This statement of work outlines requirements for the procurement of the Squad Binocular Night Vision Goggle system. The contractor shall provide over 2,000 complete systems within 12 months of award, with subsequent annual deliveries of 2,000 systems. A complete system includes a binocular image intensifier night vision goggle, modular uncooled thermal imaging sensor, external power supply, and helmet mounting system. The contractor must meet stringent configuration management, testing, logistics support, training, and documentation requirements. Key deliverables include production of systems that meet the detailed performance specification, provision of logistics data, conducting maintenance training, and providing operation and maintenance manuals. The contractor will also provide interim repair services for one to two years after the contract period. The United States Marine Corps is the contracting agency seeking to procure this system to meet its night vision capability requirements.
Pre-Solicitation Draft Statement of Work for SBNVG program.
View the file
Other files
Show all 25
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
STATEMENT OF WORK
FOR THE
SQUAD BINOCULAR NIGHT VISION GOGGLE
PREPARED BY
PROGRAM MANAGER INFANTRY WEAPONS
PORTFOLIO MANAGER GROUND COMBAT ELEMENT SYSTEMS
MARINE CORPS SYSTEMS COMMAND
13 NOVEMBER 2018
Source Selection Information - See FAR 2.101 and FAR 3.104
1.0 SCOPE
This Statement of Work (SOW) defines the effort required for procurement and delivery of the Squad Binocular Night Vision Goggle (SBNVG). The SBNVG is a commercial item purchase pursuant to FAR 2.101, and the Government will apply the standard practices for “Acquisition of Commercial Items,” listed in FAR
12.203 throughout the process. The Contractor shall provide all material, services, and necessary support documentation needed to complete the tasks identified within this SOW. Additionally, the Contractor shall provide the requisite program management and logistics support to ensure that delivery schedules, performance requirements, and overall supportability of the SBNVG is accomplished as set forth in the contract.
This SOW includes the associated Program and Data Management, Government
Furnished Property (GFP), Meeting and Reviews, System Engineering, Testing and Verification, Environment, Safety, and Occupational Health, Configuration
Management (CM), Item Unique Identification, Diminishing Manufacturing
Sources and Material Shortages, Integrated Logistics Support, Maintenance
Planning, Supply Support, Technical Publications, Support Equipment, Packaging, Handling, Storage and Transportation, Transportability, and
Software.
2.0 APPLICABLE DOCUMENTS
The following specified documents form a part of this SOW to the extent specified herein. The most recent revision of the referenced document at the time of contract governs unless otherwise specified. In the event of conflict between the applicable documents and this SOW, the SOW takes precedence. All second tier and below references cited in mandatory compliance documents shall be considered as guidance only. Nothing in this document, however, supersedes applicable laws and regulations unless a specific exemption has been obtained.
2.1 Military Standards and Specifications - Mandatory Compliance
MIL-STD-882E Standard Practice for System Safety
MIL-STD-130N Standard Practice Identification Marking of U.S.
Military Property
MIL-STD-196F Joint Electronics Type Designation System (JETDS)
MIL-PRF-32216A Evaluation of Commercial Off-the-Shelf (COTS) Manuals and Preparation of Supplemental Data
MIL-STD-40051/2C Preparation of Digital Technical Information for Page
Based Technical Manuals
MIL-PRF-29612B Training Data Products
MIL-STD-2073-1E Standard Practice for Military Packaging
MIL-STD-129R Standard Practice Military Marking for Shipment and
Storage
2.2 Handbooks - Guidance Only
MIL-HDBK-61A Military Handbook Configuration Management Guidance
MIL-HDBK-29612/2A Guidance for Acquisition of Training Data Products and Services
NAVMC 4855.1 Product Quality Deficiency Reporting (PQDR) Handbook
2.3 Other Government Documents – Mandatory Compliance.
PS-SBNVG-001 Performance Specification for the Squad Binocular
Night Vision Goggle
FED-STD-313E Material Safety Data, Transportation Data, and
Disposal Data for Hazardous Materials Furnished to
Government Activities
NAVSEA TM Technical Manual for Batteries, Navy Lithium Safety
S9310-AQ-SAF-010 Program Responsibilities and Procedures
MCO 4790.25 Ground Equipment Maintenance Program (GEMP)
MCO 4855.10C Product Quality Deficiency Report (PQDR) Program
DoDI 5000.64 Accountability and Management of DoD Equipment and
Other Accountable Property
DoDM 4140.01 Department of Defense Supply Chain Materiel
Management Regulation
US Army Project Manager, Soldier Sensors and Lasers, Security Classification Guide for Image Intensifier
Devices
US Army Night Vision and Electronic Sensors
Directorate Security Classification Guide for
Infrared Focal Plane Technology Development for
Uncooled Sensors
2.4 Non-Government Documents – Mandatory Compliance
ASTM D3951-18 Standard Practice for Commercial Packaging
2.5 Forms – Mandatory Compliance
DD Form 441 Department of Defense Security Agreement
DD Form 1149 Requisition and Invoice Shipping Document
DD Form 1692 Engineering Change Proposal
SF 368 Product Quality Deficiency Report
3.0 Requirements
The Contractor shall deliver the SBNVG in accordance with the tasks listed below and the applicable Performance Specification (PSPEC) documentation.
