Marion VA_Renovate 3B_Bid Documents_Drawings_V1 of 4_09-20-2024 28 pages.pdf

PDF 10 MB Posted

Attached to
Z2DA--657A5-23-110, Renovate 3B for Patient Privacy and Intensive Care Unit, (VA-25-00018450)
Solicitation number
36C25525R0015
Issued by

About this file

This file contains architectural drawings from Health Facilities Group and Stone Group Architects dated September 20, 2024 for renovating Patient Ward 3B at the Marion IL VA Medical Center to improve patient privacy and create an intensive care unit. The drawings include general notes, code review, life safety plans, demolition plans, temporary construction barriers, project staging, and accessibility details. The renovation work focuses on the third floor ward area and includes demolition of existing walls, ceilings, floors and MEP systems, as well as installation of new patient rooms, ICU rooms, nurse stations, utility rooms and support spaces. The drawings show extensive details for maintaining operations during construction through temporary barriers and infection control measures. Key architectural elements include new headwalls, patient lifts, solid surface finishes, and casework. The plans also indicate work required on the second floor and penthouse level to support the third floor renovation.

The drawings provide detailed technical information including mounting heights, accessibility requirements, demolition phasing, life safety considerations, and construction staging logistics. They specify locations for temporary construction barriers, dust control measures, and maintaining required egress paths during construction. The scope encompasses approximately 6,216 GSF of new ICU space along with renovation of adjacent areas. The documents include highly detailed demolition and new work plans showing precise locations of walls, doors, medical equipment, and required clearances to meet VA healthcare facility standards.

View the file

Other files

File Type Posted
36C25525R0015 0006.docx DOCX document
S02 36C25525R0015 657A5-23-110 R3.docx DOCX document
Renovate 3B Hazardous Material Report.pdf PDF
36C25525R0015 0005.docx DOCX document
Sheet AI100 Color Schedule Key.pdf PDF
36C25525R0015 0004.docx DOCX document
36C25525R0015 0003.docx DOCX document
S04 Pre-Bid Site Visit Attendance.pdf PDF
36C25525R0015 0002.docx DOCX document
Requirements for Identification and Replacement of A307 Bolts Memo_Signed.pdf PDF
Marion VA_Renovate 3B_Bid Documents_Drawings_V1 of 4_09-20-2024 28 pages - Copy.pdf PDF
Marion VA_Renovate 3B_Bid Documents_Drawings_V4 of 4_09-20-2024 41 pages - Copy.pdf PDF
Marion VA_Renovate 3B_Bid Documents_Drawings_V2 of 4_09-20-2024 26 pages - Copy.pdf PDF
36C25525R0015 0001.docx DOCX document
S02 36C25525R0015 657A5-23-110.docx DOCX document
Marion VA_Renovate 3B_Bid Documents_Drawings_V3 of 4_09-20-2024 30 pages - Copy.pdf PDF
Marion VA_Renovate 3B_Bid Documents_Specifications_09-20-2024 1723 pages rev1 - Copy.pdf PDF
Marion VA_Renovate 3B_Bid Documents_Drawings_V3 of 4_09-20-2024 30 pages.pdf PDF
36C25525R0015.docx DOCX document
Marion VA_Renovate 3B_Bid Documents_Specifications_09-20-2024 1723 pages rev1.pdf PDF
Marion VA_Renovate 3B_Bid Documents_Drawings_V4 of 4_09-20-2024 41 pages.pdf PDF
Marion VA_Renovate 3B_Bid Documents_Drawings_V2 of 4_09-20-2024 26 pages.pdf PDF
Show all 22

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

VICINITY MAP - VA FACILITY

TRUE

NORTH

PLAN

NORTH

VICINITY MAP - MARION IL

TRUE

NORTH

PLAN

NORTH

BUILDING IMAGE - EXTERIOR

VA SIGNATURESBID ITEMS LIST

BID ITEM 1: BASE BID

(BASE BID)

INCLUDES ALL SCOPE COMMUNICATED IN DRAWINGS, SPECIFICATIONS,

AND OTHER CONSTRUCTION DOCUMENTS.

BID ITEM 2: MECHANICAL DUCTWORK

(DEDUCT)

TWO LAYERS OF 1-1/2” FLEXIBLE ELASTROMERIC INSULATION WITH SELF-

ADHESIVE OUTDOOR JACKET, 3-INCH TOTAL THICKNESS FOR ALL

OUTDOOR DUCTWORK.

BID ITEM 3: HEADWALLS

(DEDUCT)

ALL HEADWALLS TO REDUCE IN PRICE INCLUDING HEADWALL SIZE AND

FINISHES.

BID ITEM 4: SOLID SURFACE & TILE

(DEDUCT)

OMIT S.O.W. RELATED TO SOLID SURFACE WALL FINISHES AND REPLACE

WITH WALL TILE. SEE SPECIFICATIONS & AI DRAWINGS.

BID ITEM 5: CASEWORK

(DEDUCT)

OMIT ALL PREMANUFACTURED METAL CASEWORK AND REPLACE WITH

MILLWORK. SEE SPECIFICATIONS AND AI DRAWINGS.

BID ITEM 6: PATIENT LIFTS

(DEDUCT)

OMIT S.O.W. RELATED TO PATIENT LIFTS. SEE SPECIFICATIONS & RCP

DRAWINGS.

BID ITEM 7: MED / SURG ROOM (ROOM 303)

(DEDUCT)

OMIT S.O.W. RELATED TO RENOVATION OF MED/SURG ROOM (ROOM 303).

REVISED DRAWINGS TO BE PROVIDED BY A/E TEAM SHOULD THIS BID ITEM

BE SELECTED.

BID ITEM 8: VISITOR TOILET (ROOM 330)

(DEDUCT)

OMIT S.O.W. RELATED TO RENOVATION, AND RESIZING, OF VISITOR TOILET

(ROOM 330). REVISED DRAWINGS TO BE PROVIDED BY A/E TEAM SHOULD

THIS BID ITEM BE SELECTED.

BID ITEM 9: VISITOR LOUNGE (ROOM 331)

(DEDUCT)

OMIT S.O.W. RELATED TO RENOVATION, AND RESIZING, OF VISITOR

LOUNGE (ROOM 331). REVISED DRAWINGS TO BE PROVIDED BY A/E TEAM

SHOULD THIS BID ITEM BE SELECTED.

BUILDING IMAGE - INTERIOR

DRAWING LOGOS

SHEET INDEX

01 - GENERAL

1 of 14 GI000 COVER SHEET

2 of 14 GI001 ARCH/INT NOTES

3 of 14 GI002 ARCH/INT NOTES

4 of 14 GI003 CODE REVIEW

5 of 14 GI011 ACCESSIBILITY & EQUIPMENT MOUNTING DETAILS

6 of 14 GI012 ACCESSIBILITY & EQUIPMENT MOUNTING DETAILS

7 of 14 GI013 ACCESSIBILITY & EQUIPMENT MOUNTING DETAILS

8 of 14 GI100 LIFE SAFETY PLAN - 3RD LEVEL - OVERALL

9 of 14 GI101 LIFE SAFETY PLAN - 3RD LEVEL - PROJECT AREA

10 of 14 GI102 LIFE SAFETY PLAN - 2ND LEVEL

11 of 14 GI110 TEMP EXITING & ICRA PLAN - 3RD LEVEL - OVERALL

12 of 14 GI111 TEMP EXITING & ICRA PLAN - 3RD LEVEL - PROJECT AREA

13 of 14 GI120 PROJECT STAGING PLAN - FACILITY MAP

14 of 14 GI121 PROJECT STAGING PLAN - GROUND LEVEL - PROJECT AREA

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

A

B

C

D

2 4 5

Phase

DESIGNER OF RECORD

A/E:

STAMPCONSULTANTS

MEP:

SPECIALIZED ENGINEERING SOLUTIONS

10360 ELLISON CIRCLE

OMAHA, NE 68134

(402) 991-5520

NATHAN BOWMAN (MECH & PUMB)

MAY ALEXANDER (ELEC)

STRUCTURAL:

BSE ENGINEERS

11320 WEST 79TH STREET

LENEXA, KS 66214

(913) 492-7400

KEVIN BOEHRINGER (STRUCT)

O N

E E

IG

H

T H

I N

C H

O

N E

F O

O T

1/

8"

'-0

O N

E Q

U A

R T

E R

I N

C H

O

N E

F O

O T

1/

4"

'-0

T H

R E

E E

IG

H

T H

S

IN

C H

O

N E

F O

O T

(3 /8

1' -0

O N

E H

A

LF

I N

C H

O

N E

F O

O T

1/

2"

'-0

T

H R

E E

Q U

A R

T E

R S

IN

C

H

O N

E F

O O

T

3/ 4"

'-0

6"

O N

E I

N C

H

O N

E F

O O

T

1"

'-0

6"

O N

E A

N D

O N

E H

A

LF

I N

C H

E S

O

N E

F O

O T

1/ 2"

'-0

6"

T H

R E

E

IN

C H

E S

O

N E

F O

O T

3"

'-0

6"

32 4 5 61

C :\U se rs

\K .K ue pe r\D oc um en ts \2

2_ M ar io n V

A _R en ov at e

3B _k yl ek

9D U

H U

.rv t

9/

/2

:4 6:

A

M

GI000

COVER SHEET

STONE / HFG ARCHITECTURE

600 EAST 7TH ST & 330 N. MEAD

SIOUX FALLS, SD 57103 & WICHITA, KS 67202

(605) 271-1144 & (316) 262-2500

BEAU FEY (ARCH) & WAYNE BONGARTZ (PM)

RENOVATE PATIENT WARD 3B

FOR PATIENT PRIVACY AND

INTENSIVE CARE

MARION IL

BLDG #001

WESLEY PINKS

09/20/2024 BF/WB/SS KK/AB/AW

DEPARTMENT OF VETERANS AFFAIRS

RENOVATE PATIENT WARD 3B FOR PATIENT PRIVACY

AND INTENSIVE CARE

MARION IL

VA #657A5-23-110

09/20/2024

FINAL BID DOCUMENTS

SGA #231942

VA #657A5-23-110

FINAL BID DOCUMENTS

GEN SHEET: 1 OF 14

SHEET INDEX

02 - STRUCTURAL

1 of 4 S-000 GENERAL NOTES

2 of 4 S-100 PARTIAL ROOF FRAMING PLAN

3 of 4 S-200 PENTHOUSE FLOOR DEMO AND NEW FRAMING PLAN

4 of 4 S-300 PENTHOUSE ROOF FRAMING PLAN & FRAMING DETAILS

03 - ARCHITECTURAL DEMOLITION

1 of 10 AD100 DEMOLITION PLAN - 3RD LEVEL - OVERALL

2 of 10 AD101 DEMOLITION PLAN - 3RD LEVEL - AREA A

3 of 10 AD102 DEMOLITION PLAN - 3RD LEVEL - AREA B

4 of 10 AD110 DEMOLITION RCP - 3RD LEVEL - OVERALL

5 of 10 AD111 DEMOLITION RCP - 3RD LEVEL - AREA A

6 of 10 AD112 DEMOLITION RCP - 3RD LEVEL - AREA B

7 of 10 AD113 DEMOLITION RCP - 2ND LEVEL - OVERALL

8 of 10 AD114 DEMOLITION RCP - 2ND LEVEL - AREA A

9 of 10 AD115 DEMOLITION RCP - 2ND LEVEL - AREA B

10 of 10 AD121 DEMOLITION PENTHOUSE PLAN - 4TH LEVEL - AREA A

04 - ARCHITECTURAL

1 of 26 AE100 ARCHITECTURAL FLOOR PLAN - 3RD LEVEL - OVERALL

2 of 26 AE101 ARCHITECTURAL FLOOR PLAN - 3RD LEVEL - AREA A

3 of 26 AE102 ARCHITECTURAL FLOOR PLAN - 3RD LEVEL - AREA B

4 of 26 AE110 REFLECTED CEILING PLAN - 3RD LEVEL - OVERALL

5 of 26 AE111 REFLECTED CEILING PLAN - 3RD LEVEL - AREA A

6 of 26 AE112 REFLECTED CEILING PLAN - 3RD LEVEL - AREA B

7 of 26 AE130 ARCHITECTURAL ROOF PLAN - OVERALL

8 of 26 AE131 ARCHITECTURAL PENTHOUSE PLAN - 4TH LEVEL - AREA A

9 of 26 AE301 BUILDING SECTIONS

10 of 26 AE311 WALL SECTIONS

11 of 26 AE312 WALL SECTIONS

12 of 26 AE401 ENLARGED PATIENT ROOM PLANS

13 of 26 AE402 ENLARGED PATIENT ROOM PLANS

14 of 26 AE403 ENLARGED PATIENT ROOM PLANS

15 of 26 AE404 ENLARGED PATIENT ROOM PLANS

16 of 26 AE405 ENLARGED PATIENT ROOM PLANS

17 of 26 AE406 ENLARGED PATIENT ROOM PLANS

18 of 26 AE411 ENLARGED PLANS

19 of 26 AE421 FLOOR SLOPES & DRAINS

20 of 26 AE422 FLOOR SLOPES & DRAINS

21 of 26 AE431 ENLARGED RCP

22 of 26 AE501 ARCHITECTURAL DETAILS

23 of 26 AE502 ARCHITECTURAL DETAILS

24 of 26 AE503 ARCHITECTURAL DETAILS

25 of 26 AE601 ARCHITECTURAL SCHEDULES & ASSEMBLIES

26 of 26 AE900 ARCHITECTURAL PERSPECTIVES

05 - ARCHITECTURAL INTERIORS

1 of 30 AI100 FINISH & INTERIORS - SCHEDULES & TYPES

2 of 30 AI101 FINISH PLAN - 3RD LEVEL - AREA A

3 of 30 AI102 FINISH PLAN - 3RD LEVEL - AREA B

4 of 30 AI200 FURNITURE & EQUIPMENT - SCHEDULES & TYPES

5 of 30 AI201 FURNITURE & EQUIPMENT - SCHEDULES & TYPES

6 of 30 AI202 FURNITURE & EQUIPMENT PLAN - 3RD LEVEL - AREA A

7 of 30 AI203 FURNITURE & EQUIPMENT PLAN - 3RD LEVEL - AREA B

8 of 30 AI301 WALL PROTECTION PLAN - 3RD LEVEL - AREA A

9 of 30 AI302 WALL PROTECTION PLAN - 3RD LEVEL - AREA B

10 of 30 AI401 INTERIOR ELEVATIONS

11 of 30 AI402 INTERIOR ELEVATIONS

12 of 30 AI411 HEADWALL - BASIS OF DESIGN

13 of 30 AI412 HEADWALL - BASIS OF DESIGN - BID DEDUCT

14 of 30 AI501 MILLWORK SECTIONS & DETAILS

15 of 30 AI502 MILLWORK SECTIONS & DETAILS - BID DEDUCT

16 of 30 AI503 FINISH DETAILS

17 of 30 AI600 SIGNAGE & WAYFINDING - SCHEDULES & TYPES

18 of 30 AI601 SIGNAGE & WAYFINDING PLAN - 3RD LEVEL - AREA A

19 of 30 AI602 SIGNAGE & WAYFINDING PLAN - 3RD LEVEL - AREA B

20 of 30 AI701 PATIENT LIFTS - BASIS OF DESIGN - DETAILS

21 of 30 AI702 PATIENT LIFTS - BASIS OF DESIGN - DETAILS

22 of 30 AI703 PATIENT LIFTS - BASIS OF DESIGN - DETAILS

23 of 30 AI704 PATIENT LIFTS - BASIS OF DESIGN - DETAILS

24 of 30 AI710 PATIENT LIFTS - BASIS OF DESIGN - OVERALL PLAN

25 of 30 AI711 PATIENT LIFTS - BASIS OF DESIGN - ENLARGED PLAN

26 of 30 AI712 PATIENT LIFTS - BASIS OF DESIGN - ENLARGED PLAN

27 of 30 AI713 PATIENT LIFTS - BASIS OF DESIGN - ENLARGED PLAN

28 of 30 AI714 PATIENT LIFTS - BASIS OF DESIGN - ENLARGED PLAN

29 of 30 AI715 PATIENT LIFTS - BASIS OF DESIGN - ENLARGED PLAN

30 of 30 AI716 PATIENT LIFTS - BASIS OF DESIGN - ENLARGED PLAN

06 - MECHANICAL

1 of 16 M-000 MECHANICAL SYMBOLS AND ABBREVIATIONS

2 of 16 M-103 MECHANICAL DEMOLITION FLOOR PLAN - 3RD LEVEL

3 of 16 M-104 MECHANICAL DEMOLITION FLOOR PLAN - ROOF

4 of 16 MH203 DUCTWORK FLOOR PLAN - 3RD LEVEL

5 of 16 MH204 MECHANICAL FLOOR PLAN - PENTHOUSE

6 of 16 MH205 MECHANICAL TEMPORARY FLOOR PLAN - 3RD LEVEL

7 of 16 MP203 HYDRONIC PIPING FLOOR PLAN - 3RD LEVEL

8 of 16 MC203 CONTROLS FLOOR PLAN - 3RD LEVEL

9 of 16 M-300 ENLARGED PLANS

10 of 16 M-301 SECTIONS

11 of 16 M-500 MECHANICAL DETAILS

12 of 16 M-501 MECHANICAL DETAILS

13 of 16 M-502 MECHANICAL CONTROLS

14 of 16 M-503 MECHANICAL CONTROLS

15 of 16 M-600 MECHANICAL SCHEDULES

16 of 16 M-601 MECHANICAL SCHEDULES

07 - PLUMBING

1 of 9 P-000 PLUMBING SYMBOLS AND ABBREVIATIONS

2 of 9 PF103 FIRE PROTECTION DEMOLITION FLOOR PLAN - 3RD LEVEL

3 of 9 PF203 FIRE PROTECTION FLOOR PLAN - 3RD LEVEL

4 of 9 P-102 PLUMBING DEMOLITION FLOOR PLAN - 2ND LEVEL

5 of 9 P-103 PLUMBING DEMOLITION FLOOR PLAN - 3RD LEVEL

6 of 9 PP202 PLUMBING FLOOR PLAN - 2ND LEVEL

7 of 9 PP203 PLUMBING FLOOR PLAN - 3RD LEVEL

8 of 9 PG203 MEDICAL GAS FLOOR PLAN - 3RD LEVEL

9 of 9 P-600 PLUMBING DETAILS AND SCHEDULES

08 - ELECTRICAL

1 of 16 E-000 ELECTRICAL SYMBOLS AND ABBREVIATIONS

2 of 16 E-001 ELECTRICAL SYMBOLS

3 of 16 E-103 ELECTRICAL DEMOLITION FLOOR PLAN - 3RD LEVEL

4 of 16 E-104 ELECTRICAL DEMOLITION FLOOR PLAN - PENTHOUSE

5 of 16 EL203 LIGHTING FLOOR PLAN - 3RD LEVEL

6 of 16 EC203 LIGHTING CONTROL FLOOR PLAN - 3RD LEVEL

7 of 16 EP203 POWER FLOOR PLAN - 3RD LEVEL

8 of 16 EP204 POWER FLOOR PLAN - PENTHOUSE

9 of 16 EV203 LOW VOLTAGE FLOOR PLAN - 3RD LEVEL

10 of 16 E-401 LIGHTING CONTROL ZONE PLANS

11 of 16 E-500 ONE-LINE DIAGRAM

12 of 16 E-600 ELECTRICAL DETAILS

13 of 16 E-601 ELECTRICAL DETAILS

14 of 16 E-700 ELECTRICAL SCHEDULES

15 of 16 E-701 ELECTRICAL SCHEDULES

16 of 16 E-800 ENERGY CODE COMPLIANCE

TOTAL SHEET COUNT: 125

REVISION # DESCRIPTION DATE

TYPICAL DIMENSION LINE

BREAK LINE

DETAIL INDICATOR AND/OR

ENLARGED DRAWING CALLOUT

XX

X-XXX

XX

X-XXX

XX WALL SECTION INDICATOR

XX

X-XXX XX X-XXX EXTERIOR ELEVATION INDICATOR

ELEVATION / LEVEL INDICATOR

CENTER LINE

INTERIOR ELEVATION INDICATORX-XXX

XX

X-XXX

XX

XX

XX

XX

NORTH ARROW(S)

CORNER GUARD - TYP

X.X KEYNOTE

X NEW GRID LINE

XXX

ROOM

XXX

XX

DRAWING TITLE

X"=X'-X"

XX

TRUE

NORTH

PLAN

NORTH

XX

X-XXX

BUILDING SECTION INDICATOR

XX

X-XXX

DETAIL INDICATOR

X-XXX

NORTH

EXISTING GRID LINEX

XX / XXX

SPOT ELEVATION INDICATOR

LEVEL TITLE

TYPICAL DRAWING BLOCK TITLE

DRAWING REFERENCE

X'-X"

ELEVATION / LEVEL INDICATOR

LEVEL TITLE

X'-X"

X' X"

SPOT COORDINATE INDICATOR

X'-X"

X'-X" / X'-X"

SLOPE INDICATOR

X

XX

XX

REVISION AND/OR ISSUE INDICATOR

ROOF TYPE INDICATOR

WINDOW / STOREFRONT TYPE INDICATOR

PARTITION TYPE INDICATOR

DOOR / OPENING INDICATOR

(BORROWED LIGHT INCLUDED)

ROOM INDICATOR

EQUIPMENT INDICATOR

CEILING HEIGHT INDICATOR

XXX

X-XXX

XX

XX

OCCUPANT LOADXX

DETAIL INDICATOR AND/OR

ENLARGED DRAWING CALLOUT

CORNER GUARD - WALL END

CORNER GUARD - OBTUSE ANGLE

CORNER GUARD - ACUTE ANGLE

SIGNAGE TYPE INDICATORXX

ARCH / INT ANNOTATION LEGEND (TAGS, SYMBOLS, AND INDICATORS)

REVISION AND/OR ISSUE CLOUD

SUGGESTED FLOORING DIRECTION

X'-X"

XXXX WALL PROTECTION TYPE INDICATOR

ARCH / INT MATERIALS LEGEND

BATT INSULATION

WOOD ROUGH (CONTINUOUS)

WOOD ROUGH (SPACED)

EXISTING CONSTRUCTION

TO BE REMOVED

NEW CONSTRUCTION

EARTH

EARTH (UNDISTURBED)

GYPSUM BOARD

CONCRETE

RIGID INSULATION

PLYWOOD

GRANULAR FILL

ASPHALT

ALUMINUM

STEEL

WOOD

BRICK

BLOCK

STONE

FIREPROOFING

LOOSE INSULATION

SAND

EXISTING CONSTRUCTION

TO REMAIN

SPRAY INSULATION

VINYL

EPOXY

NOTE

A. FLOOR PATTERN HATCHES ARE EXEMPT FROM LEGEND.

ARCH / INT LINE TYPES LEGEND

HIDDEN LINE

CENTER LINE

GRID LINE

TYPICAL LINE

DISTANT LINE

ELEVATION / LEVEL LINE

LEADER LINE

CLEARANCE LINE

EASEMENT LINE

DEMOLITION LINE

PATH OF TRAVEL

MATCHLINE

PROPERTY LINE

0.0"

0.0"

OCCUPANTS

REQUIRED WIDTH

PROVIDED WIDTH

OCCUPANT LOAD

ARCH / INT CODE SYMBOLS LEGEND

TD = X'-X"

(TD) TRAVEL DISTANCE

DIRECTION OF EGRESS

START OF PATH

DIRECTION OF EGRESSPATH OF TRAVEL

CEILING ACCESS PANEL

2X4 FLUORESCENT FIXTURE

2X2 FLUORESCENT FIXTURE

CEILING HEIGHT

RECESSED CAN FIXTURE

RETURN AIR GRILLE

SUPPLY AIR GRILLE

X'-X"

WIRELESS ACCESS POINT

AT ANTENNA

DOME LIGHT

AC ACCESS CONTROLLED DOOR

D

F HORN/ STROBE

TV ROUGH-IN TELEVISION OUTLET

SECURITY CAMERAC

CEILING SPEAKERS

EXIT SIGN

NOTE

A. REFERENCE MECHANICAL & ELECTRICAL DRAWINGS FOR SYMBOLS NOT SHOWN HERE.

RCP SYMBOLS & MATERIALS LEGEND

GYPSUM CEILING

(GWB)

2X2 SUSPENDED

ACOUSTICAL TILE

CEILING (SAT)

2X4 SUSPENDED

ACOUSTICAL TILE

CEILING (SAT)

X.XX KEYNOTE - SEE SCHEDULE

OR

RECESSED LINEAR LIGHT

VANITY LIGHTOR

OR

OR

OR

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved

VA FORM 08 - 6231

A

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

A

B

C

D

2 4 5

Phase

DESIGNER OF RECORD

A/E:

STAMPCONSULTANTS

MEP: STRUCTURAL:

6"

6"

6"

6"

O N

E E

IG

H

T H

I N

C H

O

N E

F O

O T

1/

8"

'-0

O

N E

Q U

A R

T E

R I

N C

H

O N

E F

O O

T

1/ 4"

'-0

T H

R E

E E

IG

H

T H

S

IN

C H

O

N E

F O

O T

(3 /8

1' -0

O

N E

H A

LF

I

N C

H

O N

E F

O O

T

1/ 2"

'-0

T H

R E

E Q

U A

R T

E R

S

IN

C H

O

N E

F O

O T

3/

4"

'-0

O

N E

I N

C H

O

N E

F O

O T

1"

'-0

O N

E A

N D

O N

E H

A

LF

I N

C H

E S

O

N E

F O

O T

1/ 2"

'-0

T H

R E

E

IN

C H

E S

O

N E

F O

O T

3"

'-0

32 4 5 61

SPECIALIZED ENGINEERING SOLUTIONS

10360 ELLISON CIRCLE

OMAHA, NE 68134

(402) 991-5520

NATHAN BOWMAN (MECH & PUMB)

MAY ALEXANDER (ELEC)

BSE ENGINEERS

11320 WEST 79TH STREET

LENEXA, KS 66214

(913) 492-7400

KEVIN BOEHRINGER (STRUCT)

C :\U se rs

\K .K ue pe r\D oc um en ts \2

2_ M ar io n V

A _R en ov at e

3B _k yl ek

9D U

H U

.rv t

9/

/2

:4 6:

A

M

GI001

ARCH/INT NOTES

STONE / HFG ARCHITECTURE

600 EAST 7TH ST & 330 N. MEAD

SIOUX FALLS, SD 57103 & WICHITA, KS 67202

(605) 271-1144 & (316) 262-2500

BEAU FEY (ARCH) & WAYNE BONGARTZ (PM)

RENOVATE PATIENT WARD 3B

FOR PATIENT PRIVACY AND

INTENSIVE CARE

MARION IL

BLDG #001

WESLEY PINKS

09/20/2024 BF/WB/SS KK/AB/AW

SGA #231942

VA #657A5-23-110

FINAL BID DOCUMENTS

GEN SHEET: 2 OF 14

ARCH / INT ABBREVIATIONS

SYMBOLS

" INCH / INCHES

# POUND / NUMBER

& AND

' FOOT / FEET

+/- PLUS OR MINUS

< ANGLE

<< DOUBLE ANGLE

@ AT

CL CENTERLINE

d PENNEY

Ø ROUND OR DIAMETER

A

A/C AIR CONDITIONING

A/E ARCHITECT / ENGINEER

AB ANCHOR BOLT

ABA ARCHITECTURAL BARRIERS ACT

ABBRV ABBREVIATION

ABV ABOVE

AC ASPHALTIC CONCRETE / AIR CONDITIONING /

ARCHITECTURAL CEILING / ACOUSTICAL

ACC ACCESSIBLE

ACCU AIR COOLED CONDENSING UNIT

ACM ALUMINUM COMPOSITE MATERIAL

ACOUS ACOUSTICAL

ACP ACOUSTICAL CEILING PANEL

ACT ACOUSTICAL CEILING TILE

AD AREA DRAIN / ARCHITECTURAL DEMOLITION

ADA AMERICANS WITH DISABILITIES ACT

ADD ADDENDUM

ADH ADHESIVE

ADJ ADJUSTABLE / ADJACENT / ADJOINING

AE ARCHITECTURAL ELEMENT / ARCHITECTURAL

ELEMENTS

AF ARCHITECTURAL FINISHES

AFC ABOVE FINISHED CEILING

AFF ABOVE FINISHED FLOOR

AFG ABOVE FINISHED GRADE

AG AGRICULTURAL / ARCHITECTURAL GRAPHICS

AHERA ASBESTOS HAZARD EMERGENCY RESPONSE ACT

AHJ AUTHORITY HAVING JURISDICTION

AI ARCHITECTURAL INTERIORS

AL ALUMINUM

ALN ALIGN

ALT ALTERNATIVE / ALTERNATE

ALUM ALUMINUM

ANOD ANODIZED

ANSI AMERICAN NATIONAL STANDARDS INSTITUTE

APPROX APPROXIMATE

APPROX APPROXIMATE

APR APRIL

APX APPROXIMATE

ARCH ARCHITECT / ARCHITECTURAL

AS ARCHITECTURAL SITE

ASHRAE AMERICAN SOCIETY OF HEATING, REFRIGERATING,

AND AIR CONDITIONING ENGINEERS

ASI ARCHITECT'S SUPPLEMENTAL INSTRUCTIONS

ASME AMERICAN SOCIETY OF MECHANICAL ENGINEERS

AUG AUGUST

AW ARCHITECTURAL WAYFINIDING

AWF ARCHITECTURAL WINDOW FILM

AWI ARCHITECTURAL WOODWORK INSTITUTE

AWP ACOUSTICAL WALL PANEL

B

B&B BOARD AND BATTEN / BALLED AND BURLAPPED

BATT BLANKET INSULATION / FIBERGLASS INSULATION

BD BOARD / BARN DOOR

BEV BEVELED

BF BIFOLD

BFF BELOW FINISH FLOOR

BIM BUILDING INFORMATION MODELING

BL BRICK LEDGE

BLDG BUILDING

BLKG BLOCK / BLOCKING

BM BEAM

BMRK BENCHMARK

BO BOTTOM OF

BOC BOTTOM OF CONCRETE / BACK OF CURB

BOF BOTTOM OF FOOTING

BOW BOTTOM OF WALL

BRG BEARING

BRK BRICK

BRKT BRACKET

BRNG BEARING

BRZ BRONZE

BSMT BASEMENT

BTM BOTTOM

BTWN BETWEEN

BUF BUILT UP FLOORING

BUR BUILT UP ROOFING

BW BOTTOM OF WALL

C

C CELSIUS

CA CONSTRUCTION ADMINISTRATION

CAB CABINET

CAD COMPUTER-AIDED DESIGN

CB CERAMIC BASE / CHALKBOARD

CC CENTER TO CENTER

CCW COUNTERCLOCKWISE

CD CONSTRUCTION DOCUMENTS / COILING DOOR / CIVIL

DEMOLITION

CEM CEMENT

CF CUBIC FEET/ CUBIC FOOT

CG CORNER GUARD / CIVIL GRADING

CH CHANNEL

CHR CHAIR RAIL

CI CIVIL IMPROVEMENTS

CIPC CAST-IN-PLACE CONCRETE

CIV CIVIL

CJ CONSTRUCTION JOINT / CONTROL JOINT

CL CENTER LINE

CLG CEILING

CLKG CAULKING

CLO CLOSET

CLR CLEAR / CLEARANCE / CLEAR SPACE

CM CONSTRUCTION MANAGER / CENTIMETER /

CENTIMETERS

CMU CONCRETE MASONRY UNIT

CN CIVIL NODE / CIVIL NODES

CNTR COUNTER

CO CHANGE ORDER / CLEANOUT

COL COLUMN

COMB COMBINATION / COMBINE / COMBINED

COMP COMPOSITE / COMPOSITION

CONC CONCRETE

CONF CONFIRM / CONFIRMATION / CONFIRMED /

CONFERENCE

CONN CONNECT / CONNECTION

CONST CONSTRUCTION

CONT CONTINUOUS / CONTINUE / CONTINUED

CONTR CONTRACT / CONTRACTOR

COORD COORDINATE / COORDINATION / COORDINATOR

COR CONTRACTING OFFICER'S REPRESENTATIVE

ARCH / INT ABBREVIATIONS

CORR CORRUGATED / CORRIDOR

CP CAST PLASTIC / CIVIL PAVING

CPPT CARPET TILE

CPT CARPET

CR CRASH RAIL / CARD READER

CRS COURSE

CS CIVIL SITE / CENTRAL STERILE

CSI CONSTRUCTION SPECIFICATIONS INSTITUTE

CSMT CASEMENT

CT CERAMIC TILE / COMPUTED TOMOGRAPHY

CTB CERAMIC TILE BASE

CTR CENTER / CENTERED

CU CIVIL UTILITY / CIVIL UTILITIES

CV CENTER VISION

CW COLD WATER

CWT CERAMIC WALL TILE

D

D DEPTH / DEEP

DBL DOUBLE

DD DESIGN DEVELOPMENT / DUTCH DOOR

DEC DECEMBER

DEMO DEMOLITION / DEMOLISH

DEPT DEPARTMENT

DET DETAIL

DF DRINKING FOUNTAIN

DIA DIAMETER

DIAG DIAGONAL

DIM DIMENSION

DISP DISPENSER

DN DOWN

DO DITTO

DR DOOR

DS DOWNSPOUT

DTL DETAIL

DW DISHWASHER

DWG DRAWING

DWR DRAWER

DWTR DUMBWAITER

E

(E) EXISTING

E EAST

EA EACH

ED ELECTRICAL DEMOLITION / EMERGENCY DEPARTMENT

EDT ELECTROSTATIC DISSIPATIVE TILE

EF EACH FACE

EFR EXISTING FINISH TO REMAIN / EXISTING FINSHES TO

REMAIN

EG END GUARD / EXISTING GRADE

EI ELECTRICAL INSTRUMENTATION

EJ EXPANSION JOINT

EL ELEVATION / ELECTRICAL LIGHTING

ELEC ELECTRICAL

ELEV ELEVATOR / ELEVATION

ELVR ELEVATOR

EMER EMERGENCY

ENGR ENGINEER / ENGINEERED

ENL ENLARGED

EOP EDGE OF PAVEMENT

EP ELECTRICAL POWER

EPDM ETHYLENE PROPYLENE DIENE TERPOLYMER

MEMBRANE

EPS EXPANDED POLYSTYRENE BOARD

EPT EPOXY PAINT

EQ EQUAL

EQUIP EQUIPMENT

ES EACH SIDE / ELECTRICAL SITE

EST ESTIMATE

ET ELECTRICAL TELECOMMUNICATIONS

ETC ETCETERA

ETR EXISTING TO REMAIN

EV ELECTRIC VEHICLE

EW EACH WAY

EWC ELECTRIC WATER COOLER

EXC EXCAVATE / EXCAVATION

EXH EXHAUST

EXIST EXISTING

EXP EXPANSION / EXPOSED

EXST EXISTING

EXT EXTERIOR

F

F/CC FIBERS PER CUBIC CENTIMETER

FA FIRE ALARM

FAB FABRICATE / FABRICATION / FABRICATED

FACP FIRE ALARM CONTROL PANEL

FAP FIRE SYSTEM ANNUNCIATOR PANEL

FD FLOOR DRAIN

FDC FIRE DEPARTMENT CONNECTION

FDN FOUNDATION

FDTN FOUNDATION

FE FIRE EXTINGUISHER

FEB FEBRUARY

FEC FIRE EXTINGUISHER CABINET

FF FINISHED FLOOR

FFE FINISHED FLOOR ELEVATION

FG FULL GLASS / FINISHED GRADE

FIN FINISH / FINISHED

FL FLOW LINE

FLDG FOLDING

FLR FLOOR / FLOORING

FLUOR FLUORESCENT

FO FACE OF

FOC FACE OF CONCRETE

FOF FACE OF FINISH

FOM FACE OF MASONRY

FOS FACE OF STUD / FACE OF STRUCTURE

FP FLUSH PANEL / FIRE PROTECTION / FLOOR PLAN

FPS FIRE PULL STATION

FR FIRE RESISTANT / FRAME

FRMG FRAMING

FRP FIBERGLASS REINFORCED PANEL

FRT FIRE RETARDANT

FS FLOOR SINK / FOOR SCRAPER

FSA FIRE SYSTEM ANNUNCIATOR ALARM

FT FOOT / FEET / FIRE TREATED

FTG FOOTING

FURN FURNISH / FUNITURE / FURNACE

FURR FURRING / FURRED

FUT FUTURE

FV FIELD VERIFY

G

G GALLON / GALLONS / GAS

GA GAGE / GUAGE / GYPSUM ASSOCIATION

GALV GALVANIZED

GB GRAB BAR

GC GENERAL CONTRACTOR / GENERAL CONTRACT

GI GALVANIZED IRON / GENERAL INFORMATION

GL GLASS / GLAZING

GLU GLUE

GM GENERAL MANAGER

GR GENERAL RESOURCE / GENERAL RESOURCES

GRD GRADE

ARCH / INT ABBREVIATIONS

GSF GROSS SQUARE FOOTAGE / GROSS SQUARE FEET

GT GROUT

GWB GYPSUM WALL BOARD

GYP GYPSUM

H

H HIGH / HEIGHT

HA HAZARDOUS MATERIALS ASBESTOS

HAZ HAZARDOUS

HB HOSE BIB

HC HANDICAP / HOLLOW CORE / HAT CHANNEL

HD HEAVY DUTY

HDBD HARDBOARD

HDWD HARDWOOD

HDWR HARDWARE

HFG HEALTH FACILITIES GROUP ARCHITECTURE

HG HALF GLASS

HM HOLLOW METAL

HORZ HORIZONTAL

HPDL HIGH PRESSURE DECORATIVE LAMINATE

HR HOUR / HOURS / HANDRAIL / HUMAN RESOURCES

HSK HOUSEKEEPING

HSWD HEADER

HT HEIGHT

HVAC HEATING, VENTILATION, AND AIR CONDITIONING

HW HOT WATER

HWC HYGIENIC WALL CLADDING

I

IB INTEGRAL BASE

IBC INTERNATIONAL BUILDING CODE

ICC INTERNATIONAL CODE COUNCIL

ICRA INFECTION CONTROL ASSESSMENT

ICU INTENSIVE CARE UNIT

ID INSIDE DIAMETER / INSIDE DIMENSION / INTERIOR

DESIGN / INTERIOR DESIGNER / INTERIOR DEMOLITION

IEBC INTERNATIONAL EXISTING BUILDING CODE

IECC INTERNATIONAL ENERGY CONSERVATION CODE

IF INTERIOR FURNISHINGS

IFC INTERNATIONAL FIRE CODE

IFGC INTERNATIONAL FUEL GAS CODE

IG INTERIOR GRAPHIC / INTERIOR GRAPHICS

IMC INTERNATIONAL MECHANICAL CODE

IN INCH / INCHES / INTERIOR DESIGN / INTERIOR

DESIGNER

INCL INCLUDE / INCLUDED / INCLUDING

INFO INFORMATION

INSP INSPEC / INSPECTION / INSPECTOR

INSTR INSTRUCTION / INSTRUCTIONS

INSUL INSULATE/ INSULATED / INSULATION

INT INTERIOR

IPC INTERNATIONAL PLUMBING CODE

IRC INTERNATIONAL RESIDENTIAL CODE

IT INFORMATION TECHNOLOGY

J

JAN JANITOR / JANUARY

JSN JOINT SCHEDULE NUMBER

JST JOIST

JT JOINT

JUL JULY

JUN JUNE

JV JOINT VENTURE

K

KCJ KEYED CONSTRUCTION JOINT

KM KILOMETER / KILOMETERS

KO KNOCK OUT

L

L LENGTH / LONG

LA LANDSCAPE ARCHITECT

LAB LABORATORY

LAM LAMINATE / LAMINATED

LAND LANDSCAPE

LAV LAVATORY

LB POUND

LBC LIVING BUILDING CHALLENGE

LD LANDSCAPE DEMOLITION / LANDSCAPE DESIGN /

LANDSCAPE DESIGNER

LDR LADDER

LDRP LABOR DELIVERY RECOVERY POST PARTUM

LEED LEADERSHIP IN ENERGY AND ENVIRONMENTAL DESIGN

LF LINEAR FEET

LG LANDSCAPE GRADING

LH LEFT HAND

LKR LOCKER

LL LOWER LEVEL / LANDSCAPE LIGHTING

LOC LOCATION

LOGCAT LOGISTICAL CATEGORY

LONG LONGITUDINAL

LP LANDSCAPE PLANTING

LR LANDSCAPE RELOCATION

LS LIFE SAFETY / LANDSCAPE SITE

LT LIGHT

LTC LONG TERM CARE

LVC LOW VOLUME CHANGE

LVR LOUVER

LVT LUXURY VINYL TILE

M

M METER / METERS

MAR MARCH

MAS MASONRY

MATL MATERIAL

MAX MAXIMUM

MAY MAY

MC MEDICINE CABINET

MD MECHANICAL DEMOLITION

ME MATCH EXISTING

MECH MECHANICAL

MEF MATCH EXISTING FINISH / MATCH EXISTING FINISHES

MEMB MEMBRANE

MEZZ MEZZANINE

MFR MANUFACTURE / MANUFACTURER

MH MECHANICAL HVAC / MANHOLE

MI MILE / MILES / MECHANICAL INSTRUMENTATION

MICU MEDICAL INTENSIVE CARE UNIT

MIN MINIMUM / MINUTE / MINUTES

MISC MISCELLANEOUS

MM MILLIMETER / MILLIMETERS

MNTG MOUNTING

MO MASONRY OPENING

MP MECHANICAL PIPING

MR MIRROR

MRI MAGNETIC RESONANCE IMAGING

MS MECHANICAL SITE

MT METAL TRIM

MTL METAL

MULL MULLION

N

(N) NEW

N NORTH

ARCH / INT ABBREVIATIONS

NA NOT APPLICABLE

