRS.

12. ALL PIPING SHALL CLEAR DOORS AND WINDOWS. ALL VALVES

SHALL BE ADJUSTED FOR SMOOTH AND EASY OPERATION.

13. ALL PIPING WORK SHALL BE COORDINATED w/ ALL TRADES

INVOLVED. OFFSETS IN PIPING AROUND OBSTRUCTIONS SHALL

BE PROVIDED AT NO ADDITIONAL COST TO THE OWNER.

14. PROVIDED FLEXIBLE CONNECTIONS IN ALL PIPING SYSTEMS

CONNECTED TO PUMPS, CHILLERS, COOLING TOWERS, AND

OTHER EQUIPMENT WHICH REQUIRE VIBRATION ISOLATION

EXCEPT WATER COILS.

15. ALL WORK TO MEET REQUIREMENTS OF CURRENT

INTERNATIONAL PLUMBING CODE, INTERNATIONAL MECHANICAL

CODE, APPLICABLE LOCAL CODES, LOCAL UTILITY

REQUIREMENTS, AND THE INTERNATIONAL FUEL GAS CODE.

16. FINAL COORDINATION OF SCOPE OF WORK, DIMENSIONS,

FIXTURE PLACEMENT, ROUTING, ECT. IS THE RESPONSIBILITY OF

THE PRIME CONTRACTOR AND ALL SUB-CONTRACTORS PRIOR

TO BIDDING.

PIPING NOTES

--------------------SYMBOLS------------------------------------------------------------------------

# NUMBER

& AND

º DEGREES

ºF DEGREES FAHRENHEIT

--------------------A------------------------------------------------------------------------------------

AAV AUTOMATIC AIR VENT

ABV ABOVE

AFF ABOVE FINISHED FLOOR

AHU AIR HANDLING UNIT

ALT ALTERNATE

ALUM ALUMINUM

APPROX APPROXIMATELY

AUX AUXILIARY

AVG AVERAGE

---------------B----------------------------------------------------------------------------------------

BFV BUTTERFLY VALVE

BH BASEBOARD HEATER

BHP BRAKE HORESPOWER

BLR BOILER

BTUH BRITISH THERMAL UNIT PER HOUR

BV BALL VALVE

---------------C---------------------------------------------------------------------------------------

CA COMPRESSED AIR

CAP CAPACITY

CFM CUBIC FEET PER MINUTE

CHKV CHECK VALVE

CIRC CIRCULATING

CI CAST IRON

CKT CIRCUIT

CMU CONCRETE MASONARY UNIT

C/O CLEAN OUT

CON CONDENSATE

CONT CONTINUATION

CT COOLING TOWER

CU CONDENSING UNIT

---------------D----------------------------------------------------------------------

DIA DIAMETER

DWG DRAWING

DWH DOMESTIC WATER HEATER

----------------E----------------------------------------------------------------------

EA EXHAUST AIR

EAT ENTERING AIR TEMPERATURE(ºF)

EC ELECTRICAL CONTRACTOR

EF EXHAUST FAN

EFF EFFICIENCY

ELEC ELECTRIC

ELEV ELEVATION

EQUIP EQUIPMENT

ESP EXTERNAL STATIC PRESSURE

EXH EXHAUST

EXIST EXISTING

EWT ENTERING WATER TEMPERATUR(ºF)

----------------F----------------------------------------------------------------------

ºF FAHRENHEIT

FCU FAN COIL UNIT

FD FIRE DAMPER/FLOOR DRAIN

FLA FULL LOAD AMPS

FLR FLOOR

FO FLAT OVAL

FPM FEET PER MINUTE

FPS FEET PER SECOND

FT FEET

----------------G----------------------------------------------------------------------

GAS NATURAL GAS

GALV GALVANIZED

GA GAUGE

GC GENERAL CONTRACTOR

GLV GLOBE VALVE

GPH GALLONS PER HOUR

GPM GALLONS PER MINUTE

GV GATE VALVE

----------------H----------------------------------------------------------------------

HCWL HYDRONIC CHILLED WATER LOOP

HCWR HYDRONIC CHILLED WATER RETURN

HCWS HYDRONIC CHILLED WATER SUPPLY

HHWL HYDRONIC HOT WATER LOOP

HHWR HYDRONIC HOT WATER RETURN

HHWS HYDRONIC HOT WATER SUPPLY

HORIZ HORIZONTAL

HP HORSEPOWER/HEAT PUMP

HR HOUR

HTG HEATING

HVAC HEATING, VENTILATING, AND AIR CONDITIONING

HZ HERTZ

----------------I----------------------------------------------------------------------

ID INSIDE DIAMETER

IN INCHES

INV INVERT

----------------J----------------------------------------------------------------------

JB JUNCTION BOX

----------------K----------------------------------------------------------------------

KW KILOWATT

KWH KILOWATT HOUR

----------------L----------------------------------------------------------------------

LAT LEAVING AIR TEMPERATURE(ºF)

