Marion VA_Renovate 3B_Bid Documents_Drawings_V1 of 4_09-20-2024 28 pages - Copy.pdf
PDF 10 MB Posted
- Attached to
- Z2DA--657A5-23-110, Renovate 3B for Patient Privacy and Intensive Care Unit, (VA-25-00018450)
- Solicitation number
- 36C25525R0015
About this file
This file contains architectural demolition and renovation drawings for Patient Ward 3B at the Marion IL VA Medical Center. The drawings include detailed demolition plans, reflected ceiling plans (RCP), life safety plans, accessibility details, project staging plans, and structural details spanning from ground level through the 4th level penthouse. Key aspects include the renovation of patient rooms, intensive care units, nursing stations, utility rooms, and corridors on the 3rd floor, with some associated mechanical/electrical/plumbing work required on the 2nd floor.
The drawings specify temporary construction barriers, infection control risk assessment (ICRA) requirements, demolition sequencing, and detailed accessibility mounting requirements. Notable components include a new air handling unit (AH-5) weighing 8000 lbs, modifications to existing concrete floor joists for ductwork penetrations, infill of existing exhaust fan openings, and extensive ceiling demolition and replacement. The project incorporates VA barrier-free design standards that exceed standard ABA/IBC requirements, including wider corridor widths in patient care areas (6'-0") and specific requirements for patient room toilet facilities. Drawing date is September 20, 2024 and was prepared by Stone/HFG Architecture in collaboration with specialized engineering consultants.
View the file
Other files
Show all 22
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
VICINITY MAP - VA FACILITY
TRUE
NORTH
PLAN
NORTH
VICINITY MAP - MARION IL
TRUE
NORTH
PLAN
NORTH
BUILDING IMAGE - EXTERIOR
VA SIGNATURESBID ITEMS LIST
BID ITEM 1: BASE BID
(BASE BID)
INCLUDES ALL SCOPE COMMUNICATED IN DRAWINGS, SPECIFICATIONS,
AND OTHER CONSTRUCTION DOCUMENTS.
BID ITEM 2: MECHANICAL DUCTWORK
(DEDUCT)
TWO LAYERS OF 1-1/2” FLEXIBLE ELASTROMERIC INSULATION WITH SELF-
ADHESIVE OUTDOOR JACKET, 3-INCH TOTAL THICKNESS FOR ALL
OUTDOOR DUCTWORK.
BID ITEM 3: HEADWALLS
(DEDUCT)
ALL HEADWALLS TO REDUCE IN PRICE INCLUDING HEADWALL SIZE AND
FINISHES.
BID ITEM 4: SOLID SURFACE & TILE
(DEDUCT)
OMIT S.O.W. RELATED TO SOLID SURFACE WALL FINISHES AND REPLACE
WITH WALL TILE. SEE SPECIFICATIONS & AI DRAWINGS.
BID ITEM 5: CASEWORK
(DEDUCT)
OMIT ALL PREMANUFACTURED METAL CASEWORK AND REPLACE WITH
MILLWORK. SEE SPECIFICATIONS AND AI DRAWINGS.
BID ITEM 6: PATIENT LIFTS
(DEDUCT)
OMIT S.O.W. RELATED TO PATIENT LIFTS. SEE SPECIFICATIONS & RCP
DRAWINGS.
BID ITEM 7: MED / SURG ROOM (ROOM 303)
(DEDUCT)
OMIT S.O.W. RELATED TO RENOVATION OF MED/SURG ROOM (ROOM 303).
REVISED DRAWINGS TO BE PROVIDED BY A/E TEAM SHOULD THIS BID ITEM
BE SELECTED.
BID ITEM 8: VISITOR TOILET (ROOM 330)
(DEDUCT)
OMIT S.O.W. RELATED TO RENOVATION, AND RESIZING, OF VISITOR TOILET
(ROOM 330). REVISED DRAWINGS TO BE PROVIDED BY A/E TEAM SHOULD
THIS BID ITEM BE SELECTED.
BID ITEM 9: VISITOR LOUNGE (ROOM 331)
(DEDUCT)
OMIT S.O.W. RELATED TO RENOVATION, AND RESIZING, OF VISITOR
LOUNGE (ROOM 331). REVISED DRAWINGS TO BE PROVIDED BY A/E TEAM
SHOULD THIS BID ITEM BE SELECTED.
BUILDING IMAGE - INTERIOR
DRAWING LOGOS
SHEET INDEX
01 - GENERAL
1 of 14 GI000 COVER SHEET
2 of 14 GI001 ARCH/INT NOTES
3 of 14 GI002 ARCH/INT NOTES
4 of 14 GI003 CODE REVIEW
5 of 14 GI011 ACCESSIBILITY & EQUIPMENT MOUNTING DETAILS
6 of 14 GI012 ACCESSIBILITY & EQUIPMENT MOUNTING DETAILS
7 of 14 GI013 ACCESSIBILITY & EQUIPMENT MOUNTING DETAILS
8 of 14 GI100 LIFE SAFETY PLAN - 3RD LEVEL - OVERALL
9 of 14 GI101 LIFE SAFETY PLAN - 3RD LEVEL - PROJECT AREA
10 of 14 GI102 LIFE SAFETY PLAN - 2ND LEVEL
11 of 14 GI110 TEMP EXITING & ICRA PLAN - 3RD LEVEL - OVERALL
12 of 14 GI111 TEMP EXITING & ICRA PLAN - 3RD LEVEL - PROJECT AREA
13 of 14 GI120 PROJECT STAGING PLAN - FACILITY MAP
14 of 14 GI121 PROJECT STAGING PLAN - GROUND LEVEL - PROJECT AREA
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
A
B
C
D
2 4 5
Phase
DESIGNER OF RECORD
A/E:
STAMPCONSULTANTS
MEP:
SPECIALIZED ENGINEERING SOLUTIONS
10360 ELLISON CIRCLE
OMAHA, NE 68134
(402) 991-5520
NATHAN BOWMAN (MECH & PUMB)
MAY ALEXANDER (ELEC)
STRUCTURAL:
BSE ENGINEERS
11320 WEST 79TH STREET
LENEXA, KS 66214
(913) 492-7400
KEVIN BOEHRINGER (STRUCT)
O N
E E
IG
H
T H
I N
C H
O
N E
F O
O T
1/
8"
'-0
O N
E Q
U A
R T
E R
I N
C H
O
N E
F O
O T
1/
4"
'-0
T H
R E
E E
IG
H
T H
S
IN
C H
O
N E
F O
O T
(3 /8
1' -0
O N
E H
A
LF
I N
C H
O
N E
F O
O T
1/
2"
'-0
T
H R
E E
Q U
A R
T E
R S
IN
C
H
O N
E F
O O
T
3/ 4"
'-0
6"
O N
E I
N C
H
O N
E F
O O
T
1"
'-0
6"
O N
E A
N D
O N
E H
A
LF
I N
C H
E S
O
N E
F O
O T
1/ 2"
'-0
6"
T H
R E
E
IN
C H
E S
O
N E
F O
O T
3"
'-0
6"
32 4 5 61
C :\U se rs
\K .K ue pe r\D oc um en ts \2
2_ M ar io n V
A _R en ov at e
3B _k yl ek
9D U
H U
.rv t
9/
/2
:4 6:
A
M
GI000
COVER SHEET
STONE / HFG ARCHITECTURE
600 EAST 7TH ST & 330 N. MEAD
SIOUX FALLS, SD 57103 & WICHITA, KS 67202
(605) 271-1144 & (316) 262-2500
BEAU FEY (ARCH) & WAYNE BONGARTZ (PM)
RENOVATE PATIENT WARD 3B
FOR PATIENT PRIVACY AND
INTENSIVE CARE
MARION IL
BLDG #001
WESLEY PINKS
09/20/2024 BF/WB/SS KK/AB/AW
DEPARTMENT OF VETERANS AFFAIRS
RENOVATE PATIENT WARD 3B FOR PATIENT PRIVACY
AND INTENSIVE CARE
MARION IL
VA #657A5-23-110
09/20/2024
FINAL BID DOCUMENTS
SGA #231942
VA #657A5-23-110
FINAL BID DOCUMENTS
GEN SHEET: 1 OF 14
SHEET INDEX
02 - STRUCTURAL
1 of 4 S-000 GENERAL NOTES
2 of 4 S-100 PARTIAL ROOF FRAMING PLAN
3 of 4 S-200 PENTHOUSE FLOOR DEMO AND NEW FRAMING PLAN
4 of 4 S-300 PENTHOUSE ROOF FRAMING PLAN & FRAMING DETAILS
03 - ARCHITECTURAL DEMOLITION
1 of 10 AD100 DEMOLITION PLAN - 3RD LEVEL - OVERALL
2 of 10 AD101 DEMOLITION PLAN - 3RD LEVEL - AREA A
3 of 10 AD102 DEMOLITION PLAN - 3RD LEVEL - AREA B
4 of 10 AD110 DEMOLITION RCP - 3RD LEVEL - OVERALL
5 of 10 AD111 DEMOLITION RCP - 3RD LEVEL - AREA A
6 of 10 AD112 DEMOLITION RCP - 3RD LEVEL - AREA B
7 of 10 AD113 DEMOLITION RCP - 2ND LEVEL - OVERALL
8 of 10 AD114 DEMOLITION RCP - 2ND LEVEL - AREA A
9 of 10 AD115 DEMOLITION RCP - 2ND LEVEL - AREA B
10 of 10 AD121 DEMOLITION PENTHOUSE PLAN - 4TH LEVEL - AREA A
04 - ARCHITECTURAL
1 of 26 AE100 ARCHITECTURAL FLOOR PLAN - 3RD LEVEL - OVERALL
2 of 26 AE101 ARCHITECTURAL FLOOR PLAN - 3RD LEVEL - AREA A
3 of 26 AE102 ARCHITECTURAL FLOOR PLAN - 3RD LEVEL - AREA B
4 of 26 AE110 REFLECTED CEILING PLAN - 3RD LEVEL - OVERALL
5 of 26 AE111 REFLECTED CEILING PLAN - 3RD LEVEL - AREA A
6 of 26 AE112 REFLECTED CEILING PLAN - 3RD LEVEL - AREA B
7 of 26 AE130 ARCHITECTURAL ROOF PLAN - OVERALL
8 of 26 AE131 ARCHITECTURAL PENTHOUSE PLAN - 4TH LEVEL - AREA A
9 of 26 AE301 BUILDING SECTIONS
10 of 26 AE311 WALL SECTIONS
11 of 26 AE312 WALL SECTIONS
12 of 26 AE401 ENLARGED PATIENT ROOM PLANS
13 of 26 AE402 ENLARGED PATIENT ROOM PLANS
14 of 26 AE403 ENLARGED PATIENT ROOM PLANS
15 of 26 AE404 ENLARGED PATIENT ROOM PLANS
16 of 26 AE405 ENLARGED PATIENT ROOM PLANS
17 of 26 AE406 ENLARGED PATIENT ROOM PLANS
18 of 26 AE411 ENLARGED PLANS
19 of 26 AE421 FLOOR SLOPES & DRAINS
20 of 26 AE422 FLOOR SLOPES & DRAINS
21 of 26 AE431 ENLARGED RCP
22 of 26 AE501 ARCHITECTURAL DETAILS
23 of 26 AE502 ARCHITECTURAL DETAILS
24 of 26 AE503 ARCHITECTURAL DETAILS
25 of 26 AE601 ARCHITECTURAL SCHEDULES & ASSEMBLIES
26 of 26 AE900 ARCHITECTURAL PERSPECTIVES
05 - ARCHITECTURAL INTERIORS
1 of 30 AI100 FINISH & INTERIORS - SCHEDULES & TYPES
2 of 30 AI101 FINISH PLAN - 3RD LEVEL - AREA A
3 of 30 AI102 FINISH PLAN - 3RD LEVEL - AREA B
4 of 30 AI200 FURNITURE & EQUIPMENT - SCHEDULES & TYPES
5 of 30 AI201 FURNITURE & EQUIPMENT - SCHEDULES & TYPES
6 of 30 AI202 FURNITURE & EQUIPMENT PLAN - 3RD LEVEL - AREA A
7 of 30 AI203 FURNITURE & EQUIPMENT PLAN - 3RD LEVEL - AREA B
8 of 30 AI301 WALL PROTECTION PLAN - 3RD LEVEL - AREA A
9 of 30 AI302 WALL PROTECTION PLAN - 3RD LEVEL - AREA B
10 of 30 AI401 INTERIOR ELEVATIONS
11 of 30 AI402 INTERIOR ELEVATIONS
12 of 30 AI411 HEADWALL - BASIS OF DESIGN
13 of 30 AI412 HEADWALL - BASIS OF DESIGN - BID DEDUCT
14 of 30 AI501 MILLWORK SECTIONS & DETAILS
15 of 30 AI502 MILLWORK SECTIONS & DETAILS - BID DEDUCT
16 of 30 AI503 FINISH DETAILS
17 of 30 AI600 SIGNAGE & WAYFINDING - SCHEDULES & TYPES
18 of 30 AI601 SIGNAGE & WAYFINDING PLAN - 3RD LEVEL - AREA A
19 of 30 AI602 SIGNAGE & WAYFINDING PLAN - 3RD LEVEL - AREA B
20 of 30 AI701 PATIENT LIFTS - BASIS OF DESIGN - DETAILS
21 of 30 AI702 PATIENT LIFTS - BASIS OF DESIGN - DETAILS
22 of 30 AI703 PATIENT LIFTS - BASIS OF DESIGN - DETAILS
23 of 30 AI704 PATIENT LIFTS - BASIS OF DESIGN - DETAILS
24 of 30 AI710 PATIENT LIFTS - BASIS OF DESIGN - OVERALL PLAN
25 of 30 AI711 PATIENT LIFTS - BASIS OF DESIGN - ENLARGED PLAN
26 of 30 AI712 PATIENT LIFTS - BASIS OF DESIGN - ENLARGED PLAN
27 of 30 AI713 PATIENT LIFTS - BASIS OF DESIGN - ENLARGED PLAN
28 of 30 AI714 PATIENT LIFTS - BASIS OF DESIGN - ENLARGED PLAN
29 of 30 AI715 PATIENT LIFTS - BASIS OF DESIGN - ENLARGED PLAN
30 of 30 AI716 PATIENT LIFTS - BASIS OF DESIGN - ENLARGED PLAN
06 - MECHANICAL
1 of 16 M-000 MECHANICAL SYMBOLS AND ABBREVIATIONS
2 of 16 M-103 MECHANICAL DEMOLITION FLOOR PLAN - 3RD LEVEL
3 of 16 M-104 MECHANICAL DEMOLITION FLOOR PLAN - ROOF
4 of 16 MH203 DUCTWORK FLOOR PLAN - 3RD LEVEL
5 of 16 MH204 MECHANICAL FLOOR PLAN - PENTHOUSE
6 of 16 MH205 MECHANICAL TEMPORARY FLOOR PLAN - 3RD LEVEL
7 of 16 MP203 HYDRONIC PIPING FLOOR PLAN - 3RD LEVEL
8 of 16 MC203 CONTROLS FLOOR PLAN - 3RD LEVEL
9 of 16 M-300 ENLARGED PLANS
10 of 16 M-301 SECTIONS
11 of 16 M-500 MECHANICAL DETAILS
12 of 16 M-501 MECHANICAL DETAILS
13 of 16 M-502 MECHANICAL CONTROLS
14 of 16 M-503 MECHANICAL CONTROLS
15 of 16 M-600 MECHANICAL SCHEDULES
16 of 16 M-601 MECHANICAL SCHEDULES
07 - PLUMBING
1 of 9 P-000 PLUMBING SYMBOLS AND ABBREVIATIONS
2 of 9 PF103 FIRE PROTECTION DEMOLITION FLOOR PLAN - 3RD LEVEL
3 of 9 PF203 FIRE PROTECTION FLOOR PLAN - 3RD LEVEL
4 of 9 P-102 PLUMBING DEMOLITION FLOOR PLAN - 2ND LEVEL
5 of 9 P-103 PLUMBING DEMOLITION FLOOR PLAN - 3RD LEVEL
6 of 9 PP202 PLUMBING FLOOR PLAN - 2ND LEVEL
7 of 9 PP203 PLUMBING FLOOR PLAN - 3RD LEVEL
8 of 9 PG203 MEDICAL GAS FLOOR PLAN - 3RD LEVEL
9 of 9 P-600 PLUMBING DETAILS AND SCHEDULES
08 - ELECTRICAL
1 of 16 E-000 ELECTRICAL SYMBOLS AND ABBREVIATIONS
2 of 16 E-001 ELECTRICAL SYMBOLS
3 of 16 E-103 ELECTRICAL DEMOLITION FLOOR PLAN - 3RD LEVEL
4 of 16 E-104 ELECTRICAL DEMOLITION FLOOR PLAN - PENTHOUSE
5 of 16 EL203 LIGHTING FLOOR PLAN - 3RD LEVEL
6 of 16 EC203 LIGHTING CONTROL FLOOR PLAN - 3RD LEVEL
7 of 16 EP203 POWER FLOOR PLAN - 3RD LEVEL
8 of 16 EP204 POWER FLOOR PLAN - PENTHOUSE
9 of 16 EV203 LOW VOLTAGE FLOOR PLAN - 3RD LEVEL
10 of 16 E-401 LIGHTING CONTROL ZONE PLANS
11 of 16 E-500 ONE-LINE DIAGRAM
12 of 16 E-600 ELECTRICAL DETAILS
13 of 16 E-601 ELECTRICAL DETAILS
14 of 16 E-700 ELECTRICAL SCHEDULES
15 of 16 E-701 ELECTRICAL SCHEDULES
16 of 16 E-800 ENERGY CODE COMPLIANCE
TOTAL SHEET COUNT: 125
REVISION # DESCRIPTION DATE
TYPICAL DIMENSION LINE
BREAK LINE
DETAIL INDICATOR AND/OR
ENLARGED DRAWING CALLOUT
XX
X-XXX
XX
X-XXX
XX WALL SECTION INDICATOR
XX
X-XXX XX X-XXX EXTERIOR ELEVATION INDICATOR
ELEVATION / LEVEL INDICATOR
CENTER LINE
INTERIOR ELEVATION INDICATORX-XXX
XX
X-XXX
XX
XX
XX
XX
NORTH ARROW(S)
CORNER GUARD - TYP
X.X KEYNOTE
X NEW GRID LINE
XXX
ROOM
XXX
XX
DRAWING TITLE
X"=X'-X"
XX
TRUE
NORTH
PLAN
NORTH
XX
X-XXX
BUILDING SECTION INDICATOR
XX
X-XXX
DETAIL INDICATOR
X-XXX
NORTH
EXISTING GRID LINEX
XX / XXX
SPOT ELEVATION INDICATOR
LEVEL TITLE
TYPICAL DRAWING BLOCK TITLE
DRAWING REFERENCE
X'-X"
ELEVATION / LEVEL INDICATOR
LEVEL TITLE
X'-X"
X' X"
SPOT COORDINATE INDICATOR
X'-X"
X'-X" / X'-X"
SLOPE INDICATOR
X
XX
XX
REVISION AND/OR ISSUE INDICATOR
ROOF TYPE INDICATOR
WINDOW / STOREFRONT TYPE INDICATOR
PARTITION TYPE INDICATOR
DOOR / OPENING INDICATOR
(BORROWED LIGHT INCLUDED)
ROOM INDICATOR
EQUIPMENT INDICATOR
CEILING HEIGHT INDICATOR
XXX
X-XXX
XX
XX
OCCUPANT LOADXX
DETAIL INDICATOR AND/OR
ENLARGED DRAWING CALLOUT
CORNER GUARD - WALL END
CORNER GUARD - OBTUSE ANGLE
CORNER GUARD - ACUTE ANGLE
SIGNAGE TYPE INDICATORXX
ARCH / INT ANNOTATION LEGEND (TAGS, SYMBOLS, AND INDICATORS)
REVISION AND/OR ISSUE CLOUD
SUGGESTED FLOORING DIRECTION
X'-X"
XXXX WALL PROTECTION TYPE INDICATOR
ARCH / INT MATERIALS LEGEND
BATT INSULATION
WOOD ROUGH (CONTINUOUS)
WOOD ROUGH (SPACED)
EXISTING CONSTRUCTION
TO BE REMOVED
NEW CONSTRUCTION
EARTH
EARTH (UNDISTURBED)
GYPSUM BOARD
CONCRETE
RIGID INSULATION
PLYWOOD
GRANULAR FILL
ASPHALT
ALUMINUM
STEEL
WOOD
BRICK
BLOCK
STONE
FIREPROOFING
LOOSE INSULATION
SAND
EXISTING CONSTRUCTION
TO REMAIN
SPRAY INSULATION
VINYL
EPOXY
NOTE
A. FLOOR PATTERN HATCHES ARE EXEMPT FROM LEGEND.
ARCH / INT LINE TYPES LEGEND
HIDDEN LINE
CENTER LINE
GRID LINE
TYPICAL LINE
DISTANT LINE
ELEVATION / LEVEL LINE
LEADER LINE
CLEARANCE LINE
EASEMENT LINE
DEMOLITION LINE
PATH OF TRAVEL
MATCHLINE
PROPERTY LINE
0.0"
0.0"
OCCUPANTS
REQUIRED WIDTH
PROVIDED WIDTH
OCCUPANT LOAD
ARCH / INT CODE SYMBOLS LEGEND
TD = X'-X"
(TD) TRAVEL DISTANCE
DIRECTION OF EGRESS
START OF PATH
DIRECTION OF EGRESSPATH OF TRAVEL
CEILING ACCESS PANEL
2X4 FLUORESCENT FIXTURE
2X2 FLUORESCENT FIXTURE
CEILING HEIGHT
RECESSED CAN FIXTURE
RETURN AIR GRILLE
SUPPLY AIR GRILLE
X'-X"
