This is a self-scoring matrix template for offerors responding to the Little Rock Air Force Base (LRAFB) Multiple Award Construction Contract (MACC) solicitation. The matrix establishes a Highest Technically Rated Offeror with Fair and Reasonable Price (HTRO-RFP) evaluation methodology with a maximum possible score of 17,030 points across six evaluation categories. Category 1 (Relevant Construction Experience) is worth up to 10,900 points and requires submission of construction projects completed within the last seven years and at least 80% complete by July 30, 2026, across multiple trade and specialized trade categories including US Government construction, secured area construction, fire protection/suppression systems, road construction, hazardous material abatement, building automation/data systems, and roofing. Category 2 (Design Experience) is worth up to 2,080 points and evaluates design-build projects over $1 million in construction cost, with additional points awarded for specific scope elements such as seismic work, SCIF shielding, roofing, and various MEP systems. Category 3 (Past Performance) is worth up to 1,000 points based on CPARS evaluations or Past Performance Questionnaires, with ratings of Exceptional (20 points each, maximum 50 items), Very Good (15 points each), and Satisfactory (10 points each).
Category 4 (Staffing) is worth up to 1,000 points for in-house personnel qualifications including trade/construction workers, architects/engineers, Certified Safety Manager, Qualified Fire Protection Engineer, and Hazardous Material Abatement training certification. Category 5 (Geographic Expertise) is worth up to 50 points based on proximity of manned offices to Little Rock AFB, with 50 points for offices within 100 miles, 25 points for 101-500 miles, and 0 points for locations over 500 miles. Category 6 (Estimating Capability) is worth up to 2,000 points and evaluates pricing documentation quality, ranging from fully detailed with unit prices consistent with current market rates (2,000 points) to incomplete or inconsistent pricing (0 points). The document includes an example maximum points sheet demonstrating how a fully qualified offeror can achieve the maximum 17,030-point score by submitting up to 12 work samples across multiple construction experience thresholds, two design-build projects, at least 5 CPARS/PPQ evaluations rated Exceptional, all required staffing credentials, geographic presence within 100 miles of the base, and fully detailed pricing documentation.
View the file
Other files
Show all 20
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Self-Score Sheet
| Little Rock AFB MACC | |||||
| Solicitation No.: | |||||
| Self Scoring Matrix | |||||
| ***Offerors only update the yellow cells below*** | |||||
| Element | Offeror to Fill These Columns Only | Point Value | Score |
Instruction to Offeror Category 1 – RELEVANT CONSTRUCTION EXPERIENCE
| Relevant Experience Projects: (The submitted projects must meet the conditions listed, must have taken place within the last 7 years of the release date of the MACC solicitation, and at least 80% completed no later 30 July 2026) | ||||||
| Category 1 | Commercial, Industrial & Residential Bldg. Multi Trade. Note: Category 1 has a maximum of 12 work samples for this section. For subcatagory c-f you will reference the initial 12 work samples in a-b. Offereor is responsible for numbering projects and filling in "Work Sample #" section with the corresponding project. | |||||
| a | Submit a Project for each threshold, up to 4 total multiple trade projects for each | Work Sample # | 0-4 Projects | Point Value Each | Total Across | |
