MBE_Form_B.pdf
PDF 192 KB Posted
- Solicitation number
- BPM051187
- Issued by
- Anne Arundel County, Maryland
About this file
This document is the Maryland Department of Transportation (MDOT) Minority Business Enterprise (MBE) Form B for State-Funded Contracts, which provides detailed instructions and forms for ensuring minority business enterprise participation in state procurement opportunities. The form outlines specific requirements for prime contractors and subcontractors to document and achieve MBE participation goals, including comprehensive guidelines for calculating and reporting minority business involvement across different classifications such as African American-owned, Hispanic American-owned, Asian American-owned, and Women-owned businesses.
The form emphasizes strict compliance with state minority business enterprise laws, requiring contractors to accurately document MBE firm certifications, specific work classifications, and participation percentages. Contractors must use the MDOT MBE Directory to verify firm certifications, NAICS codes, and specific product/service capabilities. The documentation process includes detailed tracking of subcontractor percentages, with specific rules for counting MBE participation, such as applying a 60% rule for suppliers and wholesalers and allowing MBE prime contractors to count up to 50% of the overall goal through self-performance. Failure to complete the form accurately can result in a bid being deemed non-responsive or ineligible for award.
View the file
Other files
Show all 46
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
MDOT-OP 013-2 (10/08/2020)
MDOT MBE FORM B
STATE-FUNDED CONTRACTS
PART 1 – INSTRUCTIONS FOR MBE PARTICIPATION SCHEDULE
PARTS 2 AND 3 MUST BE INCLUDED WITH THE BID/PROPOSAL. IF THE BIDDER/OFFEROR FAILS TO ACCURATELY COMPLETE AND SUBMIT PART 2 WITH THE BID/PROPOSAL AS REQUIRED, THE BID SHALL BE DEEMED NOT RESPONSIVE OR THE PROPOSAL SHALL BE DEEMED NOT SUSCEPTIBLE OF BEING SELECTED FOR AWARD.
PLEASE READ BEFORE COMPLETING THIS FORM
1. Please refer to the Maryland Department of Transportation (MDOT) MBE Directory at www.mdot.state.md.us to determine if a firm is certified for the appropriate North American Industry Classification System (“NAICS”) Code and the product/services description (specific product that a firm is certified to provide or specific areas of work that a firm is certified to perform). For more general information about NAICS, please visit www.naics.com. Only those specific products and/or services for which a prime or subcontractor is a certified MBE in the MDOT Directory can be used for purposes of achieving the MBE participation goals.
2. In order to be counted for purposes of achieving the MBE participation goals, the MBE firm (whether a prime or subcontractor) must be certified for that specific NAICS Code (“MBE” for State-funded projects designation after NAICS Code). WARNING: If the firm’s NAICS Code is in graduated status, such services/products will not be counted for purposes of achieving the MBE participation goals. Graduated status is clearly identified in the MDOT Directory (such graduated codes are designated with the word graduated after the appropriate NAICS Code).
3. Examining the NAICS Code is the first step in determining whether an MBE firm is certified and eligible to receive MBE participation credit for the specific products/services to be supplied or performed under the contract. The second step is to determine whether a firm’s Products/Services Description in the MBE Directory includes the products to be supplied and/or services to be performed that are being used to achieve the MBE participation goals. If you have any questions as to whether a firm is certified to perform the specific services or provide specific products, please contact MDOT’s Office of Minority Business Enterprise at 1-800-544-6056 or via email at mbe@mdot.state.md.us.
4. Complete the Part 2 – MBE Participation Schedule for all certified MBE firms (including primes and subcontractors) being used to achieve the MBE participation goal and subgoals, if any.
5. MBE Prime Self-Performance. When a certified MBE firm participates as a prime (independently or as part of a joint venture) on a contract, a procurement agency may count the distinct, clearly defined portion of the work of the contract that the certified MBE firm performs with its own forces toward fulfilling up to fifty-percent (50%) of the MBE participation goal (overall) and up to one hundred percent (100%) of not more than one of the MBE participation subgoals, if any, established for the contract. In order to receive credit for self-performance, an MBE prime must be (a) a certified MBE (see 1-3 above) and (b) listed in the Part 2 – MBE Participation Schedule with its certification number, the certification classification under which it will self-perform, and the percentage of the contract that can be counted as MBE self-performance. For the remaining portion of the overall goal and any subgoals, the MBE prime must also list, in the Part 2 – MBE Participation Schedule, other certified MBE firms used to meet those goals or, after making good faith efforts to obtain the participation of additional MBE firms, request a waiver. Note: A dually-certified MBE firm can use its own forces toward fulfilling ONLY ONE of the MBE subgoals for which it can be counted.
