J16_NPDES Inspection Form.pdf

PDF 1 MB Posted

Attached to
Competitive 8(a) SATOC JOC (DRAFT RFP)
Solicitation number
W9124P
Issued by

About this file

This document is an NPDES Construction Stormwater Inspection Report and BMP Certification form. It is used to inspect construction sites, assess the implementation and maintenance of Best Management Practices (BMPs), and certify compliance with the facility's Comprehensive Stormwater Pollution Prevention Plan (CBMPP) and NPDES permit requirements.

The form collects information on the permittee, facility details, receiving waters, and weather conditions. It includes a checklist to indicate if discharges of pollutants occurred, if BMPs were properly implemented and maintained, if additional BMPs are needed, and if any BMPs failed to operate as designed. The form also provides spaces to list details of any deficiencies observed. The inspection is certified by a Qualified Credential Inspector (QCI) or Qualified Credentialed Professional (QCP), and the permittee responsible official.

View the file

Other files

File Type Posted
J13_JOC SP Order FormUpdate 10 June 24.pdf PDF
Draft W9124P-24-R-0004 3 June 2024.pdf PDF
J2_RSA Policy 200-6.pdf PDF
J15_NOI NPDES Permit.pdf PDF
J25_Contract Data Requirements List (CDRL).pdf PDF
J13_JOC SP Order Form.pdf PDF
J19_Refrigeration Installation Form.pdf PDF
J11_Equipment Warranty List.pdf PDF
J23 Past Performance Survey.docx DOCX document
J18_Spill Response Plan.pdf PDF
J20_Equipment Demo Form.pdf PDF
J21_Time Extension Request.pdf PDF
J6_COH Landfill.pdf PDF
J7_SWDA Incinerator.pdf PDF
J12_JOC Close-out Form.pdf PDF
J14_Septic Permit Application.pdf PDF
J4_Equipment Data Sheet.pdf PDF
J5_RSA Landfill Delivery Ticket.pdf PDF
J3_EnvLaw.pdf PDF
J9_Site Visit Memo.pdf PDF
J1_DD Form 1348-1.pdf PDF
J22 Deliverables List.pdf PDF
J17_NPDES NOT.pdf PDF
J8_Quality Control Report.pdf PDF
J10_Progress Chart.xlsx XLSX spreadsheet
Show all 25

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ADEM Form 23 m1 04/2020 Page 1 of 2

Instructions: Please complete all questions. Respond with “N/A” as appropriate. Forms with incomplete or incorrect answers, or missing signatures will delay processing and may result in appropriate compliance action by the Department.

ITEM I.

Permittee Name: Facility/Site Name:

Permit Number: County:

Facility/Site Entrance Latitude & Longitude: Phone Number:

Facility/Site Street Address or Location Description:

ITEM II.

List name of current ultimate receiving water(s) (indicate if through MS4) and the number of disturbed acres which drains through each treatment system or BMP: Add additional sheet(s) if necessary.

Receiving Water Disturbed Acres Discharge Point #

ITEM III.

YES NO 1. Did discharges of sediment or other pollutants occur from the site?

If “Yes”, please list a description of the discharge(s) and their location(s):

YES NO 2. Were BMPs properly implemented and maintained at the time of inspection?

If “No”, please provide location(s) and descriptions of BMPs that need maintenance:

YES NO 3. Are BMPs needed in addition to those already present onsite at the time of inspection?

If “Yes” please provide a description and location of additional BMPs that are needed:

YES NO 4. Have any BMPs failed to operate as designed?

If “Yes”, please provide location(s) and description of BMP(s) that failed:

YES NO 5. Were there BMPs required by the CBMPP that were not installed or installed in a manner not consistent with the

CBMPP?

If “Yes”, please provide a description and location where the BMPs were not installed or installed incorrectly:

ALABAMA DEPARTMENT OF ENVIRONMENTAL MANAGEMENT (ADEM)

NPDES CONSTRUCTION STORMWATER INS

PECTION REPORT AND BMP CERTIFICATION

kara.malone Typewritten Text Attachment J16 NPDES Inspection Form 2 May 2023

ADEM Form 23 m1 04/2020 Page 2 of 2

ITEM IV.

Weather Conditions:

Discharge

Point # Date, Time, and Location of Samples Collected Sample Results Analytical Method(s)

“Based upon an inspection conducted on _______________________________ (Date & Time) by the QCP, QCI, or a qualified person (List Name(s):_______________________________________________________________) under the direct supervision of the QCP identified below, the QCI or QCP identified below certifies that effective structural and non-structural BMPs have been fully implemented and regularly maintained to the maximum extent practicable for the prevention and minimization of all sources of pollution in stormwater and authorized related process wastewater runoff, except for those deficiencies noted above, in accordance with the facility’s CBMPP, good sediment, erosion, and other pollution control practices, and the requirements of the permit. I certify that discharges have been tested or evaluated for the presence of non-stormwater and non-authorized process wastewaters. I certify under penalty of law that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. I certify that this form has not been altered, and if copied or reproduced, is consistent in format and identical in content to the ADEM approved form. I am aware that there are significant penalties for submitting false information, including the possibility of fines and imprisonment for knowing violations.”

Name & Designation of QCI or QCP Signature Date

Name & Title of Permittee Responsible Official Signature Date

“Based upon an inspection conducted on _______________________________ (Date & Time) by the QCP, QCI, or a qualified person (List Name(s):_______________________________________________________________) under the direct supervision of the QCP identifi...

Permittee Name:
FacilitySite Name:
Permit Number:
County:
FacilitySite Entrance Latitude Longitude:
Phone Number:
FacilitySite Street Address or Location Description:
Receiving WaterRow1:
Disturbed AcresRow1:
Discharge Point Row1:
Receiving WaterRow2:
Disturbed AcresRow2:
Discharge Point Row2:
Receiving WaterRow3:
Disturbed AcresRow3:
Discharge Point Row3:
Receiving WaterRow4:
Disturbed AcresRow4:
Discharge Point Row4:
Receiving WaterRow5:
Disturbed AcresRow5:
Discharge Point Row5:
Weather Conditions:
Discharge Point Row1_2:
Date Time and Location of Samples CollectedRow1:
Sample ResultsRow1:
Analytical MethodsRow1:
Discharge Point Row2_2:
Date Time and Location of Samples CollectedRow2:
Sample ResultsRow2:
Analytical MethodsRow2:
Discharge Point Row3_2:
Date Time and Location of Samples CollectedRow3:
Sample ResultsRow3:
Analytical MethodsRow3:
Discharge Point Row4_2:
Date Time and Location of Samples CollectedRow4:
Sample ResultsRow4:
Analytical MethodsRow4:
Discharge Point Row5_2:
Date Time and Location of Samples CollectedRow5:
Sample ResultsRow5:
Analytical MethodsRow5:
Discharge Point Row6:
Date Time and Location of Samples CollectedRow6:
Sample ResultsRow6:
Analytical MethodsRow6:
Discharge Point Row7:
Date Time and Location of Samples CollectedRow7:
Sample ResultsRow7:
Analytical MethodsRow7:
Discharge Point Row8:
Date Time and Location of Samples CollectedRow8:
Sample ResultsRow8:
Analytical MethodsRow8:
Discharge Point Row9:
Date Time and Location of Samples CollectedRow9:
Sample ResultsRow9:
Analytical MethodsRow9:
Discharge Point Row10:
Date Time and Location of Samples CollectedRow10:
Sample ResultsRow10:
Analytical MethodsRow10:
Discharge Point Row11:
Date Time and Location of Samples CollectedRow11:
Sample ResultsRow11:
Analytical MethodsRow11:
Discharge Point Row12:
Date Time and Location of Samples CollectedRow12:
Sample ResultsRow12:
Analytical MethodsRow12:
Discharge Point Row13:
Date Time and Location of Samples CollectedRow13:
Sample ResultsRow13:
Analytical MethodsRow13:
Discharge Point Row14:
Date Time and Location of Samples CollectedRow14:
Sample ResultsRow14:
Analytical MethodsRow14:
Discharge Point Row15:
Date Time and Location of Samples CollectedRow15:
Sample ResultsRow15:
Analytical MethodsRow15:
Discharge Point Row16:
Date Time and Location of Samples CollectedRow16:
Sample ResultsRow16:
Analytical MethodsRow16:
Discharge Point Row17:
Date Time and Location of Samples CollectedRow17:
Sample ResultsRow17:
Analytical MethodsRow17:
Discharge Point Row18:
Date Time and Location of Samples CollectedRow18:
Sample ResultsRow18:
Analytical MethodsRow18:
Discharge Point Row19:
Date Time and Location of Samples CollectedRow19:
Sample ResultsRow19:
Analytical MethodsRow19:
Discharge Point Row20:
Date Time and Location of Samples CollectedRow20:
Sample ResultsRow20:
Analytical MethodsRow20:
Discharge Point Row21:
Date Time and Location of Samples CollectedRow21:
Sample ResultsRow21:
Analytical MethodsRow21:
Discharge Point Row22:
Date Time and Location of Samples CollectedRow22:
Sample ResultsRow22:
Analytical MethodsRow22:
Based upon an inspection conducted on:
List Names:
Name Designation of QCI or QCP:
Date:
Name Title of Permittee Responsible Official:
Date_2:
QIII:
2 Desc:
1 Desc:
5 Desc:
4 Desc:
3 Desc:
III:
1: Off
2: Off
3: Off
4: Off
5: Off

File details come from the government source that posted it. Updated .