J-9 PFGS Spec Sections_(01-32).pdf

PDF 13 MB Posted

Attached to
Roof Fall Protection Systems Services Federal contract opportunity
Solicitation number
HQ003426RE004
Issued by
DOD Washington Headquarters Service

About this file

This document is a comprehensive Pentagon Facility Guide Specification (PFGS) Master Specification for construction projects, specifically focusing on Section 01 11 00 (Summary of Work) dated May 22, 2023. The specification provides detailed administrative and procedural requirements for construction work at the Pentagon Reservation, including site-specific guidelines for project management, safety, documentation, sustainability, and quality control.

Key highlights include requirements for project coordination, site access, safety protocols, sustainability reporting, and documentation standards. The specification mandates specific procedures for submittals, design reviews, construction management, indoor air quality control, and environmental compliance. It covers a wide range of construction-related aspects such as utility outages, excavation permits, waste management, cybersecurity for facility-related control systems, and third-party certification processes. The document is designed to ensure comprehensive oversight and standardization of construction projects at the Pentagon, with an emphasis on safety, sustainability, and regulatory compliance.

View the file

Other files for this federal contract opportunity

Other files attached to Roof Fall Protection Systems Services, newest first.
File Type Posted
GOVT RESPONSE TO OFFEROR QUESTIONS.pdf PDF
Solicitation Amendment HQ003426RE0040001 SF 30.pdf PDF
HQ003426RE004 Sign-In Sheet.pdf PDF
J26 Contract NDA Form.pdf PDF
J-14 Pentagon Labeling Std Rev 9.pdf PDF
J-15 2021 Excavation Permit Application Form fillable.pdf PDF
J-19 Project Man Hours Work DART Rate Example.pdf PDF
J-11 Pentagon_Reservation_Exterior_Standards_Manual.pdf PDF
J-10 Pentagon Historic Concrete Specifications.pdf PDF
J-4 ADAP Form 219-704 Subcontracting Plan Format.docx DOCX document
J-17 Asbestos Location OM Program.pdf PDF
J-16 F6-014500_CONTRACTOR_RESUMES_rev.pdf PDF
J-5 Past Performance Data Sheet.docx DOCX document
J-2 WD Constr. VA20250013 02-28-2025.pdf PDF
J-1 PWS.pdf PDF
J-24 Reservation Area Designation Plan.pdf PDF
J-21 EDS Project Kickoff Presentation.pdf PDF
J-22 FSD Electronic Data Standards_6.1.pdf PDF
J-23 ComplianceChecklist_24_XXX_Name_Submission_Date.xlsx XLSX spreadsheet
J-18 Project Man Hours Work DART Rate.xlsx XLSX spreadsheet
J-13 Sample_DID.pdf PDF
J-3 WD Services 2015-4281 Rev 34 07.08.2025.pdf PDF
J-20 AEC_CAD Standards 6.1.pdf PDF
J25 Contractor-Conflict-of-Interest-Disclosure-Form.pdf PDF
J-8 WHS Fire Regulations 2022 Edition.pdf PDF
J-12 Reservation_Finish_Standards.pdf PDF
J-7 WHS_Building_Code_2022.pdf PDF
J-6 Contractor Past Performance Questionnaire PPQ.docx DOCX document
Solicitation - HQ003426RE004.pdf PDF
Show all 29

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

FACILITY GUIDE SPECS CUI PFGS Master Spec June 7, 2023

MASTER TABLE OF CONTENTS Page 1

CUI

PFGS TABLE OF CONTENTS

DIVISION 01 - GENERAL REQUIREMENTS

01 11 00 SUMMARY OF WORK

01 20 00 PRICE AND PAYMENT PROCEDURES

01 30 00 ADMINISTRATIVE REQUIREMENTS

01 32 01.00 10 PROJECT SCHEDULE

01 33 00 SUBMITTAL PROCEDURES

01 33 29 SUSTAINABILITY REPORTING

01 35 26 GOVERNMENTAL SAFETY REQUIREMENTS

01 42 00 SOURCES FOR REFERENCE PUBLICATIONS

01 45 00.00 10 QUALITY CONTROL

01 74 19 CONSTRUCTION WASTE MANAGEMENT AND

DISPOSAL

01 78 00 CLOSEOUT SUBMITTALS

01 78 23 OPERATION AND MAINTENANCE DATA

01 79 00 DEMONSTRATION AND TRAINING

01 83 50 SYSTEM OPERATION AND MAINTENANCE

MANUALS

01 91 00 COMMISSIONING

DIVISION 02 - EXISTING CONDITIONS

02 32 13 02/21 SUBSURFACE DRILLING AND SAMPLING

02 41 00 05/10, CHG 2: 02/19 [DEMOLITION][ AND ][DECONSTRUCTION]

02 42 51 11/19 CARPET REMOVAL AND RECLAMATION

02 42 91 11/18 REMOVAL AND SALVAGE OF HISTORIC

CONSTRUCTION MATERIALS

02 65 00 02/10, CHG 1: 11/13 UNDERGROUND STORAGE TANK REMOVAL

02 81 00 11/18 TRANSPORTATION AND DISPOSAL OF

HAZARDOUS MATERIALS

02 83 00 11/18 LEAD REMEDIATION

02 84 16 05/20 HANDLING OF LIGHTING BALLASTS AND

LAMPS CONTAINING PCBs AND MERCURY

02 85 00 11/18 MOLD REMEDIATION

DIVISION 03 - CONCRETE

03 01 00 02/18 REHABILITATION OF CONCRETE

03 30 00 02/19, CHG 3: 11/21 CAST-IN-PLACE CONCRETE

03 30 53 05/14 MISCELLANEOUS CAST-IN-PLACE CONCRETE

03 33 00 11/09 CAST-IN-PLACE ARCHITECTURAL CONCRETE

03 45 00 05/16, CHG 2: 11/21 PRECAST ARCHITECTURAL CONCRETE

DIVISION 04 - MASONRY

04 03 00

04 20 00

11/17

11/15, CHG

2:

05/19

CONSERVATION TREATMENT FOR PERIOD

MASONRY

UNIT MASONRY

DIVISION 05 - METALS

05 05 23.16

08/18

STRUCTURAL WELDING

05 50 13 05/17, CHG 1: 08/18 MISCELLANEOUS METAL FABRICATIONS

05 51 00 02/17, CHG 1: 05/17 METAL STAIRS

05 51 33 02/16, CHG 2: 02/18 METAL LADDERS

MASTER TABLE OF CONTENTS Page 2

05 52 00 02/18, CHG 1: 02/20 METAL RAILINGS

DIVISION 06 - WOOD, PLASTICS, AND COMPOSITES

06 10 00 08/16, CHG 2: 11/18 ROUGH CARPENTRY

06 20 00 08/16, CHG 2: 11/18 FINISH CARPENTRY

DIVISION 07 - THERMAL AND MOISTURE PROTECTION

07 05 23 08/19 PRESSURE TESTING AN AIR BARRIER SYSTEM

FOR AIR TIGHTNESS

07 11 13 08/11, CHG 1: 05/17 BITUMINOUS DAMPPROOFING

07 12 00 02/16 BUILT-UP BITUMINOUS WATERPROOFING

07 13 53 02/16, CHG 1: 08/17 ELASTOMERIC SHEET WATERPROOFING

07 14 00 02/12, CHG 2: 02/18 FLUID-APPLIED WATERPROOFING

07 19 00 05/11, CHG 1: 08/17 WATER REPELLENTS

07 21 13 02/16, CHG 2: 08/20 BOARD AND BLOCK INSULATION

07 21 16 11/11, CHG 4: 08/18 MINERAL FIBER BLANKET INSULATION

07 22 00 02/16, CHG 3: 11/18 ROOF AND DECK INSULATION

07 31 26 08/09 SLATE ROOFING

07 42 13 05/11, CHG 2: 02/18 METAL WALL PANELS

07 51 13 05/12, CHG 2: 11/18 BUILT-UP ASPHALT ROOFING

07 60 00 05/17, CHG 2: 11/18 FLASHING AND SHEET METAL

07 81 00 02/11 SPRAY-APPLIED FIREPROOFING

07 84 00 05/10, CHG 1: 08/13 FIRESTOPPING

07 92 00 08/16, CHG 3: 11/18 JOINT SEALANTS

DIVISION 08 - OPENINGS

08 11 13 08/20 STEEL DOORS AND FRAMES

08 14 00 08/16, CHG 1: 08/18 WOOD DOORS

08 33 13 05/09, CHG 2: 11/12 COILING COUNTER DOORS

08 33 23 08/20, CHG 1: 02/22 OVERHEAD COILING DOORS

08 34 73 11/19, CHG 1: 02/21 SOUND CONTROL DOOR ASSEMBLIES

08 41 13 08/18, CHG 1: 08/18 ALUMINUM-FRAMED ENTRANCES AND

STOREFRONTS

08 51 13 05/19 ALUMINUM WINDOWS

08 71 00 02/16, CHG 4: 02/22 DOOR HARDWARE

08 81 00 05/19 GLAZING

08 91 00 08/20 METAL WALL AND DOOR LOUVERS

DIVISION 09 - FINISHES

90.50

05/09, 01/18

CHG 1: 08/17 PREPARATION OF HISTORIC WOOD AND

SURFACES FOR PAINTING

NON-STRUCTURAL METAL FRAMING

METAL

09 29 00 08/16 GYPSUM BOARD

09 30 10 08/20 CERAMIC, QUARRY, AND GLASS TILING

09 51 00 08/20 ACOUSTICAL CEILINGS

09 62 38 08/17, CHG 1: 08/18 STATIC-CONTROL FLOORING

09 64 29 08/16, CHG 2: 11/18 WOOD STRIP AND PLANK FLOORING

09 65 00 08/10, CHG 3: 08/18 RESILIENT FLOORING

09 66 23 08/16, CHG 1: 08/18 RESINOUS MATRIX TERRAZZO FLOORING

09 68 00 11/17, CHG 2: 08/20 CARPETING

09 69 13 11/15, CHG 1: 08/18 RIGID GRID ACCESS FLOORING

09 69 19 11/15, CHG 1: 08/18 STRINGERLESS ACCESS FLOORING

09 84 20 08/16, CHG 1: 08/18 ACOUSTICAL WALL PANELS

09 90 00 02/21 PAINTS AND COATINGS

DIVISION 10 - SPECIALTIES

MASTER TABLE OF CONTENTS Page 3

10 14 00.10 08/17, CHG 1: 11/18 EXTERIOR SIGNAGE

10 14 00.20 08/20 INTERIOR SIGNAGE

10 14 53 02/15, CHG 1: 05/17 TRAFFIC SIGNAGE

10 26 00 08/20 WALL AND DOOR PROTECTION

10 44 16 11/19 FIRE EXTINGUISHERS

DIVISION 12 - FURNISHINGS

12 36 00 08/16, CHG 2: 08/18 COUNTERTOPS

12 59 00 08/17, CHG 1: 08/18 SYSTEMS FURNITURE

DIVISION 21 - FIRE SUPPRESSION

21 12 00 05/11 STANDPIPE SYSTEMS

21 13 13 08/20 WET PIPE SPRINKLER SYSTEMS, FIRE

PROTECTION

21 13 16 08/20 DRY PIPE SPRINKLER SYSTEMS, FIRE

PROTECTION

DIVISION 22 - PLUMBING

22 00 00 11/15, CHG 4: 05/21 PLUMBING, GENERAL PURPOSE

22 07 19.00 40 08/16 PLUMBING PIPING INSULATION

22 13 29 02/11 SANITARY SEWERAGE PUMPS

22 14 29.00 40 05/17 SUMP PUMPS

DIVISION 23 - HEATING, VENTILATING, AND AIR CONDITIONING (HVAC)

23 01 30.41 02/15, CHG 2: 08/17 HVAC SYSTEM CLEANING

23 03 00.00 20 08/10, CHG 3: 08/18 BASIC MECHANICAL MATERIALS AND METHODS

23 05 15 02/14 COMMON PIPING FOR HVAC

23 05 93 11/15 TESTING, ADJUSTING, AND BALANCING FOR

HVAC

23 07 00 02/13, CHG 7: 05/20 THERMAL INSULATION FOR MECHANICAL

SYSTEMS

23 09 00 02/19, CHG 3: 05/21 INSTRUMENTATION AND CONTROL FOR HVAC

23 09 13 11/15, CHG 2: 05/21 INSTRUMENTATION AND CONTROL DEVICES

FOR HVAC

23 09 23.02 02/19, CHG 1: 02/20 BACNET DIRECT DIGITAL CONTROL FOR HVAC

AND OTHER BUILDING CONTROL SYSTEMS

23 22 23.00 40 08/15 STEAM CONDENSATE PUMPS

23 25 00 05/21 CHEMICAL TREATMENT OF WATER FOR

MECHANICAL SYSTEMS

23 30 00 05/20, CHG 1: 02/22 HVAC AIR DISTRIBUTION

23 31 13.00 40 05/16 METAL DUCTS

23 34 23.00 40 02/17 HVAC POWER VENTILATORS

23 36 00.00 40 05/16 AIR TERMINAL UNITS

23 37 13.00 40 05/15 DIFFUSERS, REGISTERS, AND GRILLES

23 41 13.00 40 02/16 AIR FILTERS

23 57 10.00 10 11/19 FORCED HOT WATER HEATING SYSTEMS USING

WATER AND STEAM HEAT EXCHANGERS

23 73 13.00 40 05/17 MODULAR INDOOR CENTRAL-STATION

AIR-HANDLING UNITS

23 81 23 11/20 COMPUTER ROOM AIR CONDITIONING UNITS

23 82 19.00 40 05/17 FAN COIL UNITS

23 82 46.00 40 05/17 ELECTRIC UNIT HEATERS

DIVISION 25 - INTEGRATED AUTOMATION

25 05 11.00 05/21 CYBERSECURITY FOR FACILITY RELATED

MASTER TABLE OF CONTENTS Page 4

CONTROL SYSTEMS (FRCS)

