This statement of work outlines requirements for the procurement of the Squad Binocular Night Vision Goggle system. The Marine Corps Systems Command requires the delivery of complete SBNVG systems including binocular image intensifier night vision goggles with modular uncooled thermal imaging sensors, carrying cases, power cables, external power supplies, helmet mounting systems, operator manuals, and other accessories. The contractor must provide program management, engineering support services, logistics support, training, and a 24-month interim contractor logistics support period to transition to organic government maintenance. The contractor will deliver initial units within 30 days and complete orders under a scheduled delivery timeline. The contract includes requirements for documentation such as technical manuals, provisioning guidance, and engineering data to support government maintenance of the systems.

SBNVG SOW Amendment 0002

View the file

Other files

Show all 25

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

STATEMENT OF WORK

FOR THE

SQUAD BINOCULAR NIGHT VISION GOGGLE

PREPARED BY

PROGRAM MANAGER INFANTRY WEAPONS

PORTFOLIO MANAGER GROUND COMBAT ELEMENT SYSTEMS

MARINE CORPS SYSTEMS COMMAND

17 May 2019

Source Selection Information - See FAR 2.101 and FAR 3.104

1.0 SCOPE

This Statement of Work (SOW) defines the effort required for procurement and delivery of the Squad Binocular

Night Vision Goggle (SBNVG). The SBNVG is a commercial item purchase pursuant to FAR 2.101, and the

Government will apply the standard practices for “Acquisition of Commercial Items,” listed in FAR 12.203 throughout the process. The Contractor shall provide all material, services, and necessary support documentation needed to complete the tasks identified within this SOW. Additionally, the Contractor shall provide the requisite program management and logistics support to ensure that delivery schedules, performance requirements, and overall supportability of the SBNVG is accomplished as set forth in the contract.

2.0 APPLICABLE DOCUMENTS

The following specified documents form a part of this SOW to the extent specified herein. The most recent revision of the referenced document at the time of contract governs unless otherwise specified. In the event of conflict between the applicable documents and this SOW, the SOW takes precedence. All second tier and below references cited in mandatory compliance documents are guidance only. Nothing in this document, however, supersedes applicable laws and regulations.

2.1 Military Standards and Specifications - Mandatory Compliance

MIL-STD-882E Standard Practice for System Safety

MIL-STD-130N Standard Practice Identification Marking of U.S. Military Property

MIL-STD-196F Joint Electronics Type Designation System (JETDS)

MIL-PRF-32216A Evaluation of Commercial Off-the-Shelf (COTS) Manuals and Preparation of

Supplemental Data

MIL-STD-40051-2C Preparation of Digital Technical Information for Page Based Technical Manuals

MIL-PRF-29612B Training Data Products

MIL-STD-2073-1E Standard Practice for Military Packaging

MIL-STD-129R Standard Practice Military Marking for Shipment and Storage

2.2 Handbooks - Guidance Only

MIL-HDBK-61A Military Handbook Configuration Management Guidance

MIL-HDBK-29612/2A Guidance for Acquisition of Training Data Products and Services

NAVMC 4855.1 Product Quality Deficiency Reporting (PQDR) Handbook

2.3 Other Government Documents – Mandatory Compliance.

PS-SBNVG-001 Performance Specification for the Squad Binocular

Night Vision Goggle

FED-STD-313E Material Safety Data, Transportation Data, and Disposal Data for Hazardous

Materials Furnished to Government Activities

NAVSEA TM Technical Manual for Batteries, Navy Lithium Safety

S9310-AQ-SAF-010 Program Responsibilities and Procedures

MCO 4790.25 Ground Equipment Maintenance Program (GEMP)

MCO 4855.10C Product Quality Deficiency Report (PQDR) Program

DoDI 5000.64 Accountability and Management of DoD Equipment and Other Accountable

Property

DoDM 4140.01 Department of Defense Supply Chain Materiel Management Regulation

US Army Project Manager, Soldier Sensors and Lasers, Security Classification

Guide for Image Intensifier Devices

US Army Night Vision and Electronic Sensors Directorate Security

Classification Guide for Infrared Focal Plane Technology Development for

Uncooled Sensors

2.4 Non-Government Documents – Mandatory Compliance

ASTM D3951-18 Standard Practice for Commercial Packaging

2.5 Forms – Mandatory Compliance

DD Form 254 DoD Contract Security Classification Specification

DD Form 441 Department of Defense Security Agreement

DD Form 1149 Requisition and Invoice Shipping Document

DD Form 1692 Engineering Change Proposal

SF 368 Product Quality Deficiency Report

3.0 Requirements

The Contractor shall deliver the SBNVG in accordance with the tasks listed below and the applicable Performance

Specification (PSPEC) documentation. A complete system includes a binocular image intensifier night vision goggle with a modular uncooled thermal imaging sensor, a carrying case, a dual-power cable, an associated external power supply, a helmet mounting system, an operator manual, and any other accessories necessary for operational use.

3.1 Program Management.

The Contractor shall establish a program management structure that ensures the overall quality of the SBNVG and compliance with delivery schedules. The Contractor shall ensure that it adequately addresses all task requirements pertinent to contract performance. Upon Government request, the Contractor shall readily provide Programmatic documentation to Government representatives.