| Prime Contractor under $250K Multiple Trade: Note: each project submitted receives a max point value of 100pts. | 100 | 0 | ||||
| Prime Contractor $250K to $1.0M Multiple Trades: Note: each project submitted receives a max point value of 200pts | 200 | 0 | ||||
| Prime Contractor over $1.0M Multiple Trades: Note: each project submitted receives a max point value of 300pts. | 300 | 0 | ||||
| b | Identify the number of trades managed for each project above. Note: This section has only a maximum of 12 projects, not 12 for each amount of trades. | Work Sample # | 0-12 Projects | Point Value Each | Total Across | |
| Number of trades <5 Note: each project submitted receives a max point value of 50pts. | 50 | 0 | ||||
| Number of trades 5-10 Note: each project submitted receives a max point value of 200pts. | 200 | 0 | ||||
| Number of trades >10 Note: each project submitted receives a max point value of 300pts. | 300 | 0 | ||||
| c | Construction for the US Government | |||||
| Submit a Project executed for the US Government for each threshold, up to 4 total projects for each | Work Sample # | 0-4 Projects | Point Value Each | Total Across | ||
| Prime Contractor Under $1M: Note: each project submitted receives a max point value of 200pts. | 200 | 0 | ||||
| Prime Contractor Over $1M: Note: each project submitted receives a max point value of 300pts. | 300 | 0 | ||||
| d | Multiple Construction Multi Trade | |||||
| Submit 2 to 5 Projects executed in parallel during a period of at least 6 months | Work Sample # | 2-5 Projects | Point Value Each | Total Across | ||
| Prime Contractor Multiple Projects parallel in execution: Note: each project submitted receives a max point value of 100pts. | 100 | 0 | ||||
| e | Construction in Secured Areas (e.g. Munition area, Sensitive Compartment Information Facilities, Bunkers, etc.) | |||||
| Submit a Project for each threshold, up to 3 total projects for each | Work Sample # | 0-3 Projects | Point Value Each | Total Across | ||
| Prime Contractor Under $750K: Note: each project submitted receives a max point value of 100pts. | 100 | 0 | ||||
| Prime Contractor Over $750K: Note: each project submitted receives a max point value of 200pts. | 200 | 0 | ||||
| f | Individual Trade (Individual trade shall be at least 60% of total project) | |||||
| Submit a Project for each threshold, up to 1 total individual trade projects for each | Work Sample # | 0-1 Projects | Point Value Each | Total Across | ||
| Prime Contractor Under $500K FIRE PROTECTION/SUPPRESSION SYSTEMS: Note: each project submitted receives a max point value of 100pts | 100 | 0 | ||||
| Prime Contractor Over $500K FIRE PROTECTION/SUPPRESSION SYSTEMS: Note: each project submitted receives a max point value of 200pts. | 200 | 0 | ||||
| Prime Contractor Under $500K ROAD CONSTRUCTION: Note: each project submitted receives a max point value of 100pts | 100 | 0 | ||||
| Prime Contractor Over $500K ROAD CONSTRUCTION: Note: each project submitted receives a max point value of 200pts. | 200 | 0 | ||||
| Prime Contractor Under $500K HAZARDEOUS MATERIAL ABATEMENT: Note: each project submitted receives a max point value of 100pts | 100 | 0 | ||||
| Prime Contractor Over $500K HAZARDEOUS MATERIAL ABATEMENT: Note: each project submitted receives a max point value of 200pts. | 200 | 0 | ||||
| Prime Contractor Under $500K BUILDING AUTOMATION/DATA SYSTEMS: Note: each project submitted receives a max point value of 100pts | 100 | 0 | ||||
| Prime Contractor Over $500K BUILDING AUTOMATION/DATA SYSTEMS: Note: each project submitted receives a max point value of 200pts. | 200 | 0 | ||||
| Prime Contractor Under $750K ROOFING: Note: each project submitted receives a max point value of 100pts | 100 | 0 | ||||
| Prime Contractor Over $750K ROOFING: Note: each project submitted receives a max point value of 200pts. | 200 | 0 | ||||
| SUBTOTAL SCORE FOR THIS SECTION ONLY: | 0 | |||||
| Instruction to Offeror | Category 2 - DESIGN EXPERIENCE | |||||
| Relevant Design Projects: (The submitted projects must meet the conditions listed, must have taken place within the last 7 years of the release date of the MACC solicitation, and at least 80% completed no later 30 July 2026) | ||||||
| Category 2 | Experience as Prime on Design-Build Projects (KTR Designing then Building) Note: Category 2 will use the same projects from Category 1. | |||||
| a | Submit a Project with Design Build effort, up to 2 total projects. Note: fill in "Work Sample #" section with the corresponding project number. | Work Sample # | 0-2 Projects | Point Value Each | Total Across | |
| Prime Contractor over $1M construction cost: Note: each project submitted receives a max point value of 400pts. | 400 | 0 | ||||
| b | For one of the projects above did it include the following scope? Note: fill in "Work Sample #" section with the corresponding project number. | Yes or No | Point Value Each | Total Across | ||
| Architectural | ||||||
| Space Utilization | 40 | 0 | ||||
| Enevlope | 40 | 0 | ||||
| Phased Construction (in occupied buildings) | 40 | 0 | ||||
| Sound Attenuation/STC | 40 | 0 | ||||
| ABA Compliance | 40 | 0 | ||||
| Roofing | 100 | 0 | ||||
| Civil | ||||||
| Pavement | 20 | 0 | ||||
| Demolition and Abatement | 20 | 0 | ||||
| GIS/As-builts | 20 | 0 | ||||
| Site Development | 40 | 0 | ||||
| SWPPP | 20 | 0 | ||||
| Drainage | 40 | 0 | ||||
| Utility Modification | 40 | 0 | ||||
| Mechanical | ||||||
| Building Automation Systems | 60 | 0 | ||||
| Testing and Balancing | 40 | 0 | ||||
| Coine Compliant Metering | 40 | 0 | ||||
| HVAC (4-pipe) | 40 | 0 | ||||
| Structural | ||||||
| New Footprint (foundation and structure related to new construction) | 40 | 0 | ||||
| Structural Retrofit (hugger systems) | 40 | 0 | ||||
| Seismic | 100 | 0 | ||||
| Electrical | ||||||
| Lightning Protection | 40 | 0 | ||||
| NIPR/SIPR | 40 | 0 | ||||
| Mass Notification | 40 | 0 | ||||
| Communication Systems | 40 | 0 | ||||
| Back-up Generation | 40 | 0 | ||||
| Fire Suppression and Detection | ||||||
| Fire Alarm Testing/Commissioning | 40 | 0 | ||||
| NFPA 101 Life Safety Code | 40 | 0 | ||||
| Security | ||||||
| SCIF (RF Shielding) | 100 | 0 | ||||
| ATFP/ECPs | 40 | 0 | ||||
| SUBTOTAL SCORE FOR THIS SECTION ONLY: | 0 | |||||
| Instruction to Offeror | Category 3 - PAST PERFORMANCE | |||||
| Category 3 | Contractor Performance Assessment Reporting System (CPARS) evaluations or completed Past Performance Questionnaires (PPQs) for the relevant projects you submitted in Sections 1 and 2 (Provide at least 5 but not to exceed 10 CPARS/PPQ). | |||||
| Based off submitted CPARS/PPQs, tally the ratings accordingly and input them into the quantity section. Max allowed quantity is 50. (See Example Max Pts. sheet) | ||||||
| Exceptional | Quantity | Point Value Each | Total Across | |||
| Documented rating of Exceptional on a CPARS or PPQ. | 20 | 0 | ||||
| Very Good | ||||||
| Documented rating of Very Good on a CPARS or PPQ. | 15 | 0 | ||||
| Satisfactory | ||||||
| Documented rating of Satisfactory on a CPARS or PPQ. | 10 | 0 | ||||
| Marginal | ||||||
| Documented rating of Marginal on a CPARS or PPQ. | 0 | 0 | ||||
| Unsatisfactory | ||||||
| Documented rating of Unsatisfactory on a CPARS or PPQ. | 0 | 0 | ||||
| SUBTOTAL SCORE FOR THIS SECTION ONLY: | 0 | |||||
| Instruction to Offeror | Category 4 - STAFFING | |||||