WIRELESS ACCESS POINT
AT ANTENNA
DOME LIGHT
AC ACCESS CONTROLLED DOOR
D
F HORN/ STROBE
TV ROUGH-IN TELEVISION OUTLET
SECURITY CAMERAC
CEILING SPEAKERS
EXIT SIGN
NOTE
A. REFERENCE MECHANICAL & ELECTRICAL DRAWINGS FOR SYMBOLS NOT SHOWN HERE.
RCP SYMBOLS & MATERIALS LEGEND
GYPSUM CEILING
(GWB)
2X2 SUSPENDED
ACOUSTICAL TILE
CEILING (SAT)
2X4 SUSPENDED
ACOUSTICAL TILE
CEILING (SAT)
X.XX KEYNOTE - SEE SCHEDULE
OR
RECESSED LINEAR LIGHT
VANITY LIGHTOR
OR
OR
OR
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
A
B
C
D
2 4 5
Phase
DESIGNER OF RECORD
A/E:
STAMPCONSULTANTS
MEP: STRUCTURAL:
6"
6"
6"
6"
O N
E E
IG
H
T H
I N
C H
O
N E
F O
O T
1/
8"
'-0
O
N E
Q U
A R
T E
R I
N C
H
O N
E F
O O
T
1/ 4"
'-0
T H
R E
E E
IG
H
T H
S
IN
C H
O
N E
F O
O T
(3 /8
1' -0
O
N E
H A
LF
I
N C
H
O N
E F
O O
T
1/ 2"
'-0
T H
R E
E Q
U A
R T
E R
S
IN
C H
O
N E
F O
O T
3/
4"
'-0
O
N E
I N
C H
O
N E
F O
O T
1"
'-0
O N
E A
N D
O N
E H
A
LF
I N
C H
E S
O
N E
F O
O T
1/ 2"
'-0
T H
R E
E
IN
C H
E S
O
N E
F O
O T
3"
'-0
32 4 5 61
SPECIALIZED ENGINEERING SOLUTIONS
10360 ELLISON CIRCLE
OMAHA, NE 68134
(402) 991-5520
NATHAN BOWMAN (MECH & PUMB)
MAY ALEXANDER (ELEC)
BSE ENGINEERS
11320 WEST 79TH STREET
LENEXA, KS 66214
(913) 492-7400
KEVIN BOEHRINGER (STRUCT)
C :\U se rs
\K .K ue pe r\D oc um en ts \2
2_ M ar io n V
A _R en ov at e
3B _k yl ek
9D U
H U
.rv t
9/
/2
:4 6:
A
M
GI001
ARCH/INT NOTES
STONE / HFG ARCHITECTURE
600 EAST 7TH ST & 330 N. MEAD
SIOUX FALLS, SD 57103 & WICHITA, KS 67202
(605) 271-1144 & (316) 262-2500
BEAU FEY (ARCH) & WAYNE BONGARTZ (PM)
RENOVATE PATIENT WARD 3B
FOR PATIENT PRIVACY AND
INTENSIVE CARE
MARION IL
BLDG #001
WESLEY PINKS
09/20/2024 BF/WB/SS KK/AB/AW
SGA #231942
VA #657A5-23-110
FINAL BID DOCUMENTS
GEN SHEET: 2 OF 14
ARCH / INT ABBREVIATIONS
SYMBOLS
" INCH / INCHES
# POUND / NUMBER
& AND
' FOOT / FEET
+/- PLUS OR MINUS
< ANGLE
<< DOUBLE ANGLE
@ AT
CL CENTERLINE
d PENNEY
Ø ROUND OR DIAMETER
A
A/C AIR CONDITIONING
A/E ARCHITECT / ENGINEER
AB ANCHOR BOLT
ABA ARCHITECTURAL BARRIERS ACT
ABBRV ABBREVIATION
ABV ABOVE
AC ASPHALTIC CONCRETE / AIR CONDITIONING /
ARCHITECTURAL CEILING / ACOUSTICAL
ACC ACCESSIBLE
ACCU AIR COOLED CONDENSING UNIT
ACM ALUMINUM COMPOSITE MATERIAL
ACOUS ACOUSTICAL
ACP ACOUSTICAL CEILING PANEL
ACT ACOUSTICAL CEILING TILE
AD AREA DRAIN / ARCHITECTURAL DEMOLITION
ADA AMERICANS WITH DISABILITIES ACT
ADD ADDENDUM
ADH ADHESIVE
ADJ ADJUSTABLE / ADJACENT / ADJOINING
AE ARCHITECTURAL ELEMENT / ARCHITECTURAL
ELEMENTS
AF ARCHITECTURAL FINISHES
AFC ABOVE FINISHED CEILING
AFF ABOVE FINISHED FLOOR
AFG ABOVE FINISHED GRADE
AG AGRICULTURAL / ARCHITECTURAL GRAPHICS
AHERA ASBESTOS HAZARD EMERGENCY RESPONSE ACT
AHJ AUTHORITY HAVING JURISDICTION
AI ARCHITECTURAL INTERIORS
AL ALUMINUM
ALN ALIGN
ALT ALTERNATIVE / ALTERNATE
ALUM ALUMINUM
ANOD ANODIZED
ANSI AMERICAN NATIONAL STANDARDS INSTITUTE
APPROX APPROXIMATE
APPROX APPROXIMATE
APR APRIL
APX APPROXIMATE
ARCH ARCHITECT / ARCHITECTURAL
AS ARCHITECTURAL SITE
ASHRAE AMERICAN SOCIETY OF HEATING, REFRIGERATING,
AND AIR CONDITIONING ENGINEERS
ASI ARCHITECT'S SUPPLEMENTAL INSTRUCTIONS
ASME AMERICAN SOCIETY OF MECHANICAL ENGINEERS
AUG AUGUST
AW ARCHITECTURAL WAYFINIDING
AWF ARCHITECTURAL WINDOW FILM
AWI ARCHITECTURAL WOODWORK INSTITUTE
AWP ACOUSTICAL WALL PANEL
B
B&B BOARD AND BATTEN / BALLED AND BURLAPPED
BATT BLANKET INSULATION / FIBERGLASS INSULATION
BD BOARD / BARN DOOR
BEV BEVELED
BF BIFOLD
BFF BELOW FINISH FLOOR
BIM BUILDING INFORMATION MODELING
BL BRICK LEDGE
BLDG BUILDING
BLKG BLOCK / BLOCKING
BM BEAM
BMRK BENCHMARK
BO BOTTOM OF
BOC BOTTOM OF CONCRETE / BACK OF CURB
BOF BOTTOM OF FOOTING
BOW BOTTOM OF WALL
BRG BEARING
BRK BRICK
BRKT BRACKET
BRNG BEARING
BRZ BRONZE
BSMT BASEMENT
BTM BOTTOM
BTWN BETWEEN
BUF BUILT UP FLOORING
BUR BUILT UP ROOFING
BW BOTTOM OF WALL
C
C CELSIUS
CA CONSTRUCTION ADMINISTRATION
CAB CABINET
CAD COMPUTER-AIDED DESIGN
CB CERAMIC BASE / CHALKBOARD
CC CENTER TO CENTER
CCW COUNTERCLOCKWISE
CD CONSTRUCTION DOCUMENTS / COILING DOOR / CIVIL
DEMOLITION
CEM CEMENT
CF CUBIC FEET/ CUBIC FOOT
CG CORNER GUARD / CIVIL GRADING
CH CHANNEL
CHR CHAIR RAIL
CI CIVIL IMPROVEMENTS
CIPC CAST-IN-PLACE CONCRETE
CIV CIVIL
CJ CONSTRUCTION JOINT / CONTROL JOINT
CL CENTER LINE
CLG CEILING
CLKG CAULKING
CLO CLOSET
CLR CLEAR / CLEARANCE / CLEAR SPACE
CM CONSTRUCTION MANAGER / CENTIMETER /
CENTIMETERS
CMU CONCRETE MASONRY UNIT
CN CIVIL NODE / CIVIL NODES
CNTR COUNTER
CO CHANGE ORDER / CLEANOUT
COL COLUMN
COMB COMBINATION / COMBINE / COMBINED
COMP COMPOSITE / COMPOSITION
CONC CONCRETE
CONF CONFIRM / CONFIRMATION / CONFIRMED /
CONFERENCE
CONN CONNECT / CONNECTION
CONST CONSTRUCTION
CONT CONTINUOUS / CONTINUE / CONTINUED
CONTR CONTRACT / CONTRACTOR
COORD COORDINATE / COORDINATION / COORDINATOR
COR CONTRACTING OFFICER'S REPRESENTATIVE
ARCH / INT ABBREVIATIONS
CORR CORRUGATED / CORRIDOR
CP CAST PLASTIC / CIVIL PAVING
CPPT CARPET TILE
CPT CARPET
CR CRASH RAIL / CARD READER
CRS COURSE
CS CIVIL SITE / CENTRAL STERILE
CSI CONSTRUCTION SPECIFICATIONS INSTITUTE
CSMT CASEMENT
CT CERAMIC TILE / COMPUTED TOMOGRAPHY
CTB CERAMIC TILE BASE
CTR CENTER / CENTERED
CU CIVIL UTILITY / CIVIL UTILITIES
CV CENTER VISION
CW COLD WATER
CWT CERAMIC WALL TILE
D
D DEPTH / DEEP
DBL DOUBLE
DD DESIGN DEVELOPMENT / DUTCH DOOR
DEC DECEMBER
DEMO DEMOLITION / DEMOLISH
DEPT DEPARTMENT
DET DETAIL
DF DRINKING FOUNTAIN
DIA DIAMETER
DIAG DIAGONAL
DIM DIMENSION
DISP DISPENSER
DN DOWN
DO DITTO
DR DOOR
DS DOWNSPOUT
DTL DETAIL
DW DISHWASHER
DWG DRAWING
DWR DRAWER
DWTR DUMBWAITER
E
(E) EXISTING
E EAST
EA EACH
ED ELECTRICAL DEMOLITION / EMERGENCY DEPARTMENT
EDT ELECTROSTATIC DISSIPATIVE TILE
EF EACH FACE
EFR EXISTING FINISH TO REMAIN / EXISTING FINSHES TO
REMAIN
EG END GUARD / EXISTING GRADE
EI ELECTRICAL INSTRUMENTATION
EJ EXPANSION JOINT
EL ELEVATION / ELECTRICAL LIGHTING
ELEC ELECTRICAL
ELEV ELEVATOR / ELEVATION
ELVR ELEVATOR
EMER EMERGENCY
ENGR ENGINEER / ENGINEERED
ENL ENLARGED
EOP EDGE OF PAVEMENT
EP ELECTRICAL POWER
EPDM ETHYLENE PROPYLENE DIENE TERPOLYMER
MEMBRANE
EPS EXPANDED POLYSTYRENE BOARD
EPT EPOXY PAINT
EQ EQUAL
EQUIP EQUIPMENT
ES EACH SIDE / ELECTRICAL SITE
EST ESTIMATE
ET ELECTRICAL TELECOMMUNICATIONS
ETC ETCETERA
ETR EXISTING TO REMAIN
EV ELECTRIC VEHICLE
EW EACH WAY
EWC ELECTRIC WATER COOLER
EXC EXCAVATE / EXCAVATION
EXH EXHAUST
EXIST EXISTING
EXP EXPANSION / EXPOSED
EXST EXISTING
EXT EXTERIOR
F
F/CC FIBERS PER CUBIC CENTIMETER
FA FIRE ALARM
FAB FABRICATE / FABRICATION / FABRICATED
FACP FIRE ALARM CONTROL PANEL
FAP FIRE SYSTEM ANNUNCIATOR PANEL
FD FLOOR DRAIN
FDC FIRE DEPARTMENT CONNECTION
FDN FOUNDATION
FDTN FOUNDATION
FE FIRE EXTINGUISHER
FEB FEBRUARY
FEC FIRE EXTINGUISHER CABINET
FF FINISHED FLOOR