3.1.1 Meetings, Formal Reviews, Conferences, and Audits. The Contractor shall plan, host, attend, coordinate, support, and conduct meetings, In-Process Reviews (IPRs), conferences, and audits (hereinafter called "reviews").

The reviews shall occur at mutually agreed upon Government and Contractor facilities (see Table 1-1). Reviews requiring demonstration or examination of equipment shall take place at the Contractor's facility. The Contractor shall provide agendas and summary reports applicable to this section in accordance with CDRL A001. Summary reports shall detail all action items, responsible parties, and estimated completion dates. The Government reserves the right to cancel any review or to require any review at critical points during the Period of Performance (PoP). The

Contractor shall provide the Government with a copy of all material presented at any meeting and any referenced documents.

CDRL A001, Conference Agenda / Conference Report

Table 1-1: Meetings, Formal Review, Conferences and Audits

Event Time Frame Frequency Locations

Post Award Conference (PAC)/Start of Work

Meeting

Within 10 calendar days of

Contract Award

Once

Contractor Facility

In-Process Review (IPR) Quarterly and As

Required

Quarterly and

As Required

Alternate between Contractor and Government Facility

Production Readiness Review (PRR) Within 30

Provisioning Guidance Conference (PGC) During the PAC Once Contractor Facility

Provisioning Conference

No later than 90 calendar days after the Start of

Work Meeting

As Required

Contractor/Government

Supportability Demonstration Within 180

Operator/Maintenance Manual Review PGC and Prior to

Government acceptance

As Required

3.1.1.1 Post Award Conference/Start of Work Meeting. The Contractor shall host a Post Award Conference

(PAC)/Start of Work Meeting in accordance with Table 1-1. The purpose of this meeting is for the Contractor to review the contract requirements, demonstrate to the Government its management procedures, provide progress assessments, provide technical and other specialty area status, and establish schedule dates for near term critical meetings or actions. The Contractor shall also present management, key personnel, and program implementation processes.

3.1.1.2 In-Process Review (IPR). IPRs shall be in accordance with Table 1-1. The Government reserves the right to cancel any review or to require any review to occur during the PoP. Agenda items shall include the Contractor’s progress, management, technical support services (if any), integrated logistics support, administrative, assurance of compliance with contract requirements, program status, funding, and problem identification and resolutions, For each agenda item, the Contractor shall detail actual performance in comparison to expected performance. The

Contractor shall prepare presentation materials overviewing all agenda items.

3.1.2 Delivery Schedule. First delivery order: The Contractor shall deliver 20 complete systems (CLIN 0001) within

30 calendar days from receipt of delivery order.

Second delivery order: The Contractor shall deliver 650 complete systems (CLIN 0001) within 120 calendar days of receipt of delivery order. The Contractor shall deliver all other systems (CLIN 0001) on this delivery order at a rate of 250 complete systems (CLIN 0001) per month after 120 calendar days.

Follow-on delivery orders shall have a delivery rate of 250 systems (CLIN 0001) per month starting 90 days after receipt of order.

In any case (e.g., when multiple delivery orders overlap) the Government will not require deliveries exceeding 250 systems per month regardless of the number and timing of delivery orders. However, the Government will accept early deliveries in excess of 250 systems (CLIN 0001) per month.

Delivery orders for CLINs 0002-0006 shall have a delivery rate of no fewer than 20 systems per month starting 90 days after receipt of order.

For CLINS with stepladder pricing, orders within 90 days of each other will contain the price at the higher combined stepladder quantity.

3.1.3 Quarterly Status Report (QSR). The Contractor shall provide QSRs in accordance with associated

Contractor Data Requirements List (CDRL).

CDRL A002, Contractor’s Progress, Status and Management Report

3.2 Systems Engineering.

The Contractor’s proposed system shall be the product baseline. Technical compliance is based on evidence of the systems’ ability to meet the PSPEC performance standards. At a minimum, the system shall meet PSPEC requirements 3.1.1, 3.1.2, 3.1.3 and 3.2.10, and the Contractor shall document the requirements its system meets in the Product Description (PD). If the Contractor’s system’s proposed configuration and level of performance exceeds PSPEC threshold requirements, then the Government will adopt and incorporate the improved configuration and performance as the PD baseline.

3.2.1 Product Description (PD). The Contractor shall provide a PD containing all the information necessary to define the performance and configuration of the SBNVG. The PD shall include a summary of verification procedures and relevant definitions applicable to each performance attribute. If the Contractor changes the configuration, it shall update the product description in accordance with configuration management and Engineering

Change Proposal (ECP) processes described in section 3.2.2.

3.2.2 Configuration Management.

3.2.2.1 Configuration Control. The Contractor shall implement configuration control methods and procedures, which maintain the integrity and traceability of an established baseline. The Contractor shall only make changes to established baselines after the Government approves the ECPs and contract modification. The Contractor shall submit supporting data to evaluate the proposed change, such as drawings, supplemental drawings, sketches, specifications or manufacturer's data sheets with the ECPs. The Contractor shall identify changes to the affected assembly’s serial number or equipment number, whichever is applicable. The Contractor's configuration control process shall be available at all times for Government review.