25 05 11.01 05/21 CYBERSECURITY FOR FIRE AND LIFE SAFETY

SYSTEMS (FLS)

DIVISION 26 - ELECTRICAL

26 05 00.00 40 11/20 COMMON WORK RESULTS FOR ELECTRICAL

26 05 13.00 40 05/20 MEDIUM-VOLTAGE CABLES

26 09 13 11/08 POWER MONITORING SYSTEM

26 11 13.00 20 11/21 PRIMARY UNIT SUBSTATION

26 11 16 11/21 SECONDARY UNIT SUBSTATIONS

26 12 19.10 05/19, CHG 1: 11/19 THREE-PHASE, LIQUID-FILLED PAD-MOUNTED

TRANSFORMERS

26 13 13 04/07 MEDIUM VOLTAGE GENERATOR PARALLELING

SWITCHGEAR AND CONTROL SYSTEM

26 20 00 08/19, CHG 3: 11/21 INTERIOR DISTRIBUTION SYSTEM

26 23 00 05/15, CHG 2: 11/19 LOW-VOLTAGE SWITCHGEAR

26 24 19.00 40 05/19 MOTOR CONTROL CENTERS

26 28 00.00 10 10/07 MOTOR CONTROL CENTERS, SWITCHBOARDS

AND PANELBOARDS

26 29 23 02/20, CHG 1: 05/21 ADJUSTABLE SPEED DRIVE (ASD) SYSTEMS

UNDER 600 VOLTS

26 32 15.00 05/20 ENGINE-GENERATOR SET STATIONARY

15-2500 KW, WITH AUXILIARIES

26 36 23 05/20, CHG 1: 08/21 AUTOMATIC TRANSFER SWITCHES AND

BY-PASS/ISOLATION SWITCH

26 60 13.00 40 05/19 LOW-VOLTAGE MOTORS

DIVISION 28 - ELECTRONIC SAFETY AND SECURITY

28 31 76 08/20 INTERIOR FIRE ALARM AND MASS

NOTIFICATION SYSTEM, ADDRESSABLE

DIVISION 31 - EARTHWORK

31 10 00 02/21 SITE CLEARING

31 23 00.00 20 02/11, CHG 2: 08/15 EXCAVATION AND FILL

DIVISION 32 - EXTERIOR IMPROVEMENTS

32 05 33 08/17 LANDSCAPE ESTABLISHMENT

32 92 19 08/17, CHG 1: 08/21 SEEDING

32 92 23 04/06, CHG 1: 08/21 SODDING

32 93 00 08/17, CHG 1: 08/21 EXTERIOR PLANTS

-- End of Master Table of Contents --

Washington Headquarters Services Department of Defense

FSD Construction Management General Requirements

March 4, 2021

FOR INTERNAL USE ONLY

FSD CONSTRUCTION MANAGEMENT

GENERAL REQUIREMENTS TO

SPECIFICATIONS GUIDE

Version WHS

MARCH 15, 2023

TABLE OF CONTENTS

1.0 ADMINISTRATION

2.0 KEY PERSONNEL

3.0 SITE

4.0 COST-SCHEDULE-INVOICE

5.0 QUALITY CONTROL & SAFETY

6.0 DESIGN & CONSTRUCTION

7.0 COMMISSIONING

8.0 CLOSEOUT

INTRODUCTION

This document is no longer an attachment. The requirements that were in the CMD attachment have all been moved to the Division 01 specifications or the SOW. This document now provides the user with an understanding of where information is located throughout Division 01 or the SOW so they can quickly access and verify information.

GENERAL REQUIREMENTS

Refer to the Statement of Work (SOW), Section 3.0 Submittal Requirements, for due dates, format, and review periods for Sections 01 through 09.

1.0 ADMINISTRATION

Administration: The following information was moved to Section 01 30 00 ADMINISTRATIVE

REQUIREMENTS:

(1.8) Project Kick-off Meeting

(1.8.1) eFIC Kick-Off Meeting (1.8.2) Coordination with Building Entities

(3.1) Weekly Progress Meetings (3.2) Requests for Information (RFI) (3.3) Permit Parking requirements and towing of unregistered vehicles.

2.0 KEY PERSONNEL

Personnel: The key personnel information was moved to Section 01 30 00 ADMINISTRATIVE

REQUIREMENTS, 01 45 00.00 10 QUALITY CONTROL, 01 35 26 GOVERNMENTAL SAFETY

REQUIREMENTS, 01 32 01.00 10 PROJECT SCHEDULE and Attachment F1. There is also information in SOW Section 2.2.5.

Project Manager

Qualifications for this role have been moved to Section 01 30 00 ADMINISTRATIVE REQUIREMENTS, paragraph 1.6.4 and Attachment F1.

Designer of Record (DOR)

Qualifications for this role have been moved to Attachment F1.

Qualified Fire Protection Engineer (QFPE)

Qualifications for this role have been moved to Attachment F1.

Site Safety Health Officer (SSHO)

Information on SSHO qualifications has been moved to Section 01 35 26 GOVERNMENTAL SAFETY REGULATIONS, paragraph 1.6.1 and Attachment F1.

Quality Control Manager (QCM)

Information on QCM qualifications has been moved to Section 01 45 00.00 10 QUALITY CONTROL, paragraph 3.4.2 and Attachment F1.

Site Superintendent

Qualifications for this role have been moved to Section 01 30 00 ADMINISTRATIVE REQUIREMENTS, paragraph 1.6.1 and Attachment F1.

Contractor’s Scheduler

Qualifications for Scheduling qualifications are now found in Section 01 32 01.00 10 PROJECT SCHEDULE, paragraph 1.3 and Attachment F1.

LEED Professional

Qualifications for the LEED AP is found in Section 01 45 00 QUALITY CONTROL, paragraph

3.4.3 and Attachment F1

3.0 SITE

Relevant site information was moved to Section 01 11 00 SUMMARY OF WORK.

Project Coordination Plan (PCP) requirements have been moved to 01 11 00, paragraph 1.18.

Existing Conditions Report

The requirements were moved to Section 01 11 00 SUMMARY OF WORK, paragraph 1.14.

Construction Air Quality Management Plan

The plan details were moved to Section 01 33 29 SUSTAINABILITY REQUIREMENTS, paragraph 3.5.

Stormwater Management

The storm water requirements were moved to Section 01 33 29 SUSTAINABILITY REQUIREMENTS, paragraph 1.8 and SOW template Section 2.2.10.

Debris Removal / Waste Management Plan / Waste Recycling Report

These requirements were moved to Section 01 74 19 CONSTRUCTION AND DEMOLITION

WASTE MANAGEMENT.

Pre-Construction Submittal Register

Information on the Submittal Register was moved to Section 01 33 00 SUBMITTAL PROCEDURES, paragraph 1.9.