6. The Contractor’s subcontractors are considered second-tier subcontractors. Third-tier contracting used to meet an MBE goal is to be considered the exception and not the rule. The following two conditions must be met before MDOT, its Modal Administrations and the Maryland Transportation Authority may approve a third-tier contracting agreement: (a) the bidder/offeror must request in writing approval of each third-tier contract arrangement, and (b) the request must contain specifics as to why a third-tier contracting arrangement should be approved. These documents must be submitted with the bid/proposal in Part 2 of this MBE Participation Schedule.
7. For each MBE firm that is being used as a supplier/wholesaler/regular dealer/broker/manufacturer, please follow these instructions for calculating the amount of the subcontract for purposes of achieving the MBE participation goals:
A. Is the firm certified as a broker of the products/supplies? If the answer is YES, please continue to Item C. If the answer is NO, please continue to Item B.
B. Is the firm certified as a supplier, wholesaler, regular dealer, or manufacturer of such products/supplies? If the answer is
YES, continue to Item D. If the answer is NO, continue to Item C only if the MBE firm is certified to perform trucking/hauling services under NAICS Codes 484110, 484121, 484122, 484210, 484220 and 484230. If the answer is NO and the firm is not certified under these NAICS Codes, then no MBE participation credit will be given for the supply of these products.
http://www.mdot.state.md.us/ http://www.naics.com/
STATE-FUNDED CONTRACTS
C. For purposes of achieving the MBE participation goal, you may count only the amount of any reasonable fee that the MBE firm will receive for the provision of such products/supplies - not the total subcontract amount or the value (or a percentage thereof) of such products and/or supplies. For Column 3 of the MBE Participation Schedule, please divide the amount of any reasonable fee that the MBE firm will receive for the provision of such products/services by the total Contract value and insert the percentage in Line 3.1.
D. Is the firm certified as a manufacturer (refer to the firm’s NAICS Code and specific description of products/services) of the products/supplies to be provided? If the answer is NO, please continue to Item E. If the answer is YES, for purposes of achieving the MBE participation goal, you may count the total amount of the subcontract. For Column 3 of the MBE Participation Schedule, please divide the total amount of the subcontract by the total Contract value and insert the percentage in Line 3.1.
E. Is the firm certified as a supplier, wholesaler and/or regular dealer? If the answer is YES and the MBE firm is furnishing and installing the materials and is certified to perform these services, please divide the total subcontract amount (including full value of supplies) by the total Contract value and insert the percentage in Line 3.1. If the answer is YES and the MBE firm is only being used as a supplier, wholesaler and/or regular dealer or is not certified to install the supplies/materials, for purposes of achieving the MBE participation goal, you may only count sixty percent (60%) of the value of the subcontract for these supplies/products (60% Rule). To apply the 60% Rule, first divide the amount of the subcontract for these supplies/products only (not installation) by the total Contract value. Then, multiply the result by sixty percent (60%) and insert the percentage in Line 3.2.
8. For each MBE firm that is not being used as a supplier/wholesaler/regular dealer/broker/manufacturer, to calculate the amount of the subcontract for purposes of achieving the MBE participation goals, divide the total amount of the subcontract by the total Contract value and insert the percentage in Line 3.1.
Example: $ 2,500 (Total Subcontract Amount) ÷ $10,000 (Total Contract Value) x 100 = 25%
9. WARNING: The percentage of MBE participation, computed using the percentage amounts determined per Column 3 for all of the
MBE firms listed in Part 2, MUST at least equal the MBE participation goal and subgoals (if applicable) as set forth in MDOT MBE Form A – State-Funded Contracts for this solicitation. If a bidder/offeror is unable to achieve the MBE participation goal and/or any subgoals (if applicable), then the bidder/offeror must request a waiver in Form A or the bid will be deemed not responsive, or the proposal not susceptible of being selected for award. You may wish to use the attached Goal/Subgoal Worksheet to assist you in calculating the percentages and confirming that you have met the applicable MBE participation goal and subgoals (if any).