3.2.2.2 Engineering Change Proposals (ECP). The Contractor shall submit ECPs and shall limit ECPs to engineering changes that are necessary or offer significant Government benefit. If the Government requests a system modification, then the Contractor shall submit an ECP. MIL-HDBK-61A provides guidance concerning ECP classification. The Contractor shall submit ECPs using DD Form 1692. Class I ECPs are mandatory when changes occur for the following reasons:

a. Correcting deficiencies.

b. Adding or modifying interface or interoperability requirements.

c. Making a significant and measurable effectiveness change in the operational capabilities or logistics supportability of the system.

d. Substantially affecting life cycle cost/savings.

e. Delaying the approved production schedule.

The Contractor shall submit Class II ECPs for approval for engineering changes impacting none of the factors listed above. The Government may re-designate the class designation of the ECP.

CDRL A003, Configuration Management

3.2.2.3 Notices of Revision (NOR). The Contractor shall generate and submit NORs concurrently with ECPs when technical documentation controlled by another Contractor or Government agency requires changes following an

ECP’s approval. MIL-HDBK-61A provides NOR information requirements.

3.2.2.4 Request for Deviation (RFD). The Contractor shall initiate RFDs from current approved configuration documentation. Authorized deviations are a temporary departure from the requirements and do not constitute a change in an approved baseline. The Contractor shall minimize recurring deviations. Where the Government determines a change should be permanent, the Contractor shall process an ECP. MIL-HDBK-61A provides information concerning the classification needed for a RFD.

3.2.2.5 Notification of Changes to Commercial Equipment or Software. The Contractor shall notify the

Government in writing when changes occur to commercial equipment or software procured or fabricated by the

Contractor.

3.2.2.6 Interface Control Documents (ICDs). Interface Control Documents include drawings or documentation depicting physical, functional, performance, and test interfaces of related or co-functioning products. The

Contractor shall provide all ICDs for the SBNVG, including drawings, diagrams, tables, software, and textual information that describe the electrical and mechanical interfaces between major sub-assemblies. This data shall be detailed to allow the Government to fabricate or match a compatible interfacing component for the purposes of sub-assembly technology refresh/product improvement, and compatibility with USMC Field Level of Maintenance

(LoM) and Test, Measurement, and Diagnostic Equipment, including:

a. Image Intensifier (I2) assembly to thermal imaging adapter dimensions.

b. I2 assembly to helmet positioning assembly adapter dimensions.

c. Helmet position assembly to helmet night vision bracket adapter dimensions.

d. Dimensioned physical layout, functions, and signal/power descriptions (pin-outs) of power/data cable coupling interfaces for I2 and thermal assemblies, cabling, and external battery pack.

Refer to MIL-HDBK-61A (SE) for further guidance.

CDRL A004, Interface Control Document (ICD)

3.2.3 Firmware Access for Maintenance. The Contractor shall provide system firmware data products including

SBNVG device-resident calibration and settings, and associated application software for external maintenance devices, such as Virtual Instrument Portable Equipment Repair/Tester (VIPER/T) and associated test equipment.

CDRL A005, Logistics Product Data Summaries

3.2.4 Production Readiness Review (PRR). The Contractor shall host a Production Readiness Review. The PRR shall be a technical review to evaluate the Contractor's production readiness identify existing or projected manufacturing problems and risk areas. During the PRR, the Contractor shall demonstrate progress in the following areas:

(1) Attaining the program's production requirements;

(2) Resolving manufacturing problems (or developing a plan for their resolution that is acceptable to the

Government); and

(3) Mitigating all production risks.

The Contractor shall show that the system design includes the key production factors (e.g., minimum time, manufacturing simplicity/flexibility, resource availability) necessary to assure the system’s delivery is on schedule.

The initial production readiness review shall take place at the Contractor's facility. The Government may require, at its discretion, follow-on production program reviews at the Contractor's facility. The PRR agenda shall include the following items:

a. A manufacturing program review, to include the overall manufacturing system and detailed factors such as:

manufacturing organization, responsibilities, facilities and equipment, manufacturing methods, and production flow.

b. A status review of all production efforts and concerns to minimize risk to the production schedule.

c. A status review of production engineering efforts, tooling and test equipment demonstrations, and proofing of new materials, processes, methods, special tooling and test equipment.

d. A status of the hazard list from Environmental, Safety, & Occupational Health analysis.

e. The status of long lead items for production, if applicable.

3.2.5 Quality Control. The Contractor shall maintain quality standards through the current International

Standardization Organization (ISO) quality system or equivalent standards. The Government shall have access to the Contractor’s QA data throughout the contract execution.