Contractor Badging

This information was moved to Section 01 30 00 ADMINISTRATIVE REQUIREMENTS, paragraph 3.5.

Site Access and Maintenance

This information was moved to Section 01 30 00 ADMINISTRATIVE REQUIREMENTS, paragraph 3.6.

Delivery Screening of Equipment, Materials, Tools, and Supplies

This information was moved to Section 01 30 00 ADMINISTRATIVE REQUIREMENTS, paragraph 3.7.

Construction Signage

3.8.

Outage Requests

This information was moved to Section 01 30 00 ADMINISTRATIVE REQUIREMENTS, paragraph 3.9.

Access Request Form

This information was moved to Section 01 30 00 ADMINISTRATIVE REQUIREMENTS, paragraph 3.5.

Fire Protection

This information was not moved to Division 1. It is in the WHSBC Section 233.3 and NFPA 25, Chapter 15.

Landscape Excavation/Damage Repair Requirements

This information is included in SOW template section 2.2.12.

4.0 COST-SCHEDULE-INVOICE

This information was moved to Section 01 20 00 PRICE AND PAYMENT PROCEDURES and Section 01 32 01.00 10 PROJECT SCHEUDLE.

Progress Schedule

This information was moved to Section 01 32 01.00 10 PROJECT SCHEDULE.

Coordination with OGC Schedules

3.13.

5.0 QUALITY CONTROL & SAFETY

This information was moved to Section 01 45 00.00 10 QUALITY CONTROL in paragraph 3.2.

Design Quality Control Plan (DQC)

Construction Quality Control (CQC)

The following information was moved to Section 01 30 00 ADMINISTRATIVE REQUIREMENTS:

(3.14) Accident Prevention Plan (APP) and Activity Hazard Analysis (AHA) and Section 01 35 26 GOVERNMENTAL SAFETY REQUIREMENTS, paragraphs 1.7 and 1.8.

(3.14.1) Compliance Requirements:

(3.14.3) OGC’s Construction Zone:

(3.14.4) First Response Coordinator for Emergency Services (3.14.5) Safety man hour report.

Construction Daily Reports

Requirements for these reports are located in section 2.2.14 in SOW template.

6.0 DESIGN & CONSTRUCTION

This information was moved to Section 01 30 00 ADMINISTRATIVE REQUIREMENTS.

(3.17) Basis of Design (BOD) (3.18) Historic Approval Documents (3.19) Design Intent Documents (DIDs) (3.20) Design Document Submittals

Relevant information in this section has been moved to Section 01 33 00 SUBMITTAL

PROCEDURES.

Transfer & Acceptance of Military Real Property (DD Form 1354)

This requirement has been moved to Section 01 78 00 CLOSEOUT SUBMITTALS, see section 3.9 and SOW template Section 2.2.25.

Sustainability Design Requirements

Sustainability requirements have been moved to Section 01 33 29 SUSTAINABILITY REQUIREMENTS, see paragraph 1.6.1

Metering Requirements

The information on metering was moved to Section 2.2.13 of the SOW template.

Electrical

These requirements are located in section 2.2.6 of the SOW Template and relevant sections in Divisions 02-33.

Additional requirements are found in Division 26 and in the Pentagon Labelling Standard. Contractor must have all new or modified existing mechanical and electrical equipment location, and controls tied/added or modified on the BAS (Building Automation System). Any electrical system work that impacts remotely monitored equipment need to follow UFC 4-010-06 requirements for cybersecurity.

Fire Alarm System

These requirements were moved to Section 28 31 76 INTERIOR FIRE ALARM AND MASS NOTIFICATION SYSTEM. The Pentagon fire alarm system is manufactured by Simplex. Any fire alarm system work that impacts remotely monitored equipment need to follow UFC 4-010-06 requirements for cybersecurity.

Fire Protection

These requirements were moved to Section 21 13 13 WET PIPE SPRINKLER SYSTEMS, FIRE PROTECTION & Section 21 13 16 DRY PIPE SPRINKLER SYSTEMS, FIRE PROTECTION.

For replacement of fire sprinkler piping, any Schedule 10 piping must be replaced with schedule 40 piping. Design must be coordinated with OPFM and PBMO.

Limits of Work Affecting Historic Building Elements

These requirements were moved to Division 09 FINISHES.

The Contractor must adhere to the Attachment “Pentagon Reservation Exterior Standards Manual.”

Codes

These requirements were moved to Section 01 30 00 ADMINISTRATIVE REQUIREMENTS.

Unified Facilities Criteria (UFC) Requirements

Health and Safety Standards

These requirements were moved to SOW template Section 2.2.29.

Building Monitoring Systems

These requirements were moved to Division 25 INTEGRATED AUTOMATION

All building monitoring systems that are part of the SOW must be tied into the building Facilities Related Control System (FRCS) and follow the UFC requirements. Cybersecurity documents are in Section 25.

General Inspection Procedures

An appropriate location for this requirement in the PFGS should be determined.

Construction Daily Reports

The requirement to provide daily reports are in Section 2.2.14 of the SOW template. An appropriate location in the PFGS should be determined.

The report must be provided to the Government Representative (COR, CM, QA, and Scheduler).

Design Support During Construction

Moved to SOW template Section 2.2.26.

On-Site Drawings and Permits

Moved to SOW template Section 2.2.27.

Pentagon Reservation Sign Displacement

Moved to SOW template Section 2.2.28.

Demolition Requirements

Section contains capping requirements for any existing mechanical, electrical, and plumbing (MEP) and sprinkler system components being deconstructed and/or removed in conjunction with the execution of the work.

Outages

These requirements were moved to Section 01 30 00 ADMINISTRATIVE REQUIREMENTS, paragraph 3.9 and Section 01 11 00 SUMMARY OF WORK Section 1.9.1.

Soil Removal or Procurement

7.0 COMMISSIONING

Commissioning relationships and contractor requirements were moved to Section 01 91 00COMMISSIONING and SOW template Section 2.3. System specific commissioning requirements are in Product specifications.

Commissioning will be reflected within the project schedule, see Section 01 32 01.00 10 PROJECT

SCHEDULE.

8.0 CLOSEOUT

Relevant information was moved to Section 01 78 00 CLOSEOUT SUBMITTALS, 01 78 23 OPERATION AND MAINTENANCE DATA and 01 45 00.00 10 QUALITY CONTROL and SOW template Section 2.2.30.

Systems Operations and Maintenance Manuals (SOMMs)

Closeout data submittals processes have been moved to Section 01 83 50 Systems Operations & Maintenance Manuals, paragraph 1.5.

Operation & Maintenance Manuals (O&Ms)

Closeout data submittals processes have been moved to Section 01 78 23 OPERATION AND

MAINTENANCE DATA.

NFPA 72 Form-Record of Completion

Closeout submittals processes have been moved to SOW template Section 2.2.15.

NFPA 13 Contractor’s Material and Test Certificate for Aboveground Piping

Closeout submittals processes have been moved to SOW template Section 2.2.16.