STATE-FUNDED CONTRACTS
GOAL/SUBGOAL PARTICIPATION WORKSHEET
1. Complete the Part 2 – MBE Participation Schedule for each MBE being used to meet the MBE goal and any subgoals.
2. After completion of the Part 2 – MBE Participation Schedule, you may use the Goal/Subgoal Worksheet to calculate the total MBE participation commitment for the overall goal and any subgoals.
3. MBE Overall Goal Participation Boxes: Calculate the total percentage of MBE participation for each MBE classification by adding the percentages determined per Column 3 of the Part 2 – MBE Participation Schedule. Add the percentages determined in Lines
3.1 and 3.2 for the MBE subcontractor (subs) total. Add the overall participation percentages determined in Line 3.3 for the MBE prime total.
4. MBE Subgoal Participation Boxes: Calculate the total percentage of MBE participation for each MBE classification by adding the percentages determined per Column 3 of the Part 2 – MBE Participation Schedule. Add the percentages determined in Lines 3.1 and 3.2 for the MBE subcontractor (subs) total. Add the subgoal participation percentages determined in Line 3.3 for the MBE prime total.
5. The percentage amount for the MBE overall participation in the Total MBE Firm Participation Box F1 should be equal to the sum of the percentage amounts in Boxes A through E of the MBE Overall Goal Participation Column of the Worksheet.
6. The percentage amount for the MBE subgoal participation in the Total MBE Firm Participation Box L should be equal to the sum of the percentage amounts in Boxes A through E of the MBE Subgoal Participation Column of the Worksheet.
GOAL/SUBGOAL WORKSHEET
MBE Classification MBE Overall Goal Participation
MBE Subgoal Participation
(A) Total African American Firm Participation (Add percentages determined for African American-Owned Firms per Column 3 of MBE Participation Schedule)
_________%subs
_________%prime
_________%subs
_________%prime
(B) Total Hispanic American Firm Participation (Add percentages determined for Hispanic American-Owned Firms per Column 3 of MBE Participation Schedule)
_________%subs
_________%prime
_________%subs
_________%prime
(C) Total Asian American Firm Participation (Add percentages listed for Asian American-Owned Firms per Column 3 of MBE Participation Schedule)
_________%subs
_________%prime
_________%subs
_________%prime
(D) Total Women-Owned Firm Participation (Add percentages determined for Women-Owned Firms per Column 3 of MBE Participation Schedule)
_________%subs
_________%prime
_________%subs
_________%prime
(E) Total for all other MBE Firms (Add percentages for firms listed as Other MBE Classification per Column 3 of the MBE Participation Schedule)
_________%subs
_________%prime
_________%subs
_________%prime
Total MBE Firm Participation (Add total percentages determined for all MBE Firms in each column of the Worksheet)
(F1)__________% (F2)__________%
STATE-FUNDED CONTRACTS
PART 2 – MBE PARTICIPATION SCHEDULE
PAGE __ OF ___
PARTS 2 AND 3 MUST BE INCLUDED WITH THE BID/PROPOSAL. IF THE BIDDER/OFFEROR FAILS TO ACCURATELY COMPLETE AND SUBMIT PART 2 WITH THE BID/PROPOSAL AS REQUIRED, THE BID SHALL BE DEEMED NOT RESPONSIVE OR THE PROPOSAL SHALL BE DEEMED NOT SUSCEPTIBLE OF BEING SELECTED FOR AWARD.
Prime Contractor Project Description Solicitation Number
LIST INFORMATION FOR EACH CERTIFIED MBE PRIME OR MBE SUBCONTRACTOR YOU AGREE TO USE TO ACHIEVE THE MBE
PARTICIPATION GOAL AND SUBGOALS, IF ANY. NOTE INSTRUCTIONS IN EACH COLUMN.
COLUMN 1 COLUMN 2 COLUMN 3 Unless the bidder/offeror requested a waiver in MDOT MBE Form A – State Funded Contracts for this solicitation, the cumulative MBE participation for all MBE firms listed herein must equal at least the MBE participation goal and subgoals (if applicable) set forth in Form A.
NAME OF MBE PRIME
OR MBE
SUBCONTRACTOR
AND TIER
CERTIFICATION NO. AND
MBE CLASSIFICATION
FOR PURPOSES OF ACHIEVING THE MBE PARTICIPATION GOAL AND
SUBGOALS, refer to Sections 5 through 8 in Part 1 - Instructions. State the percentage amount of the products/services in Line 3.1, except for those products or services where the MBE firm is being used as a wholesaler, supplier, or regular dealer. For items of work where the MBE firm is being used as a supplier, wholesaler and/or regular dealer, complete Line 3.2 using the 60% Rule. For items of work where the MBE firm is the prime, complete Line 3.3.