| Category 4 | Does the Offeror have each or any of the following in their own company? Type the word Yes or No in Column D. | |||||
| a | Trade/Construction Workers | |||||
| Submit number of personnel, pick only one | Yes or No | Point Value Each | Total Across | |||
| 1 - 5 Workers: Note: Only one Yes which = 100pts max /No = 0pts. | 100 | 0 | ||||
| >5 Workers: Note: Only one Yes, which = 200pts. Max/No = 0pts | 200 | 0 | ||||
| b | Architects/Engineers | |||||
| Submit number of personnel, pick only one | ||||||
| 1 - 3 A/E: Note: Only one Yes which = 100pts max /No = 0pts. | 100 | 0 | ||||
| >3 A/E: Note: Only one Yes which = 200pts max /No = 0pts. | 200 | 0 | ||||
| c | Certified Safety Manager | |||||
| Certificate: Only one Yes which = 200pts max /No = 0pts. | 200 | 0 | ||||
| d | Qualified Fire Protection Engineer | |||||
| Certificate: Only one Yes which = 200pts max /No = 0pts. | 200 | 0 | ||||
| e | Certified Training for Hazardous Material abatement TRGS (Technical Rules for Hazardous Substances) | |||||
| Certificate: Only one Yes which = 200pts max /No = 0pts. | 200 | 0 | ||||
| SUBTOTAL SCORE FOR THIS SECTION ONLY: | 0 | |||||
| Instruction to Offeror | Category 5 - GEOGRAPHIC EXPERTISE | |||||
| Category 5 | Does the Offeror have each or any of the following? Type the word Yes or No in Column D. | |||||
| a | Existing manned office within 100mi of Little Rock Air Force Base | Yes or No | Point Value Each | Total Across | ||
| Certificate: Only one Yes which = 50pts max /No = 0pts. | 50 | 0 | ||||
| b | Existing manned office within 101-500mi of Little Rock Air Force Base | |||||
| Certificate: Only one Yes which = 25pts max /No = 0pts. | 25 | 0 | ||||
| c | Existing manned office more than 500mi of Little Rock Air Force Base | |||||
| Certificate: Only one Yes which = 0pts max /No = 0pts. | 0 | 0 | ||||
| SUBTOTAL SCORE FOR THIS SECTION ONLY: | 0 | |||||
| Instruction to Offeror | Category 6 - ESTIMATING CAPABILITY | |||||
| Category 6 | Did the offeror provide complete, fair and reasonable pricing of the sample project? Type the work Yes or No in Column D. | |||||
| Evaluation is based on the documentation submitted in Volume IV. | Yes or No | Point Value Each | Total Across | |||
| Fully detailed, well-documented, unit prices consistent with current market rates. Note: Only one Yes which = 2000pts max/No = 0pts. | 2000 | 0 | ||||
| Generally complete with minor gaps. Note: Only one Yes which = 900pts max/No = 0pts. | 900 | 0 | ||||
| Basic approach, lacks sufficient documentation. Note: Only one Yes which = 50pts max/No = 0pts. | 50 | 0 | ||||
| Incomplete or inconsistent with a credible understanding of scope. Note: Only one Yes which = 0pts max/No = 0pts. | 0 | 0 | ||||
| SUBTOTAL SCORE FOR THIS SECTION ONLY: | 0 | |||||
| TOTAL POINTS SCORED | - 0 | |||||
| MAXIMUM POINTS | 17,030 | |||||
| Remarks: For Section 1 & 2 only, projects can be submitted multiple times if applicable to more than one category. |
Example Max Pts.
| Little Rock AFB MACC |
| Solicitation No.: |
| Self Scoring Matrix |
Element Offeror to Fill These Columns Only Point Value Score
Instruction to Offeror Category 1 – RELEVANT CONSTRUCTION EXPERIENCE
| Relevant Experience Projects: (The submitted projects must meet the conditions listed, must have taken place within the last 7 years of the release date of the MACC solicitation, and at least 80% completed no later 30 July 2026) | ||||||
| Category 1 | Commercial, Industrial & Residential Bldg. Multi Trade. Note: Category 1 has a maximum of 12 work samples for this section. For subcatagory c-f you will reference the initial 12 work samples in a-b. Offereor is responsible for numbering projects and filling in "Work Sample #" section with the corresponding project. | |||||
| a | Submit a Project for each threshold, up to 4 total multiple trade projects for each | Work Sample # | 0-4 Projects | Point Value Each | Total Across | |
| Prime Contractor under $250K Multiple Trade: Note: each project submitted receives a max point value of 100pts. | 1,5,8,11 | 4 | 100 | 400 | ||
| Prime Contractor $250K to $1.0M Multiple Trades: Note: each project submitted receives a max point value of 200pts | 2,4,10,12 | 4 | 200 | 800 | ||
| Prime Contractor over $1.0M Multiple Trades: Note: each project submitted receives a max point value of 300pts. | 3,6,7,9 | 4 | 300 | 1200 | ||
| b | Identify the number of trades managed for each project above. Note: This section has only a maximum of 12 projects, not 12 for each amount of trades. | Work Sample # | 0-12 Projects | Point Value Each | Total Across | |
| Number of trades <5 Note: each project submitted receives a max point value of 50pts. | 0 | 50 | 0 | |||
| Number of trades 5-10 Note: each project submitted receives a max point value of 200pts. | 0 | 200 | 0 | |||
| Number of trades >10 Note: each project submitted receives a max point value of 300pts. | 1-12 | 12 | 300 | 3600 | ||
| c | Construction for the US Government | |||||
| Submit a Project executed for the US Government for each threshold, up to 4 total projects for each | Work Sample # | 0-4 Projects | Point Value Each | Total Across | ||
| Prime Contractor Under $1M: Note: each project submitted receives a max point value of 200pts. | 2,9,11,12 | 4 | 200 | 800 | ||
| Prime Contractor Over $1M: Note: each project submitted receives a max point value of 300pts. | 4,7,8,10 | 4 | 300 | 1200 | ||
| d | Multiple Construction Multi Trade | |||||
| Submit 2 to 5 Projects executed in parallel during a period of at least 6 months | Work Sample # | 2-5 Projects | Point Value Each | Total Across | ||
| Prime Contractor Multiple Projects parallel in execution: Note: each project submitted receives a max point value of 100pts. | 3,6,8,10,12 | 5 | 100 | 500 | ||
| e | Construction in Secured Areas (e.g. Munition area, Sensitive Compartment Information Facilities, Bunkers, etc.) | |||||
| Submit a Project for each threshold, up to 3 total projects for each | Work Sample # | 0-3 Projects | Point Value Each | Total Across | ||
| Prime Contractor Under $750K: Note: each project submitted receives a max point value of 100pts. | 1,4,9 | 3 | 100 | 300 | ||
| Prime Contractor Over $750K: Note: each project submitted receives a max point value of 200pts. | 3,10,12 | 3 | 200 | 600 | ||
| f | Individual Trade (Individual trade shall be at least 60% of total project) | |||||
| Submit a Project for each threshold, up to 1 total individual trade projects for each | Work Sample # | 0-1 Projects | Point Value Each | Total Across | ||
| Prime Contractor Under $500K FIRE PROTECTION/SUPPRESSION SYSTEMS: Note: each project submitted receives a max point value of 100pts | 2 | 1 | 100 | 100 | ||
| Prime Contractor Over $500K FIRE PROTECTION/SUPPRESSION SYSTEMS: Note: each project submitted receives a max point value of 200pts. | 5 | 1 | 200 | 200 | ||
| Prime Contractor Under $500K ROAD CONSTRUCTION: Note: each project submitted receives a max point value of 100pts | 6 | 1 | 100 | 100 | ||
| Prime Contractor Over $500K ROAD CONSTRUCTION: Note: each project submitted receives a max point value of 200pts. | 10 | 1 | 200 | 200 | ||
| Prime Contractor Under $500K HAZARDEOUS MATERIAL ABATEMENT: Note: each project submitted receives a max point value of 100pts | 1 | 1 | 100 | 100 | ||