Design Master Equipment List (DMEL)

Closeout submittals processes have been moved to Section 01 83 50 SYSTEM OPERATION AND

MAINTENANCE MANUALS.

As-Built Documents

As-built processes have been moved to Section 01 78 00 CLOSEOUT SUBMITTALS, paragraph 3.1.

Issue for Record As-Built Documents

Closeout submittals processes have been moved to Section 01 78 00 CLOSEOUT SUBMITTALS, paragraph 3.2 and SOW template Section 2.2.31.

Warranty Binder

Closeout submittals processes have been moved to Section 01 78 00 CLOSEOUT SUBMITTALS, paragraphs 1.8 and SOW template Section 2.2.32.

Waivers

Elevator and Escalator Certificates of Operation

The Elevator and Escalator Installation Contractor must arrange for third-party certification prior to turning over the equipment for Building use.

Attic Stock Delivered Inventory

Spare Parts information is in Section 01 78 00 CLOSEOUT SUBMITTALS, paragraph 1.6 and SOW template Section 2.2.33.

Certificate of Occupancy

Occupancy processes have been moved to SOW template Section 2.2.20.

Guiding Principles Checklist

Guiding Principles submittal processes have been moved to SOW template Section 2.2.21.

Substantial Completion

The information was moved to SOW template Section 2.2.23.

Final/Construction Completion

The information was moved to SOW template Section 2.2.24.

Contract Completion

The information was moved to Section 01 30 00 ADMINISTRATIVE REQUIREMENTS and SOW template Section 2.2.34.

Utility Room List

This requirement has been moved to Section 01 78 00 CLOSEOUT SUBMITTALS, paragraph 1.9 and SOW template Section 2.2.35.

Joint Use Rooms List

This requirement has been moved to Section 01 78 00 CLOSEOUT SUBMITTALS, paragraph 1.9 and SOW template Section 2.2.36.

Cost to Complete

The right to retain project funds was moved to Section 01 30 00 ADMINISTRATIVE REQUIREMENTS, paragraph 3.20.

Final Submittal Register

The submittal register requirement was moved to SOW template Section 2.2.22.

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 1 OF 138 PAGES

Pentagon Facility Guide Specs

01 33 00 SD-01 Preconstruction Submittals

1.9 G DASubmittal Register

02 32 13 SD-02 Shop Drawings

3.12 GDrilling Log

SD-03 Product Data

1.5Permits, Certifications, and

Licenses

1.3.7.1 GSchedule of Drilling, Sampling, and Testing

02 41 00 SD-01 Preconstruction Submittals

1.2.2 GDemolition Plan

1.2.2 GDeconstruction Plan

1.10Existing Conditions

1.7.2 GTraffic Control Plan

SD-07 Certificates

1.7 GNotification

SD-11 Closeout Submittals

3.3.4Receipts

02 42 51 SD-01 Preconstruction Submittals

1.4.2 GDust-Control Measures

1.4.2 GPacking and Transportation

Measures

1.4.4 GSchedule of Carpet Reclamation

Activities

1.4.3 GCarpet Reclamation Agency

Records

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P H

C L A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

AUTH REMARKS

(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 2 OF 138 PAGES

02 42 91 SD-01 Preconstruction Submittals

1.2 GWork Plan

02 65 00 SD-01 Preconstruction Submittals

1.5.4 GWork Plan

1.5.4.1 GSite Safety and Health Plan

1.5.4.2 GExcavation and Material Handling

Plan

1.5.4.3 GField Sampling and Laboratory

Testing Plan

1.5.4.4 GTank and Piping Removal And

Disposal Plan

1.5.4.5 GSpill and Discharge Control Plan

1.5.1 GQualifications

1.5.2Laboratory Services

3.12.3State Licensed [Hazardous

]Waste Transporter

SD-06 Test Reports

3.15Laboratory and Field Testing

Reports

2.1Backfill Material

3.2Tank Contents Verification

3.5.2Contaminated Water Disposal

3.10Soil Examination, Testing, and

Analysis

3.11 GBackfilling

SD-11 Closeout Submittals

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 3 OF 138 PAGES

02 65 00 3.12.4 GSalvage Rights

3.15Tank Closure Report

3.15 GPhotographs

02 81 00 SD-01 Preconstruction Submittals

1.4.4 GTransportation Permits

SD-03 Product Data

2.1.1Packaging Notifications

3.1 GHazardous Waste Management

Plan

3.2 GOnsite Hazardous Waste

Management

3.3Notices of Non-Compliance and

Notices of Violation

SD-06 Test Reports

3.7 GRecordkeeping

3.7 GException Report

3.8Spill Response

SD-07 Certificates

1.4.1 GTransportation and Disposal

Coordinator

1.4.2 GTraining

1.4.3Certification

3.3.3 GShipping Documents and

Packagings Certification

3.3.4Security Plan

3.3.5Certificates of Disposal

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 4 OF 138 PAGES

02 81 00 3.6Waste Minimization

02 83 00 SD-01 Preconstruction Submittals

1.5.1.1 GCompetent Person

1.5.1.2 GTraining Certification

1.5.2.3 GOccupational and Environmental

Assessment Data Report

1.5.2.4 GMedical Examinations

1.5.2.8 GLead, Cadmium, Chromium

Waste Management Plan

1.5.4 GLicenses, Permits and

Notifications

1.5.5 GOccupant Protection Plan

1.5.2.2 GLead, Cadmium, Chromium

Compliance Plan

3.4.1.1 GInitial Sample Results

3.5.2.1 GWritten Evidence of TSD

Approval

SD-03 Product Data

1.6.1 GRespirators

1.6.4 GVacuum Filters

1.6.7 GNegative Air Pressure System

2.1 GMaterials and Equipment

2.1.1 GExpendable Supplies

3.1.1.5 GLocal Exhaust Equipment

3.1.1.5 GPressure Differential Automatic

Recording Instrument

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 5 OF 138 PAGES

02 83 00 3.1.1.6 GPressure Differential Log

1.5.2.8 GTransportation Permit

SD-06 Test Reports

1.3.3 GSampling and Analysis

1.5.2.3 GOccupational and Environmental

Assessment Data Report

1.5.2.3 GSampling Results

1.5.3 GPressure Differential Recordings

For Local Exhaust System

SD-07 Certificates

1.5.1.3 GTesting Laboratory

1.5.1.4 GThird Party Consultant

Qualifications

3.1.1.1 GNotification of the

Commencement of [LBP] Hazard

Abatement

3.5.1.1 GClearance Certification

SD-11 Closeout Submittals

3.5.2.1 GHazardous Waste Manifest

3.5.2.1 GTurn-In Documents or Weight

Tickets

02 84 16 SD-01 Preconstruction Submittals

1.8.3 GPermits

SD-07 Certificates

1.8.1 GQualifications of CIH

1.8.1 GTraining Certification

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 6 OF 138 PAGES

02 84 16 1.8.2 GPCB and Lamp Removal Work

Plan

1.8.3 GPCB and Lamp Disposal Plan

SD-11 Closeout Submittals

3.5.2 GTransporter Certification

3.2.4Certification of Decontamination

3.5.2.1Certificate of Disposal and/or recycling

3.5.3.2DD Form 1348-1

3.3.1Testing Results

02 85 00 SD-01 Preconstruction Submittals

1.2.26 GVentilation System Mold

Remediator Qualifications

1.4.1.1 GPreliminary Visual Assessment

Report

1.4.1.2 GMicrobial Remediation Plan

1.4.1.3 GRespiratory Protection Program

1.4.1.4Worker Records

1.4.1.5 GCertified Industrial Hygienist

(CIH)/Industrial Hygienist (IH)

