This document is an amendment to a solicitation for the repair of the Palo Alto Aquatic Center (Building 530) for the Department of Veterans Affairs, Veterans Health Administration, Veterans Integrated Service Network 21.

The amendment responds to several Requests for Information (RFIs) regarding the painting system required, the use of resinous coating, the governing scope of work document, and details on the roofing system. It provides specific quantities for painting the walls and window frames in the pool waiting room. The amendment also includes relevant specification sections for the roofing system. The original solicitation number is 36C26124R0053, and the proposal due date is July 1, 2024 at 3 PM PT. All questions and proposals should be emailed to samantha.henderson@va.gov.

View the file

Other files

File Type Posted
36C26124R0053 0004.pdf PDF
07 54 23 - Thermoplastic Polyolefin Roofing TPO.pdf PDF
RM 117 revised Photograph Library 28 Jun 2024.pdf PDF
Rev SOW 6.28.2024 Aquatic Center.pdf PDF
07 22 00 - Roof and Deck Insulation.pdf PDF
07 92 00 - Joint Sealants.pdf PDF
07 60 00 - Flashing and Sheet Metal.pdf PDF
07 54 23 - Thermoplastic Polyolefin Roofing.pdf PDF
36C26124R0053 0002.pdf PDF
36C26124R0053 0001.pdf PDF
FINAL SOW B530 Rev 052224.pdf PDF
Exhibit 4 B530 Specifications Rev 052324_Part1.pdf PDF
DIVISION CONSTRUCTION COSTS- Repair Aquatic Center 640-24-116.docx DOCX document
Exhibit 5 B530 Drawings Rev 052324_Part2.pdf PDF
Wage Determination CA20240018 4.26.24.pdf PDF
Exhibit 5 B530 Drawings Rev 052324_Part1.pdf PDF
Evaluation Report.docx DOCX document
CONTRACTOR CERTIFICATION REGARDING SAFETY AND ENVIRONMENTAL.docx DOCX document
Key Personnel Attachment for Evaluation 02.docx DOCX document
36C26124R0053 Repair Aquatic Center.pdf PDF
S02 - RFI Form.docx DOCX document
Photo Library.pdf PDF
Exhibit 4 B530 Specifications Rev 052324_Part3.pdf PDF
S02 - Past Performance Questionnaire.docx DOCX document
Exhibit 5 B530 Drawings Rev 052324_Part3.pdf PDF
ILSM - B530 Aquatic Center - 03.21.24.pdf PDF
Palo Alto Campus Map Site Visit.pdf PDF
Exhibit 4 B530 Specifications Rev 052324_Part2.pdf PDF
Exhibit 5 B530 Drawings Rev 052324_Part4.pdf PDF
Show all 29

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

5. PROJECT NUMBER (if applicable)

CODE 7. ADMINISTERED BY

2. AMENDMENT/MODIFICATION NUMBER

CODE

6. ISSUED BY

8. NAME AND ADDRESS OF CONTRACTOR

4. REQUISITION/PURCHASE REQ. NUMBER 3. EFFECTIVE DATE

9A. AMENDMENT OF SOLICITATION NUMBER

9B. DATED

PAGE OF PAGES

10A. MODIFICATION OF CONTRACT/ORDER NUMBER

10B. DATED

BPA NO. 1. CONTRACT ID CODE

FACILITY CODE CODE

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers

E. IMPORTANT:

is extended,

(a) By completing Items 8 and 15, and returning __________ copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY is not extended.

12. ACCOUNTING AND APPROPRIATION DATA

(REV. 11/2016)

is required to sign this document and return ___________ copies to the issuing office. is not, A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A.

15C. DATE SIGNED

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER

Contractor

16C. DATE SIGNED

14. DESCRIPTION OF AMENDMENT/MODIFICATION

16B. UNITED STATES OF AMERICA

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER 16A. NAME AND TITLE OF CONTRACTING OFFICER

15B. CONTRACTOR/OFFEROR

STANDARD FORM 30 PREVIOUS EDITION NOT USABLE

Prescribed by GSA - FAR (48 CFR) 53.243

(Type or print) (Type or print)

(Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

(Number, street, county, State and ZIP Code)

(If other than Item 6)

(Specify type of modification and authority)

(such as changes in paying office, appropriation date, etc.)

(If required)

(SEE ITEM 11)

(SEE ITEM 13)

(X)

CHECK

ONE

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

(Signature of person authorized to sign) (Signature of Contracting Officer)

1 3

06/25/2024

640-24-2-5209-0001

640-24-116

Department of Veterans Affairs VA Sierra Pacific Network (VISN 21) VA Sierra Nevada Healthcare System 975 Kirman Avenue Reno, NV 89502

Proposals have been authorized to be sent electronically and shall be emailed to samantha.henderson@va.gov.

To all Offerors/Bidders

36C26124R0053

05-31-2024

X

X X

X 1

The purpose of amendment 0003 is to:

a) Respond to RFIs, see responses on page 2, and incorporate associated attachments.

Charee Harris Contracting Officer

RFI NO. Information Being Requested Response to RFI:

006 See Section 09 96 59, paragraphs 2.1 and 2.3 attached. Which painting system is required to be Used:

RES-W1

RES-W2

If RES-W1 is chosen, do you want the optional Aliphatic Polyurethane Sealer Finish?

Yes, as stated in Specifications Section 09 96 59, paragraph 2.1.

007 For Room 201 – Is regular paint acceptable per Section 09 91 00, Painting or do you want all the walls painted with Resinous Coating per Section 09 96 59?

Resinous Coating per Section 09 96 59.

008 Please confirm that the Final Scope of Work issued via Amendment #001 is the governing document as to the scope of work for this project.

There are discrepancies/ variances between the Final Scope of work and the other documents that have been provided in the Solicitation.

These other documents include the Planate Development Construction Documents dated April 30, 2024, which includes but is not limited to the Facility Condition Evaluation and Annex 8.

Deficiency List picture with descriptions.

For example, the scope of work Task 8, attached, states to replace two each steel frame support IAW section 05 12 00. I take this to mean we will replace the two steel frames that support the heat exchangers with like in kind steel frames per Section 05 12 00.

The photo library states in multiple photos to “Replace all the connections and brackets with stainless steel.”

There is nothing in the scope of work that requires replacement of brackets with stainless steel. Frankly, I am not sure what a “bracket” is.

Confirmed. Final Scope of Work issued via Amendment #0001.

Replace all corroded structural supports.

“Brackets” are structural braces/supports. All structural supports shall be stainless steel.

009 Please be specific as possible:

No quantities are provided for the painting of walls and window frames within pool waiting room. Lack of specified quantities may result in variations in proposed cost for those particular line-item tasks. Please provide quantities for square footage of walls and linear footage for window frames to be prepped and painted.

Task #6 (Paint Walls):

Approximately 8030 Sqft Task#6 (Paint Window Frames): Approximately

4000 LF

All quantities shall be verified by Bidders.

010 Detail 4 on sheet AS2-3 provides detail for exhaust fan curb and information regarding roofing materials. Portions of the existing roofing system will need to be removed to accommodate installation of the exhaust curb. No Specification Section is referenced for the roofing membrane system. Please provide Specification Section for the TPO roofing system.

See attached Specifications Sections 07 22 00, 07 54 23, 07 60 00, 07 92 00.

See attached document: 07 22 00 - Roof and Deck Insulation.

See attached document: 07 54 23 - Thermoplastic Polyolefin Roofing.

See attached document: 07 60 00 - Flashing and Sheet Metal.

See attached document: 07 92 00 - Joint Sealants.