RM 117 revised Photograph Library 28 Jun 2024.pdf

PDF 4 MB Posted

Attached to
Z2FB--NRM 640-24-116 | Repair Aquatic Center, Palo Alto Bldg 530
Solicitation number
36C26124R0053
Issued by

About this file

This document appears to be a set of photographs and file information related to a federal contract opportunity for the repair of the Palo Alto Aquatic Center (building 530). The key details are:

The federal contract opportunity has a Solicitation Number of 36C26124R0053 and is titled "Z2FB--NRM 640-24-116 | Repair Aquatic Center, Palo Alto Bldg 530". The requirement is to repair the Palo Alto Aquatic Center, including HVAC, concrete, pool equipment electrical, drywall, mold mitigation, and plumbing. The issuing agency is the Department of Veterans Affairs, Veterans Health Administration, Veterans Integrated Service Network 21. A site visit is scheduled for June 11, 2024 at 10:30am PT, RFIs are due by June 20, 2024 at 1pm PT, and proposals are due by July 1, 2024 at 3pm PT. All questions and proposals should be emailed to samantha.henderson@va.gov.

View the file

Other files

File Type Posted
36C26124R0053 0004.pdf PDF
07 54 23 - Thermoplastic Polyolefin Roofing TPO.pdf PDF
Rev SOW 6.28.2024 Aquatic Center.pdf PDF
07 22 00 - Roof and Deck Insulation.pdf PDF
07 92 00 - Joint Sealants.pdf PDF
07 60 00 - Flashing and Sheet Metal.pdf PDF
36C26124R0053 0003.pdf PDF
07 54 23 - Thermoplastic Polyolefin Roofing.pdf PDF
36C26124R0053 0002.pdf PDF
36C26124R0053 0001.pdf PDF
FINAL SOW B530 Rev 052224.pdf PDF
Exhibit 4 B530 Specifications Rev 052324_Part1.pdf PDF
DIVISION CONSTRUCTION COSTS- Repair Aquatic Center 640-24-116.docx DOCX document
Exhibit 5 B530 Drawings Rev 052324_Part2.pdf PDF
Wage Determination CA20240018 4.26.24.pdf PDF
Exhibit 5 B530 Drawings Rev 052324_Part1.pdf PDF
Evaluation Report.docx DOCX document
CONTRACTOR CERTIFICATION REGARDING SAFETY AND ENVIRONMENTAL.docx DOCX document
Key Personnel Attachment for Evaluation 02.docx DOCX document
36C26124R0053 Repair Aquatic Center.pdf PDF
S02 - RFI Form.docx DOCX document
Photo Library.pdf PDF
Exhibit 4 B530 Specifications Rev 052324_Part3.pdf PDF
S02 - Past Performance Questionnaire.docx DOCX document
Exhibit 5 B530 Drawings Rev 052324_Part3.pdf PDF
ILSM - B530 Aquatic Center - 03.21.24.pdf PDF
Palo Alto Campus Map Site Visit.pdf PDF
Exhibit 4 B530 Specifications Rev 052324_Part2.pdf PDF
Exhibit 5 B530 Drawings Rev 052324_Part4.pdf PDF
Show all 29

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Description

Boiler Room 117, Replace the double wooden door with steel doors.

Taken Date Uploaded By

04/04/2024 at 04:19 pm Jerome Stolinski

Upload Date File Name

04/04/2024 at 07:30 pm IMG_8440.jpeg

Taken Date Uploaded By

04/04/2024 at 04:19 pm Jerome Stolinski

Upload Date File Name

04/04/2024 at 07:30 pm IMG_8439.jpeg

Description

Taken Date Uploaded By

04/04/2024 at 04:19 pm Jerome Stolinski

Upload Date File Name

04/04/2024 at 07:30 pm IMG_8438.jpeg

Taken Date Uploaded By

04/04/2024 at 04:14 pm Jerome Stolinski

Upload Date File Name

04/04/2024 at 07:30 pm IMG_8435.jpeg

Planate Management Group

Printed on Mon Apr 8, 2024 at 08:37 pm PDT

VISN 21-CM/PM CONTRACT SVS-PALO ALTO-OY2

Palo Alto, California

Description

BBooiler Room 117. Refer to SOW Task 8 and Task 22.

Description

Boiler Room 117, Refer to SOW task 8 and task 22.

Boiler Room 117. Refer to SOW task 8 and task 22.

