J18_Spill Response Plan.pdf
PDF 2 MB Posted
- Attached to
- Competitive 8(a) SATOC JOC (DRAFT RFP)
- Solicitation number
- W9124P
About this file
This document is a Spill Prevention and Response Plan for U.S. Army Garrison-Redstone (USAG-Redstone) in Alabama. It outlines the initial response actions, incident commander and on-scene coordinator responsibilities, response strategy, organization, notifications, protection priorities, spill recovery procedures, equipment, and evacuation plan in the event of an oil or hazardous substance spill. Key details include:
The USAG-Redstone Fire Department serves as the first responder and incident commander/on-scene coordinator, with responsibilities to minimize hazards, stop the spill source, and contain the spill. The Environmental Management Division is responsible for making mandatory notifications to federal, state, and local agencies. Sensitive areas like water intakes and the Tennessee River are identified as high-priority protection areas. The plan references the "Red Plan" for initial spill response actions and transitions to the more detailed USAG-Redstone Oil and Hazardous Substance Spill Prevention and Response Plan. Specific equipment, training, and communication systems are detailed to support spill response.
View the file
Other files
Show all 25
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
The Red Plan USAG-Redstone Spill Plan Excerpt
Attachment J18 Spill Prevention and Response Plan 2 May 2023
The Red Plan Purpose. In the event of a spill of oil or a hazardous substance at U.S. Army Garrison-Redstone (USAG- Redstone), Alabama, The Red Plan serves as the “jump start,” to get the right response action on track at the earliest possible time. The USAG-Redstone oil and hazardous substance (OHS) spill prevention and response plan reinforces The Red Plan and provides in-depth information on response, notification, organization, duties, containment, cleanup, and remediation procedures. The Red Plan is used in the early stages of a spill, and the user is expected to transition to the OHS spill prevention and response plan after appropriate notifications and response actions are underway.
Initial Response Actions Whenever a spill occurs or is discovered, e.g., during tank loading operations, fuel operators or other responsible personnel will take immediate action to:
1) Stop the product flow – stop transfers, secure pumps, and close valves.
2) Warn personnel – sound alarms, enforce safety and security measures.
3) Shut off ignition sources – motors, electrical circuits, open flames.
4) Contain the spill – secure valves, block drains, deploy absorbents.
5) Make notifications – supervisor, Fire Department.
6) Begin cleanup – if within capabilities (see responsible unit actions).
If there is a potential life, health, fire, or other safety hazard, the USAG-Redstone directorate of emergency services (DES) (fire, police, and medical) will be immediately notified.
Incident Commander/On-Scene Coordinator:
USAG-Redstone Fire Department (911)
Installation Operations Center ([256] 313-1043) In the event of any spill, the USAG-Redstone Fire Department will be in charge of the scene as soon as they arrive. Prior to their arrival, it may be necessary for the facility supervisor/manager to ensure prudent actions and reasonable personnel safety measures are exercised. The facility supervisor should also ensure that the 911 call has been made (as appropriate) and that Environmental Management Division (EMD) has been called, regardless of the size or hazard posed by the spill. Once arriving at the scene, the Fire Chief (or alternate Fire Chief) assumes the role of Incident Commander (IC)/On-Scene Coordinator (OSC), having full authority to implement this plan.
Response Strategy/Incident Commander Actions The USAG-Redstone Fire Department serves as the first responder for all spills and will also notify EMD of any discharges. Initial response by the Fire Department occurs within 7 minutes of notification and responding elements may include firefighting, emergency medical, and military police. Upon arrival at the spill site, the Fire Department takes appropriate steps to minimize or eliminate fire and explosion hazards. If possible, they stop the source of the discharge and contain the oil or hazardous substance.
Every effort is made to confine the spill on land and to prevent it from reaching a sensitive area or moving off the installation. As stated above, the Fire Chief or Alternate Fire Chief will serve as the IC/OSC and will be supported by members of the Installation Response Team (IRT) and the Incident Management Team (IMT), as necessary. When the IC/OSC determines that the incident is no longer an emergency scene (for example, it is determined “fire safe”), the IC/OSC may delegate cleanup responsibility to the
EMD.
A spill would most likely be discovered by on-duty operators, military personnel in the area, passersby, or by roving Directorate of Emergency Services (DES) Law Enforcement patrols. Upon notification of the spill, the Fire Department deploys to the spill site with emergency and spill response vehicles.