Qualifications

1.4.1.6 GMicrobial Remediation Supervisor

Qualifications

SD-03 Product Data

1.2.11 GDisinfectants or Biocide

Sanitizing Solutions

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 7 OF 138 PAGES

02 85 00 1.2.14 GFungicidal Agents, (EPA)

1.2.21 GPersonal Protective Equipment

(PPE)

1.2.24Pressure Differential Measuring

Instrument

2.2 GSafety Data Sheets (SDS) for All

Materials

3.1.4Dehumidifiers

3.1.5Air Filtration Units

SD-06 Test Reports

1.4.3 GIH Daily Reports

SD-11 Closeout Submittals

1.4.4 GSubmittals at Completion of

Remediation Work

03 01 00 SD-01 Preconstruction Submittals

1.5.3 GQualifications

1.5.5 GWork Plan

1.5.2 GQuality Control Plan

SD-03 Product Data

2.5Conventional Concrete

2.6Polymers

2.6Biobased Content

2.7Miscellaneous Materials And

Equipment

SD-04 Samples

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 8 OF 138 PAGES

03 01 00 2.4Reinforcement And

Reinforcement Supports

2.6[Polymers

2.7[Miscellaneous Materials And

Equipment]

SD-05 Design Data

3.1.3 GFormwork And Shoring

1.5.1 GRepair Procedures

2.8 GMixture Proportioning

SD-06 Test Reports

2.8Mixture Proportioning

3.1.5Quality Control

1.6.2[Tolerance Report]

2.4[Reinforcement And

Reinforcement Supports]

2.5[Conventional Concrete]

2.6[Polymers]

2.7[Miscellaneous Materials And

Equipment]

SD-07 Certificates

1.5.3Qualifications

2.4Reinforcement And

Reinforcement Supports

2.5[Conventional Concrete]

2.6[Polymers]

SD-08 Manufacturer’s Instructions

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 9 OF 138 PAGES

03 01 00 2.2[Equipment For Concrete

Preparation]

2.5[Conventional Concrete]

2.6[Polymers]

2.7[Miscellaneous Materials And

Equipment]

03 30 00 SD-01 Preconstruction Submittals

1.6.3.1Concrete Curing Plan

1.6.6 GQuality Control Plan

1.6.7 GQuality Control Personnel

Certifications

1.6.7Quality Control Organizational

Chart

1.6.9 GLaboratory Accreditation

1.6.2.1 GForm Removal Schedule

3.3.10Maturity Method Data

SD-02 Shop Drawings

1.6.2.1Formwork

1.6.2.2 GReinforcing Steel

SD-03 Product Data

2.4.8Joint Sealants

2.4.7Joint Filler

2.1Formwork Materials

2.3.3.3Recycled Aggregate Materials

2.3.1Cementitious Materials

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 10 OF 138 PAGES

03 30 00 2.4.9Vapor Retarder [and Vapor

Barrier]