FFE FINISHED FLOOR ELEVATION
FG FULL GLASS / FINISHED GRADE
FIN FINISH / FINISHED
FL FLOW LINE
FLDG FOLDING
FLR FLOOR / FLOORING
FLUOR FLUORESCENT
FO FACE OF
FOC FACE OF CONCRETE
FOF FACE OF FINISH
FOM FACE OF MASONRY
FOS FACE OF STUD / FACE OF STRUCTURE
FP FLUSH PANEL / FIRE PROTECTION / FLOOR PLAN
FPS FIRE PULL STATION
FR FIRE RESISTANT / FRAME
FRMG FRAMING
FRP FIBERGLASS REINFORCED PANEL
FRT FIRE RETARDANT
FS FLOOR SINK / FOOR SCRAPER
FSA FIRE SYSTEM ANNUNCIATOR ALARM
FT FOOT / FEET / FIRE TREATED
FTG FOOTING
FURN FURNISH / FUNITURE / FURNACE
FURR FURRING / FURRED
FUT FUTURE
FV FIELD VERIFY
G
G GALLON / GALLONS / GAS
GA GAGE / GUAGE / GYPSUM ASSOCIATION
GALV GALVANIZED
GB GRAB BAR
GC GENERAL CONTRACTOR / GENERAL CONTRACT
GI GALVANIZED IRON / GENERAL INFORMATION
GL GLASS / GLAZING
GLU GLUE
GM GENERAL MANAGER
GR GENERAL RESOURCE / GENERAL RESOURCES
GRD GRADE
ARCH / INT ABBREVIATIONS
GSF GROSS SQUARE FOOTAGE / GROSS SQUARE FEET
GT GROUT
GWB GYPSUM WALL BOARD
GYP GYPSUM
H
H HIGH / HEIGHT
HA HAZARDOUS MATERIALS ASBESTOS
HAZ HAZARDOUS
HB HOSE BIB
HC HANDICAP / HOLLOW CORE / HAT CHANNEL
HD HEAVY DUTY
HDBD HARDBOARD
HDWD HARDWOOD
HDWR HARDWARE
HFG HEALTH FACILITIES GROUP ARCHITECTURE
HG HALF GLASS
HM HOLLOW METAL
HORZ HORIZONTAL
HPDL HIGH PRESSURE DECORATIVE LAMINATE
HR HOUR / HOURS / HANDRAIL / HUMAN RESOURCES
HSK HOUSEKEEPING
HSWD HEADER
HT HEIGHT
HVAC HEATING, VENTILATION, AND AIR CONDITIONING
HW HOT WATER
HWC HYGIENIC WALL CLADDING
I
IB INTEGRAL BASE
IBC INTERNATIONAL BUILDING CODE
ICC INTERNATIONAL CODE COUNCIL
ICRA INFECTION CONTROL ASSESSMENT
ICU INTENSIVE CARE UNIT
ID INSIDE DIAMETER / INSIDE DIMENSION / INTERIOR
DESIGN / INTERIOR DESIGNER / INTERIOR DEMOLITION
IEBC INTERNATIONAL EXISTING BUILDING CODE
IECC INTERNATIONAL ENERGY CONSERVATION CODE
IF INTERIOR FURNISHINGS
IFC INTERNATIONAL FIRE CODE
IFGC INTERNATIONAL FUEL GAS CODE
IG INTERIOR GRAPHIC / INTERIOR GRAPHICS
IMC INTERNATIONAL MECHANICAL CODE
IN INCH / INCHES / INTERIOR DESIGN / INTERIOR
DESIGNER
INCL INCLUDE / INCLUDED / INCLUDING
INFO INFORMATION
INSP INSPEC / INSPECTION / INSPECTOR
INSTR INSTRUCTION / INSTRUCTIONS
INSUL INSULATE/ INSULATED / INSULATION
INT INTERIOR
IPC INTERNATIONAL PLUMBING CODE
IRC INTERNATIONAL RESIDENTIAL CODE
IT INFORMATION TECHNOLOGY
J
JAN JANITOR / JANUARY
JSN JOINT SCHEDULE NUMBER
JST JOIST
JT JOINT
JUL JULY
JUN JUNE
JV JOINT VENTURE
K
KCJ KEYED CONSTRUCTION JOINT
KM KILOMETER / KILOMETERS
KO KNOCK OUT
L
L LENGTH / LONG
LA LANDSCAPE ARCHITECT
LAB LABORATORY
LAM LAMINATE / LAMINATED
LAND LANDSCAPE
LAV LAVATORY
LB POUND
LBC LIVING BUILDING CHALLENGE
LD LANDSCAPE DEMOLITION / LANDSCAPE DESIGN /
LANDSCAPE DESIGNER
LDR LADDER
LDRP LABOR DELIVERY RECOVERY POST PARTUM
LEED LEADERSHIP IN ENERGY AND ENVIRONMENTAL DESIGN
LF LINEAR FEET
LG LANDSCAPE GRADING
LH LEFT HAND
LKR LOCKER
LL LOWER LEVEL / LANDSCAPE LIGHTING
LOC LOCATION
LOGCAT LOGISTICAL CATEGORY
LONG LONGITUDINAL
LP LANDSCAPE PLANTING
LR LANDSCAPE RELOCATION
LS LIFE SAFETY / LANDSCAPE SITE
LT LIGHT
LTC LONG TERM CARE
LVC LOW VOLUME CHANGE
LVR LOUVER
LVT LUXURY VINYL TILE
M
M METER / METERS
MAR MARCH
MAS MASONRY
MATL MATERIAL
MAX MAXIMUM
MAY MAY
MC MEDICINE CABINET
MD MECHANICAL DEMOLITION
ME MATCH EXISTING
MECH MECHANICAL
MEF MATCH EXISTING FINISH / MATCH EXISTING FINISHES
MEMB MEMBRANE
MEZZ MEZZANINE
MFR MANUFACTURE / MANUFACTURER
MH MECHANICAL HVAC / MANHOLE
MI MILE / MILES / MECHANICAL INSTRUMENTATION
MICU MEDICAL INTENSIVE CARE UNIT
MIN MINIMUM / MINUTE / MINUTES
MISC MISCELLANEOUS
MM MILLIMETER / MILLIMETERS
MNTG MOUNTING
MO MASONRY OPENING
MP MECHANICAL PIPING
MR MIRROR
MRI MAGNETIC RESONANCE IMAGING
MS MECHANICAL SITE
MT METAL TRIM
MTL METAL
MULL MULLION
N
(N) NEW
N NORTH
ARCH / INT ABBREVIATIONS
NA NOT APPLICABLE
NAICS NORTH AMERICAN INDUSTRY CALSSIFICATION SYSTEM
NESHAP NATIONAL EMISSION STANDARDS FOR HAZARDOUS AIR
POLLUTANTS
NFPA NATIONAL FIRE PROTECTION ASSOCIATION
NIC NOT IN CONTRACT
NO NUMBER
NOM NOMINAL
NOV NOVEMBER
NSF NET SQUARE FOOTAGE / NET SQUARE FEET
NSN NATIONAL STOCK NUMBER
NTS NOT TO SCALE
NV NARROW VISION
O
OA OVERALL
OC ON CENTER
OCT OCTOBER
OD OUTSIDE DIAMETER
OFCI OWNER FURNISHED; CONTRACTOR INSTALLED
OFF OFFICE
OFOI OWNER FURNISHED; OWNER INSTALLED
OH OVERHEAD
OPG OPENING
OPNG OPENING
OPP OPPOSITE
OR OPERATING ROOM
ORD OVERFLOW ROOF DRAIN / ORDINANCE
ORIG ORIGINAL
OSHA OCCUPATIONAL SAFETY AND HEALTH ADMINISTRATION
OT OCCUPATIONAL THERAPY
OVHD OVERHEAD
OZ OUNCE
P
P PAINT
PACU POST ANESTHETIC CARE UNIT
PAR PARALLEL
PART PARTITION
PC PLUMBING CONTRACTOR
PCF POUNDS PER CUBIC FOOT
PD PRE-DESIGN / POCKET DOOR / PLUMBING DEMOLITION
PED PEDISTAL
PEM PRE-ENGINEERED METAL
PEMB PRE-ENIGNNERED METAL BUILDING
PERF PERFORATED
PERP PERPENDICULAR
PL PLATE / PLASTIC / PROPERTY LINE
PLAM PLASTIC LAMINATE
PLAS PLASTER
PLBG PLUMBING
PLT PLATE
PLUMB PLUMBING
PLYWD PLYWOOD
PNL PANEL
PP PLUMBING PIPING
PR PAIR / PROPOSAL REQUEST
PRCST PRECAST
PREFAB PREFABRICATE / PREFABRICATED
PREFIN PREFINISHED
PS PLUMBING SITE
PSF POUNDS PER SQUARE FOOT
PSI POUNDS PER SQUARE INCH
PT PRESSURE TREATED / PORCELAIN TILE / PHYSICAL
THERAPY
PTD PAPER TOWEL DISPENSER / PAINTED
PTN PARTITION
PTR PAPER TOWEL RECEPTICAL
PVC POLYVINYL CHOLORIDE
PW PLYWOOD
PWT PORCELAIN WALL TILE
Q
QT QUARRY TILE / QUART / QUARTS
QTZ QUARTZ
R
R RADIUS / RISER / INSULATING VALUE
RAD RADIUS
RAG RETURN AIR GRILLE
RB RESILIENT BASE
RBR RUBBER
RC RESILIENT CHANNEL / RESPIRATORY CARE
RCP REFLECTED CEILING PLAN
RD ROOF DRAIN
REBAR REINFORCING BAR
REC RECESSED
REF REFERENCE / REFRIGERATOR
REINF REINFORCED / REINFORCING / REINFORCEMENT
REM REMOVE / REMVOVED
REQ REQUIRE
REQD REQUIRED
RES RESINOUS
RESIL RESILIENT
RET RETURN / RETURNED
REV REVISION / REVISIONS / REVISED
RF RESILIENT FLOORING
RFG ROOFING
RFI REQUEST FOR INFORMATION
RFP REQUEST FOR PROPOSAL
RH RIGHT HAND
RI RIGID INSULATION
RL RIDGE LINE
RM ROOM
RO ROUGH OPENING
ROW RIGHT OF WAY
RR RESTROOM
RVS REVERSE / REVERSE SIDE
RWC RIGID WALL COVERING
RWL RAIN WATER LEADER
S
S SOUTH
SAD SUPPLY AIR DIFFUSER
SAFB SOUND ATTENUATION FIRE BLANKETS
SAN SANITARY
SAT SUSPENDED ACOUSTICAL TILE
SB SPLASH BACK / STRUCTURAL SUBSTRUCTURE
SC SOLID CORE / SPECIALTY COATING
SCHED SCHEDULE
SCONC SEALED CONCRETE
SCR SHOWER CURTAIN ROD
SD SOAP DISPENSER / SCHEMATIC DESIGN / SLIDING
DOOR / STRUCTURAL DEMOLITION
SDG SIDING
SDVOSB SERVICE-DISABLED VETERAN-OWNED SMALL
BUSINESS
SEC SECOND / SECONDS
SECT SECTION / SECTIONS
SEP SEPTEMBER
SEPS SPACE & EQUIPMENT PLANNING SYSTEM
SES SPECIALIZED ENGINEERING SOLUTIONS
SF SQUARE FOOTAGE / SQUARE FEET / STRUCTURAL
FRAMING
ARCH / INT ABBREVIATIONS
SG SAFETY GLASS
SGA STONE GROUP ARCHITECTS
SHPO STATE HISTORIC PRESERVATION OFFICE
SHT SHEET
