This document is an email amendment (Amendment 7) for a Request for Proposals (RFP) issued by the Fermi National Accelerator Laboratory for the LBNF/DUNE project, with the specific RFP number LBNF-372427-KE. The amendment, sent by Ken Eichten, LBNF/DUNE Procurement Specialist IV, is intended to provide answers to questions from prospective offerors. Recipients are requested to acknowledge receipt of the amendment by emailing keichten@fnal.gov. The amendment includes an attached PDF with Questions and Answers (Q&A) related to the solicitation, though the specific Q&A content is not visible in this image.
View the file
Other files
Show all 11
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
From: Kenneth Eichten To: Kenneth Eichten Subject: FFDG RFP LBNF-372427-KE, Amendment 7 Date: Friday, September 19, 2025 10:10:13 AM Attachments: Q&A for Amendment 7.pdf
Prospective Offerors:
This email constitutes Amendment 7 to FFDG RFP LBNF-372427-KE. Please acknowledge receipt of this RFP amendment by sending an email to me at keichten@fnal.gov.
The purpose of this RFP amendment is to provide answers to questions from Prospective Offerors. Questions and answers are provided in the attachment to this email.
Regards, Ken Eichten LBNF/DUNE Procurement Specialist IV Fermi National Accelerator Laboratory
Cell Phone: 509-947-8720 keichten@fnal.gov mailto:keichten@fnal.gov
Q1 Is it possible to get a copy of the Fermilab Subcontractor Injury & Illness Data Questionnaire in Word format?
A1 A Microsoft Word version of the Fermilab Subcontractor Injury and Illness
Questionnaire is attached.
Q2 Can the requirements for the 4-gas meter be confirmed? Specifically, that CO2
(Carbon Dioxide) is required, not CO (Carbon Monoxide).
A2 The SOW states “Gas monitors shall have capacity to measure NO2, O2, CO2, H2S”. The current version of the SOW is not correct. The requirement is “NO2, O2, CO, H2S”.
Q3 There is a listed requirement for proximity sensors on hard hats. There is not a listed requirement for lights and hearing protection on hard hats. Are lights and hearing protection required for hard hats? Also, are there any other PPE requirements outside of standard Level D?
A3
• SOW Section 4.5 states “Type II Safety Helmet with cap lamp and chin strap” o Yes--a light mounted on the type II safety helmet is required for underground access o Hearing protection is also required based on the task--it is not required to be mounted to the type II safety helmet but provided as required for the task. If double hearing protection is required, then logic would prevail that safety helmet mounted ear muffs would be required to accomplish the required level of protection beyond ear plugs
• Additional requirements that exceed ‘level D’ include the listed PPE of “Reflective clothing (Class II)” and “Level IV cut resistant gloves”, both listed in the SOW