2.4.1Concrete Curing Materials

2.4.1Biobased Content

2.6Reinforcement

2.4.3.1Liquid Chemical Floor Hardeners and Sealers

2.3.4Admixtures

2.6.6Reinforcing Fibers

2.6.2Mechanical Reinforcing Bar

Connectors

2.2.2Waterstops

1.8.1Local/Regional Materials

2.2.3Biodegradable Form Release

Agent

1.6.3.2Pumping Concrete

1.6.3.4Finishing Plan

2.4.2Nonshrink Grout

SD-04 Samples

1.6.5.1Slab Finish Sample

1.6.5.2Surface Finish Samples

SD-05 Design Data

1.6.1.2 GConcrete Mix Design

1.6.1.1Formwork Calculations

SD-06 Test Reports

1.6.1.2 GConcrete Mix Design

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 11 OF 138 PAGES

03 30 00 1.6.4.1Fly Ash

1.6.4.1Pozzolan

1.6.4.2Slag Cement

1.6.4.3Aggregates

1.6.4.4 GFiber-Reinforced Concrete

3.10.3.1Tolerance Report

3.14.3.3 GCompressive Strength Tests

3.14.3.5Unit Weight of Structural

Concrete

3.14.3.6Chloride Ion Concentration

3.14.3.4Air Content

3.14.3.1Slump Tests

2.3.2Water

SD-07 Certificates

2.6.1Reinforcing Bars

1.9Welder Qualifications

1.6.3.3Silica Fume Manufacturer's

Representative

2.3.4Admixtures

1.6.3.5VOC Content for Form Release

Agents, Curing Compounds, and

Concrete Penetrating Sealers

1.6.3.6Safety Data Sheets

1.8.2Forest Stewardship Council

(FSC) Certification

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 12 OF 138 PAGES

03 30 00 1.6.7.2Field Testing Technician and

Testing Agency

2.4.1Joint Certification

2.4.1Sealer Compatibility with Access

Flooring Adhesive

SD-08 Manufacturer’s Instructions

2.4.3.1Liquid Chemical Floor Hardeners and Sealers

2.4.8Joint Sealants

2.4.1Curing Compound

03 30 53 SD-02 Shop Drawings

1.5 GInstallation Drawings

SD-03 Product Data

2.2.3.1Air-Entraining Admixture

2.2.3.2Accelerating Admixture

2.2.3.3Water-Reducing or Retarding

Admixture

2.2.11Curing Materials

2.2.6Expansion Joint Filler Strips, Premolded

2.2.7Joint Sealants - Field Molded

Sealants

2.4.1Waterstops

2.4.2Chemical Floor Hardener

3.1.4.3Batching and Mixing Equipment

3.2Conveying and Placing Concrete

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 13 OF 138 PAGES

03 30 53 2.2.8Formwork

2.3 GMix Design Data

2.3Ready-Mix Concrete

2.4.3Curing Compound

2.2.5Mechanical Reinforcing Bar

Connectors

SD-06 Test Reports

2.2.2Aggregates

2.1.3 GConcrete Mixture Proportions

3.3.3.2Measurement of Floor Tolerances

3.9.3 GCompressive Strength Testing

3.9.3 GSlump

3.9.3Air Content

2.2.4Water

SD-07 Certificates

2.2.1Cementitious Materials

2.2.1.2Pozzolan

1.5.1CPG for recycled materials or appropriate Waiver Form

2.2.2Aggregates

2.3Delivery Tickets

SD-08 Manufacturer’s Instructions

2.4.2Chemical Floor Hardener

2.4.3Curing Compound

03 33 00 SD-02 Shop Drawings

1.4.1Detail Drawings

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 14 OF 138 PAGES

03 33 00 SD-04 Samples

2.1Materials

1.4.2Panels

03 45 00 SD-01 Preconstruction Submittals

1.12.5Pre-Installation Meeting

SD-02 Shop Drawings

1.12.1 GPrecast Drawings

SD-03 Product Data

2.3 GCast-In Embedded Items And

Connectors

2.3.2 GConnection Devices

2.2.6Admixtures

2.5Gasket

2.6.1Thin Brick Veneer

2.7Bearing Pads

SD-04 Samples

1.12.2 GConcrete Wall Panel Surface

Finish

1.12.4Mock-up

2.6.1Brick Color Chips

2.6.1Form Liner

1.12.2Full Size Sample Wall Panel

SD-05 Design Data

1.5.4 GDesign Calculations

2.1.1 GContractor-Furnished Mix Design

2.4.9 GRepair of Surface Defects

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 15 OF 138 PAGES

03 45 00 1.5.5 GThermal Calculations

SD-06 Test Reports

1.11.2 GStrength Tests

1.11.2Slump

1.11.2Air Content

1.11.1Test for Concrete Materials

2.2.7Water

3.6.4Testing Precast Units for Strength

SD-07 Certificates

1.4 GManufacturer's Qualifications

1.8.1Fabricator Quality Certifications

1.9Erector Certification

SD-08 Manufacturer’s Instructions

3.3 GInstallation

3.8 GCleaning

2.6.1Thin Brick

SD-11 Closeout Submittals

1.12.3 GBatch Ticket Information

2.2.1 SRecycled Content for Fly Ash and

Pozzolan

2.2.1 SRecycled Content for Ground Iron

Blast-Furnace Slag

2.2.1 SRecycled Content for Silica Fume

04 03 00 SD-01 Preconstruction Submittals

1.5.1 GQuality Control Plan

1.5.1 GProject Training Program

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 16 OF 138 PAGES

04 03 00 1.5.2 GQualifications

SD-02 Shop Drawings

1.5.5Photographic Documentation

3.5.1 GStructural Upgrades

SD-03 Product Data

1.5.2Qualifications

1.5.6 GCleaning and Restoration

Methods

2.1 GCleaning Materials

2.1.4Biocides

2.2.2.2 GReplacement Mortar And Stucco

2.4 GMortar Mix

3.4.8.3 GWater Repellents Infiltration

3.4.8.4 GStone Consolidants

SD-04 Samples

1.5.7.1 GMock-ups

SD-05 Design Data

3.5.1 GStructural Upgrades

SD-06 Test Reports

2.2.2.1Testing and Matching

3.5.2Existing Sealants for Asbestos and PCBs

SD-07 Certificates

2.2Repair Materials

04 20 00 SD-02 Shop Drawings

3.3.5.1 GCut CMU

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 17 OF 138 PAGES

04 20 00 3.4.1.1 GDetail Drawings

SD-03 Product Data

1.5.1 GHot Weather Procedures

1.5.2 GCold Weather Procedures

2.2.2 GClay or Shale Brick

2.2.2.5 GSalvaged Brick

2.2.3.2.1 GCement

2.4.1.1 GCementitious Materials

2.6.8 GInsulation

SD-04 Samples

1.3.1 GMock-Up Panels

2.2.2 GClay or Shale Brick

2.2.3.2 GConcrete Masonry Units (CMU)

2.2.3.7 GConcrete Brick

2.2.5 GDimension Stone Units

2.4.1.4 GAdmixtures for Masonry Mortar

2.6.2 GAnchors, Ties, and Bar

Positioners

2.6.3 GJoint Reinforcement

2.6.6 GClay Masonry Expansion-Joint

Materials

2.6.8 GInsulation

SD-05 Design Data

2.1.2 GMasonry Compressive Strength

2.2.3.5Fire-Rated Concrete Masonry

Units

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 18 OF 138 PAGES

04 20 00 3.2.6 GBracing Calculations

SD-06 Test Reports

2.2.2.1.4Efflorescence Test

2.2.3.5Fire-Rated Concrete Masonry

Units

3.6.1.1Field Testing of Mortar

3.6.1.2Field Testing of Grout

3.6.1.4Prism Tests

3.6.1.5Single-Wythe Masonry Wall

Water Penetration Test

SD-07 Certificates

1.3.2Special Masonry Inspector

Qualifications

2.2.2Clay or Shale Brick

2.2.3.2Concrete Masonry Units (CMU)

2.2.3.7Concrete Brick

2.2.4Precast Concrete Units

2.4.1.1Cementitious Materials

2.4.1.2Hydrated Lime

2.2.3.1Aggregates

2.4.1.4Admixtures for Masonry Mortar

2.4.2.2Admixtures for Grout

2.6.2Anchors, Ties, and Bar

Positioners

2.6.3Joint Reinforcement

2.6.8Insulation

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 19 OF 138 PAGES

04 20 00 2.6.8Insulation

SD-08 Manufacturer’s Instructions

2.4.1.4Admixtures for Masonry Mortar

2.4.2.2Admixtures for Grout

SD-10 Operation and Maintenance

Data

3.8Take-Back Program

SD-11 Closeout Submittals

2.2.2.1.3 SClay Units

2.2.3.2.2 SRecycled Content

05 05 23.16 SD-01 Preconstruction Submittals

3.2 GWelding Quality Assurance Plan

SD-03 Product Data

1.3 GWelding Procedure Qualifications

1.3.4Welder, Welding Operator, and

Tacker Qualification

1.3.2Previous Qualifications

1.3.3 GPre-Qualified Procedures

2.2Welding Electrodes and Rods

SD-06 Test Reports

3.3Nondestructive Testing

3.2Weld Inspection Log

SD-07 Certificates

1.3.1Certified Welding Procedure

Specifications (WPS)

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 20 OF 138 PAGES

05 05 23.16 1.3.1Certified Brazing Procedure

Specifications (BPS)

1.3.1Certified Procedure Qualification

Records (PQR)

1.3.1Certified Welder Performance

Qualifications (WPQ)

1.3.1Certified Brazer Performance

Qualifications (BPQ)

