J013 - CDRL FH35 Training Plan and Materials_JB_23MAY2024.pdf
PDF 249 KB Posted
- Attached to
- USMA Wind Tunnel Federal contract opportunity
- Solicitation number
- W91RUS24R0025
About this file
This document is a Contract Data Requirements List (CDRL) for a Training Plan and associated Training Materials for the FH35 System. The Contractor shall develop a Training Plan with training materials to be used as a teaching tool for administrators on the operational functionality and system configurations of the FH35 System, which is part of the Engineering Implementation Package (CDRL FH13). The training plan and materials shall cover the overview of the new equipment/system, the role of the new system in supporting project/program requirements, the basic theory of operation, and troubleshooting techniques. The Training Plan document shall include a title page, introduction, training goals, objectives, methods, aids, materials, and duration. The Training Plan and Materials are required to be delivered in multiple draft versions, with specific timelines for submission and receipt of Government comments.
The related Federal Contract Opportunity is for a design-build requirement for a Wind Tunnel that meets or exceeds the Program of Instruction (POI) objectives for the United States Military Academy's (USMA) engineering program. The Solicitation Number is W91RUS24R0025, and it is being issued by the Department of the Army Materiel Command, Army Contracting Command Aberdeen Proving Ground.
View the file
Other files for this federal contract opportunity
Show all 16
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden to
Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington DC 20503.
Please DO NOT RETURN your form to either of these addresses. Send completed form to the government Issuing Contracting Officer for the
Contract/PR No. in Block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:
TDP ____ TM _______ OTHER_X ___
D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR
1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE 17. PRICE GROUP
FH35 System / User Training Plan
4. AUTHORITY (Data Acquisition Document No.) 6. REQUIRING OFFICE 18. ESTIMATED
N/A
5. CONTRACT REFERENCE
SOO Para. 11.4 HQUSAISEC ELIE-ISE-ES TOTAL PRICE
7. DD 250 REQ 9. DIST STATEMENT 10. FREQUENCY 12. DATE OF FIRST SUBMISSION 14. DISTRIBUTION
N/A REQUIRED See Block 16 See Block 16 b. COPIES
8. APP CODE 11. AS OF DATE 13. DATE IF SUBSEQUENT SUBM. a. ADDRESSEE final
N/A See Block 16 draft reg repr
Technical Monitor 1 1 16. REMARKS
Date of first and subsequent submissions: First Draft shall be delivered 90 business days prior to training . Delivery of the 2nd DRAFT shall be submitted within 10 business days of the receipt of comments from the Technical Monitor (TM). If Government’s comments are not provided within 15 business days following delivery of the 1st DRAFT, the 1st DRAFT will become the 2nd DRAFT deliverable. Delivery of the FINAL shall be submitted within 10 business days of the receipt of comments from the Government. If Government’s comments are not provided within 15 business days following delivery of the 2nd DRAFT, the 2nd DRAFT will become the FINAL deliverable.
Format: The plan shall use MS Office products, Arial, font size 12, black.
Method of delivery: One (1) soft copy (email copy) of the Drafts and Final shall be submitted to the Technical Monitor (TM) and the Contracting Officer’s Representative (COR). The document shall not be locked or protected in any fashion that would prevent text to be copied or edited by the Government after delivery.
Content: The Contractor shall develop a Training Plan with associated Training Materials for the systems/subsystems included in the Engineering Implementation Package (EIP), CDRL FH13. The training plan and materials will be used as a teaching tool for administrators on operational functionality and system configurations. This plan with training materials will be used for both a formal and informal training environment. The plan and materials shall be developed to address, at a minimum, the following training topics:
- Overview of the new equipment or system, to include any significant changes compared to the old equipment or system.
- The role of the new equipment or system in supporting the project/program requirements.
- Basic theory of operation of the new component or components comprising the system.
- Troubleshooting techniques to identify operational problems.
The Training Plan document(s) shall include, at a minimum, the following:
a) Title page
b) Introduction and Background (including subject of training)
c) Goal of the training to be conducted
d) Training objectives
e) Training methods/activities (i.e., computer aided, hands-on, lab, etc)
f) Training aids and/or training supplies
g) Training materials, user/operator manuals, documents, etc.
h) Length of training
COR 1
15. TOTAL - - - - - - - - -> 2 3
G. PREPARED BY H. DATE I. APPROVED BY J. DATE
DD Form 1423-1, JUN 90 Previous editions are obsolete Page 1 of 1 Pages
5/23/2024
| 2024-05-23T13:49:03-0700 | |
| BUENSALIDO.JOHN.GLENN.1171282825 |
| 2024-06-03T11:01:24-0700 | |
| KLEESE.BRYAN.EDWARD.1061856524 |
File details come from the government source that posted it. Updated .