J-7 - PRICING FORMAT - PR16088790 Wet Scrubber Project.xls
XLS spreadsheet 860 KB Posted
- Solicitation number
- PR16088790
- Issued by
-
Department of State
About this file
This is a pricing format template for a firm-fixed-price construction contract to fabricate, supply, install, test, commission, and integrate a wet scrubber and recirculation water system for an industrial incinerator at the Investigative Judicial Police (OIJ) facility in Heredia, Costa Rica. The contract is solicited by the U.S. Embassy San Jose under the Department of State's Bureau of International Narcotics and Law Enforcement Affairs (INL), with solicitation number PR16088790.
The pricing format is organized into two primary Contract Line Items (CLINs). CLIN 1 encompasses fabrication and supply services, including engineering and project management, equipment fabrication, materials and components, chemical preparation and dosing systems, and pH monitoring and control systems. CLIN 2 covers installation, testing, commissioning, and integration services, comprising engineering and project management, spare parts, shipping, on-site installation and assembly, commissioning and start-up, system integration, controls and alarm integration, baghouse removal and disposal, and technical documentation. The contractor must deliver a fully operational, code-compliant system with complete documentation and achieve final acceptance within 60 calendar days after notice to proceed. All labor costs, materials, overhead, and profit margins are to be itemized separately within each CLIN, with subtotals provided for direct costs, overhead, and profit to calculate the total project cost.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SUMMARY
| Fabrication and Installation: Wet Scrubber & Recirculation Water System | ||||||
| Investigative Judicial Police (OIJ) Incinerator | ||||||
| Heredia, Costa Rica | ||||||
| PRICING FORMAT | ||||||
| ITEM | DESCRIPTION | UNIT | QTY. | LABOR | MATERIALS | TOTAL |
| COST | COST | |||||
| REGULAR ITEMS | ||||||
| CLIN 1 | Fabrication and Supply Services | Global | 1 | |||
| 1.1 | Engineering and Project Management | - 0 | - 0 | |||
| 1.2 | Fabrication of equipment | - 0 | - 0 | |||
| 1.3 | Materials, components, instrumentation, consumables | - 0 | - 0 | |||
| 1.4 | Chemical preparation and dosing system | - 0 | - 0 | |||
| 1.5 | pH monitoring and control system | - 0 | - 0 | |||
| TOTAL CLIN 1 | - 0 | |||||
| CLIN 2 | Installation, Testing, Commissioning and integration of the new equipment with the existing system services | Global | 1 | |||
| 2.1 | Engineering and Project Management | - 0 | - 0 | |||
| 2.2 | Spare parts | - 0 | - 0 | |||
| 2.3 | Shipping | - 0 | - 0 | |||
| 2.4 | Installation and on-site assembly | - 0 | - 0 | |||
| 2.5 | Commissioning and start-up | - 0 | - 0 | |||
| 2.6 | Integration with existing system | - 0 | - 0 | |||
| 2.7 | Controls and alarm integration | - 0 | - 0 | |||
| 2.8 | Existing baghouse removal and disposal | - 0 | - 0 | |||
| 2.9 | Technical documentation as operation and maintenance manuals | - 0 | - 0 | |||
| TOTAL CLIN 2 | - 0 | |||||
| SUBTOTAL (DIRECT COST) | - 0 | - 0 | - 0 | |||
| OVERHEAD | - 0 | - 0 | - 0 | |||
| PROFIT | - 0 | - 0 | - 0 | |||
| TOTAL PROJECT COST | - 0 | - 0 | - 0 |
Sheet1
| Earth Moving | 14871.00 | 0.2002454222 | 9460.9954611846 | 24,332.00 | 3193.1175068038 | 27,525.11 | 20,501.14 | 157,958.03 | 26723.5816783605 |
| Fundations | 19095.83 | 0.2571348625 | 12148.8508477945 | 31,244.68 | 4100.2776598715 | 35,344.96 | 34315.7133159227 | ||
| Sand Bed | 5388.98 | 0.0725652999 | 3428.4927254666 | 8,817.47 | 1157.1277238797 | 9,974.60 | 9684.1400842614 | ||
| Structural Steel | 15902.38 | 0.2141334676 | 10117.1639433819 | 26,019.54 | 3414.5765569125 | 29,434.12 | 28576.9989113258 | ||
| Obstacle Course | 19005.68 | 0.2559209478 | 12091.4970221724 | 31,097.18 | 4080.9205525325 | 35,178.10 | 34153.7113733295 | ||
| 74263.87 | 47247.00 | 121,510.87 | 15946.02 | 137,456.89 | |||||
| CI | CD+CI | ADM+IMP | SUBTOTAL | UTILIDAD | |||||
| ADM | 12300.68 | ||||||||
| IMP | 3645.34 | ||||||||
| 15946.02 | |||||||||
| Earth Moving | 25115.00 | 0.2505995331 | 11840.2014385201 | 36,955.20 | 4971.766930261 | 41,926.97 | 25,692.43 | 192,999.08 | 40706.0550498822 |
| Fundations | 22693.62 | 0.2264388045 | 10698.6674166526 | 33,392.29 | 4492.4303979259 | 37,884.72 | 36781.514831818 | ||
| Sand Bed | 5388.98 | 0.0537716851 | 2540.5776925406 | 7,929.56 | 1066.8028091514 | 8,996.36 | 8734.3864838827 | ||
| Structural Steel | 15902.38 | 0.1586752539 | 7497.0090603979 | 23,399.39 | 3148.0361137346 | 26,547.43 | 25774.3641530618 | ||
| Obstacle Course | 19005.68 | 0.1896402363 | 8960.0270625544 | 27,965.71 | 3762.3655708191 | 31,728.07 | |||
| Mechanical | 12114.00 | 0.1208744871 | 5711.0173293344 | 17,825.02 | 2398.088178108 | 20,223.11 | 30804.1511582897 | ||
| 1 | 47247.5 | ||||||||
| 100219.66 | 47247.50 | 147,467.16 | 19839.49 | 167,306.65 | |||||
| CI | CD+CI | ADM+IMP | SUBTOTAL | UTILIDAD | |||||
| ADM | 15415.46 | 0.15 | |||||||
| IMP | 4424.03 | ||||||||
| 19839.49 |