3.2.5.1 Production Acceptance Test (PAT). The Contractor shall develop and implement PAT procedures. The

Contractor shall demonstrate the PAT confirms system compliance with the SBNVG PD. The PAT shall specify the individual PD attributes to be tested, and frequency or percentage for sampling. At a minimum, all verification requirements listed in Table 4-1 of the PSPEC shall be met and documented in the PD and incorporated into the

PAT procedures. If the Contractor’s proposed verification methods exceed PSPEC threshold requirements, the

Government will adopt and incorporate the improved verification methods as the PD baseline and within the PAT procedures. The Contractor shall conduct testing which will ensure the manufacturing processes, equipment, and procedures are effective. Once the PAT is approved by the Government, SBNVG units for each Delivery Order shall undergo the specified tests to ensure quality and performance. Additional PAT shall be required if the manufacturing process or design changes significantly, or when a second source is brought on line.

CDRL A006, Acceptance Test Plan

3.2.5.2 Refurbishment of Initial Deliveries. Contractor shall refurbish SBNVGs used in support of Government

Testing, Supportability Demonstration, and Instructor & Key Personnel Training events. The Contractor shall refurbish systems to like new condition and deliver them as part of the contract quantity, provided the systems is repairable within the Beyond Economical Repair (BER) limit of 65% of system cost. Refurbished systems shall meet PAT requirements.

3.2.6 Environmental, Safety, & Occupational Health (ESOH). The Contractor shall deliver a Safety Assessment

Report (SAR) in accordance with Task 301 of MIL-STD-882E. The software contribution to system risk shall be assessed in accordance with MIL-STD-882E. The Contractor shall identify all explosive safety risks as such in the system safety documentation. In addressing the hazards associated with lithium batteries, information shall be included in the SAR to support an independent evaluation of the selection, design, testing, evaluation, use, packaging, storage, transportation and disposal of the lithium batteries to include Contractor test data on the complete system. NAVSEA Technical Manual S9310-AQ-SAF-010 Section 2-3 provides guidance on the information needed to support the independent evaluation for lithium batteries that do not meet the exceptions outlined in Chapter 3 of NAVSEA Technical Manual S9310-AQ-SAF-010. The Contractor shall provide the

Government with access to all documentation referenced in the SAR, when requested by the Government.

CDRL A007, Safety Assessment Report (SAR)

3.3 Logistics. The Contractor shall provide Interim Contractor Logistics Support (ICLS) for the first 24 months of the SBNVG’s ten-year lifecycle. After the 24-month ICLS period and for the rest of the SBNVG’s lifecycle, the

Government will sustain the SBNVG organically in accordance with the Government Maintenance Concept through organizational-level and intermediate-level maintenance as articulated in MCO 4790.25, Ground Equipment

Maintenance Program. This sustainment strategy requires the Government to requisition parts from the Contractor’s final, fully-provisioned, and cataloged SBNVG system. After the ICLS period and during the period of organic maintenance, the Contractor shall make available for purchase all parts and support equipment identified in the

Provisioning Guidance Conference and Supportability Demonstration.

3.3.1 Maintenance Planning. The Contractor shall conduct maintenance planning to define optimal maintenance activities, which fully support the Marine Corps’ organic SBNVG maintenance concept. The maintenance concept for the SBNVG is based upon two Levels of Maintenance (LoM), Organizational and Intermediate.

3.3.2 Provisioning Guidance Conference (PGC). The Contractor shall host a PGC in accordance with Table 1-1.

The Government will chair the PGC. The PGC’s purpose is to discuss the contractual requirements pertaining to

Logistics Data Products and conduct a preliminary Level of Repair Analysis (LORA). The PGC Agenda will be:

1) The format and medium of delivery

2) Unique Government requirements

3) Unclear provisioning or cataloging related areas

4) Operator/Maintenance Manual, packaging and technical publications deliverables

5) Provisioning Performance Schedule (PPS) and schedule of periodic submissions for Government review

6) Common understanding of the overall logistics requirements

7) Organic maintenance activities at the user level during the period of ICLS

3.3.3 Provisioning Conference. The Contractor shall hold the Provisioning Conference in accordance with Table 1-

1. The Provisioning Conference will last at no longer than one calendar day. The Contractor shall provide the following Logistics Product Data Summaries (CDRL A005) 30 days prior to the Provisioning Conference:

Provisioning Technical Documentation (PTD)

Repair Parts and Special Tools List (RPSTL)

Provisioning Parts List (PPL)

Tools and Test Equipment List (TTEL)

Design Change Notices (DCN)

Engineering Data for Provisioning (EDFP)

Indentured Bill of Material (IBOM)

Basic Issue Items (BII)

Recommended Buy List (RBL)

These lists shall contain the Data Products specified during the PGC. The Contractor shall update the PTD in accordance with CDRL A005.

CDRL A005, Logistics Product Data Summaries

CDRL A008, Engineering Data for Provisioning (EDFP)

3.3.4 Government Furnished Equipment (GFE)/Government Furnished Property (GFP). The Contractor may, after contract award, request to use test, measurement, and diagnostic equipment available within the Marine Corps inventory. For example, the Contractor may receive access to the Virtual Instrument Portable Equipment

Repair/Tester (VIPER/T) in support of developing its requirement to support organizational and intermediate maintenance. The Government will make equipment available to the Contractor at a Government facility within 60 days of receiving the Contractor's written request to the Contracting Officer. The Contractor will receive no

GFE/GFP resulting from this contract otherwise.