3.1 Program Management.
The Contractor shall establish a program management structure that ensures the overall quality of the SBNVG and compliance with delivery schedules. The
Contractor shall ensure that all task requirements pertinent to contract performance are adequately addressed. Programmatic documentation shall be readily available to Government representative(s) during planned visits or upon request.
3.1.1 Meetings, Formal Reviews, Conferences, and Audits. The Contractor shall plan, host, attend, coordinate, support and conduct meetings, In-
Process Reviews (IPRs), conferences, and audits (hereinafter called
"reviews"). The reviews shall be conducted at mutually agreed upon
Government and contractor facilities (see Table 1-1). Reviews requiring demonstration or examination of equipment shall be conducted at the contractor's facility. The Contractor shall prepare agendas prior to each review and provide after action summary/reports which include all action items, responsible parties, and estimated completion dates prior to the completion of all reviews, and conference presentation materials following each review. The Government reserves the right to cancel any review or to require any review to be scheduled at critical points during the period of performance. The Contractor shall provide the Government with a copy of all material presented at any meeting and any referenced documents.
Table 1-1: Meetings, Formal Review, Conferences and Audits
Event Time Frame Frequency Locations
Post Award Conference
(PAC)/Start of Work Meeting
Within 30 calendar days of
Contract
Award
Once Contractor Facility
In-Process Review (IPR) As Required As
Required
Alternate between
Contractor and
Government Facility
Production Readiness Review
(PRR)
Within 30 calendar days of
Contract
Award
Once Contractor Facility
Product Baseline Review (PBR)
Within 30 calendar days of
Once Contractor Facility
Event Time Frame Frequency Locations
Contract
Award
Provisioning Guidance
Conference (PGC)
During the
PAC
Once Contractor Facility
Provisioning Conference
No later than 60 to
90 calendar days after the Start of Work
Meeting
As
Required Contractor/Government
Operator/Maintenance Manual
Review
PGC and
Prior to
Government acceptance
As
Required Contractor/Government
3.1.1.1 Post Award Conference/Start of Work Meeting. The Contractor shall host a Post Award Conference (PAC)/Start of Work Meeting in accordance with
Table 1-1. The purpose of this meeting is for the Contractor to review the contract requirements, demonstrate to the Government the management procedures, provide progress assessments, provide technical and other specialty area status, and to establish schedule dates for near term critical meetings or actions. The Contractor shall also present management, key personnel, and program implementation processes.
3.1.1.2 In-Process Review (IPR). IPRs will be held in accordance with Table
1-1. The Government reserves the right to cancel any review or to require any review to be scheduled during the PoP. The contractor’s progress, management, technical support services (if any), integrated logistics support, administrative, assurance of compliance with contract requirements, program status, funding, problem identification and resolutions shall be agenda items. Actual versus expected performance of each area shall be addressed. The contractor shall prepare presentation materials providing an overview of all agenda items.
3.1.2 Delivery Schedule. The Contractor shall be capable of delivering no less than 20 complete systems within 30 calendar days, 650 complete systems within 120 calendar days and a total of 2,000 complete systems within 12 months after contract award date. After the first 12 months of deliveries the contractor shall be capable of delivering no less than 2,000 complete systems every 12 months until contract completion. A complete system consists of a binocular image intensifier night vision goggle, with a modular uncooled thermal imaging sensor, and associated external power supply and helmet mounting system.
3.2 Systems Engineering.
The Contractor shall deliver systems that comply with the performance capabilities stated in the PSPEC. Technical compliance shall be assessed based on evidence of the systems’ ability to meet the PSPEC performance standards and conformance to the delivery schedule. At a minimum, all PSPEC threshold requirements shall be met and documented in the Product Description
(PD). If the Contractor’s proposed configuration and level of performance exceeds the threshold requirements then the improved performance and configuration shall be utilized as the PD baseline.
3.2.1 Product Description (PD). The Contractor shall provide a PD that contains all the information necessary to define the performance and configuration of the SBNVG. The PD shall include a summary of verification procedures and relevant definitions applicable to each performance attribute.
If configuration changes are made, the product description shall be updated in accordance with configuration management and engineering change proposal processes described it sections 3.2.3.1 and 3.2.3.2.
3.2.1 Environmental, Safety, & Occupational Health (ESOH).
3.2.1.1 System Safety. The Contractor’s system safety program shall identify, evaluate, and mitigate environmental, safety and health hazards associated with the lifecycle of the SBNVG. The Contractor shall perform and document a Safety Assessment Report (SAR) in accordance with Task 301 of MIL-
STD-882E. The software contribution to system risk shall be assessed in accordance with MIL-STD-882E. The Contractor shall identify all explosive safety risks as such in the system safety documentation. In addressing the hazards associated with lithium batteries, sufficient information shall be included in the SAR to support an independent evaluation of the selection, design, testing, evaluation, use, packaging, storage, transportation and disposal of the lithium batteries to include contractor test data on the complete system. NAVSEA Technical Manual S9310-AQ-SAF-010 Section 2-3 provides guidance on the information needed to support the independent evaluation for lithium batteries that do not meet the exceptions outlined in
Chapter 3 of NAVSEA Technical Manual S9310-AQ-SAF-010. The Contractor shall provide the Government with access to all documentation referenced in the
SAR, when requested by the Government.