| Prime Contractor Over $500K HAZARDEOUS MATERIAL ABATEMENT: Note: each project submitted receives a max point value of 200pts. | 5 | 1 | 200 | 200 | ||
| Prime Contractor Under $500K BUILDING AUTOMATION/DATA SYSTEMS: Note: each project submitted receives a max point value of 100pts | 4 | 1 | 100 | 100 | ||
| Prime Contractor Over $500K BUILDING AUTOMATION/DATA SYSTEMS: Note: each project submitted receives a max point value of 200pts. | 11 | 1 | 200 | 200 | ||
| Prime Contractor Under $750K ROOFING: Note: each project submitted receives a max point value of 100pts | 4 | 1 | 100 | 100 | ||
| Prime Contractor Over $750K ROOFING: Note: each project submitted receives a max point value of 200pts. | 5 | 1 | 200 | 200 | ||
| SUBTOTAL SCORE FOR THIS SECTION ONLY: | 10900 | |||||
| Instruction to Offeror | Category 2 - DESIGN EXPERIENCE | |||||
| Relevant Design Projects: (The submitted projects must meet the conditions listed, must have taken place within the last 7 years of the release date of the MACC solicitation, and at least 80% completed no later 30 July 2026) | ||||||
| Category 2 | Experience as Prime on Design-Build Projects (KTR Designing then Building) Note: Category 2 will use the same projects from Category 1. | |||||
| a | Submit a Project with Design Build effort, up to 2 total projects. Note: fill in "Work Sample #" section with the corresponding project number. | Work Sample # | 0-2 Projects | Point Value Each | Total Across | |
| Prime Contractor over $1M construction cost: Note: each project submitted receives a max point value of 400pts. | 5,10 | 2 | 400 | 800 | ||
| b | For one of the projects above did it include the following scope? Note: fill in "Work Sample #" section with the corresponding project number. | 5 | Yes or No | Point Value Each | Total Across | |
| Architectural | ||||||
| Space Utilization | Yes | 40 | 40 | |||
| Enevlope | Yes | 40 | 40 | |||
| Phased Construction (in occupied buildings) | Yes | 40 | 40 | |||
| Sound Attenuation/STC | Yes | 40 | 40 | |||
| ABA Compliance | Yes | 40 | 40 | |||
| Roofing | Yes | 100 | 100 | |||
| Civil | ||||||
| Pavement | Yes | 20 | 20 | |||
| Demolition and Abatement | Yes | 20 | 20 | |||
| GIS/As-builts | Yes | 20 | 20 | |||
| Site Development | Yes | 40 | 40 | |||
| SWPPP | Yes | 20 | 20 | |||
| Drainage | Yes | 40 | 40 | |||
| Utility Modification | Yes | 40 | 40 | |||
| Mechanical | ||||||
| Building Automation Systems | Yes | 60 | 60 | |||
| Testing and Balancing | Yes | 40 | 40 | |||
| Coine Compliant Metering | Yes | 40 | 40 | |||
| HVAC (4-pipe) | Yes | 40 | 40 | |||
| Structural | ||||||
| New Footprint (foundation and structure related to new construction) | Yes | 40 | 40 | |||
| Structural Retrofit (hugger systems) | Yes | 40 | 40 | |||
| Seismic | Yes | 100 | 100 | |||
| Electrical | ||||||
| Lightning Protection | Yes | 40 | 40 | |||
| NIPR/SIPR | Yes | 40 | 40 | |||
| Mass Notification | Yes | 40 | 40 | |||
| Communication Systems | Yes | 40 | 40 | |||
| Back-up Generation | Yes | 40 | 40 | |||
| Fire Suppression and Detection | ||||||
| Fire Alarm Testing/Commissioning | Yes | 40 | 40 | |||
| NFPA 101 Life Safety Code | Yes | 40 | 40 | |||
| Security | ||||||
| SCIF (RF Shielding) | Yes | 100 | 100 | |||
| ATFP/ECPs | Yes | 40 | 40 | |||
| SUBTOTAL SCORE FOR THIS SECTION ONLY: | 2080 | |||||
| Instruction to Offeror | Category 3 - PAST PERFORMANCE | |||||
| Category 3 | Contractor Performance Assessment Reporting System (CPARS) evaluations or completed Past Performance Questionnaires (PPQs) for the relevant projects you submitted in Sections 1 and 2 (Provide at least 5 but not to exceed 10 CPARS/PPQ). | |||||