SHTHG SHEATHING
SHWR SHOWER
SICU SURGICAL CARE UNIT
SIM SIMILAR
SL SHAFT LINER
SLDG SLIDING
SLNT SEALANT
SND SANITARY NAPKIN DISPENSER
SNX SANIARY NAPKIN DISPOSAL
SOG SLAB ON GRADE
SPEC SPECIFICATION / SPECIFICATIONS
SQ SQUARE
SRT STUDDED RUBBER TILE
SS SOLID SURFACE / STRUCTURAL SITE / STAINLESS
STEEL
SSM SOLID SURFACE MATERIAL
SST STAINLESS STEEL
ST STREET / SOUND TRANSMISSION
STAG STAGGERED
STC SOUND TRANSMISSION CLASS
STD STANDARD
STL STEEL
STOR STORAGE
STRUCT STRUCTURE / STRUCTURAL
SUSP SUSPENDED
SV SHEET VINYL
SW SHEARWALL
SYM SYMMETRICAL
T
T TREAD
T&B TOP AND BOTTOM
T&G TOUNGE AND GROOVE
TA TELECOMMUNICATIONS AUDIO VISUAL
TB TOWEL BAR / TACKBOARD
TBD TO BE DETERMINED
TC TELECOMMUNICATIONS CLOCK
TCNA TILE COUNCIL OF NORTH AMERICA
TD TRAVEL DISTANCE
TEL TELEPHONE / TELEMETRY
TEMP TEMPORARY / TEMPERED
TER TERRAZZO
TFE TOP FOOTING ELEVATION
TG TEMPERED GLASS
THD THREA / THREADED / THREADS
THK THICKNESS
THRU THROUGH
TI TELECOMMUNICATIONS INTERCOM
TIL TECHNICAL INFORMATION LIBRARY
TKBD TACKBOARD
TL TILE
TLT TOILET
TM TELECOMMUNICATIONS MONITORING
TMV THERMOSTATIC MIXING VALVE
TN TELECOMMUNICATIONS DATA NETWORKS
TO TOP OF
TOB TOP OF BEAM
TOC TOP O F CONCRETE / TOP OF CURB
TOD TOP OF DECK
TOF TOP OF FOOTING / TOP OF FOUNDATION
TOJ TOP OF JOIST
TOM TOP OF MASONRY
TOP TOP OF PIER
TOS TOP OF SLAB / TOP OF STEEL
TOW TOP OF WALL
TPD TOILET PAPER DISPENSER
TPH TOILET PAPER HOLDER
TPO THERMOPLASTIC POLYOLEFIN
TPTN TOILET PARTITION
TRANS TRANSVERSE / TRANSPARENT
TS TUBE STEEL / TRANSITION STRIP
TT TELECOMMUNITCATIONS TELEPHONE
TV TELEVISION
TXV THERMAL EXPANSION VALVE
TYP TYPICAL / TYPICALLY
U
UCL UNDER CABINET LIGHT
UG UNDERGROUND
UH UNIT HEATER
UL UNDERWRITERS LABORATORIES
UNFIN UNFINISHED
UNO UNLESS NOTED OTHERWISE
UON UNLESS OTHERWISE NOTED
USGBC UNITED STATES GREEN BUILDING COUNCIL
UTIL UTILITY / UTILITIES
UTL UTILITY / UTILITIES
V
V SHEAR
VA VETERAN AFFAIRS
VAR VARIES
VB VAPOR BARRIER / VINYL BASE
VCT VINYL COMPOSITION TILE
VERT VERTICAL
VEST VESTIBULE
VFY VERIFY
VIF VERIFY IN FIELD
VISN VETERANS INTEGRATED SERVICES NETWORK
VR VAPOR RETARDER
VWC VINYL WALL COVERING
VWT VINYL WALL TILE
W
(W) WIDE FLANGE
W WEST / WIDTH / WIDE / WIDE FLANGE
W/ WITH
W/O WITHOUT
WA WEDGE ACHOR
WB WOOD BASE
WC WATER CLOSET
WD WOOD / WOODWORK
WDW WINDOW
WF WIDE FLANGE
WG WALL GUARD
WH WATER HEATER
WI WROUGHT IRON
WL WIND LOAD
WNDW WINDOW
WNSCT WAINSCOT
WP WATERPROOF / WATERPROOFING
WR WATER RESISTANT
WSCT WAINSCOT
WSF WELDED SHEET FLOORING
WT WEIGHT / WINDOW TREATMENT
WWF WELDED WIRE FABRIC
Y
YD YARD
A. ANY DISCREPANCIES OR CONFLICTS FOUND IN THE VARIOUS PARTS OF THE CONSTRUCTION
DOCUMENTS SHALL BE BROUGHT TO THE ATTENTION OF THE ARCHITECT AND THE OWNER BEFORE
PROCEEDING WITH THE WORK.
B. SOME SPECIFIED PRODUCTS MAY HAVE SUBSTANTIAL LEAD TIMES. THE CONTRACTOR SHALL BE
RESPONSIBLE FOR PLACING ORDERS IN A MANNER TO ENSURE THEIR TIMELY ARRIVAL. THE
CONTRACTOR SHALL BE RESPONSIBLE FOR EXPENSES, INCLUDING DESIGN FEES, RELATED TO ANY
RESELECTIONS REQUIRED DUE TO FAILURE TO ORDER PRODUCTS IN A TIMELY MANNER.
C. FREE-STANDING FURNITURE IS PROVIDED AND INSTALLED BY OTHERS.
D. WRITTEN DIMENSIONS TAKE PRECEDENCE OVER SCALED DIMENSIONS. DO NOT SCALE THE
DRAWINGS.
E. CONTRACTOR & SUBCONTRACTORS TO VERIFY ALL EXISTING CONDITIONS AT THE PROJECT SITE.
F. ALL MATERIALS & EQUIPMENT SHALL BE INSTALLED PER MANUFACTURERS INSTRUCTIONS.
G. DETAILS SHOWN ARE TYPICAL UON. SIMILAR DETAILS APPLY IN SIMILAR CONDITIONS.
H. PROVIDE BACKING FOR ALL TOILET ACCESSORIES, HANDRAILS, OR OTHER ITEMS ATTACHED TO
BUILDING WALLS.
I. INSTALL BLOCKING AS REQUIRED IN ALL PARTITIONS TO RECEIVE COUNTERS, SHELVING,
MARKERBOARDS, WALL MOUNTED MONITORS/TVS, COUNTERTOP SUPPORTS, ETC.
J. GYPSUM USED IN RESTROOMS SHALL BE WATER RESISTANT GYPSUM BOARD.
K. PROVIDE CONTROL JOINTS IN DRYWALL EVERY 30'-0".
L. ALL DIMENSIONS ARE TO OUTSIDE OF WALL FRAMING.
M. SEE MECHANICAL, ELECTRICAL AND PLUMBING DRAWINGS FOR ADDITIONAL INFORMATION.
N. SEE SHEET AE601, ARCHITECTURAL SCHEDULES & ASSEMBLIES, FOR MORE INFORMATION
REGARDING DOORS, WINDOWS, AND WALL TYPES.
O. CONTRACTOR TO NOTIFY THE ARCHITECT OF ANY EXISTING STRUCTURAL MEMBERS WHICH MAY
CONFLICT WITH THE DESIGNED WALL LAYOUT AND/OR DESIGNED PLUMBING LOCATIONS BEFORE ANY
WALLS ARE CONSTRUCTED.
P. CONTRACTOR TO NOTIFY ARCHITECT OF LOCATIONS WHERE PENETRATIONS IN THE FLOOR MAY INTERSECT AND/OR INTERFERE WITH THE INTERGITY OF EXISTING CONCRETE JOISTS. WHERE MEP SYSTEMS CANNOT BE EASILY REROUTED WITHIN ALREADY DESIGNED WALLS, CEILINGS, OR CHASES, THE A/E TEAM WILL REVISE AND REISSUE DRAWINGS SO AS TO AVOID CONFLICTS WITH THE EXISTING
JOISTS.
GENERAL PLAN NOTES
A. ANY DISCREPANCIES OR CONFLICTS FOUND IN THE VARIOUS PARTS OF THE CONSTRUCTION
DOCUMENTS SHALL BE BROUGHT TO THE ATTENTION OF THE ARCHITECT AND THE OWNER BEFORE
PROCEEDING WITH THE WORK.
B. SOME SPECIFIED PRODUCTS MAY HAVE SUBSTANTIAL LEAD TIMES. THE CONTRACTOR SHALL BE
RESPONSIBLE FOR PLACING ORDERS IN A MANNER TO ENSURE THEIR TIMELY ARRIVAL. THE
CONTRACTOR SHALL BE RESPONSIBLE FOR EXPENSES, INCLUDING DESIGN FEES, RELATED TO ANY
RESELECTIONS REQUIRED DUE TO FAILURE TO ORDER PRODUCTS IN A TIMELY MANNER.
C. COORDINATE DEVICE PENETRATIONS AT COUNTERTOPS W/ COR, MECHANICAL, & ELECTRICAL.
D. PROVIDE COUNTERTOP SUPPORTS AT ALL OPEN SPACES APPROXIMATELY 3'-0" O.C. BRACKETS TO BE
PAINTED TO MATCH SPECIFIED WALL FINISH.
E. PROVIDE FINISHED END PANELS AT ALL EXPOSED MILLWORK SURFACES. ALL PLAM CABINETS TO
HAVE PVC EDGES. MATCH PVC EDGE TO PLAM. SUBMIT SAMPLES FOR APPROVAL. SEE DETAILS FOR
PVC EDGEBANDING SIZES.
F. PROVIDE 4" RESILIENT BASE AT ALL BASE CABINETS (UON).
G. MILLWORK SUPPLIER SHALL PROVIDE FILLER PANELS & SCRIBE STRIPS WHERE NEEDED FOR
COMPLETE INSTALLATION.
H. CABINETS OVER 30" WIDE SHALL HAVE 1" THICK PARTICLE BOARD CORE.
I. UNLESS OTHERWISE INDICATED, PROVIDE PRODUCTS OF QUALITY SPECIFIED BY AWI
ARCHITECTURAL WOODWORK QUALITY STANDARDS FOR PREMIUM GRADE.
J. INSTALL BLOCKING AS REQUIRED IN ALL PARTITIONS TO RECEIVE COUNTERS, SHELVING,
MARKERBOARDS, WALL MOUNTED MONITORS/TVS, COUNTERTOP SUPPORTS, ETC.
K. VERIFY ALL GROMMET LOCATIONS AND COUNT WITH COR.
GENERAL CASEWORK / MILLWORK NOTES
A. ANY DISCREPANCIES OR CONFLICTS FOUND IN THE VARIOUS PARTS OF THE CONSTRUCTION
DOCUMENTS SHALL BE BROUGHT TO THE ATTENTION OF THE ARCHITECT AND THE OWNER BEFORE
PROCEEDING WITH THE WORK.
B. SOME SPECIFIED PRODUCTS MAY HAVE SUBSTANTIAL LEAD TIMES. THE CONTRACTOR SHALL BE
RESPONSIBLE FOR PLACING ORDERS IN A MANNER TO ENSURE THEIR TIMELY ARRIVAL. THE
CONTRACTOR SHALL BE RESPONSIBLE FOR EXPENSES, INCLUDING DESIGN FEES, RELATED TO ANY
RESELECTIONS REQUIRED DUE TO FAILURE TO ORDER PRODUCTS IN A TIMELY MANNER.