CDRL A001, Safety Assessment Report (SAR)
3.2.2 Configuration Management.
3.2.2.1 Configuration Control. The Contractor shall implement configuration control methods and procedures, which maintain the integrity and traceability of an established baseline. Changes to established baselines shall only be made after Government approval of Engineering Change Proposals (ECPs) and contract modification. Sufficient supporting data to evaluate the proposed change, such as drawings, supplemental drawings, sketches, specifications or manufacturer's data sheets shall be submitted with ECPs. Changes shall be identified to the affected assembly serial number, or if not part of an assembly, to the affected equipment serial number. The Contractor's configuration control process shall be available for Government review.
3.2.2.2 Engineering Change Proposals (ECP). ECPs shall be submitted by the
Contractor and shall be limited to those engineering changes which are necessary or offer significant benefit to the Government. MIL-HDBK-61A provides guidance concerning the classification of ECPs. ECPs should be submitted using DD Form 1692. Class I ECPs shall be submitted when changes are required to the following:
a. Correct deficiencies.
b. Add or modify interface or interoperability requirements.
c. Make a significant and measurable effectiveness change in the operational capabilities or logistics supportability of the system.
d. Effect substantial life cycle cost/savings.
e. Prevent slippage in an approved production schedule.
Class II ECPs shall be submitted for approval of those engineering changes which impact none of the factors listed above. The Government will approve/disapprove the class designation of the ECP.
CDRL A002, Configuration Management
3.2.2.3 Notices of Revision (NOR). The Contractor shall generate and submit
NORs concurrently with ECPs when technical documentation controlled by another Contractor or Government agency requires changes following approval of an ECP. MIL-HDBK-61A provides guidance concerning the information needed for a NOR.
3.2.2.4 Request for Deviation (RFD). The Contractor shall process RFDs from current approved configuration documentation. Authorized deviations are a temporary departure from the requirements and do not constitute a change in an approved baseline. Submission of recurring deviations is discouraged and shall be minimized. Where it is determined that a change should be permanent, the Contractor shall process an ECP. MIL-HDBK-61A provides guidance concerning the classification and information needed for a RFD.
3.2.2.5 Notification of Changes to Commercial Equipment/Software. The
Contractor shall submit notification to the Government when changes occur to commercial equipment or software, which is being procured or fabricated by the Contractor.
3.2.2.6 Interface Control Documents (ICDs). Interface control drawings or other documentation that depict physical, functional, performance, and test interfaces of related or co-functioning products. The Contractor shall provide all ICDs for the SBNVG, including drawings, diagrams, tables, software, and textual information that describe the electrical and mechanical interfaces between major sub-assemblies. This data shall be in sufficient detail to fabricate or match a compatible interfacing component for the purposes of sub-assembly technology refresh/product improvement, and compatibility with USMC Field Level of Maintenance (LoM) and Test, Measurement, and Diagnostic Equipment, including:
a. Image Intensifier (I2) assembly to thermal imaging adapter dimensions.
b. I2 assembly to helmet positioning assembly adapter dimensions.
c. Helmet position assembly to helmet night vision bracket adapter dimensions.
d. Dimensioned physical layout, functions, and signal/power descriptions (pin-outs) of power/data cable coupling interfaces for I2 and thermal assemblies, cabling, and external battery pack.
Refer to MIL-HDBK-61A (SE) for further guidance.
CDRL A003, Interface Control Document (ICD)
3.2.3 Software/Firmware Maintenance
3.2.3.1 Firmware Access for Maintenance. The Contractor shall provide system firmware data products including SBNVG device-resident calibration and settings, and associated application software for external maintenance devices.
3.2.3.2 Software Development Kit (SDK). In support of product improvement and technology refresh, the Contractor shall provide a SDK application suite for the SBNVG. The SDK shall provide sufficient functionality to alter SBNVG firmware to modify displayed data presentation, export or import data to/from external devices, or alter the operating parameters of the SBNVG components.
3.2.4 Technical Reviews. The Contractor shall host a Production Readiness
Review and Product Baseline Review, as described below. Additional technical reviews, in support of configuration changes and/or additional testing, may be requested by the Government as needed.
3.2.4.1 Production Readiness Review (PRR). The PRR shall be a technical review performed to evaluate the contractor's production readiness and identify existing or projected manufacturing problems and areas of risk. The contractor shall demonstrate progress in the following areas: (1) attaining the program's production requirements, (2) resolving manufacturing problems
(or developing a plan for their resolution that is acceptable to the
Government), and (3) mitigating all production risks. The contractor shall show that the system design has included those key production factors (e.g., minimum time, manufacturing simplicity/flexibility, resource availability, etc.) necessary to assure the system can be acquired on schedule. The initial production readiness review shall be conducted at the contractor's facility. At the Government's discretion, follow-on production program reviews may be held at the contractor's facility. The agenda of the PRR shall include the following considerations:
a. A manufacturing program review to include the overall manufacturing system and detailed factors such as: manufacturing organization, responsibilities, facilities and equipment, manufacturing methods, and production flow.
b. A status review of all production efforts for schedule considerations.
c. The identity of open production concerns which require additional direction/effort to minimize risk to the production program.
d. A status review of production engineering efforts, tooling and test equipment demonstrations, and proofing of new materials, processes, methods, special tooling and test equipment.
e. A status of the hazard list from Environmental, Safety, &
Occupational Health analysis.
f. The status of long lead items for production, if applicable.
3.2.5 Quality Control. The Contractor shall maintain quality standards through the use of the current International Standardization Organization
(ISO) quality system or equivalent standards. The Government shall have access to the Contractor’s QA data throughout the contract execution.