| Based off submitted CPARS/PPQs, tally the ratings accordingly and input them into the quantity section. Max allowed quantity is 50. (See Example Max Pts. sheet) | ||||||
| Exceptional | Quantity | Point Value Each | Total Across | |||
| Documented rating of Exceptional on a CPARS or PPQ. | 50 | 20 | 1000 | |||
| Very Good | ||||||
| Documented rating of Very Good on a CPARS or PPQ. | 0 | 15 | 0 | |||
| Satisfactory | ||||||
| Documented rating of Satisfactory on a CPARS or PPQ. | 0 | 10 | 0 | |||
| Marginal | ||||||
| Documented rating of Marginal on a CPARS or PPQ. | 0 | 0 | 0 | |||
| Unsatisfactory | ||||||
| Documented rating of Unsatisfactory on a CPARS or PPQ. | 0 | 0 | 0 | |||
| SUBTOTAL SCORE FOR THIS SECTION ONLY: | 1000 | |||||
| Instruction to Offeror | Category 4 - STAFFING | |||||
| Category 4 | Does the Offeror have each or any of the following in their own company? Type the word Yes or No in Column D. | |||||
| a | Trade/Construction Workers | |||||
| Submit number of personnel, pick only one | Yes or No | Point Value Each | Total Across | |||
| 1 - 5 Workers: Note: Only one Yes which = 100pts max /No = 0pts. | No | 100 | 0 | |||
| >5 Workers: Note: Only one Yes, which = 200pts. Max/No = 0pts | Yes | 200 | 200 | |||
| b | Architects/Engineers | |||||
| Submit number of personnel, pick only one | ||||||
| 1 - 3 A/E: Note: Only one Yes which = 100pts max /No = 0pts. | No | 100 | 0 | |||
| >3 A/E: Note: Only one Yes which = 200pts max /No = 0pts. | Yes | 200 | 200 | |||
| c | Certified Safety Manager | |||||
| Certificate: Only one Yes which = 200pts max /No = 0pts. | Yes | 200 | 200 | |||
| d | Qualified Fire Protection Engineer | |||||
| Certificate: Only one Yes which = 200pts max /No = 0pts. | Yes | 200 | 200 | |||
| e | Certified Training for Hazardous Material abatement TRGS (Technical Rules for Hazardous Substances) | |||||
| Certificate: Only one Yes which = 200pts max /No = 0pts. | Yes | 200 | 200 | |||
| SUBTOTAL SCORE FOR THIS SECTION ONLY: | 1000 | |||||
| Instruction to Offeror | Category 5 - GEOGRAPHIC EXPERTISE | |||||
| Category 5 | Does the Offeror have each or any of the following? Type the word Yes or No in Column D. | |||||
| a | Existing manned office within 100mi of Little Rock Air Force Base | Yes or No | Point Value Each | Total Across | ||
| Certificate: Only one Yes which = 50pts max /No = 0pts. | Yes | 50 | 50 | |||
| b | Existing manned office within 101-500mi of Little Rock Air Force Base | |||||
| Certificate: Only one Yes which = 25pts max /No = 0pts. | No | 25 | 0 | |||
| c | Existing manned office more than 500mi of Little Rock Air Force Base | |||||
| Certificate: Only one Yes which = 0pts max /No = 0pts. | No | 0 | 0 | |||
| SUBTOTAL SCORE FOR THIS SECTION ONLY: | 50 | |||||
| Instruction to Offeror | Category 6 - ESTIMATING CAPABILITY | |||||
| Category 6 | Did the offeror provide complete, fair and reasonable pricing of the sample project? Type the work Yes or No in Column D for only 1 of the following. | |||||
| Evaluation is based on the documentation submitted in Volume IV. | Yes or No | Point Value Each | Total Across | |||
| Fully detailed, well-documented, unit prices consistent with current market rates. Note: Yes which = 2000pts max/No = 0pts. | Yes | 2000 | 2000 | |||
| Generally complete with minor gaps. Note: Yes which = 900pts max/No = 0pts. | No | 900 | 0 | |||
| Basic approach, lacks sufficient documentation. Note: Yes which = 50pts max/No = 0pts. | No | 50 | 0 | |||
| Incomplete or inconsistent with a credible understanding of scope. Note: Yes which = 0pts max/No = 0pts. | No | 0 | 0 | |||
| SUBTOTAL SCORE FOR THIS SECTION ONLY: | 2000 | |||||
| TOTAL POINTS SCORED | 17,030 | |||||
| MAXIMUM POINTS | 17,030 |