MBE Name:
Check here if MBE firm is a subcontractor and complete in accordance with Sections 6, 7, & 8 of Part 1 - Instructions. If this box is checked, complete 3.1 or
3.2 in Column C, whichever is appropriate.
firm is the prime contractor, including a participant in a joint venture, and self-performance is being counted pursuant to Section 5 of Part 1 - Instructions. If this box is checked, complete 3.3 in Column C.
firm is a third-tier contractor (if applicable).
Please submit written documents in accordance with Section 6 of Part 1 - Instructions
Certification Number:
(If dually certified, check only one box.)
African American-Owned
Hispanic American- Owned
Asian American-Owned
Women-Owned
Other MBE Classification
3.1. TOTAL PERCENTAGE TO BE PAID TO THE SUBCONTRACTOR (STATE
THIS PERCENTAGE AS A PERCENTAGE OF THE TOTAL CONTRACT
VALUE- EXCLUDING PRODUCTS/SERVICES FROM SUPPLIERS,
WHOLESALERS OR REGULAR DEALERS).
__________% (Percentage for purposes of calculating achievement of MBE Participation goal and subgoals, if any)
3.2 TOTAL PERCENTAGE TO BE PAID TO THE SUBCONTRACTOR FOR
ITEMS OF WORK WHERE THE MBE FIRM IS BEING USED AS A SUPPLIER,
WHOLESALER AND/OR REGULAR DEALER) (STATE THE PERCENTAGE AS
A PERCENTAGE OF THE TOTAL CONTRACT VALUE AND THEN APPLY THE
60% RULE PER SECTION 7(E) IN PART 1 - INSTRUCTIONS).
_____________% Total percentage of Supplies/Products x _________60% (60% Rule)
__________% (Percentage for purposes of calculating achievement of MBE Participation goal and subgoals, if any)
3.3. TOTAL PERCENTAGE TO BE PAID TO MBE PRIME FOR WORK THAT
CAN BE COUNTED AS MBE SELF-PERFORMANCE (STATE THIS
PERCENTAGE AS A PERCENTAGE OF THE TOTAL CONTRACT VALUE)..
(a) ____________% Total percentage for self-performed items of work in which MBE is certified)
(b) ____________% (Insert 50% of MBE overall goal)
(c) ____________% (Insert subgoal for classification checked in Column 2, if applicable)
Percentages for purposes of calculating achievement of MBE Participation goals:
For MBE Overall goal – Use lesser of (a) or (b) For MBE Subgoal – Use lesser of (a) or (c) If MBE Prime is supplier, wholesaler and/or regular dealer, apply the 60% rule.
Check here if Continuation Sheets are attached.
STATE-FUNDED CONTRACTS
PART 2 – MBE PARTICIPATION SCHEDULE
CONTINUATION SHEET
PAGE __ OF ___
Prime Contractor Project Description Solicitation Number
LIST INFORMATION FOR EACH CERTIFIED MBE PRIME OR MBE SUBCONTRACTOR YOU AGREE TO USE TO ACHIEVE THE MBE
PARTICIPATION GOAL AND SUBGOALS, IF ANY. NOTE INSTRUCTIONS IN EACH COLUMN.
COLUMN 1 COLUMN 2 COLUMN 3 Unless the bidder/offeror requested a waiver in MDOT MBE Form A – State Funded Contracts for this solicitation, the cumulative MBE participation for all MBE firms listed herein must equal at least the MBE participation goal and subgoals (if applicable) set forth in Form A.
NAME OF MBE PRIME
OR MBE
SUBCONTRACTOR
AND TIER
CERTIFICATION NO. AND
MBE CLASSIFICATION
FOR PURPOSES OF ACHIEVING THE MBE PARTICIPATION GOAL AND
SUBGOALS, refer to Sections 5 through 8 in Part 1 - Instructions. State the percentage amount of the products/services in Line 3.1, except for those products or services where the MBE firm is being used as a wholesaler, supplier, or regular dealer. For items of work where the MBE firm is being used as a supplier, wholesaler and/or regular dealer, complete Line 3.2 using the 60% Rule. For items of work where the MBE firm is the prime, complete Line 3.3.