NAICS NORTH AMERICAN INDUSTRY CALSSIFICATION SYSTEM

NESHAP NATIONAL EMISSION STANDARDS FOR HAZARDOUS AIR

POLLUTANTS

NFPA NATIONAL FIRE PROTECTION ASSOCIATION

NIC NOT IN CONTRACT

NO NUMBER

NOM NOMINAL

NOV NOVEMBER

NSF NET SQUARE FOOTAGE / NET SQUARE FEET

NSN NATIONAL STOCK NUMBER

NTS NOT TO SCALE

NV NARROW VISION

O

OA OVERALL

OC ON CENTER

OCT OCTOBER

OD OUTSIDE DIAMETER

OFCI OWNER FURNISHED; CONTRACTOR INSTALLED

OFF OFFICE

OFOI OWNER FURNISHED; OWNER INSTALLED

OH OVERHEAD

OPG OPENING

OPNG OPENING

OPP OPPOSITE

OR OPERATING ROOM

ORD OVERFLOW ROOF DRAIN / ORDINANCE

ORIG ORIGINAL

OSHA OCCUPATIONAL SAFETY AND HEALTH ADMINISTRATION

OT OCCUPATIONAL THERAPY

OVHD OVERHEAD

OZ OUNCE

P

P PAINT

PACU POST ANESTHETIC CARE UNIT

PAR PARALLEL

PART PARTITION

PC PLUMBING CONTRACTOR

PCF POUNDS PER CUBIC FOOT

PD PRE-DESIGN / POCKET DOOR / PLUMBING DEMOLITION

PED PEDISTAL

PEM PRE-ENGINEERED METAL

PEMB PRE-ENIGNNERED METAL BUILDING

PERF PERFORATED

PERP PERPENDICULAR

PL PLATE / PLASTIC / PROPERTY LINE

PLAM PLASTIC LAMINATE

PLAS PLASTER

PLBG PLUMBING

PLT PLATE

PLUMB PLUMBING

PLYWD PLYWOOD

PNL PANEL

PP PLUMBING PIPING

PR PAIR / PROPOSAL REQUEST

PRCST PRECAST

PREFAB PREFABRICATE / PREFABRICATED

PREFIN PREFINISHED

PS PLUMBING SITE

PSF POUNDS PER SQUARE FOOT

PSI POUNDS PER SQUARE INCH

PT PRESSURE TREATED / PORCELAIN TILE / PHYSICAL

THERAPY

PTD PAPER TOWEL DISPENSER / PAINTED

PTN PARTITION

PTR PAPER TOWEL RECEPTICAL

PVC POLYVINYL CHOLORIDE

PW PLYWOOD

PWT PORCELAIN WALL TILE

Q

QT QUARRY TILE / QUART / QUARTS

QTZ QUARTZ

R

R RADIUS / RISER / INSULATING VALUE

RAD RADIUS

RAG RETURN AIR GRILLE

RB RESILIENT BASE

RBR RUBBER

RC RESILIENT CHANNEL / RESPIRATORY CARE

RCP REFLECTED CEILING PLAN

RD ROOF DRAIN

REBAR REINFORCING BAR

REC RECESSED

REF REFERENCE / REFRIGERATOR

REINF REINFORCED / REINFORCING / REINFORCEMENT

REM REMOVE / REMVOVED

REQ REQUIRE

REQD REQUIRED

RES RESINOUS

RESIL RESILIENT

RET RETURN / RETURNED

REV REVISION / REVISIONS / REVISED

RF RESILIENT FLOORING

RFG ROOFING

RFI REQUEST FOR INFORMATION

RFP REQUEST FOR PROPOSAL

RH RIGHT HAND

RI RIGID INSULATION

RL RIDGE LINE

RM ROOM

RO ROUGH OPENING

ROW RIGHT OF WAY

RR RESTROOM

RVS REVERSE / REVERSE SIDE

RWC RIGID WALL COVERING

RWL RAIN WATER LEADER

S

S SOUTH

SAD SUPPLY AIR DIFFUSER

SAFB SOUND ATTENUATION FIRE BLANKETS

SAN SANITARY

SAT SUSPENDED ACOUSTICAL TILE

SB SPLASH BACK / STRUCTURAL SUBSTRUCTURE

SC SOLID CORE / SPECIALTY COATING

SCHED SCHEDULE

SCONC SEALED CONCRETE

SCR SHOWER CURTAIN ROD

SD SOAP DISPENSER / SCHEMATIC DESIGN / SLIDING

DOOR / STRUCTURAL DEMOLITION

SDG SIDING

SDVOSB SERVICE-DISABLED VETERAN-OWNED SMALL

BUSINESS

SEC SECOND / SECONDS

SECT SECTION / SECTIONS

SEP SEPTEMBER

SEPS SPACE & EQUIPMENT PLANNING SYSTEM

SES SPECIALIZED ENGINEERING SOLUTIONS

SF SQUARE FOOTAGE / SQUARE FEET / STRUCTURAL

FRAMING

ARCH / INT ABBREVIATIONS

SG SAFETY GLASS

SGA STONE GROUP ARCHITECTS

SHPO STATE HISTORIC PRESERVATION OFFICE

SHT SHEET

SHTHG SHEATHING

SHWR SHOWER

SICU SURGICAL CARE UNIT

SIM SIMILAR

SL SHAFT LINER

SLDG SLIDING

SLNT SEALANT

SND SANITARY NAPKIN DISPENSER

SNX SANIARY NAPKIN DISPOSAL

SOG SLAB ON GRADE

SPEC SPECIFICATION / SPECIFICATIONS

SQ SQUARE

SRT STUDDED RUBBER TILE

SS SOLID SURFACE / STRUCTURAL SITE / STAINLESS

STEEL

SSM SOLID SURFACE MATERIAL

SST STAINLESS STEEL

ST STREET / SOUND TRANSMISSION

STAG STAGGERED

STC SOUND TRANSMISSION CLASS

STD STANDARD

STL STEEL

STOR STORAGE

STRUCT STRUCTURE / STRUCTURAL

SUSP SUSPENDED

SV SHEET VINYL

SW SHEARWALL

SYM SYMMETRICAL

T

T TREAD

T&B TOP AND BOTTOM

T&G TOUNGE AND GROOVE

TA TELECOMMUNICATIONS AUDIO VISUAL

TB TOWEL BAR / TACKBOARD

TBD TO BE DETERMINED

TC TELECOMMUNICATIONS CLOCK

TCNA TILE COUNCIL OF NORTH AMERICA

TD TRAVEL DISTANCE

TEL TELEPHONE / TELEMETRY

TEMP TEMPORARY / TEMPERED

TER TERRAZZO

TFE TOP FOOTING ELEVATION

TG TEMPERED GLASS

THD THREA / THREADED / THREADS

THK THICKNESS

THRU THROUGH

TI TELECOMMUNICATIONS INTERCOM

TIL TECHNICAL INFORMATION LIBRARY

TKBD TACKBOARD

TL TILE

TLT TOILET

TM TELECOMMUNICATIONS MONITORING

TMV THERMOSTATIC MIXING VALVE

TN TELECOMMUNICATIONS DATA NETWORKS

TO TOP OF

TOB TOP OF BEAM

TOC TOP O F CONCRETE / TOP OF CURB

TOD TOP OF DECK

TOF TOP OF FOOTING / TOP OF FOUNDATION

TOJ TOP OF JOIST

TOM TOP OF MASONRY

TOP TOP OF PIER

TOS TOP OF SLAB / TOP OF STEEL

TOW TOP OF WALL

TPD TOILET PAPER DISPENSER

TPH TOILET PAPER HOLDER

TPO THERMOPLASTIC POLYOLEFIN

TPTN TOILET PARTITION

TRANS TRANSVERSE / TRANSPARENT

TS TUBE STEEL / TRANSITION STRIP

TT TELECOMMUNITCATIONS TELEPHONE

TV TELEVISION

TXV THERMAL EXPANSION VALVE

TYP TYPICAL / TYPICALLY

U

UCL UNDER CABINET LIGHT

UG UNDERGROUND

UH UNIT HEATER

UL UNDERWRITERS LABORATORIES

UNFIN UNFINISHED

UNO UNLESS NOTED OTHERWISE

UON UNLESS OTHERWISE NOTED

USGBC UNITED STATES GREEN BUILDING COUNCIL

UTIL UTILITY / UTILITIES

UTL UTILITY / UTILITIES

V

V SHEAR

VA VETERAN AFFAIRS

VAR VARIES

VB VAPOR BARRIER / VINYL BASE

VCT VINYL COMPOSITION TILE

VERT VERTICAL

VEST VESTIBULE

VFY VERIFY

VIF VERIFY IN FIELD

VISN VETERANS INTEGRATED SERVICES NETWORK

VR VAPOR RETARDER

VWC VINYL WALL COVERING

VWT VINYL WALL TILE

W

(W) WIDE FLANGE

W WEST / WIDTH / WIDE / WIDE FLANGE

W/ WITH

W/O WITHOUT

WA WEDGE ACHOR

WB WOOD BASE

WC WATER CLOSET

WD WOOD / WOODWORK

WDW WINDOW

WF WIDE FLANGE

WG WALL GUARD

WH WATER HEATER

WI WROUGHT IRON

WL WIND LOAD

WNDW WINDOW

WNSCT WAINSCOT

WP WATERPROOF / WATERPROOFING

WR WATER RESISTANT

WSCT WAINSCOT

WSF WELDED SHEET FLOORING

WT WEIGHT / WINDOW TREATMENT

WWF WELDED WIRE FABRIC

Y

YD YARD

A. ANY DISCREPANCIES OR CONFLICTS FOUND IN THE VARIOUS PARTS OF THE CONSTRUCTION

DOCUMENTS SHALL BE BROUGHT TO THE ATTENTION OF THE ARCHITECT AND THE OWNER BEFORE

PROCEEDING WITH THE WORK.

B. SOME SPECIFIED PRODUCTS MAY HAVE SUBSTANTIAL LEAD TIMES. THE CONTRACTOR SHALL BE

RESPONSIBLE FOR PLACING ORDERS IN A MANNER TO ENSURE THEIR TIMELY ARRIVAL. THE

CONTRACTOR SHALL BE RESPONSIBLE FOR EXPENSES, INCLUDING DESIGN FEES, RELATED TO ANY

RESELECTIONS REQUIRED DUE TO FAILURE TO ORDER PRODUCTS IN A TIMELY MANNER.

C. FREE-STANDING FURNITURE IS PROVIDED AND INSTALLED BY OTHERS.

D. WRITTEN DIMENSIONS TAKE PRECEDENCE OVER SCALED DIMENSIONS. DO NOT SCALE THE

DRAWINGS.

E. CONTRACTOR & SUBCONTRACTORS TO VERIFY ALL EXISTING CONDITIONS AT THE PROJECT SITE.

F. ALL MATERIALS & EQUIPMENT SHALL BE INSTALLED PER MANUFACTURERS INSTRUCTIONS.

G. DETAILS SHOWN ARE TYPICAL UON. SIMILAR DETAILS APPLY IN SIMILAR CONDITIONS.

H. PROVIDE BACKING FOR ALL TOILET ACCESSORIES, HANDRAILS, OR OTHER ITEMS ATTACHED TO

BUILDING WALLS.

I. INSTALL BLOCKING AS REQUIRED IN ALL PARTITIONS TO RECEIVE COUNTERS, SHELVING,

MARKERBOARDS, WALL MOUNTED MONITORS/TVS, COUNTERTOP SUPPORTS, ETC.

J. GYPSUM USED IN RESTROOMS SHALL BE WATER RESISTANT GYPSUM BOARD.

K. PROVIDE CONTROL JOINTS IN DRYWALL EVERY 30'-0".

L. ALL DIMENSIONS ARE TO OUTSIDE OF WALL FRAMING.

M. SEE MECHANICAL, ELECTRICAL AND PLUMBING DRAWINGS FOR ADDITIONAL INFORMATION.

N. SEE SHEET AE601, ARCHITECTURAL SCHEDULES & ASSEMBLIES, FOR MORE INFORMATION

REGARDING DOORS, WINDOWS, AND WALL TYPES.

O. CONTRACTOR TO NOTIFY THE ARCHITECT OF ANY EXISTING STRUCTURAL MEMBERS WHICH MAY

CONFLICT WITH THE DESIGNED WALL LAYOUT AND/OR DESIGNED PLUMBING LOCATIONS BEFORE ANY

WALLS ARE CONSTRUCTED.

P. CONTRACTOR TO NOTIFY ARCHITECT OF LOCATIONS WHERE PENETRATIONS IN THE FLOOR MAY INTERSECT AND/OR INTERFERE WITH THE INTERGITY OF EXISTING CONCRETE JOISTS. WHERE MEP SYSTEMS CANNOT BE EASILY REROUTED WITHIN ALREADY DESIGNED WALLS, CEILINGS, OR CHASES, THE A/E TEAM WILL REVISE AND REISSUE DRAWINGS SO AS TO AVOID CONFLICTS WITH THE EXISTING

JOISTS.

GENERAL PLAN NOTES

A. ANY DISCREPANCIES OR CONFLICTS FOUND IN THE VARIOUS PARTS OF THE CONSTRUCTION

DOCUMENTS SHALL BE BROUGHT TO THE ATTENTION OF THE ARCHITECT AND THE OWNER BEFORE

PROCEEDING WITH THE WORK.

B. SOME SPECIFIED PRODUCTS MAY HAVE SUBSTANTIAL LEAD TIMES. THE CONTRACTOR SHALL BE

RESPONSIBLE FOR PLACING ORDERS IN A MANNER TO ENSURE THEIR TIMELY ARRIVAL. THE

CONTRACTOR SHALL BE RESPONSIBLE FOR EXPENSES, INCLUDING DESIGN FEES, RELATED TO ANY

RESELECTIONS REQUIRED DUE TO FAILURE TO ORDER PRODUCTS IN A TIMELY MANNER.

C. COORDINATE DEVICE PENETRATIONS AT COUNTERTOPS W/ COR, MECHANICAL, & ELECTRICAL.

D. PROVIDE COUNTERTOP SUPPORTS AT ALL OPEN SPACES APPROXIMATELY 3'-0" O.C. BRACKETS TO BE

PAINTED TO MATCH SPECIFIED WALL FINISH.

E. PROVIDE FINISHED END PANELS AT ALL EXPOSED MILLWORK SURFACES. ALL PLAM CABINETS TO

HAVE PVC EDGES. MATCH PVC EDGE TO PLAM. SUBMIT SAMPLES FOR APPROVAL. SEE DETAILS FOR

PVC EDGEBANDING SIZES.

F. PROVIDE 4" RESILIENT BASE AT ALL BASE CABINETS (UON).

G. MILLWORK SUPPLIER SHALL PROVIDE FILLER PANELS & SCRIBE STRIPS WHERE NEEDED FOR

COMPLETE INSTALLATION.

H. CABINETS OVER 30" WIDE SHALL HAVE 1" THICK PARTICLE BOARD CORE.

I. UNLESS OTHERWISE INDICATED, PROVIDE PRODUCTS OF QUALITY SPECIFIED BY AWI

ARCHITECTURAL WOODWORK QUALITY STANDARDS FOR PREMIUM GRADE.

J. INSTALL BLOCKING AS REQUIRED IN ALL PARTITIONS TO RECEIVE COUNTERS, SHELVING,

MARKERBOARDS, WALL MOUNTED MONITORS/TVS, COUNTERTOP SUPPORTS, ETC.

