J4_Equipment Data Sheet.pdf

PDF 1 MB Posted

Attached to
Competitive 8(a) SATOC JOC (DRAFT RFP)
Solicitation number
W9124P
Issued by

About this file

This document is an Equipment Data Sheet related to a federal contract opportunity. It provides detailed information on various equipment items including the manufacturer, model number, serial number, size/capacity, manufactured date, installation and startup dates, and a description. The document includes fields for tracking information such as the Delivery Order number, building number, room number, and whether the equipment is a new installation or a replacement.

The related federal contract opportunity is a Draft Request for Proposal (RFP) for a Competitive 8(a) Small Business Set-Aside Job Order Contract (JOC) to provide new construction, alterations, maintenance, repair, sustainment, restoration, and modernization services for the U.S. Army Garrison and tenant organizations at Redstone Arsenal. The potential projects span a wide range of facilities including administrative, support, child development, fitness, vehicle maintenance, food service, public safety, airfield, and research/testing. The JOC is a 100% 8(a) small business set-aside acquisition.

View the file

Other files

File Type Posted
J13_JOC SP Order FormUpdate 10 June 24.pdf PDF
Draft W9124P-24-R-0004 3 June 2024.pdf PDF
J2_RSA Policy 200-6.pdf PDF
J15_NOI NPDES Permit.pdf PDF
J25_Contract Data Requirements List (CDRL).pdf PDF
J13_JOC SP Order Form.pdf PDF
J19_Refrigeration Installation Form.pdf PDF
J11_Equipment Warranty List.pdf PDF
J23 Past Performance Survey.docx DOCX document
J18_Spill Response Plan.pdf PDF
J16_NPDES Inspection Form.pdf PDF
J20_Equipment Demo Form.pdf PDF
J21_Time Extension Request.pdf PDF
J6_COH Landfill.pdf PDF
J7_SWDA Incinerator.pdf PDF
J12_JOC Close-out Form.pdf PDF
J14_Septic Permit Application.pdf PDF
J5_RSA Landfill Delivery Ticket.pdf PDF
J3_EnvLaw.pdf PDF
J9_Site Visit Memo.pdf PDF
J1_DD Form 1348-1.pdf PDF
J22 Deliverables List.pdf PDF
J17_NPDES NOT.pdf PDF
J8_Quality Control Report.pdf PDF
J10_Progress Chart.xlsx XLSX spreadsheet
Show all 25

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DO# BLDG # Room #

Is this install going to be:

New: Replacement: Serial # of item replaced:

Location: Wing: Floor: Room:

Manufacturer:

Model Number:

Serial Number:

Size/Capacity:

Manufactured date:

Final Acceptance Date:

Contractor Installation Date:

Contractor Startup Date:

Description:

Is this install going to be:

New: Replacement: Serial # of item replaced:

Location: Wing: Floor: Room:

Manufacturer:

Model Number:

Serial Number:

Size/Capacity:

Manufactured date:

Final Acceptance Date:

Contractor Installation Date:

Contractor Startup Date:

Description:

Is this install going to be:

New: Replacement: serial # of item replaced:

Location: Wing: Floor: Room:

Manufacturer:

Model Number:

Serial Number:

Size/Capacity:

Manufactured date:

Final Acceptance Date:

Contractor Installation Date:

Contractor Startup Date:

Revision Date 17 January 2020

Equipment Check List Form Subcontractor Name and Number:

Tracking #

Is job a complete demolition of

Building,wing,floor and/or room:

DescriptionDescription :

Size

Size Size

Size Size

Size

Wing: Floor: Room:

Wing Floor Room

UOM UOM

UOM UOM

UOM UOM

Other

Attachment J4 Equipment Data Sheet 1 May 2023

Subcontractor Name & Number:
Tracking Number:
DO Number:
BLDG #:
Room #:
Dropdown3: [--]
Wing:
Floor:
Room:
UOM1: [--]
UOM2: [--]
Wing 1:
Floor 1:
Room 1:
Wing 2:
Floor 2:
Room 2:
Unit number 2:
Manufacturer 2:
Model Number 2:
Serial Number 2:
Manufacturer 1:
Model Number 1:
Serial Number 1:
Other:
Description 1:
Unit number 1:
Size 1:
Size 1a:
Manufactured date 1:
Contractors Installation date 1:
Final Acceptance date 1:
Contractors Startup Date 1:
Description 2:
Size 2:
Size 2a:
Manufactured date 2:
Contractors Installation date 2:
Contractors Startup Date 2:
Final Acceptance date 2:
Description 3:
Unit number 3:
Wing 3:
Floor 3:
Room 3:
Manufacturer 3:
Model Number 3:
Serial Number 3:
Size 3:
Size 3a:
Manufactured date 3:
Contractors Installation date 3:
Final Acceptance date 3:
Contractors Startup Date 3:
UOM1a: [--]
UOM2a: [--]
UOM3: [--]
UOM3a: [--]
Dropdown1: [--]
Dropdown1a: [--]
Dropdown2: [--]
Dropdown2a: [--]
Dropdown3a: [--]

File details come from the government source that posted it. Updated .