3.3.5 Item Unique Identification (IUID). The Contractor shall comply with MIL-STD-130N, DoDI 5000.64, and

DoDM 4140.01. The two-dimensional IUID data matrix shall be machine-readable with scanning devices and shall be accompanied by the corresponding human readable markings when practical. All two-dimensional data matrices shall be permanently affixed or engraved and able to withstand and perform within the same environmental conditions as the SBNVG. Proposed size and location of IUID markings shall be presented to the Government for approval.

3.3.6 Parent End Item Data Plate Information. The Contractor shall comply with MIL-STD-130N, Table IV

(Unique Item Identifier (UII) Construct 2), Figure 1, and DoDI 5000.64 when developing the SBNVG data plate.

The Parent End Item two-dimensional matrix shall contain human-readable and machine-readable markings and shall be no less than 1 centimeter wide and no less than 40% contrast. The minimum data plate information for the

Principle End Item is listed below:

a. Nomenclature.

b. National Stock Number (NSN).

c. CAGE Code.

d. Serial Number.

e. Government Ownership Designation (US Property).

f. Contract Number.

g. Two-dimensional IUID data matrix.

h. UII.

i. Date of manufacture in accordance with MIL-STD-130N Paragraph 5.7 and Figure 16.

3.3.7 Diminishing Manufacturing Sources and Material Shortages (DMSMS). The Contractor shall promptly notify the Contracting Officer in writing whenever the Contractor believes that one or more of the components of materials intended to be incorporated directly into an item specified to be delivered under the purchase order or contract is a

Diminishing Manufacturing Sources (DMS) component. The notice shall identify the part number, National Stock

Number, and nomenclature of each DMS component.

CDRL A009, Source Data for Forecasting Diminishing Manufacturing Sources and Material Shortages

(DMSMS)

3.3.8 Supply Support & Sustainment Planning. The SBNVG shall be organically maintainable at the Field Level of

Maintenance (LoM) utilizing the AN/USM-717(V)3 Virtual Instrument Portable Equipment Repair/Tester

(VIPER/T) and VEO-2 Infrared Collimator System or other tailored test equipment capable of infrared and image intensified equipment testing.

3.3.9 Reserved.

3.3.9.1 Common and Bulk Items List (CBIL). The CBIL contains items that are difficult or impractical to list on a top-down or disassembly sequence PPL, but for which provisioning may be required to support operating the end item or equipment.

3.3.9.2 Provisioning Parts List (PPL). The PPL shall contain the end-item, component, or assembly and all support items that can be disassembled, reassembled, or replaced at the Field LoM. The Contractor may use MCO 4790.25

Ground Equipment Maintenance Program (GEMP) as a guide for Marine Corps LoM.

3.3.9.3 Recommended Buy List (RBL). The Contractor shall provide recommendations for a RBL for the Initial

Issue Provisioning spares packages and shall provide the currently available supporting Reliability, Availability, Maintainability and Durability data for the RBL. The RBL shall contain nomenclature, Contractor part number, cost of part (to include step ladder pricing), CAGE code, and recommended quantities for a period of two years. The

Contractor shall provide the RBL during the PAC/PGC.

3.3.9.4 Engineering Data for Provisioning (EDFP). EDFP is technical data describing parts and equipment and consists of data, such as specifications, standards, drawings, photographs, sketches and descriptions, necessary assembly and general arrangement drawings, schematic drawings, schematic diagrams, and wiring and cable diagrams necessary to indicate the physical characteristics, location, and/or function of the item. The Contractor shall provide the Government all EDFP in accordance with SAE-GEIA-STD-0007.

a. The Contractor shall furnish EDFP in the following order of precedence:

(1) Government or industry recognized specifications or standards.

(2) Engineering drawings.

(3) Commercial catalogs or catalog descriptions.

(4) Sketches or photographs with brief descriptions of dimensional, material, mechanical, electrical or other descriptive characteristics.

b. EDFP shall be in electronic format and marked in such a manner as to identify proprietary rights.

3.3.10 Level of Repair Analysis (LORA). The Contractor shall conduct a LORA during the Provisioning

Conference. The Contractor shall provide and disassemble production representative equipment to verify all provisioning documentation.

3.3.11 Intermediate Level Maintenance Training Products and Services.

3.3.11.1 Maintenance Instructor and Key Personnel Training (I&KPT). The Contractor shall conduct a maintenance training event in accordance with MIL-PRF-29612 for both Government and their representatives at the Contractor’s facility. The Contractor shall provide all materials and conduct I&KPT via the Government-approved, Contractor-developed draft courseware. The Contractor shall conduct one class for a maximum of 20 students targeted for personnel to maintain and train on the maintenance of the SBNVG system up to the Field (Intermediate) LoM. The course shall not be more than 40 hours in length (five, eight-hour days).

3.3.11.2 Methods of Instruction. The instruction shall include lectures, demonstrations, practical exercises and practical application. Fault isolation shall be accomplished by having students identify faults to the specific Line

Replaceable Unit (LRU) with emphasis on high failure items. A minimum of one instructor per 10 students for practical exercises and a minimum of one instructor per 20 students for lectures shall be provided.

3.3.11.3 Maintenance Course Requirements. The Contractor shall base this course on the Government maintenance concept. This course shall ensure students are qualified to maintain the SBNVG system to the level of repair which supports the Government maintenance concept using the TMs, general-purpose test equipment, and all required diagnostic tools. This course shall include instructor-inserted faults or malfunctions. The Contractor shall provide four (4) fault inducing kits each with five (5) unique faults for training purposes. Each fault inducing kit shall be removable without damaging the system. This course shall provide students with the knowledge and understanding of the system capabilities, limitations, interfacing, operations, maintenance tasks, and required maintenance related skill sets.

1) At a minimum, the instruction shall include:

(a) Capabilities, functions, electro-optical/electronic theory of operation and functional operation of the SBNVG system;

(b) Preventive and corrective maintenance procedures;

(c) External diagnostics, trouble shooting, component removal/installation procedures and other tests;

(d) Measured performance data; and

(e) Highlights of interaction between the SBNVG and Virtual Instrument VIPER/T EOV or other test equipment.

2) At a minimum, the instruction shall include and upon completion, enable the student to:

(a) Operate the system and subsystems;

(b) Execute diagnostic self-test and interpret readouts;

(c) Remove and install major components and perform setup tests;

(d) Determine if the system/subsystem is malfunctioning or not;

(e) Isolate and locate malfunctions in the SBNVG;

(f) Replace the defective assemblies and sub-assemblies;

(g) Troubleshoot and repair assemblies and sub-assemblies;

(h) Perform all required alignments and adjustments;

(i) Verify proper system/subsystem functions; and

(j) Perform routine preventive maintenance functions.

CDRL A010, Maintenance Course Requirements for I&KPT

3.3.11.4 Maintenance Course Material. The Contractor shall provide intermediate maintenance training course material. The content of the course material shall focus on providing the maintainer with the knowledge and skills necessary to perform maintainer tasks. All course material shall be prepared per MIL-PRF-29612B. The Contractor shall provide, to each student attending intermediate maintenance I&KPT events, a copy of all course material required to teach the course. The Contractor shall provide all supplies and technical literature to each Government student while taking the course or as deemed most reasonable by the Government. The Contractor shall provide one fault inducing kit as described in paragraph 3.3.11.3 to the Electro-Optic Ordnance Repairer Course, Ft. Lee, VA following the I&KPT event as described in paragraph 3.3.11.1. Test equipment shall be similar in capability and operation to equipment in the operational environment. The Contractor shall prepare and deliver the below training documentation in accordance with MIL-PRF-29612B. For further guidance MIL-HDBK-29612B dated Aug 2001 may be used.

a. Lesson Plan (LP). The Contractor shall provide a LP to the Government that shall contain data that provides specific definition and direction to the instructor on learning objectives, equipment, instructional media requirements, and the conduct of training.

b. Student Handout. The Contractor shall provide a student handout that shall contain data, which enhances the mastery of the knowledge and skills required to perform SBNVG maintenance. These materials may be in the form of PowerPoint files, diagrams, assignments and outline sheets.

c. Instructional Visual Aids. The Contractor shall provide visual aids, such as PowerPoint media, graphics, schematics to be used by the instructor in the conduct of classes.

d. Fault Isolation Training Aids. The Contractor shall provide fault isolation training aids that utilize the students’ knowledge of theory and require the use of system support and test equipment. These training aids shall be in the form of faulty components or other modules inserted into the system which produce a predicted fault. Upon completion of I&KPT these modules should be provided to the Electro-Optic Ordnance Repairer

Course, Ft. Lee.

3.3.11.5 Instructional Performance Requirements Document (IPRD). The Contractor shall provide an IPRD for

Maintenance Training. The Contractor shall prepare an IPRD providing the individual job task data and listing of knowledge, skills, and attitudes associated with the performance of tasks selected for training. Contractor-provided training materials shall include Learning Objectives derived from the IPRD.

CDRL A011, Maintenance Course Materials for I&KPT

3.3.12 Supportability Demonstration (SD). The Contractor shall develop and implement maintenance support capabilities that will transition to full organic support conducted by the Marine Corps. The Contractor shall plan and conduct an SD event to provide tangible demonstration of meeting the Integrated Product Support Elements contract requirements. The SD shall occur within 180 days after contract award. The Contractor shall provide and disassemble production representative equipment to verify all provisioning documentation. The SD shall demonstrate:

a. Maintainability goals: Verify achievement of maintainability goals and to identify and correct supportability deficiencies.

b. Life-Cycle Initiatives: Identification of needed improvements to materiel design for improved supportability and reduced life-cycle cost.

c. The contractor will verify that the SBNVG system demonstrates a software based, integrated system-level fault isolation support solution centered on an SBNVG data interface cable assembly with SBNVG unique fault isolation software (including all necessary macros for the AN/USM-717 VIPER/T EOV, or other test equipment).

d. System safety: Verify system safety label/markings and mitigation of operational and maintenance hazards, to confirm the safety of all procedures, tasks, and system labels.

e. Equipment publications: Review and verify the equipment maintainer publication includes:

(1) Detailed theory of operation, including functional theory of operation, component theory, and schematic diagrams.

(2) Fault diagnosis procedures: Confirm fault diagnosis procedures utilizing SBNVG system-level fault isolation support solution.

(3) Maintenance tasks and procedures: Confirm maintenance tasks/procedures and repair/replacement procedures through the removal and replacement of component SBNVG major assemblies and sub-assemblies. Demonstrate maintenance processes that are applicable to each level of maintenance within the

Marine Corps.

(4) Illustrations: Verify all illustrations match actual equipment configuration as well as the task sequencing for fault isolation, calibration, and SBNVG disassembly/assembly procedures.

3.3.12.1 SD Test Report. The Contractor shall develop and submit a final SD Test Report documenting the results of the SD within 30 calendar days of completion of the SD. Preceding submission of the final SD Test

Report, the Contractor shall provide a quick-look report within five calendar days of the SD to the program office. Any failures that occur during the SD shall be documented by the Contractor in the SD Test Report.

Should failures occur, the Contractor shall conduct Government-approved follow-on regression test/demonstration. The Government will approve the SD Test Report when all requirements have been met.

CDRL A012, Supportability Demonstration Report

3.3.13 Supportability Demonstration (SD) and I&KPT Production Refurbishment. The Contractor shall refurbish

Production Ready SBNVGs used during the Government Testing, Supportability Demonstration and Instructor &

Key Personnel Training events. Systems shall be refurbished to like new condition and delivered as part of the contract quantity, provided the systems is repairable within the Beyond Economical Repair (BER) limit of 65% of system cost. Refurbished systems shall meet PAT requirements.

3.3.14 Technical Publications. The Contractor shall furnish Technical Manuals and Supplemental data in accordance with MIL-PRF-32216A and MIL-STD 40051-2C. MIL-PRF-32216A guides the Government’s verification and acceptance of the Contractors’ manuals by providing criteria for evaluating commercial off-the-shelf (COTS) manuals for acceptance.

3.3.14.1 Copyright Release. The requirements of DFARS 252.227-7013(d) apply to this contract regardless of the commercial determination of technical documents provided. Manuals delivered to the Government shall include the approved copyright release statements.

3.3.14.2 Operator Manual and Maintenance Manual Reviews. The Contractor shall host Operator Manual and

Maintenance Manual reviews. These reviews shall be conducted at the 50%, 75%, and 100% completion levels by the Contractor prior to Government acceptance of the Operator Manual and Maintenance Manual. If applicable in accordance with CDRL A013, the Contractor shall submit Operator Manual and Maintenance Manual review schedules for review of the manuals at the 50%, 75%, and 100% completion levels. The Government may require, and the Contractor may request, additional Operator Manual and Maintenance Manual reviews irrespective of the schedule.

3.3.14.3 Operator Manual. The Contractor shall deliver a complete Operator Manual per MIL-PRF-32216A concurrent with first SBNVG system delivery. Commercially available operator manuals shall be delivered until the

Government approves the Government version of the operator's manual. Within 30 days of approval, only the

Government-approved operator manual shall be included with every SBNVG delivered. The manuals shall contain installation, operation, troubleshooting, operator-level maintenance instructions, a complete repair parts lists

(including exploded views of all assemblies and subassemblies), and special tools lists. The operator’s manual shall be no larger than 4 ½ x 6 inches.

3.3.14.4 Maintenance Manual. The Contractor shall provide a complete field-level Maintenance Manual per MIL-

STD 40051-2C. The manual shall contain the theory of operation installation, operation, troubleshooting, and field-level maintenance instructions, a complete repair parts lists (including exploded views of all assemblies and subassemblies), and special tools lists. The field-level Maintenance Manual shall be no larger than 8½ x 11 inches.

3.3.14.5 Final Acceptance and Delivery. The Government will accept manuals after the Contractor has incorporated all comments and changes resulting from the validation and verification into the applicable final manuals.

CDRL A013, Technical Manuals and Associated Supplemental Data

3.3.15 Packaging, Handling, Storage and Transportation. The Contractor shall be responsible for preserving and packaging the deliverables under the terms of this SOW. Packaging shall be in accordance with MIL-STD-2073-1E.

All packages containing SBNVG shall contain the quantity and serial number of enclosed systems.

3.3.15.1 Preservation and Packaging (P&P). The Contractor shall preserve and package shipments for immediate use in accordance with the best commercial practices of ASTM D3951-18 and mark all items for shipment and storage in accordance with MIL-STD-129R. The Contractor shall package and preserve items scheduled for Outside the

Continental United States (OCONUS) overseas shipment in accordance with ASTM D3951-18, paragraph 6.1., Export requirements.

3.3.15.2 Development of Marking Requirements. The Contractor shall mark all items in accordance with MIL-

STD-129R.

3.3.15.3 Hazardous Materials. The Contractor shall prepare and package hazardous materials in accordance with

FED-STD-313.

3.3.16 Product Quality Deficiency Reports (PQDR). Upon receipt of a PQDR, the Contractor shall execute Support

Point responsibilities in accordance with MCO 4855.10C and using NAVMC 4855.1 as guidance.

3.3.17 Warranty. The Contractor shall provide a standard commercial warranty on the SBNVG. In addition, the

Contractor shall be responsible for all costs relative to the shipping and handling of returns approved for warranty service to and from Marine Corps Logistics Base, Albany, GA. Warranty repair turnaround time shall not exceed thirty (30) calendar days after receipt of system at Contractor’s facility.

3.3.17.1 Warranty Procedures. Upon notification by an authorized Marine Corps activity of a warranty failure, the Contractor shall provide a Return Material Authorization number and appropriate shipping instructions. The

Contractor shall prepare a new DD Form 1149 (Requisition and Invoice/Shipping Document) for return shipments, to include system serialization data as part of the data requirements called for within DD Form 1149 block 4 (b).

Marine Corps wide execution of warranty returns is dependent upon Contractor’s attainment of “L” series

Department of Defense Activity Address Code by the Government.

3.3.17.2 Reserved.

3.3.17.3 Warranty Returns. Upon receipt of a failed SBNVG pursuant to the warranty during the warranty period, the Contractor shall jointly inspect the failed SBNVG with a Government Defense Contract Management Agency

(DCMA) representative to verify the item’s warranty status. In cases where the item for repair is deployed or if in a location that the Government cannot return the item during the Warranty period, and the Government has properly notified the Contractor that the item malfunctioned during the Warranty period, Contractor shall honor the Warranty as though it was received during the Warranty period.

3.3.18 Interim Contractor Logistics Support (ICLS). The Government plans to sustain the system organically following the period of ICLS on the contract. Organic maintenance will follow Marine Corps Order 4790.25 in which the Government intends to maximize organic maintenance to fullest extent feasible through intermediate level maintenance. ICLS may be implemented for the SBNVG for a period of up to 24 months after Contract Award.

During the ICLS period, upon receipt of a system requiring non-warranty repair, the Contractor shall inspect jointly with a DCMA representative, and conduct Test and Failure Analysis. The Contractor shall repair/restore the

SBNVG to Product Description performance or recommend condemnation.

The Contractor is not required to restore systems submitted for ICLS to a like-new cosmetic condition; however, the

Contractor shall repair damage to protective finishes to the extent necessary to maintain corrosion prevention and structural integrity. The Contractor shall replace all damaged markings, identifications, and decals if the markings, identifications, or decals become unreadable. The Contractor shall ensure all repaired, upgraded, or modified systems meet or exceed Product Description performance.

3.3.18.1 Receipt and Inspections. Upon receipt at the Contractor’s facility, the Contractor, jointly with a DCMA representative, shall check for the SBNVG identification, visible damage or mishandling, and the completeness and accuracy of accompanying documentation.

The Contractor shall bring deficiencies it finds during the incoming inspection to the attention of the Government representative.

3.3.18.2 Inspection and Acceptance. The Contractor shall ensure that each repaired and serviceable SBNVG is packaged IAW this Statement of Work.

3.3.18.3 Time Constraints. The Contractor shall acknowledge receipt of non-warranty systems within two calendar days. The Contractor shall conduct ICLS actions and return the SBNVG system within 60 days of receipt at the

Contractor’s facility.

3.3.18.4 Transportation. The Contractor shall establish transportation processes and procedures for equipment returns to the Government. The Contractor shall return items for non-warranty repair to the Government at the

Contractor’s expense.

3.3.18.5 ICLS Tracking. The Contractor shall track shipments from its facility to the item’s receipt at Marine Corps

Logistics Base, Albany, GA. The Contractor shall immediately notify the Contracting Activity about any shipping problems or delivery delays.

4.0 SECURITY REQUIREMENTS

This contract will require the contractor to have a Secret Facility Clearance and will require certain contractors to obtain and maintain classified access eligibility. The contractor shall have a valid Secret Facility Clearance and a

Secret Safeguarding Level prior to classified performance at the contractor’s facility. The prime contractor and all sub-contractors (through the prime contractor) shall adhere to all aspects of DoD Directive 5220.22-M and DoD

Manual 5220.22 Volume 2. All personnel identified to perform on this contract shall maintain compliance with

Department of Defense, Department of the Navy, and Marine Corps Information and Personnel Security Policy to include completed background investigations (as required) prior to classified performance. This contract shall include a DoD Contract Security Classification Specification (DD-254) as an attachment. The contractor shall notify the Government (written notice) within twenty-four hours of any contractor personnel added or removed from the contract that have been granted classified access, issued a Common Access Card (CAC) and/or MCSC Building badge/access.

4.1 Classified Information. The Contractor shall comply with FAR 52.204-2, Security Requirement. This clause involves access to information identified as “Confidential,” “Secret,” or “Top Secret” and requires Contractors to comply with: (1) the Security Agreement (DD Form 441), including the National Industrial Security Program

Operating Manual (DoD 5220.22-M); and (2) any revisions to the DoD 5220.22-M, notice of which has been furnished to the Contractor.

The Contractor shall utilize Security Classification Guides for Image Intensifier Devices and Infrared Focal Plane

Technology Development for Uncooled Sensors for determination of appropriate distribution markings and classification required, if any, for any data products developed during the period of performance.