This document is a Contractor's Quality Control Report (QCR) that details the work performed, inspections conducted, tests performed, verbal instructions received, remarks, and safety considerations for a federal construction contract.

The QCR covers the weather conditions, work performed by the prime contractor and subcontractors, types of inspections (preparatory, initial, follow-up) and their results, tests conducted, any verbal instructions received from government personnel, general remarks on progress, conflicts, delays, and safety infractions. The contractor's authorized representative certifies the report's completeness and compliance with the contract requirements, except as noted.

The related federal contract opportunity is a draft Request for Proposal (RFP) for a 100% 8(a) small business set-aside Job Order Contract (JOC) to provide new construction, alterations, maintenance, repair, sustainment, restoration, and modernization services for the U.S. Army Garrison at Redstone Arsenal. The potential projects span various facility types, including administrative, support, and research facilities, as well as infrastructure such as roads, utilities, and airfield structures.

View the file

Other files

File Type Posted
J13_JOC SP Order FormUpdate 10 June 24.pdf PDF
Draft W9124P-24-R-0004 3 June 2024.pdf PDF
J2_RSA Policy 200-6.pdf PDF
J15_NOI NPDES Permit.pdf PDF
J25_Contract Data Requirements List (CDRL).pdf PDF
J13_JOC SP Order Form.pdf PDF
J19_Refrigeration Installation Form.pdf PDF
J11_Equipment Warranty List.pdf PDF
J23 Past Performance Survey.docx DOCX document
J18_Spill Response Plan.pdf PDF
J16_NPDES Inspection Form.pdf PDF
J20_Equipment Demo Form.pdf PDF
J21_Time Extension Request.pdf PDF
J6_COH Landfill.pdf PDF
J7_SWDA Incinerator.pdf PDF
J12_JOC Close-out Form.pdf PDF
J14_Septic Permit Application.pdf PDF
J4_Equipment Data Sheet.pdf PDF
J5_RSA Landfill Delivery Ticket.pdf PDF
J3_EnvLaw.pdf PDF
J9_Site Visit Memo.pdf PDF
J1_DD Form 1348-1.pdf PDF
J22 Deliverables List.pdf PDF
J17_NPDES NOT.pdf PDF
J10_Progress Chart.xlsx XLSX spreadsheet
Show all 25

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

CONTRACTOR'S QUALITY CONTROL REPORT (QCR) DATE: REPORT NO:

CONTRACT NUMBER AND NAME OF CONTRACTOR: DESCRIPTION AND LOCATION OF THE WORK:

WEATHER CLASSIFICATION: CLASSIFICATION:

CLASS A No interruptions of any kind from weather conditions occurring on this or previous shifts.

CLASS B Weather occurred during this shift that caused a complete stoppage of all work. CLASS _______________

CLASS C Weather occurred during this shift that caused a partial stoppage of work. TEMPERATURE:

CLASS D Weather overhead excellent or suitable during shift. Work completely stopped due to results of previous adverse weather.

CLASS E Weather overhead excellent or suitable during shift but work partially stopped MAX ______ MIN ______ due to previous adverse manner. PRECIPITATION:

OTHER Explain

INCHES _____________

CONTRACTOR/SUBCONTRACTORS AND AREA OF RESPONSIBILITY FOR WORK PERFORMED TODAY: (Attach list of items of equipment either idle or working as appropriate.)

a.

b.

c.

d.

e.

f.

g.

1. WORK PERFORMED TODAY: (Indicate location and description of work performed. Refer to work performed by prime and/or subcontractors by letter in Table above. Indicate any delays in work.)

2. TYPE AND RESULTS OF INSPECTION: (Indicate whether: P - Preparatory, I - Initial, or F - Follow-up and include satisfactory work completed or deficiencies with action to be taken.)

3. TESTS REQUIRED BY PLANS AND/OR SPECIFICATIONS PERFORMED AND RESULTS OF TESTS:

Attachment J8 Daily QCR 1 May 2023

ATTACHMENT J8

4. VERBAL INSTRUCTIONS RECEIVED: (List any instructions given by Government personnel on construction deficiencies retesting required, etc., with action to be taken. List the names of the Government personnel who gave verbal instruction)

5. REMARKS: (Cover any conflicts in plans, specifications or instructions: acceptability of incoming materials; offsite surveillance activities; progress of work, delays, causes and extent thereof; days of no work with reasons for same.)

Include any telephone conversations/instructions with the Contracting Officer, COR or other representative.

Indication of delays to be in accordance with para 2 of Part B of FAR 52.249-10.

6. SAFETY: (Include any infractions of approved safety plan, safety manual or instructions from Government personnel.

Specify corrective action taken.)

INSPECTOR

CONTRACTOR'S CERTIFICATION: I certify that the above report is complete and correct and that all material and equipment used, work performed and tests conducted during this reporting period were in strict compliance with the contract plans and specifications except as noted above.

CONTRACTOR'S APPROVED AUTHORIZED REPRESENTATIVE

SAM FORM 696, 1 SEP 79

Attachment J8 Daily QCR 1 May 2023

QCR (1)
QCR (2)
CONTRACTORS QUALITY CONTROL REPORT QCR:
REPORT NO:
CONTRACT NUMBER AND NAME OF CONTRACTOR:
DESCRIPTION AND LOCATION OF THE WORK:
CLASSIFICATION CLASS:
CLASS:
TEMPERATURE MAX MIN:
MAX:
MIN:
PRECIPITATION INCHES:
INCHES:
b:
c:
d:
e:
f:
g:
1 WORK PERFORMED TODAY Indicate location and description of work performed Refer to work performed by prime andor subcontractors by letter in Table above Indicate any delays in work:
2 TYPE AND RESULTS OF INSPECTION Indicate whether P Preparatory I Initial or F Followup and include satisfactory work completed or deficiencies with action to be taken:
3 TESTS REQUIRED BY PLANS ANDOR SPECIFICATIONS PERFORMED AND RESULTS OF TESTS:
4 VERBAL INSTRUCTIONS RECEIVED List any instructions given by Government personnel on construction deficiencies retesting required etc with action to be taken List the names of the Government personnel who gave verbal instruction:
INSPECTOR:
Date2_af_date:
5 REMARKS Cover any conflicts in plans specifications or instructions acceptability of incoming materials offsite surveillance activities progress of work delays causes and extent thereof days of no work with reasons for same Include any telephone conversationsinstructions with the Contracting Officer COR or other representative Indication of delays to be in accordance with para 2 of Part B of FAR 5224910:
6 SAFETY Include any infractions of approved safety plan, safety manual, or instructions from Government personnel:
Specify corrective action taken: