J.2 DO 0001 - SOW.pdf

PDF 6 KB Posted

Attached to
RF & Circuit Design Assembly & Fabrication Support Federal contract opportunity
Solicitation number
N00178-21-R-4401
Issued by
Department of the Navy Naval Sea Systems Command

About this file

This document outlines a statement of work for a kick-off meeting delivery order under a contract for design, technical documentation, fabrication, system integration, test and evaluation, and rapid prototyping support for the Naval Surface Warfare Center, Dahlgren Division. The contractor shall attend a kick-off meeting via teleconference to be scheduled within 15 days of award of the underlying contract. The work under this delivery order shall be performed at the unclassified level, and there is no government furnished information, equipment, travel, or deliverables required. The period of performance for the kick-off meeting is 30 days from award of the contract.

View the file

Other files for this federal contract opportunity

Other files attached to RF & Circuit Design Assembly & Fabrication Support, newest first.
File Type Posted
N0017821R4401 QA-6th Round.pdf PDF
N0017821R4401 QA-5th Round.pdf PDF
N0017821R4401 QA-4th Round.pdf PDF
N0017821R4401 QA-3rd Round.pdf PDF
N0017821R4401 0003.pdf PDF
N0017821R4401 QA-2nd Round.pdf PDF
J.3 DO 0002 - SOW_rev.pdf PDF
N0017821R4401 Questions and Answers.pdf PDF
N0017821R4401 (Conform Copy 03FEB2021).pdf PDF
N0017821R4401 0002.pdf PDF
N0017821R4401 0001.pdf PDF
Exhibit A - CDRLs A001-A004.pdf PDF
J.3 DO 0002 - SOW.pdf PDF
N0017821R4401.pdf PDF
Show all 14

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DELIVERY ORDER 0001 – KICK-OFF MEETING

STATEMENT OF WORK

1.0 BACKGROUND

The Naval Surface Warfare Center, Dahlgren Division (NSWCDD), Code H124, has a requirement for design, technical documentation, fabrication, system integration, test and evaluation, and rapid prototyping support.

2.0 REQUIREMENTS

The Contractor shall attend a kick-off meeting to be scheduled within 15 days of award of the contract. This kick-off meeting will be held via teleconference.

3.0 Security

All work being performed by the Contractor under this order shall be at the unclassified level.

4.0 Government Furnished Information (GFI)

There is no GFI for this tasking.

5.0 Government Furnished Equipment (GFE)

There is no GFE for this tasking.

6.0 Travel

There is no travel for this tasking.

7.0 Deliverables

There are no deliverables for this tasking.

8.0 Period of Performance

Period of performance shall be through 30 days from award of contract.

9.0 TECHNICAL POINT OF CONTACT

TBD

File details come from the government source that posted it. Updated .