The IC/OSC alerts members of the IRT (see page 5 of THE RED PLAN), as needed. The IRT is directed to assemble at a designated location. When the IC/OSC arrives at the spill site, they are briefed by first responders about the spill situation and what actions have been taken. If further fire prevention measures are required, the IC/OSC makes those decisions, working with the first responders to coordinate actions. If evacuation is required due to a risk of fire or explosion, the IC/OSC initiates the evacuation plan at page 7 of THE RED PLAN (also see Evacuation Plan at Annex C of the OHS Spill Prevention and Response Plan).
As soon as all immediate emergency actions have been initiated, the IC/OSC refers to page 5 of THE RED PLAN and alerts EMD and the primary spill response contractor, as appropriate.
The spill response contractor is also a vital component within the overall USAG-Redstone spill response. If the spill is in state waters, exceeds the capability of the Fire Department, or threatens/has reached beyond USAG-Redstone boundaries, the IC/OSC is immediately apprised of this situation. The IC/OSC will ensure appropriate notification is made to local emergency service organizations. EMD is responsible for notifying federal, state, and local officials, providing as much information as possible on the size of the spill and its pathway. Key IRT members are directed to begin marshaling installation equipment, supplies, and personnel to assist in the cleanup. All cleanup actions beyond the capability of the IRT are referred to the primary spill response contractor (notified by EMD) but coordinated with the IC/OSC.
NOTE: The IC/OSC determines which IMT members are required during a spill.
Incident Commander / On-Scene Coordinator (IC/OSC)
Chief, USAG-Redstone Fire Department
Assistant Chief, USAG-Redstone Fire Department (alternate)
Regulatory Agencies
USEPA
State/Local Agencies Installation Operations Center
USAG-Redstone Installation Response Team (IRT)
Environmental Management Division
Directorate of Emergency Services ( D E S )
Base Ops Division
USAG-Redstone Incident Management Team (IMT)
Directorate of Public Works
Directorate of Emergency Services
Safety
Public Affairs
Legal Office
Spill Removal Organizations
Base Operations Contractor
Support Services Contractor
Organization for Spill Response The EMD is responsible for making all mandatory notifications using the oil and hazardous substances discharge telephone report form located at the end of THE RED PLAN. The name of the person called and the time of notification should be recorded on the report form. Any spill that enters state waters (including waters on the military reservation) or wetlands, or any spill equal to or greater than 25 gallons, and any hazardous substance discharges equal to or greater than the designated reportable quantity (RQ) are reportable spills, requiring mandatory notifications be made. However, when the time sensitivity of an emergency requires immediate notification, the first responders will initiate this process and ensure that the IC/OSC and EMD is informed.
When spill response contractor support is requested, the IC/OSC briefs their operations manager upon arrival at the spill site. Protection priorities are determined from assessing the conditions at the spill site and referring to the priorities listed on page 6 of THE RED PLAN. The spill response contractor's operations manager and the IRT, with the approval of the IC/OSC and EMD, develop a cleanup plan tailored to the requirements at the spill site. The IC/OSC then directs the cleanup assets to the tasks and priorities and begins transition from THE RED PLAN to the USAG-Redstone Oil and Hazardous Substance Spill Prevention and Response Plan. The IC/OSC refers to Annex B, notifications, and ensures all appropriate remaining notifications are conducted.
For hazardous material spills of any quantity, the IC/OSC may consult with the EMD SPCC manager to make an immediate assessment. Based upon this assessment, if further cleanup actions are required, a plan is developed and implemented by the on-scene coordinator, following the guidance in THE RED PLAN.
Recovered spill material may be treated as hazardous waste and pads, soiled absorbent materials, etc.
Materials are recovered into sealed plastic bags or other appropriate containers. Disposal of the hazardous waste is accomplished through Defense Logistics Agency Disposition Services (DLADS).
Notifications This is a prioritized emergency notification list. For additional numbers, see Annex B OHS Spill Prevention and Response Plan, notification checklist.
Emergency Notifications Response times for the Fire Department and DES Law Enforcement are approximately 5 minutes after notification.
USAG-Redstone Fire Department and Medical Support 911
USAG-Redstone DES Law Enforcement 911
Installation Response Team Notifications All personnel on this prioritized listing can be at the EMD office or the spill site within 60 minutes after notification.
Response Team Member Telephone Number Who/When Contacted
USAG-Redstone Fire Chief (IC/OSC) 911
(256) 842-2580
(256) 313-2066 (24 hour)
USAG-Redstone Assistant Fire Chief (Alternate
IC/OSC)
(256) 842-2580
(256) 313-2066 (24 hour)
Chief, Environmental Management Division (256) 876-8554
Chief, Installation Compliance Division (256) 955-8505
Installation Operations Center (IOC) (256) 313-1043 (24 hour)
Garrison Safety Office (256) 313-3297
Provost Marshal (USAG-Redstone Military Police)
(256) 876-2222
(256) 876-4135
Public Affairs Office (PAO)* (256) 876-4161
Legal Office (256) 876-1100
Directorate of Public Works (Contracting Officer’s Representative) (256) 313-5043
*The PAO will make all contacts with news media (TV, Radio). TV and Radio Station telephone numbers are not included in this plan.
Mandatory Notifications** Reportable spills are those entering surface waters or wetlands or any spill equal to or greater than 25 gallons or any release above the reportable quantity (RQ). Mandatory notifications should be made within 30 minutes of discovery of the discharge.
Agency 24-Hour Number Who/When Contacted
National Response Center (NRC) (800) 424-8802
Alabama Department of Environmental Management (ADEM) Decatur Field Office (business hours only) or
Alabama Emergency Management Agency State Warning Point (24 hour)
Business Hours Only ( 256) 353-1713
24 hour
(800) 843-0699
Agency 24-Hour Number Who/When Contacted
EPA Region IV (404) 562-8700
IMCOM Atlantic Region (Env. Command)
(210) 466-1678
Defense Energy Support Center (DESC) DESC Americas East (713) 332-4103
Installation Directorate Sustainment (256) 450-8585
Huntsville Emergency Management (24 hour)*** (256) 427-5130
Decatur Water Treatment Plant (256) 552-1480
Wheeler National Wildlife Refuge (256) 353-7243
Alabama Department of Environmental Management (ADEM) Water Programs (334) 271-7832
State of AL, Conservation and Natural Resources, Game and Fish Division (256) 353-2634
**Mandatory notifications are made by EMD.
***Notified only for an extremely hazardous substance release.
Spill Response Contractor Notification****
Contractor Telephone Number Who/When Contacted Base Operations Contractor Management Services (256) 876-2007
Support Services Contractor (256) 876-2007
****Requests for Spill Contractor support are made by EMD.
Other Assistance***** Local Agency Telephone Number Notification
Alabama State Troopers (256) 533-4202
Madison County Sheriff (256) 722-7181
Ambulance Service and Rescue Squad (256) 722-7158
Huntsville Hospital (Switchboard) (256) 533-8020
National Weather Service (800) 737-8624
Chemical Transportation Emergency Center
(CHEMTREC)
For information on hazardous substances
24 hours:
1-(800) 424-9300
*****Contacted by EMD or designee
Protection Priorities The vulnerability analysis under Annex E, OHS Spill Prevention and Response Plan, identifies intakes to Water Treatment Plants 1 and 2, Wheeler Wildlife Refuge, and the Tennessee River as being environmentally sensitive to oil spills and other pollution. These waterways, and the wetlands and shoreline associated with them, are regarded as the highest priority environmentally sensitive areas that could be affected by a spill from USAG-Redstone. Should a large spill enter these waterways, it could place at risk some socioeconomic and environmentally sensitive areas. For spills from USAG-Redstone threatening to impact outside the installation boundaries, the IRT and the primary spill response contractor should take immediate action to contain the spill. The USAG-Redstone Fire Department would initially employ containment measures at the likely points leading from USAG-Redstone. If spilled product cannot be contained at these points, the spill response contractor would establish multiple containment sites at other critical areas. Key to the success of a protection strategy is the early notification of the spill response contractor and notification of the potential booming requirements.
Recovery of Spills The USAG-Redstone Fire Department is trained to recover small fuel or hazardous material spills on the ground. Fuel that enters waterways and is confined by containment boom at the entry site will be recovered by trained and certified spill response contractor personnel only. In these circumstances, specialized spark free and explosion proof equipment must be used during the recovery operation.
Response Training, Equipment Testing and Deployment The USAG-Redstone Fire Department, the first responder to all spills on the installation, has personnel who are trained to deal with hazardous substance emergencies. All members of the IRT are trained on the execution of the USAG-Redstone Oil and Hazardous Substance Spill Prevention and Response Plan, following guidelines in the national Preparedness for Response Exercise Program (PREP). Additionally, these IRT members are trained annually at the awareness or operations level, as required by the Occupational Safety and Health Administration (OSHA).
The Fire Department and selected members of the IRT employ and test the items of spill response equipment stored at the installation when they participate in annual oil spill response simulation exercises (or actual spills). The IC/OSC can arrange for other heavy response equipment to be deployed within 45 minutes of notification during duty hours and within 2 hours, after duty hours.
Communications and Alarm Systems Communications at USAG-Redstone are extensive and allow the USAG-Redstone Fire Department, DES Law Enforcement and Installation Emergency Operations Center (IEOC) to be fully functional on a 24-hour basis as required. The Fire Department has multi-channel radio communications, augmented by cellular telephones, with backup telephone and radio systems at the fire station. The military police, IEOC, and Public Works have comparable emergency communication systems.
Installation Response Equipment and Location
For a more detailed listing of equipment, refer to Annex F.
Equipment Item Number Location
Base Operations Contractor Spill Response Truck 1 Bldg. 5486
Fire Department Special Response Truck 1 Fire Department
Fire Department Response Trailer 1 Fire Department
Evacuation Plan (See Annex C for Further Guidance) In the event that an evacuation beyond the immediate area is required because of a spill, DES-Law Enforcement, in coordination with the IC/OSC, will block roads leading to the spill site and re-route traffic to other locations on the installation. Non-essential personnel in the area of the spill site will be evacuated to a safe distance beyond the spill area.
If the general evacuation of military and civilian personnel is deemed necessary, the IC/OSC will direct that the IRT take all appropriate actions and, if required, coordinate USAG-Redstone's actions with those of any affected communities outside the installation's boundaries.
Personnel to be evacuated will be directed along routes designated by the IRT to selected assembly areas and safe havens.
Key Referral Sections and Annexes Section 10 — Discovery, Notification and Response Countermeasures Section 12 — Protection and Cleanup Priorities, Methods, and Techniques Annex C — Evacuation Plan Annex D — Spill Response Organization and Duties
USAG-Redstone General Evacuation Map
Oil and Hazardous Substance Discharge Telephone Report Sheet (Blank Forms also provided in Annex B)
Do not delay sending the report while awaiting complete or additional information.
1. Name, location and mailing address of facility
U.S. Army Garrison-Redstone Environmental Management Division IMRE-PWE Building 4488 Redstone Arsenal, AL 35898
2. Name and telephone number of IC/OSC (To be contacted for further information).
Ragnar Opiniano, Chief, USAG-Redstone Fire Department Building 4424 Redstone Arsenal, AL 35898 (Day) (256) 876-1893 (24 Hour) (256) 313-2066 (Command Operations Center)
3. Name and telephone number of person making report
4. Name/type of substance spilled (indicate if extremely hazardous)
5. Location of spill
6. Date/time of spill and weather conditions
7. Environment affected (Especially any body of water)
8. Cause and source of incident
9. Injuries (or anticipated health problems) or property damage
10. Quantity or duration of discharge
11. Remedial Actions (ongoing, anticipated and recommended)
12. Agencies Notified (See Notification Checklist in Annex B.)
Serious Incident Report (SIR) - Reporting Format to the On-Scene Coordinator
In addition to preparing the written Category 1 SIR, the Garrison will prepare an EXSUM of the SIR IAW the following format:
EXAMPLE
1. Region / Installation: GARRISON REDSTONE / HUNTSVILLE AL.
2. What: MOTOR VECHICLE CRASH (MVC)
3. Who: CASUALTIES LT. SOMEONE WAS KILLED IN A MOTOR VECHICLE CRASH (MVC)
4. Where: BUILDING 172, 1371 LEE STREET, FT ATLANTA, GA
5. When: 1200, THURSDAY, 27APRIL06 (NOTE: TIME, DAY, and DATE)
6. AOC(?) Notified: E-MAIL REPORT SENT TO IMA OPS CENTER /
7. Summary: LT. SOMEONE WAS KILLED IN A MOTOR VECHICLE CRASH (MVC) A TRACTOR TRAILOR
OF TOLUENE LIQUID INVOLVED WITH LT SOMEONE, MVC.
POC to this ACTION is:
File details come from the government source that posted it. Updated .