3.2.5.1 Acceptance Testing, Verification, and Demonstration.
3.2.5.2 Production Acceptance Test (PAT). The Contractor shall develop and implement PAT procedures that will verify compliance with the SBNVG PD to demonstrate the adequacy and suitability of the Contractor's production processes and procedures for achieving the performance inherent in the design. The Contractor’s PAT shall specify the individual PD attributes to be tested, and frequency or percentage for sampling. At a minimum, all PSPEC verification requirements, including procedures, sample size, and frequency, shall be met and documented in the PD and incorporated into the PAT procedures. If the Contractor’s proposed verification methods exceeds the
PSPEC requirements, then the improved verification methods shall be utilized as the PD baseline and within the PAT procedures. The Contractor shall conduct testing, which will ensure that the manufacturing processes, equipment, and procedures are effective, and that the PAT adequately addresses the performance requirements. Once the PAT is approved by the
Government, SBNVG units for each Delivery Order shall undergo the specified tests to ensure quality and performance. The main purpose of this event is to validate and verify that the PAT serves as a benchmark for Government approval. The PAT shall be conducted prior to the Supportability
Demonstration (SD). Additional PAT shall be required if the manufacturing process or design changes significantly, or when a second source is brought on line.
CDRL A004, Production Acceptance Report
3.2.5.3 Nonconformance of Initial Contract Production Units. In the event the first contract production units fail to meet requirements the units will be rejected by the Government. The Contractor shall submit plans for the corrective action or disposition to the Government for approval.
3.3 Logistics
3.3.1 Maintenance Planning. The Contractor shall conduct maintenance planning to define optimal maintenance activities, which fully support the
SBNVG maintenance concept. The maintenance concept for the SBNVG is based upon two Levels of Maintenance (LoM), Organizational and Intermediate. The
Marine Corps’ maintenance philosophy is articulated in MCO 4790.25, Ground
Equipment Maintenance Program.
3.3.2 Provisioning Guidance Conference (PGC). The Contractor shall host a PGC in accordance with Table 1-1. The Government will chair the PGC.
The purpose of this conference is to discuss the contractual requirements pertaining to Logistics Data Product(s) including:
1) The format and medium of delivery
2) Address any unique Government requirements
3) Resolve any unclear provisioning or cataloging related areas
4) Operator/Maintenance Manual, packaging and technical publications deliverables
5) Provisioning Performance Schedule (PPS) and schedule of periodic submissions for Government review
6) Ensure a common understanding of the overall logistics requirements
3.3.3 Provisioning Conference. The Provisioning Conference shall be held in accordance with Table 1-1. The Contractor shall plan to support a conference lasting a minimum of one business day and up to 5 business days.
At the Provisioning Conference the Contractor shall provide Provisioning
Technical Documentation (PTD), a draft Repair Parts and Special Tools List
(RPSTL), Provisioning Parts List (PPL), Long Lead Time Items List (LLTIL), Tools and Test Equipment List (TTEL), Common and Bulk Items List (CBIL), Design Change Notices (DCN), Engineering Data for Provisioning (EDFP), Indentured Bill of Material (IBOM), Recommended Buy List (RBL) and Basic
Issue Items (BII). These lists shall contain the Data Products specified during the PGC. The Contractor shall update the PTD to reflect any changes discussed at the conference and submit a corrected copy to the Equipment
Specialist within 15 calendar days after the Provisioning Conference. If deemed necessary by the Government, an additional Provisioning Conference meeting will be held at a mutually agreed upon date.
CDRL A005, Engineering Data for Provisioning (EDFP)
CDRL A006, Logistics Product Data Summaries
3.3.4 Government Furnished Equipment (GFE)/Government Furnished Property
(GFP). No GFE/GFP will be provided to the Contractor. However, Test, Measurement and Diagnostic Equipment/Systems currently available within the
Marine Corps inventory will be made available to the Contractor upon request.
For example, the Contractor will have access to the Virtual Instrument
Portable Equipment Repair/Tester (VIPER/T) in support of organizational and intermediate maintenance capability development, testing and validation.
Items will be made available to the Contractor at a Government facility within 60 days of receipt of Contractor's written request to the Contracting
Officer.
3.3.5 Item Unique Identification (IUID). The Contractor shall comply with
MIL-STD-130N, DoDI 5000.64, and DoDM 4140.01. The two-dimensional IUID data matrix shall be machine-readable with scanning devices and shall be accompanied by the corresponding human readable markings when practical. All two-dimensional data matrix shall be permanently affixed or engraved and have the ability to withstand and perform within the same environmental conditions as the SBNVG. Proposed size and location of IUID markings shall be presented to the Government for approval.
3.3.6 Parent End Item Data Plate Information. The Contractor shall comply with MIL-STD-130N, Table IV (Unique Item Identifier (UII) Construct 2), Figure 1, and DoDI 5000.64 when developing the SBNVG data plate. The Parent
End Item two-dimensional matrix shall contain human-readable and machine-readable markings and shall be no less than 1 centimeter wide and no less than 40% contrast. The minimum data plate information for the Principle End
Item is listed below:
a. Nomenclature.
b. National Stock Number (NSN).
c. CAGE Code.
d. Serial Number.
e. Government Ownership Designation (US Property).
f. Contract Number.
g. Two-dimensional IUID data matrix.
h. UII.
i. Date of manufacture in accordance with MIL-STD-130N Paragraph 5.7 and
Figure 16.