C. SMOKE SEALS TO BE INSTALLED AT ALL RATED DOORS.
D. SEE MECHANICAL, ELECTRICAL, AND PLUMBING DRAWINGS FOR ADDITIONAL INFORMATION.
E. WHERE A SMOKE BARRIER IS PENETRATED BY A DUCT OR AIR TRANSFER OPENING, A SMOKE
DAMPER DESIGNED AND TESTED IN ACCORDANCE WITH THE REQUIREMENTS OF UL 555S, SMOKE
DAMPERS, SHALL BE INSTALLED. (NFPA 101-8.5.5.2.1)
F. WHERE A SMOKE BARRIER IS ALSO CONSTRUCTED AS A FIRE BARRIER, A COMBINATION FIRE/SMOKE
DAMPER DESIGNED AND TESTED IN ACCORDANCE WITH THE REQUIREMENTS OF UL 555, FIRE
DAMPERS AND UL55S, SMOKE DAMPERS, SHALL BE INSTALLED. (NFPA 101-8.5.5.2.2)
G. REQUIRED SMOKE DAMPERS IN DUCTS PENETRATING SMOKE BARRIERS SHALL CLOSE UPON
DETECTION OF SMOKE. (NFPA 101-8.5.5.7)
H. ALL OCCUPANCIES ARE CALCULATED USING INSTITUTIONAL SLEEPING AREAS LOAD FACTOR OF 1
OCCUPANT PER 120 GROSS SQUARE FEET UON. (PER NFPA & IBC )
I. ROOMS LABELED AS "CORRIDOR" ARE ASSUMED TO HAVE 0 OCCUPANTS, UON, BUT ARE A PART OF
PATHS OF EGRESS FOR OTHER SPACES. OCCUPANTS HAVE BEEN CALCULATED FOR NURSE
STATIONS, EQUIPMENT STORAGE, & OTHER ACCESSORY SPACES OPEN TO CORRIDORS. (SEE LIFE
SAFETY PLANS)
J. ALL NEW RATED PARTITIONS TO HAVE GENERAL RATING INFORMATION STENCILED ABOVE FINISH
CEILING ELEVATION ON BOTH SIDES OF THE PARTITION.
K. STENCILS MUST BE VISIBLE FROM CEILING ACCESS PANELS IN ROOMS WHERE GWB CEILINGS ARE TO
BE INSTALLED.
L. STENCILS FOR RATED PARTITIONS ON THE 2ND LEVEL ARE TO BE PROVIDED WHERE PENETRATIONS
OCCUR.
M. ALL NEW COMPONENTS THAT PENETRATE RATED ASSEMBLIES ARE TO BE LABELED ACCORDING TO
THE FACILITIES STANDARD.
GENERAL CODE & LIFE SAFETY NOTES
A. ANY DISCREPANCIES OR CONFLICTS FOUND IN THE VARIOUS PARTS OF THE CONSTRUCTION
DOCUMENTS SHALL BE BROUGHT TO THE ATTENTION OF THE ARCHITECT AND THE OWNER BEFORE
PROCEEDING WITH THE WORK.
B. SOME SPECIFIED PRODUCTS MAY HAVE SUBSTANTIAL LEAD TIMES. THE CONTRACTOR SHALL BE
RESPONSIBLE FOR PLACING ORDERS IN A MANNER TO ENSURE THEIR TIMELY ARRIVAL. THE
CONTRACTOR SHALL BE RESPONSIBLE FOR EXPENSES, INCLUDING DESIGN FEES, RELATED TO ANY
RESELECTIONS REQUIRED DUE TO FAILURE TO ORDER PRODUCTS IN A TIMELY MANNER.
C. THERE IS NO ARCHITECTURAL WORK PLANNED FOR THE 2ND LEVEL IN THIS PROJECT. ROOMS AND
SPACES ARE EXISTING TO REMAIN EXCEPT FOR REPAIR WORK NECESSARY TO SUPPORT
MECHANICAL, ELECTRICAL, AND PLUMBING WORK FOR 3RD LEVEL REMODEL. SCOPE OF WORK IN THIS
AREA WILL PRIMARILY BE ABOVE CEILINGS.
D. GC TO COMPLETE WALKTHROUGH OF EXISTING SPACES WITH VA STAFF BEFORE COMPLETION OF
ANY WORK AND IDENTIFY ITEMS THAT ARE TO BE SALVAGED.
E. GC TO VERIFY AND CONFIRM PLAN FOR STORAGE OF SALVAGED ITEMS WITH THE VA BEFORE
COMPLETION OF ANY WORK.
F. CONTRACTOR TO PROTECT ALL EXISTING UTILITIES DURING CONSTRUCTION.
G. CONTRACTOR TO VERIFY ALL EXISTING CONDITIONS AT THE PROJECT SITE.
H. CONTRACTOR TO VERIFY WINDOW, COLUMN, AND DOOR SPACING AND SIZING UPON COMPLETION OF
DEMOLITION AND COMMUNICATE ANY DISCREPANCIES TO THE OWNER AND ARCHITECT.
I. CONTRACTOR TO PATCH REMAINING EXISTING CONSTRUCTION, AFFECTED BY DEMOLITION.
J. FINISHES IN PATCHED AREAS TO MATCH EXISTING UON.
K. NO ITEMS TO BE DEMOED IN ROOMS 301, 301A, 302, 339, 334, 364, AND 364A EXCEPT AT CEILINGS - SEE
DEMOLITION REFLECTED CEILING PLANS.
L. INFILL OF PENETRATIONS IN FIRE AND/OR SMOKE RATED PARTITIONS, FLOORS, AND ROOFS SHALL
MAINTAIN THE INTEGRITY OF THE RATING.
M. ALL PENETRATIONS IMPAIRING EXISTING RATED ASSEMBLIES MUST BE REMEDIED, EITHER
TEMPORARILY OR PERMANENTLY, BEFORE CONSTRUCTION CONCLUDES EACH DAY. PENETRATIONS
SHOULD BE INFILLED WITH APPLICABLE RATED PRODUCTS OR PROTECTED BY A ADEQUATE RATED
ASSEMBLY.
N. SEE MECHANICAL AND ELECTRICAL DRAWINGS FOR ADDITIONAL INFORMATION RELEVANT TO
DEMOLITION & PATCHING.
O. ALL EXISTING INTERIOR FLOOR FINISHES ON THE 3RD FLOOR, AND WITHIN THE PROJECT AREA
SPECIFIED ON THE DEMOLITION PLANS, ARE TO BE REMOVED UON.
P. ALL EXISTING WALL PROTECTION, COVERINGS, AND FINISHES ON THE 3RD FLOOR, AND WITHIN THE
PROJECT AREA SPECIFIED ON THE DEMOLITION PLANS, ARE TO BE REMOVED UON.
Q. ALL EXISTING CEILINGS ON THE 3RD FLOOR, AND WITHIN THE PROJECT AREA SPECIFIED ON THE
DEMOLITION REFLECTED CEILING PLANS, ARE TO BE REMOVED UON.
R. SEE DEMOLITION REFLECTED CEILING PLANS FOR LOCATIONS WHERE EXISTING CEILINGS ARE TO BE
TEMPORARILY REMOVED AND SAVED FOR REINSTALLATION.
S. CONCRETE AND/OR REMAINING GWB TO BE PATCHED AND PREPPED FOR NEW FINISHES UPON
COMPLETION OF DEMOLITION WORK.
T. ALL EXISTING FURNITURE AND EQUIPMENT ON THE 3RD FLOOR TO BE REMOVED AND TURNED OVER
TO THE OWNER OR SAVED FOR REINSTALLATION PER AI SHEETS. SEE MEP SHEETS FOR
INFORMATION REGARDING REMOVAL OF MEP EQUIPMENT.
U. ALL EXTERIOR FURRING AND INSULATION WITHIN PROJECT AREA TO BE DEMOED TO MASONRY
BLOCK.S
V. SEE HAZARDOUS MATERIALS REPORT FOR ADDITIONAL INFORMATION REGARDING DEMOLITION.
W. WHERE DAMAGED AS RESULT OF DEMOLITON WORK AND/OR INSTALLATION OF NEW MEP SYSTEMS, CONTRACTOR IS TO REPLACE EXISTING CEILING TILE AND/OR SUSPENDED CEILING GRIDS.
GENERAL DEMOLITION NOTES
A. ANY DISCREPANCIES OR CONFLICTS FOUND IN THE VARIOUS PARTS OF THE CONSTRUCTION
DOCUMENTS SHALL BE BROUGHT TO THE ATTENTION OF THE ARCHITECT AND THE OWNER BEFORE
PROCEEDING WITH THE WORK.
B. SOME SPECIFIED PRODUCTS MAY HAVE SUBSTANTIAL LEAD TIMES. THE CONTRACTOR SHALL BE
RESPONSIBLE FOR PLACING ORDERS IN A MANNER TO ENSURE THEIR TIMELY ARRIVAL. THE
CONTRACTOR SHALL BE RESPONSIBLE FOR EXPENSES, INCLUDING DESIGN FEES, RELATED TO ANY
RESELECTIONS REQUIRED DUE TO FAILURE TO ORDER PRODUCTS IN A TIMELY MANNER.
C. VERIFY ALL DOOR AND WINDOW OPENINGS WITH MANUFACTURER.
D. PROVIDE ABA & ADA APPROVED LEVER TYPE HARDWARE FOR ALL DOORS UON.
E. PROVIDE 1" INSULATED GLASS FOR ALL EXTERIOR GLAZING AND 1/4" GLASS FOR ALL INTERIOR
GLAZING.
F. COORDINATE DOOR PROTECTION WITH DOOR SUPPLIER.
G. COORDINATE DOOR HARDWARE STYLE AND FINISH WITH OWNER.
H. SPRING HINGE CLOSER ALLOWED AT DOOR CLOSER LOCATIONS. VERIFY WITH OWNER.
I. ALL WOOD DOORS TO HAVE A HIGH PRESSURE DECORATIVE LAMINATE FINISH (HPDL) UON.
GENERAL DOOR & WINDOW NOTES
A. ANY DISCREPANCIES OR CONFLICTS FOUND IN THE VARIOUS PARTS OF THE CONSTRUCTION
DOCUMENTS SHALL BE BROUGHT TO THE ATTENTION OF THE ARCHITECT AND THE OWNER BEFORE
PROCEEDING WITH THE WORK.
B. BASIS OF DESIGN FOR ARCHITECTURAL EQUIPMENT IS IDENTIFIED IN THE ARCHITECTURAL
EQUIPMENT SCHEDULE. ARCHITECT APPROVAL IS REQUIRED FOR ALL EQUIPMENT.
C. SOME SPECIFIED EQUIPMENT MAY HAVE SUBSTANTIAL LEAD TIMES. THE CONTRACTOR SHALL BE
RESPONSIBLE FOR PLACING ORDERS IN A MANNER TO ENSURE THEIR TIMELY ARRIVAL. THE
CONTRACTOR SHALL BE RESPONSIBLE FOR EXPENSES, INCLUDING DESIGN FEES, RELATED TO ANY
RESELECTIONS REQUIRED DUE TO FAILURE TO ORDER EQUIPMENT IN A TIMELY MANNER.
D. EQUIPMENT PLANS DEPICT ARCHITECTURAL / INTERIORS EQUIPMENT LOCATIONS. SEE EQUIPMENT
SCHEDULE FOR QUANTITIES AND MORE DETAILED INFORMATION.
E. ALL WALL MOUNTED EQUIPMENT TO HAVE REQUIRED BLOCKING BY GC.
GENERAL EQUIPMENT NOTES
A. ANY DISCREPANCIES OR CONFLICTS FOUND IN THE VARIOUS PARTS OF THE CONSTRUCTION
DOCUMENTS SHALL BE BROUGHT TO THE ATTENTION OF THE ARCHITECT AND THE OWNER BEFORE
PROCEEDING WITH THE WORK.
B. SOME SPECIFIED PRODUCTS MAY HAVE SUBSTANTIAL LEAD TIMES. THE CONTRACTOR SHALL BE
RESPONSIBLE FOR PLACING ORDERS IN A MANNER TO ENSURE THEIR TIMELY ARRIVAL. THE
CONTRACTOR SHALL BE RESPONSIBLE FOR EXPENSES, INCLUDING DESIGN FEES, RELATED TO ANY
RESELECTIONS REQUIRED DUE TO FAILURE TO ORDER PRODUCTS IN A TIMELY MANNER.
C. FREE STANDING FURNITURE IS PROVIDED AND INSTALLED BY OTHERS.
D. WRITTEN DIMENSIONS TAKE PRECEDENCE OVER SCALED DIMENSIONS. DO NOT SCALE THE
DRAWINGS. FIELD VERIFY ALL CRITICAL DIMENSIONS.
E. CONTRACTOR & SUBCONTRACTORS TO VERIFY ALL EXISTING CONDITIONS AT THE PROJECT SITE.
F. ALL MATERIALS & EQUIPMENT SHALL BE INSTALLED PER MANUFACTURERS INSTRUCTIONS.
G. DETAILS SHOWN ARE TYPICAL UNLESS OTHERWISE NOTED. SIMILAR DETAILS APPLY IN SIMILAR
CONDITIONS.
H. PROVIDE WOOD BACKING FOR ALL TOILET ACCESSORIES, HANDRAILS, OR OTHER ITEMS ATTACHED
TO BUILDING WALLS.
I. INSTALL BLOCKING AS REQUIRED IN ALL PARTITIONS TO RECEIVE COUNTERS, SHELVING,
MARKERBOARDS, WALL MOUNTED MONITORS/TVS, COUNTERTOP SUPPORTS, ETC.
J. GYPSUM USED IN TOILET ROOMS, HAC ROOMS, AND SOILED UTILITY ROOMS SHALL BE MOISTURE
RESISTANT GYPSUM BOARD.
K. REFER TO AE422 FOR MORE INFORMATION REGARDING PORCELAIN & CERAMIC TILE INSTALLATION.
L. HEIGHT OF OPERATIONAL OR DISPENSING PORTION OF ACCESSORIES & FIXTURES NOT TO EXCEED
48" A.F.F.
M. DIMENSIONS ARE FROM FACE OF GWB TO FACE OF GWB.
N. CONTRACTOR TO INSTALL ALL TOILET ACCESSORIES ACCORDING TO ADA AND ANSI REGULATIONS.
O. FIELD VERIFY ALL DIMENSIONS.
GENERAL INTERIOR ELEVATION NOTES
A. ANY DISCREPANCIES FOUND IN THE VARIOUS PARTS OF THE CONSTRUCTION DOCUMENTS SHALL BE BROUGHT TO THE ATTENTION OF THE ARCHITECTS AND THE OWNER BEFORE PROCEEDING WITH ALL
THE WORK.
B. SOME SPECIFIED PRODUCTS MAY HAVE SUBSTANTIAL LEAD TIMES. THE CONTRACTOR SHALL BE
RESPONSIBLE FOR PLACING ORDERS IN A MANNER TO ENSURE THEIR TIMELY ARRIVAL. THE
CONTRACTOR SHALL BE RESPONSIBLE FOR EXPENSES, INCLUDING DESIGN FEES, RELATED TO ANY
RESELECTIONS REQUIRED DUE TO FAILURE TO ORDER PRODUCTS IN A TIMELY MANNER.
C. ALL ITEMS INSTALLED IN CEILINGS ARE TO BE CENTERED AND/OR SYMMETRICAL ON THE CENTERLINE
OF ROOMS AND CENTERED IN TILES UON.
D. INSTALL ALL WALL MOUNTED EXIT SIGNS AND OTHER FIXTURES CENTERED ABOVE OPENINGS WHERE
POSSIBLE.
E. REFLECTED CEILING PLANS SHOW LOCATIONS OF ITEMS THAT ARE ARCHITECTURALLY SIGNIFICANT
ONLY. MECHANICAL AND ELECTRICAL ITEMS INDICATED ARE FOR REFERENCE ONLY. REFER TO
MECHANICAL AND ELECTRICAL DOCUMENTS.
F. GYPSUM USED IN RESTROOM AND OTHER AREAS EXPOSED TO MOISTURE SHALL BE WATER
RESISTANT GYPSUM BOARD.
G. VA STANDARD CEILING HEIGHT REQUIREMENTS NOT MET. CONFIRM EXEMPTION REQUEST HAS BEEN
APPROVED BY FACILITY COR.
H. ALL ACCESS PANELS TO BE PAINTED COLOR AND SHEEN OF ADJACENT CEILING FINISH.
I. WHERE DAMAGED AS RESULT OF DEMOLITON WORK AND/OR INSTALLATION OF NEW MEP SYSTEMS, CONTRACTOR IS TO REPLACE EXISTING CEILING TILE AND/OR SUSPENDED CEILING GRIDS.
J. CONTRACTOR TO NOTIFY THE COR & ARCHITECT IF CEILING MOUNTED FIXTURES, AND/OR
EQUIPMENT, WILL OBSTRUCT THE VIEW OF EXIT SIGNAGE. CONTRACTOR, COR, & A/E TEAM TO
REVIEW AND COORDINATE RESOLUTION.
GENERAL REFLECTED CEILING PLAN NOTES
A. ANY DISCREPANCIES OR CONFLICTS FOUND IN THE VARIOUS PARTS OF THE CONSTRUCTION
DOCUMENTS SHALL BE BROUGHT TO THE ATTENTION OF THE ARCHITECT AND THE OWNER BEFORE
PROCEEDING WITH THE WORK.
B. SOME SPECIFIED PRODUCTS MAY HAVE SUBSTANTIAL LEAD TIMES. THE CONTRACTOR SHALL BE
RESPONSIBLE FOR PLACING ORDERS IN A MANNER TO ENSURE THEIR TIMELY ARRIVAL. THE
CONTRACTOR SHALL BE RESPONSIBLE FOR EXPENSES, INCLUDING DESIGN FEES, RELATED TO ANY
RESELECTIONS REQUIRED DUE TO FAILURE TO ORDER PRODUCTS IN A TIMELY MANNER.
C. PROVIDE SEALANT AT ALL INTERIOR AND EXTERIOR JOINTS BETWEEN DIFFERENT MATERIALS, TRANSITIONS, AND ACCORDING TO INDUSTRY STANDARDS AND MANUFACTURER'S SPECIFICATIONS.
D. CONTRACTOR MUST PROVIDE PROTECTION FOR ROOF MEMBRANE & RELATED COMPONENTS DURING
ALL PHASES OF ROOF & PENTHOUSE CONSTRUCTION.
E. ANY DAMAGE TO THE EXISTING ROOF MEMBRANE, CAUSED BY OR DISCOVERED DURING
CONSTRUCTION, MUST BE IMMEDIATELY COMMUNICATED TO THE OWNER & ARCHITECT.
F. FASTEN PENTHOUSE GUARDRAILS TO EXTERIOR FACE OF EXISTING PENTHOUSE.
GENERAL ROOF NOTES
A. ANY DISCREPANCIES OR CONFLICTS FOUND IN THE VARIOUS PARTS OF THE CONSTRUCTION
DOCUMENTS SHALL BE BROUGHT TO THE ATTENTION OF THE ARCHITECT AND THE OWNER BEFORE
PROCEEDING WITH THE WORK.
B. SOME SPECIFIED PRODUCTS MAY HAVE SUBSTANTIAL LEAD TIMES. THE CONTRACTOR SHALL BE
RESPONSIBLE FOR PLACING ORDERS IN A MANNER TO ENSURE THEIR TIMELY ARRIVAL. THE
CONTRACTOR SHALL BE RESPONSIBLE FOR EXPENSES, INCLUDING DESIGN FEES, RELATED TO ANY
RESELECTIONS REQUIRED DUE TO FAILURE TO ORDER PRODUCTS IN A TIMELY MANNER.
C. FURNITURE IS PROVIDED AND INSTALLED BY OTHERS.
D. WRITTEN DIMENSIONS TAKE PRECEDENCE OVER SCALED DIMENSIONS. DO NOT SCALE THE
DRAWINGS.
E. CONTRACTOR & SUBCONTRACTORS TO VERIFY ALL EXISTING CONDITIONS AT THE PROJECT SITE.
F. ALL MATERIALS & EQUIPMENT SHALL BE INSTALLED PER MANUFACTURERS INSTRUCTIONS.
G. DETAILS SHOWN ARE TYPICAL UNLESS OTHERWISE NOTED. SIMILAR DETAILS APPLY IN SIMILAR
CONDITIONS.
H. PROVIDE WOOD BACKING FOR ALL BATH ACCESSORIES, HANDRAILS, OR OTHER ITEMS ATTACHED TO
BUILDING WALLS.
I. INSTALL BLOCKING AS REQUIRED IN ALL PARTITIONS TO RECEIVE COUNTERS, SHELVING,
MARKERBOARDS, WALL MOUNTED MONITORS/TVS, COUNTERTOP SUPPORTS, ETC.
J. GYPSUM USED IN TOILET ROOMS, HAC ROOMS, AND SOILED UTILITY ROOMS SHALL BE MOISTURE
RESISTANT GYPSUM BOARD.
K. REFER TO AE422 FOR MORE INFORMATION REGARDING PORCELAIN & CERAMIC TILE INSTALLATION.
L. PROVIDE ADA COMPLIANT SIGNAGE FOR ALL REQUIRED AREAS, ROOMS, & ACCESSIBLE PATHS.
M. SEE SHEET GI012 FOR TYPICAL MOUNTING HEIGHTS.
GENERAL SECTION NOTES
A. ANY DISCREPANCIES OR CONFLICTS FOUND IN THE VARIOUS PARTS OF THE CONSTRUCTION
DOCUMENTS SHALL BE BROUGHT TO THE ATTENTION OF THE ARCHITECT AND THE OWNER BEFORE
PROCEEDING WITH THE WORK.
B. SOME SPECIFIED PRODUCTS MAY HAVE SUBSTANTIAL LEAD TIMES. THE CONTRACTOR SHALL BE
RESPONSIBLE FOR PLACING ORDERS IN A MANNER TO ENSURE THEIR TIMELY ARRIVAL. THE
CONTRACTOR SHALL BE RESPONSIBLE FOR EXPENSES, INCLUDING DESIGN FEES, RELATED TO ANY
RESELECTIONS REQUIRED DUE TO FAILURE TO ORDER PRODUCTS IN A TIMELY MANNER.
C. REFERENCE SIGNAGE DETAIL(S) FOR SIGNAGE VISUALS.
D. OWNER, CONTRACTOR, AND SIGNAGE SUPPLIER TO MEET AND CONFIRM SIGNAGE
COPY/MESSAGE/TEXT PRIOR TO ISSUING SIGNAGE SUBMITTAL DOCUMENTS FOR APPROVAL.
E. SIGNAGE SUBMITTAL TO INCLUDE VISUAL GRAPHIC OF EACH INDIVIDUAL SIGN IN PROJECT.
F. ALL SIGNAGE TO BE IN COMPLIANCE WITH ADA & ABA ACCESSIBILITY STANDARDS FOR FEDERAL
FACILITIES.
G. SIGNAGE INSTALLER TO COORDINATE LOCATIONS OF CEILING-HUNG SIGNS WITH FIRE PROTECTION
SPRINKLER HEADS IN ACCORDANCE WITH NFPA REGULATIONS.
H. SIGNAGE PROVIDED AND INSTALLED BY GC.
I. GC TO CONFIRM ALL REQUIRED SIGNS ARE CALLED OUT.
J. WALL MOUNTED SIGNS SHALL BE MECHANICALLY FASTENED TO WALL. GC TO PROVIDE BLOCKING AS
REQUIRED.
K. GLASS MOUNTED SIGNS SHALL BE MOUNTED WITH VHB DOUBLE-SIDED TAPE AND SILICONE
ADHESIVE. A 100% OPAQUE WHITE VINYL BACK-UP TO BE ADHERED EXACLTY BEHIND THE SIGN ON
THE OPPOSITE SIDE OF THE GLASS TO CONCEAL THE MOUNTING ADHESIVE.
L. DOOR MOUNTED SIGNS SHALL BE LOW PROFILE WITH WITH EASED CORNERS MOUNTED TO DOORS
WITH VHB DOUBLE-SIDED TAPE AND SILICONE ADHESIVE.
M. SIGN COLORS TO BE SUBSURFACE APPLIED.
N. BASIS OF DESIGN: 2/90 SIGN SYSTEMS SLIDE SYSTEM OR EQUAL.
O. SIGN FRAME TO CONTAIN 75% RECYCLED CONTENT.
P. SIGN BACKING TO BE ENVIRONMENTALLY PREFERRED PRODUCT, EPP DOWNSTREAM CERTIFIED.
GENERAL SIGNAGE NOTES
A. ANY DISCREPANCIES OR CONFLICTS FOUND IN THE VARIOUS PARTS OF THE CONSTRUCTION
DOCUMENTS SHALL BE BROUGHT TO THE ATTENTION OF THE ARCHITECT AND THE OWNER BEFORE
PROCEEDING WITH THE WORK.
B. SOME SPECIFIED PRODUCTS MAY HAVE SUBSTANTIAL LEAD TIMES. THE CONTRACTOR SHALL BE
RESPONSIBLE FOR PLACING ORDERS IN A MANNER TO ENSURE THEIR TIMELY ARRIVAL. THE
CONTRACTOR SHALL BE RESPONSIBLE FOR EXPENSES, INCLUDING DESIGN FEES, RELATED TO ANY
RESELECTIONS REQUIRED DUE TO FAILURE TO ORDER PRODUCTS IN A TIMELY MANNER.
C. SEE MECHANICAL AND ELECTRICAL PLANS FOR ADDITIONAL INFORMATION.
D. SEE PROJECT STAGING PLANS FOR PROPOSED CONTRACTOR LAYDOWN AND PARKING AREAS.
E. CONSTRUCTION MEETING LOCATIONS MAY VARY FROM WHAT IS PROPOSED ON THE FACILITY MAP.
VA TO CONFIRM LOCATION(S) OF CONSTRUCTION MEETINGS.
F. ANY DAMAGE TO THE EXISTING SITE, RESULTING FROM DEMOLITION AND/OR CONSTRUCTION, MUST
BE IMMEDIATLEY COMMUNICATED TO THE COR. COR & CONTRACTOR TO COORDINATE ADEQUATE
TIMELINE FOR REPAIRS. ALL REPAIRS TO BE COMPLETED BEFORE THE END OF THE PROJECT.
G. REPAIRS MUST BE COMPLETE UPON COMPLETION OF THE PROJECT.
H. THE CONTRACTOR MUST NOTIFY THE VA 21 DAYS IN ADVANCE OF ANY SHUTDOWNS PERTAINING TO
MEP AND/OR IT SYSTEMS. THE CONTRACTOR MUST NOTIFY THE VA IN ADVANCE OF ANY WORK THAT
MAY IMPACT THE DAILY OPERATIONS OF THE FACILITY.
I. COORDINATE KEY/FAB ACCESS AND ALARM DISABLEMENT WITH THE VA BEFORE COMPLETION OF ANY
WORK.
J. STAIRWELL S102-01 AND STAIRWELL S104-01 TO SERVE AS PRIMARY ACCESS TO 2ND LEVEL, 3RD
LEVEL, AND ROOF.
K. BEFORE COMPLETION OF ANY WORK, CONTRACTOR AND VA TO CONFIRM WHAT ELEVATOR IS TO BE
UTILIZED FOR TRANSPORTATION OF MATERIALS BETWEEN LEVELS. FINAL PATHS AND ACCESS
POINTS MAY DIFFER FROM WHAT IS SHOWN ON THE PROJECT STAGING PLAN.
L. CONTRACTOR AND SUB CONTRACTORS TO AVOID TRAVELING THROUGH, OR WORKING IN, OCCUPIED
SPACES WHENEVER POSSIBLE.
M. BEFORE COMPLETION OF ANY WORK, CONTRACTOR SHOULD COORDINATE WITH THE VA AND
IDENTIFY WHEN WORK IS TO BE COMPLETED IN SPACES OCCUPIED BY STAFF, VISITORS AND/OR
PATIENTS.
N. CONTRACTOR IS TO PROVIDE COR WITH DAILY LOGS. DAILY LOGS MUST BE SUBMITTED BY O-900 OF
THE FOLLOWING BUSINESS DAY.
O. CONTRACTOR IS TO PROVIDE COR WIH A WEEKLY WASTE REPORT. WASTE REPORTS MUST BE
SUBMITTED BY O-900 OF THE FOLLOWING BUSINESS DAY. WASTE REPORTS SHOULD INCLUDE
INFORMATION PERTAINING TO WASTE TYPE, WEIGHT, AND METHOD OF DISPOSAL.
P. PER VA POLICY, SMOKING AND VAPING IS PROHIBITED ON VA CAMPUSES EXCEPT AT DESIGNATED LOCATIONS. THIS INCLUDES CIGARETTES, CIGARS, PIPES, VAPE PENS, E-CIGARETTES, ETC.
Q. UNLESS APPROVED IN WRITING, CONSTRUCTION MATERIALS SHALL NOT BE SCHEDULED FOR
DELIVERY TO VA RECEIVING / LOGISTICS.
R. BEFORE COMPLETION OF ANY WORK, CONTRACTOR TO ENSURE NECESSARY CONSTRUCTION
PERMITS HAVE BEEN OBTAINED.
GENERAL SITE / MEANS & METHODS NOTES
A. ANY DISCREPANCIES OR CONFLICTS FOUND IN THE VARIOUS PARTS OF THE CONSTRUCTION
DOCUMENTS SHALL BE BROUGHT TO THE ATTENTION OF THE ARCHITECT AND THE OWNER BEFORE
PROCEEDING WITH THE WORK.
B. SOME SPECIFIED PRODUCTS MAY HAVE SUBSTANTIAL LEAD TIMES. THE CONTRACTOR SHALL BE
RESPONSIBLE FOR PLACING ORDERS IN A MANNER TO ENSURE THEIR TIMELY ARRIVAL. THE
CONTRACTOR SHALL BE RESPONSIBLE FOR EXPENSES, INCLUDING DESIGN FEES, RELATED TO ANY
RESELECTIONS REQUIRED DUE TO FAILURE TO ORDER PRODUCTS IN A TIMELY MANNER.
C. BASIS OF DESIGN FOR SELECTED FINISHES IS IDENTIFIED ON MATERIAL & COLOR SCHEDULE.
ARCHITECT APPROVAL IS REQUIRED FOR ALL FINISHES.
D. ALL FINISH WORK SHALL BE PERFORMED IN COMPLIANCE WITH DRAWINGS AND SPECIFICATIONS.
SHOP DRAWINGS, SAMPLES AND PRODUCT DATA SHALL BE SUBMITTED TO THE ARCHITECT FOR
THEIR REVIEW PRIOR TO BEGINNING WORK.
E. WALL PROTECTION PLAN DEPICTS WALL PROTECTION LOCATIONS AND FINISH LOCATIONS IN AREAS OF SPECIAL SIGNIFICANCE, I.E., MATERIAL CHANGES WITHIN A SINGLE ROOM OR SPACE. REFER TO ROOM FINISH SCHEDULE AND MATERIAL & COLOR SCHEDULE FOR THE FINISH SELECTIONS OF EACH
INDIVIDUAL ROOM NOT OTHERWISE DESIGNATED ON PLAN.
F. VERIFY GROUT AND MORTAR THICKNESS PER MANUFACTURER'S RECOMMENDATIONS.
G. INSTALL ALL WALL CORNER GUARDS, END GUARDS, & ANGLE GUARDS ABOVE FLOOR BASE.
H. INSTALL ALL RIGID VINYL SHEET ABOVE FLOOR BASE.
I. REFER TO COLOR SCHEDULE KEY AND SPECIFICATIONS MANUAL FOR WALL PROTECTION
MANUFACTURER, SIZE & COLOR.
J. REFERENCE ELEVATIONS FOR COORDINATION WITH SPECIALTY EQUIPMENT, PATIENT BED SERVICE
WALLS, CLINICAL SINKS, TERMINATION AT MILLWORK AND OTHER WALL MOUNTED ITEMS MAY
REQUIRE COORDINATION.
GENERAL WALL PROTECTION NOTES
A. ANY DISCREPANCIES OR CONFLICTS FOUND IN THE VARIOUS PARTS OF THE CONSTRUCTION
DOCUMENTS SHALL BE BROUGHT TO THE ATTENTION OF THE ARCHITECT AND THE OWNER BEFORE
PROCEEDING WITH THE WORK.
B. SOME SPECIFIED PRODUCTS MAY HAVE SUBSTANTIAL LEAD TIMES. THE CONTRACTOR SHALL BE
RESPONSIBLE FOR PLACING ORDERS IN A MANNER TO ENSURE THEIR TIMELY ARRIVAL. THE
CONTRACTOR SHALL BE RESPONSIBLE FOR EXPENSES, INCLUDING DESIGN FEES, RELATED TO ANY
RESELECTIONS REQUIRED DUE TO FAILURE TO ORDER PRODUCTS IN A TIMELY MANNER.
C. SEE ILSM (INTERIM LIFE SAFETY MEASURES) FOR REQUIREMENTS IN TEMPORARY CONSTRUCTION
FACILITES AND CONTROLS SPECIFICATIONS FOR FULL ILSM INFORMATION.
D. ENSURE EXITS HAVE FREE AND UNOBSTRUCTED EGRESS. IN SUCH INSTANCES FACILITY PERSONNEL
SHALL RECEIVE TRAINING IF ALTERNATE EXITS ARE DESIGNATED.
E. ENSURE FREE AND UNOBSTRUCTED…
This is the start of the file's text. The full file is on GovTribe.