This document is an attachment providing key personnel requirements and evaluation criteria for Solicitation 36C26124R0053 to repair the Palo Alto Aquatic Center (Building 530). It requires offerors to submit resumes and qualifications for key personnel, including the project manager, project superintendent, quality control manager, and safety officer.

The attachment outlines the information that must be provided for each key person, including their name, proposed role, employment history, education, professional registrations, training, and experience on up to 5 similar projects completed within the past 6 years. The solicitation seeks to repair the aquatic center's HVAC, concrete, pool equipment, electrical, drywall, mold mitigation, and plumbing. Proposals are due by July 1, 2024 at 3pm PT, with a site visit scheduled for June 11, 2024 and RFIs due by June 20, 2024.

View the file

Other files

File Type Posted
36C26124R0053 0004.pdf PDF
07 54 23 - Thermoplastic Polyolefin Roofing TPO.pdf PDF
RM 117 revised Photograph Library 28 Jun 2024.pdf PDF
Rev SOW 6.28.2024 Aquatic Center.pdf PDF
07 22 00 - Roof and Deck Insulation.pdf PDF
07 92 00 - Joint Sealants.pdf PDF
07 60 00 - Flashing and Sheet Metal.pdf PDF
36C26124R0053 0003.pdf PDF
07 54 23 - Thermoplastic Polyolefin Roofing.pdf PDF
36C26124R0053 0002.pdf PDF
36C26124R0053 0001.pdf PDF
FINAL SOW B530 Rev 052224.pdf PDF
Exhibit 4 B530 Specifications Rev 052324_Part1.pdf PDF
DIVISION CONSTRUCTION COSTS- Repair Aquatic Center 640-24-116.docx DOCX document
Exhibit 5 B530 Drawings Rev 052324_Part2.pdf PDF
Wage Determination CA20240018 4.26.24.pdf PDF
Exhibit 5 B530 Drawings Rev 052324_Part1.pdf PDF
Evaluation Report.docx DOCX document
CONTRACTOR CERTIFICATION REGARDING SAFETY AND ENVIRONMENTAL.docx DOCX document
36C26124R0053 Repair Aquatic Center.pdf PDF
S02 - RFI Form.docx DOCX document
Photo Library.pdf PDF
Exhibit 4 B530 Specifications Rev 052324_Part3.pdf PDF
S02 - Past Performance Questionnaire.docx DOCX document
Exhibit 5 B530 Drawings Rev 052324_Part3.pdf PDF
ILSM - B530 Aquatic Center - 03.21.24.pdf PDF
Palo Alto Campus Map Site Visit.pdf PDF
Exhibit 4 B530 Specifications Rev 052324_Part2.pdf PDF
Exhibit 5 B530 Drawings Rev 052324_Part4.pdf PDF
Show all 29

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

36C26124R0053 Repair Aquatic Center Bldg 530

ATTACHMENT: PERSONNEL RESUMES EVALUATION

OFFERORS’s NAME: ________________________________

OFFEROR’S KEY PERSONNEL

EXPERIENCE/QUALIFICATIONS

Repair Aquatic Center

Provide the following information, on separate sheets, to demonstrate the key personnel's experience one for each:

Name:

Proposed Assignment to this Project:

Name of Firm, Position held, Dates of Employment:

Number of Years with other Firms, Position held, dates of employment:

Educational Background: (Year, Degree, Specialization, Name of U.S. Accredited University)

Professional Registration (if any): (Year, State, Discipline)

Training Course Completed: (COE construction quality management, Safety, etc.)

Familiar with Safety Compliance and Sustainability:

Provide a list of projects on a maximum of five projects that were completed by the key personnel within the past six years:

PROJECT 1:

Contract No:

Title:

Contract Amount:

Contract Start/Completion Date:

Role in Project (PM, Sup, QC, Safety):

Description of Work (Description shall adequately describe building construction):

PROJECT 2:

Contract No:

Title:

Contract Amount:

Contract Start/Completion Date:

PROJECT 3:

Contract No:

Title:

Contract Amount:

Contract Start/Completion Date:

Role in Project (PM, Sup, QC, Safety):

Description of Work (Description shall adequately describe building construction):

PROJECT 4:

Contract No:

Title:

Contract Amount:

Contract Start/Completion Date:

Role in Project (PM, Sup, QC, Safety): .

Description of Work (Description shall adequately describe building construction):

PROJECT 5:

Contract No:

Title:

Contract Amount:

Contract Start/Completion Date:

IF it is not clear from the information provided on the five projects described above, the proposal shall clearly indicate the number of years of Project Manager and Project Superintendent experience and shall NOT show combined experience, for example, Project Manager/Project Engineer for three years.