3.3.7 Diminishing Manufacturing Sources and Material Shortages (DMSMS). The
Contractor shall promptly notify the Contracting Officer in writing whenever the Contractor believes that one or more of the components of materials intended to be incorporated directly into an item specified to be delivered under the purchase order or contract is a Diminishing Manufacturing Sources
(DMS) component. The notice shall identify the part number, National Stock
Number, and nomenclature of each DMS component.
CDRL A007, Source Data for Forecasting Diminishing Manufacturing Sources and
Material Shortages (DMSMS)
3.3.8 Supply Support & Sustainment Planning. The SBNVG shall be organically maintainable at the Field Level of Maintenance (LoM) utilizing the AN/USM-
717(V)3 Virtual Instrument Portable Equipment Repair/Tester (VIPER/T) and
VEO-2 Infrared Collimator System or other tailored test equipment capable of infrared and image intensified equipment testing.
3.3.9 Provisioning Technical Documentation (PTD). At the PAC the Contractor shall provide updated PTD including, but not limited to: a Provisioning Parts
List (PPL), a Long Lead Time Items List, a Common and Bulk Items List (CBIL) and Electronic Data for Provisioning (EDFP).
3.3.9.1 Common and Bulk Items List (CBIL). The CBIL contains those items that are difficult or impractical to list on a top-down or disassembly sequence PPL, but for which provisioning may be required to support the operation of the end item or equipment.
3.3.9.2 Provisioning Parts List (PPL). The PPL shall contain the end-item, component, or assembly and all support items which can be disassembled, reassembled, or replaced at the Field LOM through Depot LOM. MCO 4790.25
Ground Equipment Maintenance Program (GEMP) may be used as a guide for the
Marine Corps specified LoM.
3.3.9.3 Recommended Buy List (RBL). The Contractor shall provide recommendations for a RBL for the Initial Issue Provisioning spares packages and shall provide the currently available supporting Reliability, Availability, Maintainability and Durability data for the RBL. The RBL shall contain nomenclature, Contractor part number, cost of part (to include step ladder pricing), CAGE code, and recommended quantities for a period of two
(2) years. The Contractor shall provide the RBL during the PAC/PGC.
3.3.9.4 Engineering Data for Provisioning (EDFP). EDFP is technical data used to describe parts and equipment and consists of data such as specifications, standards, drawings, photographs, sketches and descriptions, necessary assembly and general arrangement drawings, schematic drawings, schematic diagrams, and wiring and cable diagrams necessary to indicate the physical characteristics, location, and/or function of the item. The
Contractor shall provide the Government all EDFP in accordance with SAE-GEIA-
STD-0007.
a. The Contractor shall furnish EDFP in the following order of precedence:
(1) Government or industry recognized specifications or standards.
(2) Engineering drawings.
(3) Commercial catalogs or catalog descriptions.
(4) Sketches or photographs with brief descriptions of dimensional, material, mechanical, electrical or other descriptive characteristics.
b. EDFP shall be in electronic format and marked in such a manner as to identify proprietary rights.
3.3.10 Level of Repair Analysis (LORA). The Contractor shall host a
Government led LORA during the Provisioning Conference. This LORA is a separate event from the PAC/PGC LORA. Upon Government request, the
Contractor shall provide and disassemble production representative equipment to verify all provisioning documentation. The Contractor shall also furnish provisioning data resulting from the Provisioning Conference at mutually agreed upon intervals thereafter. The Contractor shall identify provisioning and other pre-procurement data to be submitted for Government screening.
3.3.11 Intermediate Level Maintenance Training Products and Services.
3.3.11.1 Maintenance Instructor and Key Personnel Training (I&KPT). The
Contractor shall conduct a maintenance training event in accordance with MIL-
PRF-29612 for both Government and support Contractors. The Government reserves the right to determine training site location based upon the best value and economy of effort. The specific location of the training event will be determined by the Government and coordinated with the Contractor as an outcome of the SBNVG Supportability Demonstration (SD) event. The
Contractor shall provide all materials, conduct and be responsible for I&KPT utilizing the Government-approved Contractor-developed draft courseware. The
Contractor shall conduct one class for a maximum of 20 students. This course shall be targeted to the personnel who will maintain and or train on the maintenance of the SBNVG system up to the Field (Intermediate) LoM. The course shall not be more than 40 hours in length (five, eight-hour days).
3.3.11.2 Methods of Instruction. The preferred methods of instruction are lectures, demonstrations, practical exercises and application. No less than sixty percent of course presentation shall be practical exercise and hands-on training. Fault isolation shall be accomplished by having students identify faults to the specific Line Replaceable Unit (LRU) with particular emphasis on high failure items. The trainee to instructor ratios shall be 10:1 for practical exercises and 20:1 for lectures.
3.3.11.3 Maintenance Course Requirements. This course shall be based on the
Government maintenance concept. This course shall be of sufficient depth to ensure that students are qualified to maintain the SBNVG system to the appropriate level using the TMs, general-purpose test equipment, and all required diagnostic tools. This course shall include instructor-inserted faults or malfunctions. The Contractor shall provide fault inducing material for training purposes. This course shall provide students with the knowledge and understanding of the system capabilities, limitations, interfacing, operations, maintenance tasks, and required maintenance related skill sets.
(1) At a minimum, the instruction shall include:
(a) Capabilities, functions, electro-optical/electronic theory of operation and functional operation of the SBNVG system.
(b) Preventive and corrective maintenance procedures.
(c) External diagnostics, trouble shooting, component removal/installation procedures and other tests.
(d) Measured performance data.
(e) An understanding of the interaction between the SBNVG and VIPER/T EOV or other tailored test equipment.
2) At a minimum, the instruction shall include and upon completion, enable the student to:
(a) Operate the system and subsystems.
(b) Execute diagnostic self-test and interpret readouts.
(c) Remove and install major components and perform setup tests.
(d) Determine if the system/subsystem is malfunctioning or not.
(e) Isolate and locate malfunctions in the SBNVG.
(f) Replace the defective assemblies and sub-assemblies.
(g) Troubleshoot and repair assemblies and sub-assemblies.
(h) Perform all required alignments and adjustments.
(i) Verify proper system/subsystem functions.
(j) Perform routine preventive maintenance functions.
CDRL A008, Maintenance Course Requirements for I&KPT
3.3.11.4 Maintenance Course Material. The Contractor shall provide intermediate maintenance training course material. The content of the course material shall focus on providing the maintainer with the knowledge and skills necessary to perform maintainer tasks. All course material shall be prepared per MIL-PRF-29612B. The Contractor shall provide, to each student attending intermediate maintenance I&KPT events, a copy of all course material required to teach the course. The Contractor shall provide all supplies and technical literature to each Government student while taking the course or as deemed most reasonable by the Government. Test equipment utilized shall be similar in capability and operation to that used in the operational environment. The Contractor shall prepare and deliver the below training documentation in accordance with MIL-PRF-29612B. For further guidance MIL-HDBK-29612B dated Aug 2001 may be used.
a. Lesson Plan (LP). The Contractor shall provide a LP to the Government that shall contain data that provides specific definition and direction to the instructor on learning objectives, equipment, instructional media requirements, and the conduct of training.
b. Student Handout. The Contractor shall provide a student handout that shall contain data, which enhances the mastery of the knowledge and skills required to perform SBNVG maintenance. These materials may be in the form of PowerPoint files, diagrams, assignments and outline sheets.
c. Instructional Visual Aids. The Contractor shall provide visual aids, such as PowerPoint media, graphics, schematics to be used by the instructor in the conduct of classes.
d. Fault Isolation Training Aids. The Contractor shall provide fault isolation training aids that utilize the students’ knowledge of theory and require the use of system support and test equipment. These training aids shall be in the form of faulty components or other modules inserted into the system which produce a predicted fault.
3.3.11.5 Instructional Performance Requirements Document (IPRD). The
Contractor shall provide an IPRD for Maintenance Training. The Contractor shall prepare an IPRD providing the individual job task data and listing of knowledge, skills, and attitudes associated with the performance of tasks selected for training. The IPRD shall include Terminal and Enabling Learning
Objectives from which training materials will be developed.
CDRL A009, Maintenance Course Materials for I&KPT
3.3.12 Supportability Demonstration. The Contractor shall plan and conduct an
SD event to provide tangible demonstration of meeting the Integrated
Logistics Support (ILS) contract requirements. The SD shall occur within 180 days after contract award. The Contractor shall perform all work necessary to develop, fabricate and deliver the System Support Package (SSP) which will be evaluated during the SD. Marine Corps maintenance personnel performing the SD will be trained and equipped as specified by the logistic concept being tested and will be representative of personnel described in the target audience description i.e. Marine Corps SBNVG maintainers. The SD will be performed to demonstrate the achievement of the following:
a. Maintainability goals: Verify achievement of maintainability goals and to identify and correct supportability deficiencies.
b. Pre-Planned Product Improvement (P3I): Identification of needed improvements to materiel design for improved supportability and reduced life-cycle cost.
c. System Support Package (SSP): Validate that the SSP demonstrates a software based, integrated SBNVG system-level fault isolation support solution centered on an SBNVG data interface cable assembly with SBNVG unique fault isolation software (including all necessary macros for the
AN/USM-717 VIPER/T EOV, or other tailored test equipment).
d. System safety: Verify system safety label/markings and mitigation of operational and maintenance hazards, to confirm the safety of all procedures, tasks, and system labels.
e. Equipment publications: Review and verify the equipment maintainer publication includes:
(1) Detailed theory of operation, including functional theory of operation, component theory, and schematic diagrams.
(2) Fault diagnosis procedures: Confirm fault diagnosis procedures utilizing SBNVG system-level fault isolation support solution.
(3) Maintenance tasks and procedures: Confirm maintenance tasks/procedures and repair/replacement procedures through the removal and replacement of component SBNVG major assemblies and sub-assemblies.
Demonstrate maintenance processes that are applicable to each level of maintenance within the Marine Corps.
(3) Illustrations: Verify all illustrations match actual equipment configuration as well as the task sequencing for fault isolation, calibration, and SBNVG disassembly/assembly procedures.
3.3.12.1 SD Test Report. The Contractor shall develop and submit a SD test report documenting the results of the SD within thirty (30) business days. The Contractor shall provide a quick look report within five (5) business days of the SD to the program office in addition to the official final SD test report. Any failures that occur during the course of the event shall be documented. The Contractor shall conduct an approved follow-on regression test/demonstration which will be observed by the
Government for any failures in order to meet the requirement. The
Government will approve the Test Report when all requirements have been met.
CDRL A010, Supportability Demonstration Report
3.3.13 Supportability Demonstration (SD) and I&KPT Production Refurbishment.
At the Contractor’s expense, the Contractor shall refurbish Production Ready
SBNVGs used in the SD and I&KPT events to like new condition and deliver these units as part of the contract quantity, provided they meet PAT requirements.
3.3.14 Technical Publications. All publications listed below will be provided with no less than Government Purpose Rights in the technical data contained therein and shall not incorporate any information, whether or not defined as technical data, which is not compliant with DFARS 252.227-7013(d).
Government Purpose Rights are those defined by DFARS 252.227-7013(a) (13), incorporated by reference into the contract. Technical Manuals and
Preparation of Supplemental data shall be developed in accordance with MIL-
PRF-32216A and MIL-STD 40051/2C. The Government verification and acceptance of the contractors’ manuals will be guided by MIL-PRF-32216A this specification provides criteria for evaluating commercial off-the-shelf
(COTS) manuals for acceptance.
3.3.14.1 Technical Publication IPRs. IPRs will be held prior to Government acceptance. Technical publication IPRs shall be held at the Contractor's or designated Government facility. The Contractor shall submit an IPR schedule for review of the manual at 50/75/100 percent completion levels. The
Government may require, and the Contractor may request additional IPRs irrespective of the schedule. For example, the Contractor shall provide an initial draft of the operator/maintenance manual and quick reference guide 10 days prior to the PGC.
3.3.14.2 Operator Manual. The Contractor shall deliver a complete, operator manual per MIL-PRF-32216A concurrent with first SBNVG system delivery. The operator manual shall be over-packed with every SBNVG when delivered. The manual(s) shall contain installation, operation, troubleshooting and operator level maintenance instructions. The manual(s) shall include a complete repair parts lists (including exploded views of all assemblies and subassemblies) and special tools lists. The operator’s manual shall be no larger than 4 ½ x 6 inches.
3.3.14.3 Intermediate Maintenance Manual. The Contractor shall provide a complete, field level maintenance manual at the time stated within the contract per MIL-STD 40051/2C. The manual(s) shall contain theory of operation installation, operation, troubleshooting and field level maintenance instructions. The manual(s) shall include a complete repair parts lists (including exploded views of all assemblies and subassemblies) and special tools lists. The field level maintenance manual shall be no larger than 8½ x 11 inches.
3.3.14.4 Final Acceptance and Delivery. Final acceptance will be made by the Government once all comments resulting from the validation and verification and all changes from verification have been incorporated into the applicable final maintenance draft manuals. Upon Government acceptance, the Contractor shall deliver the manuals electronically, including all graphics, in the most current version of MS Word format. Digital photographs used in the maintenance manuals shall be provided electronically for each operator and maintenance task.
CDRL A011, Commercial-Off-The-Shelf (COTS) Manual and Associated Supplemental
Data
3.3.15 Packaging, Handling, Storage and Transportation. The Contractor shall be responsible for preservation and packaging of the deliverables under the terms of this SOW. Packaging shall be in accordance with MIL-STD-2073-1E.
All packages containing SBNVG shall contain the quantity and serial number of enclosed systems.
3.3.15.1 Preservation and Packaging (P&P). Shipments for immediate use shall be preserved and packaged by the Contractor in accordance with the best commercial practices of ASTM D3951-18. Items scheduled for Outside the
Continental United States (OCONUS) overseas shipment shall be preserved and packaged by the Contractor in accordance with ASTM D3951-18, paragraph 6.1., Export requirements. Marking of all items for shipment and storage shall be in accordance with MIL-STD-129R.
3.3.15.2 Development of Marking Requirements. Marking shall be accomplished by the Contractor in accordance with MIL-STD-129R.
3.3.15.3 Hazardous Materials. Hazardous materials shall be P&P’d in accordance with FED-STD-313.
3.3.16 Product Quality Deficiency Reports (PQDR). Upon receipt of a PQDR, the
Contractor shall execute Support Point responsibilities in accordance with
MCO 4855.10C. The use of NAVMC 4855.1 as guidance is strongly encouraged.
3.3.17 Warranty. The Contractor shall provide a standard commercial warranty on the SBNVG. The Contractor shall warrant the SBNVG to be free from any defects in material or workmanship and there shall be no degradation of system operation or performance due to manufacturing defects during the period of warranty. The Contractor shall be responsible for all costs relative to the shipping and handling of returns approved for warranty service to and from Marine Corps Logistics Base, Albany, GA. Warranty repair turnaround time shall not exceed thirty (30) calendar days after receipt of system at Contractor’s facility.
3.3.17.1 Warranty Procedures. Upon notification by an authorized Marine
Corps activity of a warranty failure, the Contractor will provide a Return
Material Authorization number and appropriate shipping instructions. The
Contractor will prepare a new DD Form 1149 (Requisition and Invoice/Shipping
Document) for return shipments, to include system serialization data as part of the data requirements called for within DD Form 1149 block 4 (b).
3.3.17.2 Warranty Exclusions. Repair by authorized Marine Corps personnel in accordance with Contractor developed maintenance procedures will not void this warranty.
