J12_JOC Close-out Form.pdf

PDF 118 KB Posted

Attached to
Competitive 8(a) SATOC JOC (DRAFT RFP)
Solicitation number
W9124P
Issued by

About this file

The document provided is a JOC Close-Out Form, which is required to be signed by the Prime Contractor Superintendent, Prime Contractor Project Manager, Government Inspector, and Government Project Manager upon completion of a project under the Competitive 8(a) SATOC JOC contract.

The related federal contract opportunity is a Draft Request for Proposal (RFP) for a 100% 8(a) small business set-aside Job Order Contract (JOC) to provide new construction, alterations, maintenance, repair, sustainment, restoration, and modernization services for the U.S. Army Garrison and tenant organizations located at Redstone Arsenal. Potential projects include administrative facilities, base support and facility maintenance, child development centers, physical fitness centers, vehicle maintenance, food service facilities, public safety facilities, airfield structures, roads, utilities, and research/development/testing facilities. This is a pre-solicitation notice, and no cost or pricing data is required at this time.

View the file

Other files

File Type Posted
J13_JOC SP Order FormUpdate 10 June 24.pdf PDF
J18_Spill Response Plan.pdf PDF
J16_NPDES Inspection Form.pdf PDF
J20_Equipment Demo Form.pdf PDF
J21_Time Extension Request.pdf PDF
J6_COH Landfill.pdf PDF
J7_SWDA Incinerator.pdf PDF
Draft W9124P-24-R-0004 3 June 2024.pdf PDF
J2_RSA Policy 200-6.pdf PDF
J15_NOI NPDES Permit.pdf PDF
J25_Contract Data Requirements List (CDRL).pdf PDF
J13_JOC SP Order Form.pdf PDF
J19_Refrigeration Installation Form.pdf PDF
J11_Equipment Warranty List.pdf PDF
J23 Past Performance Survey.docx DOCX document
J14_Septic Permit Application.pdf PDF
J4_Equipment Data Sheet.pdf PDF
J5_RSA Landfill Delivery Ticket.pdf PDF
J3_EnvLaw.pdf PDF
J9_Site Visit Memo.pdf PDF
J1_DD Form 1348-1.pdf PDF
J22 Deliverables List.pdf PDF
J17_NPDES NOT.pdf PDF
J8_Quality Control Report.pdf PDF
J10_Progress Chart.xlsx XLSX spreadsheet
Show all 25

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

JOC CLOSE-OUT FORM

This form must be signed by all four persons listed below and turned in with the Red-Lines, EQ List, Controls, REFRIG Form and T&B Report (If not per Red-Line Drawings send forms to 1354 Processor)

Project Information:

DO# W9124P- -F-

Tracking Number

Building Number

Job Description

This Project includes: (circle below) (Yes/Y, No/N, or Submittal/S)

Equipment List Y

Controls Y

REFRIG Form Y

N

N

N

S

S

S

T&B Report Y N S

This Project Red-Lines are: (check correct box)

Per Red-Line Drawings

Per Scope WITH Drawings

Per Scope WITHOUT Drawings

Special Notes: _____________________________

SIGNATURES

(ALL SIGNATURES/DATE REQUIRED BEFORE SUBMITTED)

Prime Contractor Superintendent

Name Printed

DATE

Prime Contractor PM

Name Printed

DATE

Government Inspector

Name Printed

DATE

Government PM

Name Printed

DATE

File details come from the government source that posted it. Updated .