MBE Name:
firm is a subcontractor and complete in accordance with Sections 6, 7, & 8 of Part 1 - Instructions. If this box is checked, complete 3.1 or
3.2 in Column C, whichever is appropriate.
firm is the prime contractor, including a participant in a joint venture, and self-performance is being counted pursuant to Section 5 of Part 1 - Instructions. If this box is checked, complete 3.3 in Column C.
firm is a third-tier contractor (if applicable).
Please submit written documents in accordance with Section 6 of Part 1 - Instructions
Certification Number:
(If dually certified, check only one box.)
African American-Owned
Hispanic American- Owned
Asian American-Owned
Women-Owned
Other MBE Classification
3.1. TOTAL PERCENTAGE TO BE PAID TO THE SUBCONTRACTOR (STATE
THIS PERCENTAGE AS A PERCENTAGE OF THE TOTAL CONTRACT
VALUE- EXCLUDING PRODUCTS/SERVICES FROM SUPPLIERS,
WHOLESALERS OR REGULAR DEALERS).
__________% (Percentage for purposes of calculating achievement of MBE Participation goal and subgoals, if any)
3.2 TOTAL PERCENTAGE TO BE PAID TO THE SUBCONTRACTOR FOR
ITEMS OF WORK WHERE THE MBE FIRM IS BEING USED AS A SUPPLIER,
WHOLESALER AND/OR REGULAR DEALER) (STATE THE PERCENTAGE AS
A PERCENTAGE OF THE TOTAL CONTRACT VALUE AND THEN APPLY THE
60% RULE PER SECTION 7(E) IN PART 1 - INSTRUCTIONS).
_____________% Total percentage of Supplies/Products x _________60% (60% Rule)
__________% (Percentage for purposes of calculating achievement of MBE Participation goal and subgoals, if any)
3.3. TOTAL PERCENTAGE TO BE PAID TO MBE PRIME FOR WORK THAT
CAN BE COUNTED AS MBE SELF-PERFORMANCE (STATE THIS
PERCENTAGE AS A PERCENTAGE OF THE TOTAL CONTRACT VALUE)..
(a) ____________% Total percentage for self-performed items of work in which MBE is certified)
(b) ____________% (Insert 50% of MBE overall goal)
(c) ____________% (Insert subgoal for classification checked in Column 2, if applicable)
Percentages for purposes of calculating achievement of MBE Participation goals:
For MBE Overall goal – Use lesser of (a) or (b) For MBE Subgoal – Use lesser of (a) or (c) If MBE Prime is supplier, wholesaler and/or regular dealer, apply the 60% rule.
Check here if Continuation Sheets are attached.
STATE-FUNDED CONTRACTS
PART 3 – CERTIFICATION FOR MBE PARTICIPATION SCHEDULE
PARTS 2 AND 3 MUST BE INCLUDED WITH THE BID/PROPOSAL
AS DIRECTED IN THE INVITATION TO BID/ REQUEST FOR PROPOSALS.
I hereby affirm that I have reviewed the Products and Services Description (specific product that a firm is certified to provide or areas of work that a firm is certified to perform) set forth in the MDOT MBE Directory for each of the MBE firms listed in Part 2 of this MBE Form B for purposes of achieving the MBE participation goals and subgoals that were identified in the MBE Form A that I submitted with this solicitation, and that the MBE firms listed are only performing those products/services/areas of work for which they are certified. I also hereby affirm that I have read and understand the form instructions set forth in Part 1 of this MBE Form B.
The undersigned Prime Contractor hereby certifies and agrees that they have fully complied with the State Minority Business Enterprise law, State Finance and Procurement Article §14-308(a)(2), Annotated Code of Maryland which provides that, except as otherwise provided by law, a contractor may not identify a certified minority business enterprise in a bid or proposal and:
(1) fail to request, receive, or otherwise obtain authorization from the certified minority business enterprise to identify the certified minority business enterprise in its bid or proposal;
(2) fail to notify the certified minority business enterprise before execution of the contract of its inclusion of the bid or proposal;
(3) fail to use the certified minority business enterprise in the performance of the contract; or
(4) pay the certified minority business enterprise solely for the use of its name in the bid or proposal.
I solemnly affirm under the penalties of perjury that the contents of Parts 2 and 3 of MDOT MBE Form B are true to the best of my knowledge, information and belief.
Company Name Signature of Representative
Address Printed Name and Title
City, State and Zip Code Date
| Solicitation Number |
| Solicitation Number |
File details come from the government source that posted it. Updated .