3.3.17.3 Warranty Returns. Government will return the Equipment to
Contractor during the warranty period, transportation prepaid, for
Contractor’s examination and determination that such Equipment is defective and covered by the terms of the Warranty. Upon receipt of the failed SBNVG, a joint inspection shall be conducted with a Government Defense Contract
Management Agency (DCMA) representative to verify the warranty status of the item. However, if the equipment is deployed on a ship or if in a location that the Government cannot return the equipment during the Warranty period, and the Government has properly notified the Contractor that the equipment malfunctioned during the Warranty period, Contractor shall honor the Warranty as though the unit was returned during the Warranty period. The Warranty on any portion of the Equipment which has been repaired or replaced by the
Contractor under this Warranty shall be for the balance of the original
Warranty period, or 90 days, whichever is longer. This Warranty specifically covers the SBNVG complete System.
3.3.18 Interim Contractor Support (ICS). ICS may be implemented for the
SBNVG for a period of one (1) year with an additional option period of one
(1) year. During this time, the Contractor shall develop and implement maintenance support capabilities that will transition to full organic support conducted by the Marine Corps.
The Contractor shall receive, inspect, and conduct test and failure analysis to determine the specific work required to restore each SBNVG to an operational condition or recommend condemnation. The Contractor shall repair any SBNVG determined to be defective upon authorization by the Government.
Disassembly shall be limited to the minimum extent possible.
The Contractor shall notify the Government within 48 hours for disposition instructions. The Contractor shall be responsible for the procurement actions for all spares and repair parts required to accomplish the work specified in the SOW during the PoP. All parts and materials used during the repair process shall meet or exceed the original specifications and technical data requirements of the applicable contracts.
The Contractor shall store all units and spare parts in such a manner as to preclude any damage or loss. The Contractor shall not be required to restore the SBNVG to a like-new cosmetic condition; however, damage to protective finishes shall be repaired to the extent necessary to provide adequate protection during field usage and to maintain corrosion prevention and structural integrity. The Contractor shall replace all damaged markings, identifications, and decals if the markings, identifications, or decals become unreadable. The Contractor shall ensure all repaired, upgraded, or modified systems meet or exceed the original performance. Scratches, delaminating or other optical flaws on the optics will be repaired only if they degrade the system’s performance.
3.3.18.1 Major/Moderate/Minor/Assessment Criteria. The Contractor shall characterize all individual SBNVG maintenance tasks which comprise the sum total of all maintenance tasks required to execute SBNVG non-warranty repairs under the following criteria: Minor (Level 1), Moderate (Level 2), or Major
(Level 3).
The criteria used to categorize/organize individual non-warranty repair tasks shall be as follows:
a. Level 1 repair shall not exceed 8% of the current year SBNVG price per the contract.
b. Level 2 repair shall not exceed 40% of the current year SBNVG price per the contract.
c. Level 3 repair shall not exceed 65% of the current year SBNVG price per the contract (unless otherwise approved by the Government).
3.3.18.2 Receipt and Inspections. Upon receipt at the contractor’s facility, the Contractor and the Government shall perform a joint inspection.
The incoming inspection shall check for the following:
a. SBNVG identification, visible damage or mishandling, completeness and accuracy of accompanying paperwork/documentation.
b. Deficiencies found during the incoming inspection shall be brought to the attention of the Government representative.
3.3.18.3 Inspection and Acceptance. Should a Government representative be unavailable for final inspection/acceptance after repair, a day-to-day slip in the repair turnaround time will be allowed. The Contractor shall ensure that each repaired and serviceable SBNVG is packaged IAW this statement of work.
3.3.18.4 Time Constraints. The Contractor shall acknowledge receipt within two (2) business day. The ICS repair shall be completed within thirty (30) business days after the joint determination with the Government.
3.3.18.5 ICS Tracking. The Contractor shall track shipments to ensure direct and timely arrival to and receipt from Marine Corps Logistics Base, Albany, GA. The Contractor shall immediately notify the Contracting Activity about any shipping problems or delivery delays that may be encountered.
3.3.18.6 Transportation. The Contractor shall establish transportation processes and procedures for equipment returns. The Contractor shall price
ICS, including transportation costs, for major, moderate, and minor repairs.
4.0 SECURITY REQUIREMENTS
This contract will require the contractor to have a Secret Facility Clearance and will require certain contractors to obtain and maintain classified access eligibility. The contractor shall have a valid Secret Facility Clearance and a Secret Document Safeguarding Level prior to classified performance at the contractor’s facility. The prime contractor and all sub-contractors (through the prime contractor) shall adhere to all aspects of DoD Directive 5220.22-M and DoD Manual 5220.22 Volume 2. All personnel identified to perform on this contract shall maintain compliance with Department of Defense, Department of the Navy, and Marine Corps Information and Personnel Security Policy to include completed background investigations (as required) prior to classified performance. This contract shall include a DoD Contract Security
Classification Specification (DD-254) as an attachment.
4.1 Classified Information. The Contractor shall comply with FAR 52.204-2, Security Requirement. This clause involves access to information identified as “Confidential,” “Secret,” or “Top Secret” and requires contractors to comply with: (1) the Security Agreement (DD Form 441), including the National
Industrial Security Program Operating Manual (DoD 5220.22-M); and (2) any revisions to the DoD 5220.22-M, notice of which has been furnished to the contractor.
The Contractor shall utilize Security Classification Guides for Image
Intensifier Devices and Infrared Focal Plane Technology Development for