LBS POUNDS

LBS/HR POUNDS PER HOUR

LF LINEAR FEET

LP LIQUID PROPANE

LV LOUVER

LVG LEAVING

LWT LEAVING WATER TEMPERATURE(ºF)

----------------M----------------------------------------------------------------------

MAU MAKE-UP AIR UNIT

MAV MANUAL AIR VENT

MAX MAXIUM

MBH THOUSAND BTUH

MC MECHANICAL CONTRACTOR

MCC MOTOR CONTROL CENTER

MECH MECHANICAL

MFG MANUFACTURER

MIN MINIMUM

MISC MISCELLANEOUS

MS MINI-SPLIT SYSTEM

----------------N----------------------------------------------------------------------

N/A NOT APPLICABLE

NC NORMALLY CLOSED; NOISE CRITERIA

NEC NATIONAL ELECTRICAL CODE

NEG NEGATIVE

NFC NATIONAL FIRE CODE

NFPA NATIONAL FIRE PROTECTION ASSOCIATION

NO NORMALLY OPEN

NTS NOT TO SCALE

----------------O----------------------------------------------------------------------

OA OUTSIDE AIR

OC ON CENTER

OCC OCCUPANCY

OD OUTSIDE DIAMETER

OSHA OCCUPATIONAL SAFETY AND HEALTH

ADMINISTRATION

OSV OIL SAFETY VALVE

OZ OUNCE

----------------P----------------------------------------------------------------------

P PUMP

PC PLUMBING CONTRACTOR

PNL PANEL

PRV PRESSURE REDUCING VALVE

PSI POUNDS PER SQUARE INCH

PSIA POUNDS PER SQUARE INCH ABSOLUTE

PSIG POUNDS PER SQUARE INCH GAGE

PTAC PACKAGED TERMINAL AIR CONDITIONER

----------------Q----------------------------------------------------------------------

QTY QUANTITY

----------------R----------------------------------------------------------------------

RA RETURN AIR

RAD RADIATOR

RCP RADIANT CEILING PANEL

REFRIG REFRIGERANT

REQD REQUIRED

REV REVISION

RH RELATIVE HUMIDITY

RPM REVOLUTIONS PER MINUTE

RV RELIEF VALVE

----------------S----------------------------------------------------------------------

SA SUPPLY AIR

SCH SCHEDULE

SD SMOKE DAMPER

SENS SENSIBLE

SP STATIC PRESSURE (INCHES OF WATER)

SPEC SPECIFICATION

SQ SQUARE

SQFT SQUARE FOOT

SS STAINLESS STEEL

STD STANDARD

STRUCT STRUCTURAL

----------------T----------------------------------------------------------------------

T THERMOSTATE

TA TRANSFER AIR

TCV TEMPERATURE CONTROL VALVE

TDV TRIPLE DUTY VALVE

TEMP TEMPERATURE

TOT TOTAL

TRANS TRANSITION

TSTAT THERMOSTAT

TV TURNING VANES

TYP TYPICAL

----------------U----------------------------------------------------------------------

UH UNIT HEATER

UV UNIT VENTILATOR

----------------V----------------------------------------------------------------------

VOLTS VOLTAGE

VA VOLT AMPERES

VAC VACUUM

VAV VARIABLE AIR VOLUME

VEL VELOCITY

VERT VERTICAL

VFD VARIABLE FREQUENCY DRIVE

VOL VOLUME

VOLTS VOLTAGE

VRF VARIABLE REFRIGERANT FLOW

VVT VARIABLE VOLUME AND TEMPERATURE

----------------W----------------------------------------------------------------------

W/ WITH

W/O WITHOUT

WP WEATHERPROOF

WT WEIGHT

----------------Z----------------------------------------------------------------------

Z ZONE

ZCV ZONE CONTROL VALVE

Montum Architecture, LLC

55 ER Path

Keyser, WV 26726

304-276-7151 www.montumarch.com

PA OFFICE:

429 LAUREL RUN ROAD

CARMICHAELS, PA 15320

PH: (724) 966-5655

WV OFFICE:

54 WEST RUN RD.

MORGANTOWN, WV 26508

PH: (304) 291-2234

SHEET NAME:

MILLER ENGINEERING INC.

COPY RIGHT:

CHECKED BY:

DRAWN BY:

DESIGNED BY:

BCM

SEAL:

CONSULTANT:

PROJECT NAME:

PROJECT OWNER:

PROJECT STATUS:

PROJECT NUMBER:

ORIGINAL PAGE SIZE: 22x34

M000

MECHANICAL

ABBREVIATIONS

18 JUNE, 2025

TRT

TWT

24014

CONSTRUCTION

DOCUMENTS

WV ARMY NATIONAL

GUARD

CHALLENGE

ACADEMY SOUTH

KITCHEN HVAC

UPGRADES

MECHANICAL ABBREVIATIONS

ANNOTATION STYLE DUCTWORK SHAPE

24" x 12" RECTANGULAR

24" ø ROUND

24" / 12" FLAT OVAL

DUCTWORK SHAPE LEGEND

DUCT SYSTEM LEGEND

ABBREVIATION SYSTEM NAME

EA EXHAUST AIR

OA OUTDOOR AIR

RA RETURN AIR

SA SUPPLY AIR

MECH. PIPING SYSTEM LEGEND

ABBREVIATION SYSTEM TYPE

GAS NATURAL GAS

HCWL HYDRONIC CHILLED WATER LOOP

HCWR HYDRONIC CHILLED WATER RETURN

HCWS HYDRONIC CHILLED WATER SUPPLY

HHWR HYDRONIC HOT WATER RETURN

HHWS HYDRONIC HOT WATER SUPPLY

N O

D

E S

C R

IP

T

IO

N

D A

INDICATED ON THE DRAWINGS, SPECIFICATIONS, AND

REQUIRED BY CODE.

2. SEPARATE BALANCE DAMPERS WILL BE INSTALLED AT ALL

TAKE-OFFS FROM MAIN DUCTS. FIRE DAMPERS WILL BE

INSTALLED AT LOCATIONS SHOWN OR WHERE ANY DUCT

PENETRATES A FIRE RATED WALL. REFER TO ARCHITECTURAL

SHEETS FOR RATED WALLS. FIRE DAMPERS ARE TO MATCH THE

RATING OF THE WALL OR CEILING BEING PENETRATED.

3. ALL DUCT TAKE-OFFS AND TRANSITIONS WILL BE TAPERED.

ELBOWS AND TURNS SHALL BE CONSTRUCTED w/ A SMOOTH

RADIUSED FITTING MIN 1.5 TIMES THE WIDTH OF THE DUCT.

TURNING VANES ARE NOT PERMITTED, UNLESS APPROVED BY

ENGINEER OR INDICATED ON DRAWINGS.

4. CERTAIN ITEMS SUCH AS RISERS AND DROPS IN DUCTWORK,

ACCESS DOORS, VOLUME DAMPERS, ETC. ARE INDICATED ON

THE CONTRACT DOCUMENT DRAWINGS FOR CLARITY FOR A

SPECIFIC LOCATION REQUIREMENT AND SHALL NOT BE

INTERPRETED AS THE EXTENT OF THE REQUIREMENTS FOR

THOSE ITEMS.

5. ALL DUCTWORK IS TO BE EXTERNALLY INSULATED. INTERIOR

MOUNTED DUCTWORK SHALL HAVE FOIL FACED 1-1/2 TO 2"

FIBERGLASS INSULATION AND SEALED w/ FIBERGLASS

REINFORCED FOIL TAPE.

6. CONSTRUCT ALL DUCTWORK PER SMACNA STANDARDS FOR

LOW PRESSURE DUCTWORK (2.0" STATIC). ALL JOINTS ARE TO

BE SEALED w/ MASTIC.

7. PROVIDE AIR LOUVERS w/ GRAVITY BACKDRAFT DAMPERS. ALL

EXTERIOR LOUVERS WILL HAVE 60% MIN. OPEN AREA AND BUG

SCREENS. INSTALL ALL w/ BIRD SCREEN. COLORS BY OWNER/ARCHITECT. COORDINATE LOCATIONS w/ GENERAL

CONTRACTOR.

8. PROVIDE FULLY ADHERED VELOCITY DUCT LINER FROM UNIT

DISCHARGE AND RETURN TO 10'-0" BEYOND UNIT. PROVIDE

NOSING AT THE BEGINNING AND END OF THE DUCT LINER.

9. UNLESS OTHERWISE SHOWN, LOCATE ALL ROOM

THERMOSTATS AND HUMIDISTATS AT 5'-0" ABOVE FINISHED

FLOOR. FINAL THERMOSTAT LOCATION BY OWNER/ARCHITECT.

10. ALL DUCTWORK SHALL CLEAR DOORS AND WINDOWS.

11. ALL DUCTWORK DIMENSIONS, AS SHOWN ON THE DRAWINGS,

ARE INTERNAL CLEAR DIMENSIONS AND DUCT SIZE SHALL BE

INCREASED TO COMPENSATE FOR DUCT LINING WHERE

APPLICABLE.

12. COORDINATE DIFFUSERS, REGISTER, AND GRILLE LOCATIONS

w/ ARCHITECTURAL REFLECTED CEILING PLANS, LIGHTING, AND

OTHER CEILING ITEMS. MAKE MINOR DUCT MODIFICATIONS TO

SUIT.

13. LOCATE ALL MECHANICAL EQUIPMENT FOR UN-OBSTRUCTED

ACCESS TO UNIT ACCESS PANELS, CONTROL, AND VALVING.

14. PROVIDE FLEXIBLE CONNECTIONS IN ALL DUCTWORK SYSTEMS

CONNECTED TO AIR HANDLING UNITS, FANS, AND OTHER

EQUIPMENT WHICH REQUIRE VIBRATION ISOLATION.

OTHERWISE NOTED, ALL DUCTWORK IS OVERHEAD, TIGHT TO

THE UNDERSIDE OF THE STRUCTURAL, WITH SPACE FOR

INSULATION.

15. RUNS OF FLEXIBLE DUCT SHALL NOT EXCEED 3'-0". FLEXIBLE

DUCT IS TO BE USED FOR FINAL CONNECTIONS TO GRILLES

AND DIFFUSER ONLY.

16. ALL DUCTWORK SHALL BE COORDINATED w/ ALL TRADES

INVOLVED. OFFSETS IN DUCTS, INCLUDING DIVIDED DUCTS AND

TRANSITIONS AROUND OBSTRUCTIONS, SHALL BE PROVIDED AT

NO ADDITIONAL COST TO THE OWNER.

17. PROVIDE ACCESS DOORS IN DUCTWORK TO PROVIDE ACCESS

FOR ALL SMOKE DETECTORS, FIRE DAMPERS, SMOKE

DAMPERS, HUMIDIFIERS, COILS AND OTHER ITEMS LOCATED IN

DUCTWORK WHICH REQUIRE SERVICE OR INSPECTION.

18. SEE SPEC FOR DUCTWORK GAUGES, BRACING, HANGERS, AND

OTHER REQUIREMENTS.

19. EXTERIOR LOUVERS ARE INDICATED FOR INFORMATION ONLY.

DETAILED DESCRIPTIONS ARE PROVIDED IN THE

ARCHITECTURAL SPECIFICATIONS. LOUVER SIZES, LOCATIONS,

MOUNTING, AND DETAILS SHALL BE COORDINATED w/ OTHER

TRADES INVOLVED.

20. PERFORM WORK IN ACCORDANCE w/ CURRENT INTERNATIONAL

MECHANICAL CODE, FUEL GAS CODE, ASHRAE, SMACNA, STATE,

AND LOCAL CODES AND REQUIREMENTS.

21. VERIFY ALL FIELD CONDITIONS AND MEASUREMENTS PRIOR TO

BIDDING. COORDINATE ALL WORK w/ OTHER TRADES.

COORDINATE ALL CEILING MOUNTED DEVICES w/ ALL OTHER

TRADES PRIOR TO INSTALLATION. FINAL COORDINATION OF

SCOPE OF WORK, DIMENSIONS, FIXTURE PLACEMENT, ROUTING

ETC. IS THE RESPONSIBILITY OF THE GENERAL CONTRACTOR

AND ALL SUB-CONTRACTORS PRIOR TO BIDDING.

MECHANICAL NOTES

FCU-4

FCU-7

FCU-2

FCU-6

FCU-5

FCU-1

FCU-8

A

B

C

D

E

F

G

1 2 3 4 5 6 7

DEMO FCU (TYP) DEMO DUCTWORK, DIFFUSERS, & GRILLES (TYP)

REMOVE MARKED SPRINKLER HEADS AND

REPLACE IN FIELD TO ACCOMODATE NEW

DUCTWO…