Description

Boiler Room 117, Refer to SOW task 8 and task 22.

https://storage.procore.com/v4/d/us-east-1/pro-core.com/companies/92011/01HTP1F5FRM27G93A2A92CZTAX?sig=f215fef171a406c2b6bcd490bc5be3bcbcb662aeebc5600b9292080b44368fb4 https://storage.procore.com/v4/d/us-east-1/pro-core.com/companies/92011/01HTP1F5F1NQJ4G0SJNYX6Q6K8?sig=e21d92b393324a5db01792337df98a8059c5f3cba22858ff1c8c01cea91d102b https://storage.procore.com/v4/d/us-east-1/pro-core.com/companies/92011/01HTP1F5RTYKTVM4ZPKB3S3MF0?sig=6f4351e32bd78ef8daf8ea58b887edc4eaee50aabbd1f4219cbe9d9535c7756c https://storage.procore.com/v4/d/us-east-1/pro-core.com/companies/92011/01HTP1F5RF4XMC6XH1X0G6MKJ4?sig=4a718ee5c76cbcf91dfc06b5a15d741bd94b74d321569634d7cd3d01e6ee59e2

Taken Date Uploaded By

04/04/2024 at 04:14 pm Jerome Stolinski

Upload Date File Name

04/04/2024 at 07:30 pm IMG_8434.jpeg

Taken Date Uploaded By

04/04/2024 at 04:14 pm Jerome Stolinski

Upload Date File Name

04/04/2024 at 07:30 pm IMG_8433.jpeg

Taken Date Uploaded By

04/04/2024 at 04:14 pm Jerome Stolinski

Upload Date File Name

04/04/2024 at 07:30 pm IMG_8432.jpeg

Taken Date Uploaded By

04/04/2024 at 04:14 pm Jerome Stolinski

Upload Date File Name

04/04/2024 at 07:31 pm IMG_8430.jpeg

Planate Management Group

Printed on Mon Apr 8, 2024 at 08:37 pm PDT

VISN 21-CM/PM CONTRACT SVS-PALO ALTO-OY2

Palo Alto, California

Description

Boiler Room 117, Refer to SOW task 8 and task 22.

Description

Boiler Room 117, Refer to SOW task 8 and task 22.

Description

Boiler Room 117, Refer to SOW task 8 and task 22.

Description

Boiler Room 117, Refer to SOW task 8 and task 22.

https://storage.procore.com/v4/d/us-east-1/pro-core.com/companies/92011/01HTP1F5R20C09BK60AES735K8?sig=cd45a96e8a7e1e8ff303fc1f7ab8ecd56bdc46901724e2e63d19b1883b1f59fa https://storage.procore.com/v4/d/us-east-1/pro-core.com/companies/92011/01HTP1F5SWNADS1ZGSDAT5H9PG?sig=2bd4c79446fc1383ff3e05a145716c524eecbf18c710c35692bf048a8b1384a3 https://storage.procore.com/v4/d/us-east-1/pro-core.com/companies/92011/01HTP1F5REAB67X8NX07397N6Y?sig=3fe314e20e06ff61a97886bc2b149001b291a3a2b5859eaffded7210fe4dbcd2 https://storage.procore.com/v4/d/us-east-1/pro-core.com/companies/92011/01HTP1F61Y9FDJDJB6PBCE613Q?sig=6202e085fe6e0a5005098d05d868bdb5ea5e06a7305563344b2ba4f2c92890e0

Taken Date Uploaded By

04/04/2024 at 04:14 pm Jerome Stolinski

Upload Date File Name

04/04/2024 at 07:31 pm IMG_8429.jpeg

Taken Date Uploaded By

04/04/2024 at 04:13 pm Jerome Stolinski

Upload Date File Name

04/04/2024 at 07:31 pm IMG_8428.jpeg

Taken Date Uploaded By

04/04/2024 at 04:13 pm Jerome Stolinski

Upload Date File Name

04/04/2024 at 07:31 pm IMG_8427.jpeg

Taken Date Uploaded By

04/04/2024 at 04:13 pm Jerome Stolinski

Upload Date File Name

04/04/2024 at 07:31 pm IMG_8425.jpeg

Planate Management Group

Printed on Mon Apr 8, 2024 at 08:37 pm PDT

VISN 21-CM/PM CONTRACT SVS-PALO ALTO-OY2

Palo Alto, California

Description

Boiler Room 117, Refer to SOW task 8 and task 22.

Description

Boiler Room 117, Refer to SOW task 8 and task 22.

Description

Boiler Room 117, Refer to SOW task 8 and task 22.

Description

Boiler Room 117, Refer to SOW task 8 and task 22.

https://storage.procore.com/v4/d/us-east-1/pro-core.com/companies/92011/01HTP1F67JWQPJ4B697ZX1JQKB?sig=6bbb898cc0f338f6bb33ae8d4a63cc89e8be8bac089c7d3433974d32c1b5218c https://storage.procore.com/v4/d/us-east-1/pro-core.com/companies/92011/01HTP1F63A6MWCEVG5JNY131RB?sig=3304c54b7b1ffdeb99edb03caa898f2128cea5fedce4bad2663206bfc9e3cf97 https://storage.procore.com/v4/d/us-east-1/pro-core.com/companies/92011/01HTP1F63WAT5NRKE2G8ZKZDPN?sig=e42d74f65c59c1782bc339e566cc253ede558e53ea4fdaed13d8589a90393ce5 https://storage.procore.com/v4/d/us-east-1/pro-core.com/companies/92011/01HTP1F6DFBDXN83A9TTT0JT1V?sig=d79f7359ea6d82e49782d958d5a50ad1126a5d1285c5f088bfaeb98fd2f413bf

File details come from the government source that posted it. Updated .