K. VERIFY ALL GROMMET LOCATIONS AND COUNT WITH COR.

GENERAL CASEWORK / MILLWORK NOTES

A. ANY DISCREPANCIES OR CONFLICTS FOUND IN THE VARIOUS PARTS OF THE CONSTRUCTION

DOCUMENTS SHALL BE BROUGHT TO THE ATTENTION OF THE ARCHITECT AND THE OWNER BEFORE

PROCEEDING WITH THE WORK.

B. SOME SPECIFIED PRODUCTS MAY HAVE SUBSTANTIAL LEAD TIMES. THE CONTRACTOR SHALL BE

RESPONSIBLE FOR PLACING ORDERS IN A MANNER TO ENSURE THEIR TIMELY ARRIVAL. THE

CONTRACTOR SHALL BE RESPONSIBLE FOR EXPENSES, INCLUDING DESIGN FEES, RELATED TO ANY

RESELECTIONS REQUIRED DUE TO FAILURE TO ORDER PRODUCTS IN A TIMELY MANNER.

C. SMOKE SEALS TO BE INSTALLED AT ALL RATED DOORS.

D. SEE MECHANICAL, ELECTRICAL, AND PLUMBING DRAWINGS FOR ADDITIONAL INFORMATION.

E. WHERE A SMOKE BARRIER IS PENETRATED BY A DUCT OR AIR TRANSFER OPENING, A SMOKE

DAMPER DESIGNED AND TESTED IN ACCORDANCE WITH THE REQUIREMENTS OF UL 555S, SMOKE

DAMPERS, SHALL BE INSTALLED. (NFPA 101-8.5.5.2.1)

F. WHERE A SMOKE BARRIER IS ALSO CONSTRUCTED AS A FIRE BARRIER, A COMBINATION FIRE/SMOKE

DAMPER DESIGNED AND TESTED IN ACCORDANCE WITH THE REQUIREMENTS OF UL 555, FIRE

DAMPERS AND UL55S, SMOKE DAMPERS, SHALL BE INSTALLED. (NFPA 101-8.5.5.2.2)

G. REQUIRED SMOKE DAMPERS IN DUCTS PENETRATING SMOKE BARRIERS SHALL CLOSE UPON

DETECTION OF SMOKE. (NFPA 101-8.5.5.7)

H. ALL OCCUPANCIES ARE CALCULATED USING INSTITUTIONAL SLEEPING AREAS LOAD FACTOR OF 1

OCCUPANT PER 120 GROSS SQUARE FEET UON. (PER NFPA & IBC )

I. ROOMS LABELED AS "CORRIDOR" ARE ASSUMED TO HAVE 0 OCCUPANTS, UON, BUT ARE A PART OF

PATHS OF EGRESS FOR OTHER SPACES. OCCUPANTS HAVE BEEN CALCULATED FOR NURSE

STATIONS, EQUIPMENT STORAGE, & OTHER ACCESSORY SPACES OPEN TO CORRIDORS. (SEE LIFE

SAFETY PLANS)

J. ALL NEW RATED PARTITIONS TO HAVE GENERAL RATING INFORMATION STENCILED ABOVE FINISH

CEILING ELEVATION ON BOTH SIDES OF THE PARTITION.

K. STENCILS MUST BE VISIBLE FROM CEILING ACCESS PANELS IN ROOMS WHERE GWB CEILINGS ARE TO

BE INSTALLED.

L. STENCILS FOR RATED PARTITIONS ON THE 2ND LEVEL ARE TO BE PROVIDED WHERE PENETRATIONS

OCCUR.

M. ALL NEW COMPONENTS THAT PENETRATE RATED ASSEMBLIES ARE TO BE LABELED ACCORDING TO

THE FACILITIES STANDARD.

GENERAL CODE & LIFE SAFETY NOTES

A. ANY DISCREPANCIES OR CONFLICTS FOUND IN THE VARIOUS PARTS OF THE CONSTRUCTION

DOCUMENTS SHALL BE BROUGHT TO THE ATTENTION OF THE ARCHITECT AND THE OWNER BEFORE

PROCEEDING WITH THE WORK.

B. SOME SPECIFIED PRODUCTS MAY HAVE SUBSTANTIAL LEAD TIMES. THE CONTRACTOR SHALL BE

RESPONSIBLE FOR PLACING ORDERS IN A MANNER TO ENSURE THEIR TIMELY ARRIVAL. THE

CONTRACTOR SHALL BE RESPONSIBLE FOR EXPENSES, INCLUDING DESIGN FEES, RELATED TO ANY

RESELECTIONS REQUIRED DUE TO FAILURE TO ORDER PRODUCTS IN A TIMELY MANNER.

C. THERE IS NO ARCHITECTURAL WORK PLANNED FOR THE 2ND LEVEL IN THIS PROJECT. ROOMS AND

SPACES ARE EXISTING TO REMAIN EXCEPT FOR REPAIR WORK NECESSARY TO SUPPORT

MECHANICAL, ELECTRICAL, AND PLUMBING WORK FOR 3RD LEVEL REMODEL. SCOPE OF WORK IN THIS

AREA WILL PRIMARILY BE ABOVE CEILINGS.

D. GC TO COMPLETE WALKTHROUGH OF EXISTING SPACES WITH VA STAFF BEFORE COMPLETION OF

ANY WORK AND IDENTIFY ITEMS THAT ARE TO BE SALVAGED.

E. GC TO VERIFY AND CONFIRM PLAN FOR STORAGE OF SALVAGED ITEMS WITH THE VA BEFORE

COMPLETION OF ANY WORK.

F. CONTRACTOR TO PROTECT ALL EXISTING UTILITIES DURING CONSTRUCTION.

G. CONTRACTOR TO VERIFY ALL EXISTING CONDITIONS AT THE PROJECT SITE.

H. CONTRACTOR TO VERIFY WINDOW, COLUMN, AND DOOR SPACING AND SIZING UPON COMPLETION OF

DEMOLITION AND COMMUNICATE ANY DISCREPANCIES TO THE OWNER AND ARCHITECT.

I. CONTRACTOR TO PATCH REMAINING EXISTING CONSTRUCTION, AFFECTED BY DEMOLITION.

J. FINISHES IN PATCHED AREAS TO MATCH EXISTING UON.

K. NO ITEMS TO BE DEMOED IN ROOMS 301, 301A, 302, 339, 334, 364, AND 364A EXCEPT AT CEILINGS - SEE

DEMOLITION REFLECTED CEILING PLANS.

L. INFILL OF PENETRATIONS IN FIRE AND/OR SMOKE RATED PARTITIONS, FLOORS, AND ROOFS SHALL

MAINTAIN THE INTEGRITY OF THE RATING.

M. ALL PENETRATIONS IMPAIRING EXISTING RATED ASSEMBLIES MUST BE REMEDIED, EITHER

TEMPORARILY OR PERMANENTLY, BEFORE CONSTRUCTION CONCLUDES EACH DAY. PENETRATIONS

SHOULD BE INFILLED WITH APPLICABLE RATED PRODUCTS OR PROTECTED BY A ADEQUATE RATED

ASSEMBLY.

N. SEE MECHANICAL AND ELECTRICAL DRAWINGS FOR ADDITIONAL INFORMATION RELEVANT TO

DEMOLITION & PATCHING.

O. ALL EXISTING INTERIOR FLOOR FINISHES ON THE 3RD FLOOR, AND WITHIN THE PROJECT AREA

SPECIFIED ON THE DEMOLITION PLANS, ARE TO BE REMOVED UON.

P. ALL EXISTING WALL PROTECTION, COVERINGS, AND FINISHES ON THE 3RD FLOOR, AND WITHIN THE

PROJECT AREA SPECIFIED ON THE DEMOLITION PLANS, ARE TO BE REMOVED UON.

Q. ALL EXISTING CEILINGS ON THE 3RD FLOOR, AND WITHIN THE PROJECT AREA SPECIFIED ON THE

DEMOLITION REFLECTED CEILING PLANS, ARE TO BE REMOVED UON.

R. SEE DEMOLITION REFLECTED CEILING PLANS FOR LOCATIONS WHERE EXISTING CEILINGS ARE TO BE

TEMPORARILY REMOVED AND SAVED FOR REINSTALLATION.

S. CONCRETE AND/OR REMAINING GWB TO BE PATCHED AND PREPPED FOR NEW FINISHES UPON

COMPLETION OF DEMOLITION WORK.

T. ALL EXISTING FURNITURE AND EQUIPMENT ON THE 3RD FLOOR TO BE REMOVED AND TURNED OVER

TO THE OWNER OR SAVED FOR REINSTALLATION PER AI SHEETS. SEE MEP SHEETS FOR

INFORMATION REGARDING REMOVAL OF MEP EQUIPMENT.

U. ALL EXTERIOR FURRING AND INSULATION WITHIN PROJECT AREA TO BE DEMOED TO MASONRY

BLOCK.S

V. SEE HAZARDOUS MATERIALS REPORT FOR ADDITIONAL INFORMATION REGARDING DEMOLITION.

W. WHERE DAMAGED AS RESULT OF DEMOLITON WORK AND/OR INSTALLATION OF NEW MEP SYSTEMS, CONTRACTOR IS TO REPLACE EXISTING CEILING TILE AND/OR SUSPENDED CEILING GRIDS.

GENERAL DEMOLITION NOTES

A. ANY DISCREPANCIES OR CONFLICTS FOUND IN THE VARIOUS PARTS OF THE CONSTRUCTION

DOCUMENTS SHALL BE BROUGHT TO THE ATTENTION OF THE ARCHITECT AND THE OWNER BEFORE

PROCEEDING WITH THE WORK.

B. SOME SPECIFIED PRODUCTS MAY HAVE SUBSTANTIAL LEAD TIMES. THE CONTRACTOR SHALL BE

RESPONSIBLE FOR PLACING ORDERS IN A MANNER TO ENSURE THEIR TIMELY ARRIVAL. THE

CONTRACTOR SHALL BE RESPONSIBLE FOR EXPENSES, INCLUDING DESIGN FEES, RELATED TO ANY

RESELECTIONS REQUIRED DUE TO FAILURE TO ORDER PRODUCTS IN A TIMELY MANNER.

C. VERIFY ALL DOOR AND WINDOW OPENINGS WITH MANUFACTURER.

D. PROVIDE ABA & ADA APPROVED LEVER TYPE HARDWARE FOR ALL DOORS UON.

E. PROVIDE 1" INSULATED GLASS FOR ALL EXTERIOR GLAZING AND 1/4" GLASS FOR ALL INTERIOR

GLAZING.

F. COORDINATE DOOR PROTECTION WITH DOOR SUPPLIER.

G. COORDINATE DOOR HARDWARE STYLE AND FINISH WITH OWNER.

H. SPRING HINGE CLOSER ALLOWED AT DOOR CLOSER LOCATIONS. VERIFY WITH OWNER.

I. ALL WOOD DOORS TO HAVE A HIGH PRESSURE DECORATIVE LAMINATE FINISH (HPDL) UON.

GENERAL DOOR & WINDOW NOTES

A. ANY DISCREPANCIES OR CONFLICTS FOUND IN THE VARIOUS PARTS OF THE CONSTRUCTION

DOCUMENTS SHALL BE BROUGHT TO THE ATTENTION OF THE ARCHITECT AND THE OWNER BEFORE

PROCEEDING WITH THE WORK.

B. BASIS OF DESIGN FOR ARCHITECTURAL EQUIPMENT IS IDENTIFIED IN THE ARCHITECTURAL

EQUIPMENT SCHEDULE. ARCHITECT APPROVAL IS REQUIRED FOR ALL EQUIPMENT.

C. SOME SPECIFIED EQUIPMENT MAY HAVE SUBSTANTIAL LEAD TIMES. THE CONTRACTOR SHALL BE

RESPONSIBLE FOR PLACING ORDERS IN A MANNER TO ENSURE THEIR TIMELY ARRIVAL. THE

CONTRACTOR SHALL BE RESPONSIBLE FOR EXPENSES, INCLUDING DESIGN FEES, RELATED TO ANY

RESELECTIONS REQUIRED DUE TO FAILURE TO ORDER EQUIPMENT IN A TIMELY MANNER.

D. EQUIPMENT PLANS DEPICT ARCHITECTURAL / INTERIORS EQUIPMENT LOCATIONS. SEE EQUIPMENT

SCHEDULE FOR QUANTITIES AND MORE DETAILED INFORMATION.

E. ALL WALL MOUNTED EQUIPMENT TO HAVE REQUIRED BLOCKING BY GC.

GENERAL EQUIPMENT NOTES

A. ANY DISCREPANCIES OR CONFLICTS FOUND IN THE VARIOUS PARTS OF THE CONSTRUCTION

DOCUMENTS SHALL BE BROUGHT TO THE ATTENTION OF THE ARCHITECT AND THE OWNER BEFORE

PROCEEDING WITH THE WORK.

B. SOME SPECIFIED PRODUCTS MAY HAVE SUBSTANTIAL LEAD TIMES. THE CONTRACTOR SHALL BE

RESPONSIBLE FOR PLACING ORDERS IN A MANNER TO ENSURE THEIR TIMELY ARRIVAL. THE

CONTRACTOR SHALL BE RESPONSIBLE FOR EXPENSES, INCLUDING DESIGN FEES, RELATED TO ANY

RESELECTIONS REQUIRED DUE TO FAILURE TO ORDER PRODUCTS IN A TIMELY MANNER.

C. FREE STANDING FURNITURE IS PROVIDED AND INSTALLED BY OTHERS.

D. WRITTEN DIMENSIONS TAKE PRECEDENCE OVER SCALED DIMENSIONS. DO NOT SCALE THE

DRAWINGS. FIELD VERIFY ALL CRITICAL DIMENSIONS.

E. CONTRACTOR & SUBCONTRACTORS TO VERIFY ALL EXISTING CONDITIONS AT THE PROJECT SITE.

F. ALL MATERIALS & EQUIPMENT SHALL BE INSTALLED PER MANUFACTURERS INSTRUCTIONS.

G. DETAILS SHOWN ARE TYPICAL UNLESS OTHERWISE NOTED. SIMILAR DETAILS APPLY IN SIMILAR

CONDITIONS.

H. PROVIDE WOOD BACKING FOR ALL TOILET ACCESSORIES, HANDRAILS, OR OTHER ITEMS ATTACHED

TO BUILDING WALLS.

I. INSTALL BLOCKING AS REQUIRED IN ALL PARTITIONS TO RECEIVE COUNTERS, SHELVING,

MARKERBOARDS, WALL MOUNTED MONITORS/TVS, COUNTERTOP SUPPORTS, ETC.

J. GYPSUM USED IN TOILET ROOMS, HAC ROOMS, AND SOILED UTILITY ROOMS SHALL BE MOISTURE

RESISTANT GYPSUM BOARD.

K. REFER TO AE422 FOR MORE INFORMATION REGARDING PORCELAIN & CERAMIC TILE INSTALLATION.

L. HEIGHT OF OPERATIONAL OR DISPENSING PORTION OF ACCESSORIES & FIXTURES NOT TO EXCEED

48" A.F.F.

M. DIMENSIONS ARE FROM FACE OF GWB TO FACE OF GWB.

N. CONTRACTOR TO INSTALL ALL TOILET ACCESSORIES ACCORDING TO ADA AND ANSI REGULATIONS.

O. FIELD VERIFY ALL DIMENSIONS.

GENERAL INTERIOR ELEVATION NOTES

A. ANY DISCREPANCIES FOUND IN THE VARIOUS PARTS OF THE CONSTRUCTION DOCUMENTS SHALL BE BROUGHT TO THE ATTENTION OF THE ARCHITECTS AND THE OWNER BEFORE PROCEEDING WITH ALL

THE WORK.

B. SOME SPECIFIED PRODUCTS MAY HAVE SUBSTANTIAL LEAD TIMES. THE CONTRACTOR SHALL BE

RESPONSIBLE FOR PLACING ORDERS IN A MANNER TO ENSURE THEIR TIMELY ARRIVAL. THE

CONTRACTOR SHALL BE RESPONSIBLE FOR EXPENSES, INCLUDING DESIGN FEES, RELATED TO ANY

RESELECTIONS REQUIRED DUE TO FAILURE TO ORDER PRODUCTS IN A TIMELY MANNER.

C. ALL ITEMS INSTALLED IN CEILINGS ARE TO BE CENTERED AND/OR SYMMETRICAL ON THE CENTERLINE

OF ROOMS AND CENTERED IN TILES UON.

D. INSTALL ALL WALL MOUNTED EXIT SIGNS AND OTHER FIXTURES CENTERED ABOVE OPENINGS WHERE

POSSIBLE.

E. REFLECTED CEILING PLANS SHOW LOCATIONS OF ITEMS THAT ARE ARCHITECTURALLY SIGNIFICANT

ONLY. MECHANICAL AND ELECTRICAL ITEMS INDICATED ARE FOR REFERENCE ONLY. REFER TO

MECHANICAL AND ELECTRICAL DOCUMENTS.

F. GYPSUM USED IN RESTROOM AND OTHER AREAS EXPOSED TO MOISTURE SHALL BE WATER

RESISTANT GYPSUM BOARD.

G. VA STANDARD CEILING HEIGHT REQUIREMENTS NOT MET. CONFIRM EXEMPTION REQUEST HAS BEEN

APPROVED BY FACILITY COR.

H. ALL ACCESS PANELS TO BE PAINTED COLOR AND SHEEN OF ADJACENT CEILING FINISH.

I. WHERE DAMAGED AS RESULT OF DEMOLITON WORK AND/OR INSTALLATION OF NEW MEP SYSTEMS, CONTRACTOR IS TO REPLACE EXISTING CEILING TILE AND/OR SUSPENDED CEILING GRIDS.

J. CONTRACTOR TO NOTIFY THE COR & ARCHITECT IF CEILING MOUNTED FIXTURES, AND/OR

EQUIPMENT, WILL OBSTRUCT THE VIEW OF EXIT SIGNAGE. CONTRACTOR, COR, & A/E TEAM TO

REVIEW AND COORDINATE RESOLUTION.

GENERAL REFLECTED CEILING PLAN NOTES

A. ANY DISCREPANCIES OR CONFLICTS FOUND IN THE VARIOUS PARTS OF THE CONSTRUCTION

DOCUMENTS SHALL BE BROUGHT TO THE ATTENTION OF THE ARCHITECT AND THE OWNER BEFORE

PROCEEDING WITH THE WORK.

B. SOME SPECIFIED PRODUCTS MAY HAVE SUBSTANTIAL LEAD TIMES. THE CONTRACTOR SHALL BE

RESPONSIBLE FOR PLACING ORDERS IN A MANNER TO ENSURE THEIR TIMELY ARRIVAL. THE

CONTRACTOR SHALL BE RESPONSIBLE FOR EXPENSES, INCLUDING DESIGN FEES, RELATED TO ANY

RESELECTIONS REQUIRED DUE TO FAILURE TO ORDER PRODUCTS IN A TIMELY MANNER.

C. PROVIDE SEALANT AT ALL INTERIOR AND EXTERIOR JOINTS BETWEEN DIFFERENT MATERIALS, TRANSITIONS, AND ACCORDING TO INDUSTRY STANDARDS AND MANUFACTURER'S SPECIFICATIONS.

D. CONTRACTOR MUST PROVIDE PROTECTION FOR ROOF MEMBRANE & RELATED COMPONENTS DURING

ALL PHASES OF ROOF & PENTHOUSE CONSTRUCTION.

E. ANY DAMAGE TO THE EXISTING ROOF MEMBRANE, CAUSED BY OR DISCOVERED DURING

CONSTRUCTION, MUST BE IMMEDIATELY COMMUNICATED TO THE OWNER & ARCHITECT.

F. FASTEN PENTHOUSE GUARDRAILS TO EXTERIOR FACE OF EXISTING PENTHOUSE.

GENERAL ROOF NOTES

A. ANY DISCREPANCIES OR CONFLICTS FOUND IN THE VARIOUS PARTS OF THE CONSTRUCTION

DOCUMENTS SHALL BE BROUGHT TO THE ATTENTION OF THE ARCHITECT AND THE OWNER BEFORE

PROCEEDING WITH THE WORK.

B. SOME SPECIFIED PRODUCTS MAY HAVE SUBSTANTIAL LEAD TIMES. THE CONTRACTOR SHALL BE

RESPONSIBLE FOR PLACING ORDERS IN A MANNER TO ENSURE THEIR TIMELY ARRIVAL. THE

CONTRACTOR SHALL BE RESPONSIBLE FOR EXPENSES, INCLUDING DESIGN FEES, RELATED TO ANY

RESELECTIONS REQUIRED DUE TO FAILURE TO ORDER PRODUCTS IN A TIMELY MANNER.

C. FURNITURE IS PROVIDED AND INSTALLED BY OTHERS.

D. WRITTEN DIMENSIONS TAKE PRECEDENCE OVER SCALED DIMENSIONS. DO NOT SCALE THE

DRAWINGS.

E. CONTRACTOR & SUBCONTRACTORS TO VERIFY ALL EXISTING CONDITIONS AT THE PROJECT SITE.

F. ALL MATERIALS & EQUIPMENT SHALL BE INSTALLED PER MANUFACTURERS INSTRUCTIONS.

G. DETAILS SHOWN ARE TYPICAL UNLESS OTHERWISE NOTED. SIMILAR DETAILS APPLY IN SIMILAR

CONDITIONS.

H. PROVIDE WOOD BACKING FOR ALL BATH ACCESSORIES, HANDRAILS, OR OTHER ITEMS ATTACHED TO

BUILDING WALLS.

I. INSTALL BLOCKING AS REQUIRED IN ALL PARTITIONS TO RECEIVE COUNTERS, SHELVING,

MARKERBOARDS, WALL MOUNTED MONITORS/TVS, COUNTERTOP SUPPORTS, ETC.

J. GYPSUM USED IN TOILET ROOMS, HAC ROOMS, AND SOILED UTILITY ROOMS SHALL BE MOISTURE

RESISTANT GYPSUM BOARD.

K. REFER TO AE422 FOR MORE INFORMATION REGARDING PORCELAIN & CERAMIC TILE INSTALLATION.

L. PROVIDE ADA COMPLIANT SIGNAGE FOR ALL REQUIRED AREAS, ROOMS, & ACCESSIBLE PATHS.

M. SEE SHEET GI012 FOR TYPICAL MOUNTING HEIGHTS.

GENERAL SECTION NOTES

A. ANY DISCREPANCIES OR CONFLICTS FOUND IN THE VARIOUS PARTS OF THE CONSTRUCTION

DOCUMENTS SHALL BE BROUGHT TO THE ATTENTION OF THE ARCHITECT AND THE OWNER BEFORE

PROCEEDING WITH THE WORK.

B. SOME SPECIFIED PRODUCTS MAY HAVE SUBSTANTIAL LEAD TIMES. THE CONTRACTOR SHALL BE

RESPONSIBLE FOR PLACING ORDERS IN A MANNER TO ENSURE THEIR TIMELY ARRIVAL. THE

CONTRACTOR SHALL BE RESPONSIBLE FOR EXPENSES, INCLUDING DESIGN FEES, RELATED TO ANY

RESELECTIONS REQUIRED DUE TO FAILURE TO ORDER PRODUCTS IN A TIMELY MANNER.

C. REFERENCE SIGNAGE DETAIL(S) FOR SIGNAGE VISUALS.

D. OWNER, CONTRACTOR, AND SIGNAGE SUPPLIER TO MEET AND CONFIRM SIGNAGE

COPY/MESSAGE/TEXT PRIOR TO ISSUING SIGNAGE SUBMITTAL DOCUMENTS FOR APPROVAL.

E. SIGNAGE SUBMITTAL TO INCLUDE VISUAL GRAPHIC OF EACH INDIVIDUAL SIGN IN PROJECT.

F. ALL SIGNAGE TO BE IN COMPLIANCE WITH ADA & ABA ACCESSIBILITY STANDARDS FOR FEDERAL

FACILITIES.

G. SIGNAGE INSTALLER TO COORDINATE LOCATIONS OF CEILING-HUNG SIGNS WITH FIRE PROTECTION

SPRINKLER HEADS IN ACCORDANCE WITH NFPA REGULATIONS.

H. SIGNAGE PROVIDED AND INSTALLED BY GC.

I. GC TO CONFIRM ALL REQUIRED SIGNS ARE CALLED OUT.

J. WALL MOUNTED SIGNS SHALL BE MECHANICALLY FASTENED TO WALL. GC TO PROVIDE BLOCKING AS

REQUIRED.

K. GLASS MOUNTED SIGNS SHALL BE MOUNTED WITH VHB DOUBLE-SIDED TAPE AND SILICONE

ADHESIVE. A 100% OPAQUE WHITE VINYL BACK-UP TO BE ADHERED EXACLTY BEHIND THE SIGN ON

THE OPPOSITE SIDE OF THE GLASS TO CONCEAL THE MOUNTING ADHESIVE.

L. DOOR MOUNTED SIGNS SHALL BE LOW PROFILE WITH WITH EASED CORNERS MOUNTED TO DOORS

WITH VHB DOUBLE-SIDED TAPE AND SILICONE ADHESIVE.

M. SIGN COLORS TO BE SUBSURFACE APPLIED.

N. BASIS OF DESIGN: 2/90 SIGN SYSTEMS SLIDE SYSTEM OR EQUAL.

O. SIGN FRAME TO CONTAIN 75% RECYCLED CONTENT.

P. SIGN BACKING TO BE ENVIRONMENTALLY PREFERRED PRODUCT, EPP DOWNSTREAM CERTIFIED.

GENERAL SIGNAGE NOTES

A. ANY DISCREPANCIES OR CONFLICTS FOUND IN THE VARIOUS PARTS OF THE CONSTRUCTION

DOCUMENTS SHALL BE BROUGHT TO THE ATTENTION OF THE ARCHITECT AND THE OWNER BEFORE

PROCEEDING WITH THE WORK.

B. SOME SPECIFIED PRODUCTS MAY HAVE SUBSTANTIAL LEAD TIMES. THE CONTRACTOR SHALL BE

RESPONSIBLE FOR PLACING ORDERS IN A MANNER TO ENSURE THEIR TIMELY ARRIVAL. THE

CONTRACTOR SHALL BE RESPONSIBLE FOR EXPENSES, INCLUDING DESIGN FEES, RELATED TO ANY

RESELECTIONS REQUIRED DUE TO FAILURE TO ORDER PRODUCTS IN A TIMELY MANNER.

C. SEE MECHANICAL AND ELECTRICAL PLANS FOR ADDITIONAL INFORMATION.

D. SEE PROJECT STAGING PLANS FOR PROPOSED CONTRACTOR LAYDOWN AND PARKING AREAS.

E. CONSTRUCTION MEETING LOCATIONS MAY VARY FROM WHAT IS PROPOSED ON THE FACILITY MAP.

VA TO CONFIRM LOCATION(S) OF CONSTRUCTION MEETINGS.

F. ANY DAMAGE TO THE EXISTING SITE, RESULTING FROM DEMOLITION AND/OR CONSTRUCTION, MUST

BE IMMEDIATLEY COMMUNICATED TO THE COR. COR & CONTRACTOR TO COORDINATE ADEQUATE

TIMELINE FOR REPAIRS. ALL REPAIRS TO BE COMPLETED BEFORE THE END OF THE PROJECT.

G. REPAIRS MUST BE COMPLETE UPON COMPLETION OF THE PROJECT.

H. THE CONTRACTOR MUST NOTIFY THE VA 21 DAYS IN ADVANCE OF ANY SHUTDOWNS PERTAINING TO

MEP AND/OR IT SYSTEMS. THE CONTRACTOR MUST NOTIFY THE VA IN ADVANCE OF ANY WORK THAT

MAY IMPACT THE DAILY OPERATIONS OF THE FACILITY.

I. COORDINATE KEY/FAB ACCESS AND ALARM DISABLEMENT WITH THE VA BEFORE COMPLETION OF ANY

WORK.

J. STAIRWELL S102-01 AND STAIRWELL S104-01 TO SERVE AS PRIMARY ACCESS TO 2ND LEVEL, 3RD

LEVEL, AND ROOF.

K. BEFORE COMPLETION OF ANY WORK, CONTRACTOR AND VA TO CONFIRM WHAT ELEVATOR IS TO BE

UTILIZED FOR TRANSPORTATION OF MATERIALS BETWEEN LEVELS. FINAL PATHS AND ACCESS

POINTS MAY DIFFER FROM WHAT IS SHOWN ON THE PROJECT STAGING PLAN.

L. CONTRACTOR AND SUB CONTRACTORS TO AVOID TRAVELING THROUGH, OR WORKING IN, OCCUPIED

SPACES WHENEVER POSSIBLE.

M. BEFORE COMPLETION OF ANY WORK, CONTRACTOR SHOULD COORDINATE WITH THE VA AND

IDENTIFY WHEN WORK IS TO BE COMPLETED IN SPACES OCCUPIED BY STAFF, VISITORS AND/OR

PATIENTS.

N. CONTRACTOR IS TO PROVIDE COR WITH DAILY LOGS. DAILY LOGS MUST BE SUBMITTED BY O-900 OF

THE FOLLOWING BUSINESS DAY.

O. CONTRACTOR IS TO PROVIDE COR WIH A WEEKLY WASTE REPORT. WASTE REPORTS MUST BE

SUBMITTED BY O-900 OF THE FOLLOWING BUSINESS DAY. WASTE REPORTS SHOULD INCLUDE

INFORMATION PERTAINING TO WASTE TYPE, WEIGHT, AND METHOD OF DISPOSAL.

P. PER VA POLICY, SMOKING AND VAPING IS PROHIBITED ON VA CAMPUSES EXCEPT AT DESIGNATED LOCATIONS. THIS INCLUDES CIGARETTES, CIGARS, PIPES, VAPE PENS, E-CIGARETTES, ETC.

Q. UNLESS APPROVED IN WRITING, CONSTRUCTION MATERIALS SHALL NOT BE SCHEDULED FOR

DELIVERY TO VA RECEIVING / LOGISTICS.

R. BEFORE COMPLETION OF ANY WORK, CONTRACTOR TO ENSURE NECESSARY CONSTRUCTION

PERMITS HAVE BEEN OBTAINED.

GENERAL SITE / MEANS & METHODS NOTES

A. ANY DISCREPANCIES OR CONFLICTS FOUND IN THE VARIOUS PARTS OF THE CONSTRUCTION

DOCUMENTS SHALL BE BROUGHT TO THE ATTENTION OF THE ARCHITECT AND THE OWNER BEFORE

PROCEEDING WITH THE WORK.

B. SOME SPECIFIED PRODUCTS MAY HAVE SUBSTANTIAL LEAD TIMES. THE CONTRACTOR SHALL BE

RESPONSIBLE FOR PLACING ORDERS IN A MANNER TO ENSURE THEIR TIMELY ARRIVAL. THE

CONTRACTOR SHALL BE RESPONSIBLE FOR EXPENSES, INCLUDING DESIGN FEES, RELATED TO ANY

RESELECTIONS REQUIRED DUE TO FAILURE TO ORDER PRODUCTS IN A TIMELY MANNER.

C. BASIS OF DESIGN FOR SELECTED FINISHES IS IDENTIFIED ON MATERIAL & COLOR SCHEDULE.

ARCHITECT APPROVAL IS REQUIRED FOR ALL FINISHES.

D. ALL FINISH WORK SHALL BE PERFORMED IN COMPLIANCE WITH DRAWINGS AND SPECIFICATIONS.

SHOP DRAWINGS, SAMPLES AND PRODUCT DATA SHALL BE SUBMITTED TO THE ARCHITECT FOR

THEIR REVIEW PRIOR TO BEGINNING WORK.

E. WALL PROTECTION PLAN DEPICTS WALL PROTECTION LOCATIONS AND FINISH LOCATIONS IN AREAS OF SPECIAL SIGNIFICANCE, I.E., MATERIAL CHANGES WITHIN A SINGLE ROOM OR SPACE. REFER TO ROOM FINISH SCHEDULE AND MATERIAL & COLOR SCHEDULE FOR THE FINISH SELECTIONS OF EACH

INDIVIDUAL ROOM NOT OTHERWISE DESIGNATED ON PLAN.

F. VERIFY GROUT AND MORTAR THICKNESS PER MANUFACTURER'S RECOMMENDATIONS.

G. INSTALL ALL WALL CORNER GUARDS, END GUARDS, & ANGLE GUARDS ABOVE FLOOR BASE.

H. INSTALL ALL RIGID VINYL SHEET ABOVE FLOOR BASE.

I. REFER TO COLOR SCHEDULE KEY AND SPECIFICATIONS MANUAL FOR WALL PROTECTION

MANUFACTURER, SIZE & COLOR.

J. REFERENCE ELEVATIONS FOR COORDINATION WITH SPECIALTY EQUIPMENT, PATIENT BED SERVICE

WALLS, CLINICAL SINKS, TERMINATION AT MILLWORK AND OTHER WALL MOUNTED ITEMS MAY

REQUIRE COORDINATION.

GENERAL WALL PROTECTION NOTES

A. ANY DISCREPANCIES OR CONFLICTS FOUND IN THE VARIOUS PARTS OF THE CONSTRUCTION

DOCUMENTS SHALL BE BROUGHT TO THE ATTENTION OF THE ARCHITECT AND THE OWNER BEFORE

PROCEEDING WITH THE WORK.

B. SOME SPECIFIED PRODUCTS MAY HAVE SUBSTANTIAL LEAD TIMES. THE CONTRACTOR SHALL BE

RESPONSIBLE FOR PLACING ORDERS IN A MANNER TO ENSURE THEIR TIMELY ARRIVAL. THE

CONTRACTOR SHALL BE RESPONSIBLE FOR EXPENSES, INCLUDING DESIGN FEES, RELATED TO ANY

RESELECTIONS REQUIRED DUE TO FAILURE TO ORDER PRODUCTS IN A TIMELY MANNER.

C. SEE ILSM (INTERIM LIFE SAFETY MEASURES) FOR REQUIREMENTS IN TEMPORARY CONSTRUCTION

FACILITES AND CONTROLS SPECIFICATIONS FOR FULL ILSM INFORMATION.

D. ENSURE EXITS HAVE FREE AND UNOBSTRUCTED EGRESS. IN SUCH INSTANCES FACILITY PERSONNEL

SHALL RECEIVE TRAINING IF ALTERNATE EXITS ARE DESIGNATED.

E. ENSURE FREE AND UNOBSTRUCTED…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .