J2 - APPENDIX CLARIFICATIONS 2 SYSTEM AND CONTROL EQUIPMENT DESIGN INCINER8 LATAM.pdf
PDF 740 KB Posted
- Solicitation number
- PR16088790
- Issued by
-
Department of State
About this file
This document is a clarifications appendix for a federal contract involving an incinerator combustion gas conditioning and control system designed for the Embassy of the United States of America in Costa Rica.
The clarification addresses the recirculation tank design component of the spin washing machine system. It specifies that the hatches (upper access covers) on the recirculation tank may be modified, divided, or reduced in size without affecting system operation, and may be constructed from alternative materials including galvanized steel, HDPE plastic, or acrylic to reduce weight. The document confirms that sufficient space must be maintained for personnel to enter the tank for cleaning, maintenance, and water sampling purposes. Additionally, the clarification permits an increase in the height of the sediment curtain (first baffle) and tank by up to 35 centimeters to maintain a constant circular hydraulic volume or capacity without compromising the proper operation of the washing system. The document is signed by two INCINER8 LatAm representatives: Sebastián López Montoya, Commercial Director with an MBA in Environmental Engineering, and Carlos Alberto Echeverri Londoño, Technical Advisor with a PhD in Environmental Engineering. The clarification was prepared in Guatemala in July 2026 and is marked as Sensitive But Unclassified.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SPIN WASHING MACHINE
JUNE 2026
ANNEX 2 – CLARIFICATIONS
FINAL DESIGN | INCINERATOR COMBUSTION GAS
CONDITIONING AND CONTROL SYSTEM –
EMBASSY OF THE UNITED STATES OF AMERICA –
COSTA RICA
Drug Incinerator Operations Advisor
Contractor - ATSG Corporation
ATSG CARSI
Costa Rica – Central America
Guatemala, July 2026
Prepared by
SENSITIVE BUT UNCLASSIFIED
APPENDIX CLARIFICATIONS 2 -SYSTEM AND CONTROL EQUIPMENT DESIGN – INCINER8 LATAM
Página 2 de 3
1. CONTENTS
CONTENT
2. ADDITIONAL CLARIFICATION ON RECIRCULATION TANK DESIGN……………………………………………………………….. 3
APPENDIX CLARIFICATIONS 2 -SYSTEM AND CONTROL EQUIPMENT DESIGN – INCINER8 LATAM
Página 3 de 3
2. ADDITIONAL CLARIFICATION ON RECIRCULATION TANK DESIGN
The recirculation tank design proposes hatches (upper access covers) that may be modified, divided, or reduced without affecting system operation. They may even be made of different types of materials in order to reduce or decrease their weight, such as galvanized steel, HDPE plastic, acrylic, among others. It should be noted that sufficient space must be left for a person to enter in order to clean, maintain, and/or take water samples from the system.
Regarding the height of the sediment curtain (first baffle) and the tank, there is no issue with increasing its height by up to an additional 35 cm in order to maintain a constant circular hydraulic volume or capacity; therefore, this will not affect the proper operation of the washing system.
Sebastián López Montoya | MBA ENVIRONMENTAL ENGINEER
Professional License No. 05238175412ANT
Commercial Director | INCINER8 LatAm
Email: slopez@inciner8latam.com
Website: www.inciner8latam.com
Carlos Alberto Echeverri Londoño | PhD ENVIRONMENTAL ENGINEERING
Professional Card No. 3546
Technical Advisor | INCINER8 LatAm