This file contains on/off ramping procedures for a Multiple Award Construction Contract (MACC) IDIQ vehicle being established by Little Rock Air Force Base (LRAFB) 19th Contracting Squadron under the Air Force Installation Contracting Center (AFICC). The procedures outline the administrative and operational mechanisms for contractors to enter (on-ramp) and exit (off-ramp) the MACC IDIQ contract throughout its performance period. The MACC is structured as an Indefinite Delivery/Indefinite Quantity (IDIQ) contract with an anticipated one 3-year base period, two optional 2-year periods, and a possible six-month extension, supporting multiple award construction services at Little Rock Air Force Base.
The on/off ramping procedures document establishes the framework for managing contractor participation on this multiple-award vehicle, allowing new qualified contractors to be added to the contract vehicle during designated windows and providing an exit mechanism for contractors who can no longer meet contract requirements. These procedures are critical to the overall contract administration strategy and ensure continuity of construction services while allowing flexibility in contractor availability and performance throughout the contract's full term of performance.
View the file
Other files
Show all 20
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
FA446027R0001
| Attachment |
| Aug 2026 |
ON AND OFF RAMP PROCEDURES
A. On-Ramping: The Government reserves the right to expand the competitive pool for small business competition at any time during the term of the contract.
i. The Government will advertise the re-opening of the competition on SAM.gov.
ii. The evaluation and selection of awardees for any on-ramp will be exactly the same as the evaluation and award criteria used for the MACC initial basic contract awards.
iii. Any additions due to on-ramps will not impact the MACC ceiling.
iv. The Government anticipates the following awards:
· Small Business Set Aside (SBSA) Awards – The Government intends to make eight (8) awards to the firms comprising the HTROs.
· The Government anticipates maintaining similar numbers of contracts awarded under each scope throughout the duration of the period of performance but may choose to have more or fewer contracts depending on the availability of qualified offerors and the needs of the Government.
v. Successful on-ramp awardees will compete with any existing or remaining contractors for all future TOs in the manner stated in the ordering procedures.
vi. The ordering period for new awardees will be in line with the dates established at initial award.
vii. The Government will not consider unsolicited requests for addition to the MACC.
B. Off-Ramping: The Government reserves the right to off-ramp any awardee who is not actively competing for orders, not winning awards, and/or are not performing Statement of Work (SOW) requirements satisfactorily.
i. Awardees must, on an annual basis, demonstrate their participation in the program.
ii. The Government will open dialogue with those awardees who are not actively competing for orders, are not winning awards, and/or are not performing SOW requirements satisfactorily. This may be accomplished during an annual Program Management Review (PMR) or at any other point deemed necessary.
iii. Any awardee whom the Government believes has not demonstrated participation in the program may be subject to off-ramping. This may occur either during the base period of three-years or the Government may elect not to exercise an awardee’s option. Option exercise continues to be a unilateral right of the Government and does not require dialogue with a contractor prior to making the determination to either exercise or not exercise an option.
iv. Any small businesses awarded a contract under the SBSA scope who outgrow their size standard by the end of the three (3) year basic period or during their two (2) year option period will be off-ramped.