1.3.5Certified Welding Inspector

1.3.5Nondestructive Testing Personnel

05 50 13 SD-02 Shop Drawings

2.14 GStructural Steel Door Frames

2.5 GCover Plates and Frames

2.6 GExpansion Joint Covers

2.7 GFloor Gratings

2.7 GRoof Walkways

2.8 GBollards/Pipe Guards

2.15 GWheel Guards

2.17 GWindow[ and Door] Guards

2.10 GAngles and Plates

2.16 GRoof Hatches

SD-03 Product Data

2.4Corner Guards

2.5 GCover Plates and Frames

2.6 GExpansion Joint Covers

2.7 GFloor Gratings

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 21 OF 138 PAGES

05 50 13 2.7 GRoof Walkways

2.14 GStructural Steel Door Frames

2.15Wheel Guards

2.17 GWindow[ and Door] Guards

2.16 GRoof Hatches

2.9 GDownspout Terminations

2.1 SRecycled Content

SD-04 Samples

2.6Expansion Joint Covers

SD-05 Design Data

2.7Floor Gratings

2.7Roof Walkways

2.14Structural Steel Door Frames

2.1 GCertificates of Compliance

2.2 GCertified Mill

05 51 00 SD-02 Shop Drawings

2.1 GIron and Steel Hardware

2.1 GSteel Shapes, Plates, Bars, and

Strips

2.2.1 GMetal Stair System

SD-03 Product Data

2.4.1 GStructural Steel Plates, Shapes, and Bars

2.4.2 GStructural Steel Tubing

2.4.5 GHot-Rolled Carbon Steel Sheets

and Strips

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 22 OF 138 PAGES

05 51 00 2.4.4 GCold-Finished Steel Bars

2.4.3 GHot-Rolled Carbon Steel Bars

2.4.6 GCold-Rolled Carbon Steel Sheets

2.4.7 GGalvanized Carbon Steel Sheets

2.4.8 GCold-Drawn Steel Tubing

2.4.9 GGray Iron Castings

2.4.10 GMalleable Iron Castings

2.3.5 GConcrete Inserts

2.3.6 GMasonry Anchorage Devices

2.2.4 GProtective Coating

2.2.2 GSteel Pan Stairs

2.3.1 GSteel Stairs

2.3.2 GSteel Stairs, Circular

SD-07 Certificates

1.3.1 GWelding Procedures

1.3.1 GWelder Qualification

SD-08 Manufacturer’s Instructions

2.4.1 GStructural Steel Plates, Shapes, and Bars

2.4.2 GStructural Steel Tubing

2.4.5 GHot-Rolled Carbon Steel Sheets

and Strips

2.4.4 GCold-Finished Steel Bars

2.4.3 GHot-Rolled Carbon Steel Bars

2.4.6 GCold-Rolled Carbon Steel Sheets

2.4.7 GGalvanized Carbon Steel Sheets

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 23 OF 138 PAGES

05 51 00 2.4.8 GCold-Drawn Steel Tubing

2.4.9 GGray Iron Castings

2.4.10 GMalleable Iron Castings

2.2.4 GProtective Coating

2.3.6 GMasonry Anchorage Devices

05 51 33 SD-02 Shop Drawings

2.4Ladders

2.4.3Ship's Ladder

SD-03 Product Data

2.4Ladders

2.4.3Ship's Ladder

2.4.2Ladder Safety Devices

SD-07 Certificates

1.3Fabricator Certification for Ladder

Assembly

1.3Fabricator Certification for Ships

Ladder Assembly

05 52 00 SD-02 Shop Drawings

1.2.1 GFabrication Drawings

3.2 GIron and Steel Hardware

3.2 GSteel Shapes, Plates, Bars and

Strips

SD-03 Product Data

2.2.1 GStructural-Steel Plates, Shapes, and Bars

2.2.2 GStructural-Steel Tubing

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 24 OF 138 PAGES

05 52 00 2.2.4 GCold-Finished Steel Bars

2.2.3 GHot-Rolled Carbon Steel Bars

2.2.5 GCold-Drawn Steel Tubing

2.2.7 GConcrete Inserts

2.2.8 GMasonry Anchorage Devices

2.1.3 GProtective Coating

2.2.10 GSteel Railings and Handrails

2.2.11 GAluminum Railings and Handrails

1.2.1 GAnchorage and Fastening

Systems

SD-07 Certificates

1.4.1 GWelding Procedures

1.4.2 GWelder Qualification

SD-08 Manufacturer’s Instructions

3.2Installation Instructions

06 10 00 SD-02 Shop Drawings

2.2.3 GStructural Glued Laminated

2.5.6 GTrussed Rafters

2.5.7 GTrussed Joists

1.9.1 GFabricated Structural Members

1.9.2 GModifications of Structural

Members

2.2.2 GNailing Strips

SD-03 Product Data

2.1.3Salvaged Lumber

2.1.4Recovered Lumber

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 25 OF 138 PAGES

06 10 00 2.4Underlayment

2.1.6Plastic Lumber

2.5.2Fiberboard Wall Sheathing

2.5.5Cellulose Honeycomb Panels

1.8Fire-retardant Treatment

1.4.4Structural-use and OSB Panels

2.3.3.2Structural-use and OSB Panels

2.3Oriented Strand Board

2.5.10Adhesives

2.4.6 SBiobased Content for Strawboard

Panels

2.4.7 SBiobased Content for Cork

Underlayment

2.1.6 SRecycled Content for Plastic

Lumber

2.4.5 SRecycled Content for Fiberboard

Underlayment

2.4.7 SRecycled Content for Cork

Underlayment

2.5.2 SRecycled Content for Fiberboard

Wall Sheathing

2.5.5 SRecycled Content for Cellulose

Honeycomb Panels

SD-05 Design Data

1.9.2 GModifications of Structural

Members

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

CONTR

DATE FWD

TO OTHER

REVIEWER

DATE RCD

FROM OTH

REVIEWER

A C T I O N

C O D E

DATE

OF

ACTION

MAILED

TO

CONTR/

DATE RCD

FRM APPR

SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 26 OF 138 PAGES

06 10 00 SD-06 Test Reports

1.4.5Preservative-treated

SD-07 Certificates

1.11.1Certificates of Grade

2.1.2 SCertified Sustainably Harvested

Virgin Lumber

2.1.5 SCertified Sustainably Harvested

Natural-decay and Insect-resistant

Wood

2.2.2 SCertified Sustainably Harvested

Framing Lumber

2.2.3 SCertified Sustainably Harvested

Structural Glued Laminated Timber

2.3.1.1 SCertified Sustainably Harvested

Plywood Subflooring

2.3.1.2 SCertified Sustainably Harvested

Structural-use and OSB Panel

Subfloor Sheathing

2.3.2.1 SCertified Sustainably Harvested

Plywood Combination Subfloor

Underlayment

2.3.3.1 SCertified Sustainably Harvested

Plywood Wall Sheathing

2.3.3.2 SCertified Sustainably Harvested

Structural-use and OSB Panel

Wall Sheathing

SUBMITTAL REGISTER

CONTRACT NO.

TITLE AND LOCATION CONTRACTOR

CONTRACTOR:

SCHEDULE DATES

CONTRACTOR

ACTION

APPROVING AUTHORITY

A C T I V I T Y

N O

T R A N S M I T T A L

N O

S P E C

S E C T

DESCRIPTION

ITEM SUBMITTED

P A R A G R A P

A S S I F I C A T I O N

G O V T

O R

A E

R E V W

R SUBMIT

APPROVAL

NEEDED

BY

MATERIAL

NEEDED

BY

A C T I O N

C O D E

DATE

OF

ACTION

DATE FWD

TO APPR

AUTH/

DATE RCD

FROM

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .