This document is a comprehensive Pentagon Facility Guide Specification (PFGS) Master Specification for construction projects, specifically focusing on Section 01 11 00 (Summary of Work) dated May 22, 2023. The specification provides detailed administrative and procedural requirements for construction work at the Pentagon Reservation, including site-specific guidelines for project management, safety, documentation, sustainability, and quality control.
Key highlights include requirements for project coordination, site access, safety protocols, sustainability reporting, and documentation standards. The specification mandates specific procedures for submittals, design reviews, construction management, indoor air quality control, and environmental compliance. It covers a wide range of construction-related aspects such as utility outages, excavation permits, waste management, cybersecurity for facility-related control systems, and third-party certification processes. The document is designed to ensure comprehensive oversight and standardization of construction projects at the Pentagon, with an emphasis on safety, sustainability, and regulatory compliance.
View the file
Other files for this federal contract opportunity
Show all 29
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
FACILITY GUIDE SPECS CUI PFGS Master Spec June 7, 2023
MASTER TABLE OF CONTENTS Page 1
CUI
PFGS TABLE OF CONTENTS
DIVISION 01 - GENERAL REQUIREMENTS
01 11 00 SUMMARY OF WORK
01 20 00 PRICE AND PAYMENT PROCEDURES
01 30 00 ADMINISTRATIVE REQUIREMENTS
01 32 01.00 10 PROJECT SCHEDULE
01 33 00 SUBMITTAL PROCEDURES
01 33 29 SUSTAINABILITY REPORTING
01 35 26 GOVERNMENTAL SAFETY REQUIREMENTS
01 42 00 SOURCES FOR REFERENCE PUBLICATIONS
01 45 00.00 10 QUALITY CONTROL
01 74 19 CONSTRUCTION WASTE MANAGEMENT AND
DISPOSAL
01 78 00 CLOSEOUT SUBMITTALS
01 78 23 OPERATION AND MAINTENANCE DATA
01 79 00 DEMONSTRATION AND TRAINING
01 83 50 SYSTEM OPERATION AND MAINTENANCE
MANUALS
01 91 00 COMMISSIONING
DIVISION 02 - EXISTING CONDITIONS
02 32 13 02/21 SUBSURFACE DRILLING AND SAMPLING
02 41 00 05/10, CHG 2: 02/19 [DEMOLITION][ AND ][DECONSTRUCTION]
02 42 51 11/19 CARPET REMOVAL AND RECLAMATION
02 42 91 11/18 REMOVAL AND SALVAGE OF HISTORIC
CONSTRUCTION MATERIALS
02 65 00 02/10, CHG 1: 11/13 UNDERGROUND STORAGE TANK REMOVAL
02 81 00 11/18 TRANSPORTATION AND DISPOSAL OF
HAZARDOUS MATERIALS
02 83 00 11/18 LEAD REMEDIATION
02 84 16 05/20 HANDLING OF LIGHTING BALLASTS AND
LAMPS CONTAINING PCBs AND MERCURY
02 85 00 11/18 MOLD REMEDIATION
DIVISION 03 - CONCRETE
03 01 00 02/18 REHABILITATION OF CONCRETE
03 30 00 02/19, CHG 3: 11/21 CAST-IN-PLACE CONCRETE
03 30 53 05/14 MISCELLANEOUS CAST-IN-PLACE CONCRETE
03 33 00 11/09 CAST-IN-PLACE ARCHITECTURAL CONCRETE
03 45 00 05/16, CHG 2: 11/21 PRECAST ARCHITECTURAL CONCRETE
DIVISION 04 - MASONRY
04 03 00
04 20 00
11/17
11/15, CHG
2:
05/19
CONSERVATION TREATMENT FOR PERIOD
MASONRY
UNIT MASONRY
DIVISION 05 - METALS
05 05 23.16
08/18
STRUCTURAL WELDING
05 50 13 05/17, CHG 1: 08/18 MISCELLANEOUS METAL FABRICATIONS
05 51 00 02/17, CHG 1: 05/17 METAL STAIRS
05 51 33 02/16, CHG 2: 02/18 METAL LADDERS
MASTER TABLE OF CONTENTS Page 2
05 52 00 02/18, CHG 1: 02/20 METAL RAILINGS
DIVISION 06 - WOOD, PLASTICS, AND COMPOSITES
06 10 00 08/16, CHG 2: 11/18 ROUGH CARPENTRY
06 20 00 08/16, CHG 2: 11/18 FINISH CARPENTRY
DIVISION 07 - THERMAL AND MOISTURE PROTECTION
07 05 23 08/19 PRESSURE TESTING AN AIR BARRIER SYSTEM
FOR AIR TIGHTNESS
07 11 13 08/11, CHG 1: 05/17 BITUMINOUS DAMPPROOFING
07 12 00 02/16 BUILT-UP BITUMINOUS WATERPROOFING
07 13 53 02/16, CHG 1: 08/17 ELASTOMERIC SHEET WATERPROOFING
07 14 00 02/12, CHG 2: 02/18 FLUID-APPLIED WATERPROOFING
07 19 00 05/11, CHG 1: 08/17 WATER REPELLENTS
07 21 13 02/16, CHG 2: 08/20 BOARD AND BLOCK INSULATION
07 21 16 11/11, CHG 4: 08/18 MINERAL FIBER BLANKET INSULATION
07 22 00 02/16, CHG 3: 11/18 ROOF AND DECK INSULATION
07 31 26 08/09 SLATE ROOFING
07 42 13 05/11, CHG 2: 02/18 METAL WALL PANELS
07 51 13 05/12, CHG 2: 11/18 BUILT-UP ASPHALT ROOFING
07 60 00 05/17, CHG 2: 11/18 FLASHING AND SHEET METAL
07 81 00 02/11 SPRAY-APPLIED FIREPROOFING
07 84 00 05/10, CHG 1: 08/13 FIRESTOPPING
07 92 00 08/16, CHG 3: 11/18 JOINT SEALANTS
DIVISION 08 - OPENINGS
08 11 13 08/20 STEEL DOORS AND FRAMES
08 14 00 08/16, CHG 1: 08/18 WOOD DOORS
08 33 13 05/09, CHG 2: 11/12 COILING COUNTER DOORS
08 33 23 08/20, CHG 1: 02/22 OVERHEAD COILING DOORS
08 34 73 11/19, CHG 1: 02/21 SOUND CONTROL DOOR ASSEMBLIES
08 41 13 08/18, CHG 1: 08/18 ALUMINUM-FRAMED ENTRANCES AND
STOREFRONTS
08 51 13 05/19 ALUMINUM WINDOWS
08 71 00 02/16, CHG 4: 02/22 DOOR HARDWARE
08 81 00 05/19 GLAZING
08 91 00 08/20 METAL WALL AND DOOR LOUVERS
DIVISION 09 - FINISHES
90.50
05/09, 01/18
CHG 1: 08/17 PREPARATION OF HISTORIC WOOD AND
SURFACES FOR PAINTING
NON-STRUCTURAL METAL FRAMING
METAL
09 29 00 08/16 GYPSUM BOARD
09 30 10 08/20 CERAMIC, QUARRY, AND GLASS TILING
09 51 00 08/20 ACOUSTICAL CEILINGS
09 62 38 08/17, CHG 1: 08/18 STATIC-CONTROL FLOORING
09 64 29 08/16, CHG 2: 11/18 WOOD STRIP AND PLANK FLOORING
09 65 00 08/10, CHG 3: 08/18 RESILIENT FLOORING
09 66 23 08/16, CHG 1: 08/18 RESINOUS MATRIX TERRAZZO FLOORING
09 68 00 11/17, CHG 2: 08/20 CARPETING
09 69 13 11/15, CHG 1: 08/18 RIGID GRID ACCESS FLOORING
09 69 19 11/15, CHG 1: 08/18 STRINGERLESS ACCESS FLOORING
09 84 20 08/16, CHG 1: 08/18 ACOUSTICAL WALL PANELS
09 90 00 02/21 PAINTS AND COATINGS
DIVISION 10 - SPECIALTIES
MASTER TABLE OF CONTENTS Page 3
10 14 00.10 08/17, CHG 1: 11/18 EXTERIOR SIGNAGE
10 14 00.20 08/20 INTERIOR SIGNAGE
10 14 53 02/15, CHG 1: 05/17 TRAFFIC SIGNAGE
10 26 00 08/20 WALL AND DOOR PROTECTION
10 44 16 11/19 FIRE EXTINGUISHERS
DIVISION 12 - FURNISHINGS
12 36 00 08/16, CHG 2: 08/18 COUNTERTOPS
12 59 00 08/17, CHG 1: 08/18 SYSTEMS FURNITURE
DIVISION 21 - FIRE SUPPRESSION
21 12 00 05/11 STANDPIPE SYSTEMS
21 13 13 08/20 WET PIPE SPRINKLER SYSTEMS, FIRE
PROTECTION
21 13 16 08/20 DRY PIPE SPRINKLER SYSTEMS, FIRE
PROTECTION
DIVISION 22 - PLUMBING
22 00 00 11/15, CHG 4: 05/21 PLUMBING, GENERAL PURPOSE
22 07 19.00 40 08/16 PLUMBING PIPING INSULATION
22 13 29 02/11 SANITARY SEWERAGE PUMPS
22 14 29.00 40 05/17 SUMP PUMPS
DIVISION 23 - HEATING, VENTILATING, AND AIR CONDITIONING (HVAC)
23 01 30.41 02/15, CHG 2: 08/17 HVAC SYSTEM CLEANING
23 03 00.00 20 08/10, CHG 3: 08/18 BASIC MECHANICAL MATERIALS AND METHODS
23 05 15 02/14 COMMON PIPING FOR HVAC
23 05 93 11/15 TESTING, ADJUSTING, AND BALANCING FOR
HVAC
23 07 00 02/13, CHG 7: 05/20 THERMAL INSULATION FOR MECHANICAL
SYSTEMS
23 09 00 02/19, CHG 3: 05/21 INSTRUMENTATION AND CONTROL FOR HVAC
23 09 13 11/15, CHG 2: 05/21 INSTRUMENTATION AND CONTROL DEVICES
FOR HVAC
23 09 23.02 02/19, CHG 1: 02/20 BACNET DIRECT DIGITAL CONTROL FOR HVAC
AND OTHER BUILDING CONTROL SYSTEMS
23 22 23.00 40 08/15 STEAM CONDENSATE PUMPS
23 25 00 05/21 CHEMICAL TREATMENT OF WATER FOR
MECHANICAL SYSTEMS
23 30 00 05/20, CHG 1: 02/22 HVAC AIR DISTRIBUTION
23 31 13.00 40 05/16 METAL DUCTS
23 34 23.00 40 02/17 HVAC POWER VENTILATORS
23 36 00.00 40 05/16 AIR TERMINAL UNITS
23 37 13.00 40 05/15 DIFFUSERS, REGISTERS, AND GRILLES
23 41 13.00 40 02/16 AIR FILTERS
23 57 10.00 10 11/19 FORCED HOT WATER HEATING SYSTEMS USING
WATER AND STEAM HEAT EXCHANGERS
23 73 13.00 40 05/17 MODULAR INDOOR CENTRAL-STATION
AIR-HANDLING UNITS
23 81 23 11/20 COMPUTER ROOM AIR CONDITIONING UNITS
23 82 19.00 40 05/17 FAN COIL UNITS
23 82 46.00 40 05/17 ELECTRIC UNIT HEATERS
DIVISION 25 - INTEGRATED AUTOMATION
25 05 11.00 05/21 CYBERSECURITY FOR FACILITY RELATED
MASTER TABLE OF CONTENTS Page 4
CONTROL SYSTEMS (FRCS)
25 05 11.01 05/21 CYBERSECURITY FOR FIRE AND LIFE SAFETY
SYSTEMS (FLS)
DIVISION 26 - ELECTRICAL
26 05 00.00 40 11/20 COMMON WORK RESULTS FOR ELECTRICAL
26 05 13.00 40 05/20 MEDIUM-VOLTAGE CABLES
26 09 13 11/08 POWER MONITORING SYSTEM
26 11 13.00 20 11/21 PRIMARY UNIT SUBSTATION
26 11 16 11/21 SECONDARY UNIT SUBSTATIONS
26 12 19.10 05/19, CHG 1: 11/19 THREE-PHASE, LIQUID-FILLED PAD-MOUNTED
TRANSFORMERS
26 13 13 04/07 MEDIUM VOLTAGE GENERATOR PARALLELING
SWITCHGEAR AND CONTROL SYSTEM
26 20 00 08/19, CHG 3: 11/21 INTERIOR DISTRIBUTION SYSTEM
26 23 00 05/15, CHG 2: 11/19 LOW-VOLTAGE SWITCHGEAR
26 24 19.00 40 05/19 MOTOR CONTROL CENTERS
26 28 00.00 10 10/07 MOTOR CONTROL CENTERS, SWITCHBOARDS
AND PANELBOARDS
26 29 23 02/20, CHG 1: 05/21 ADJUSTABLE SPEED DRIVE (ASD) SYSTEMS
UNDER 600 VOLTS
26 32 15.00 05/20 ENGINE-GENERATOR SET STATIONARY
15-2500 KW, WITH AUXILIARIES
26 36 23 05/20, CHG 1: 08/21 AUTOMATIC TRANSFER SWITCHES AND
BY-PASS/ISOLATION SWITCH
26 60 13.00 40 05/19 LOW-VOLTAGE MOTORS
DIVISION 28 - ELECTRONIC SAFETY AND SECURITY
28 31 76 08/20 INTERIOR FIRE ALARM AND MASS
NOTIFICATION SYSTEM, ADDRESSABLE
DIVISION 31 - EARTHWORK
31 10 00 02/21 SITE CLEARING
31 23 00.00 20 02/11, CHG 2: 08/15 EXCAVATION AND FILL
DIVISION 32 - EXTERIOR IMPROVEMENTS
32 05 33 08/17 LANDSCAPE ESTABLISHMENT
32 92 19 08/17, CHG 1: 08/21 SEEDING
32 92 23 04/06, CHG 1: 08/21 SODDING
32 93 00 08/17, CHG 1: 08/21 EXTERIOR PLANTS
-- End of Master Table of Contents --
Washington Headquarters Services Department of Defense
FSD Construction Management General Requirements
March 4, 2021
FOR INTERNAL USE ONLY
FSD CONSTRUCTION MANAGEMENT
GENERAL REQUIREMENTS TO
SPECIFICATIONS GUIDE
Version WHS
MARCH 15, 2023
TABLE OF CONTENTS
1.0 ADMINISTRATION
2.0 KEY PERSONNEL
3.0 SITE
4.0 COST-SCHEDULE-INVOICE
5.0 QUALITY CONTROL & SAFETY
6.0 DESIGN & CONSTRUCTION
7.0 COMMISSIONING
8.0 CLOSEOUT
INTRODUCTION
This document is no longer an attachment. The requirements that were in the CMD attachment have all been moved to the Division 01 specifications or the SOW. This document now provides the user with an understanding of where information is located throughout Division 01 or the SOW so they can quickly access and verify information.
GENERAL REQUIREMENTS
Refer to the Statement of Work (SOW), Section 3.0 Submittal Requirements, for due dates, format, and review periods for Sections 01 through 09.
1.0 ADMINISTRATION
Administration: The following information was moved to Section 01 30 00 ADMINISTRATIVE
REQUIREMENTS:
(1.8) Project Kick-off Meeting
(1.8.1) eFIC Kick-Off Meeting (1.8.2) Coordination with Building Entities
(3.1) Weekly Progress Meetings (3.2) Requests for Information (RFI) (3.3) Permit Parking requirements and towing of unregistered vehicles.
2.0 KEY PERSONNEL
Personnel: The key personnel information was moved to Section 01 30 00 ADMINISTRATIVE
REQUIREMENTS, 01 45 00.00 10 QUALITY CONTROL, 01 35 26 GOVERNMENTAL SAFETY
REQUIREMENTS, 01 32 01.00 10 PROJECT SCHEDULE and Attachment F1. There is also information in SOW Section 2.2.5.
Project Manager
Qualifications for this role have been moved to Section 01 30 00 ADMINISTRATIVE REQUIREMENTS, paragraph 1.6.4 and Attachment F1.
Designer of Record (DOR)
Qualifications for this role have been moved to Attachment F1.
Qualified Fire Protection Engineer (QFPE)
Qualifications for this role have been moved to Attachment F1.
Site Safety Health Officer (SSHO)
Information on SSHO qualifications has been moved to Section 01 35 26 GOVERNMENTAL SAFETY REGULATIONS, paragraph 1.6.1 and Attachment F1.
Quality Control Manager (QCM)
Information on QCM qualifications has been moved to Section 01 45 00.00 10 QUALITY CONTROL, paragraph 3.4.2 and Attachment F1.
Site Superintendent
Qualifications for this role have been moved to Section 01 30 00 ADMINISTRATIVE REQUIREMENTS, paragraph 1.6.1 and Attachment F1.
Contractor’s Scheduler
Qualifications for Scheduling qualifications are now found in Section 01 32 01.00 10 PROJECT SCHEDULE, paragraph 1.3 and Attachment F1.
LEED Professional
Qualifications for the LEED AP is found in Section 01 45 00 QUALITY CONTROL, paragraph
3.4.3 and Attachment F1
3.0 SITE
Relevant site information was moved to Section 01 11 00 SUMMARY OF WORK.
Project Coordination Plan (PCP) requirements have been moved to 01 11 00, paragraph 1.18.
Existing Conditions Report
The requirements were moved to Section 01 11 00 SUMMARY OF WORK, paragraph 1.14.
Construction Air Quality Management Plan
The plan details were moved to Section 01 33 29 SUSTAINABILITY REQUIREMENTS, paragraph 3.5.
Stormwater Management
The storm water requirements were moved to Section 01 33 29 SUSTAINABILITY REQUIREMENTS, paragraph 1.8 and SOW template Section 2.2.10.
Debris Removal / Waste Management Plan / Waste Recycling Report
These requirements were moved to Section 01 74 19 CONSTRUCTION AND DEMOLITION
WASTE MANAGEMENT.
Pre-Construction Submittal Register
Information on the Submittal Register was moved to Section 01 33 00 SUBMITTAL PROCEDURES, paragraph 1.9.
Contractor Badging
This information was moved to Section 01 30 00 ADMINISTRATIVE REQUIREMENTS, paragraph 3.5.
Site Access and Maintenance
This information was moved to Section 01 30 00 ADMINISTRATIVE REQUIREMENTS, paragraph 3.6.
Delivery Screening of Equipment, Materials, Tools, and Supplies
This information was moved to Section 01 30 00 ADMINISTRATIVE REQUIREMENTS, paragraph 3.7.
Construction Signage
3.8.
Outage Requests
This information was moved to Section 01 30 00 ADMINISTRATIVE REQUIREMENTS, paragraph 3.9.
Access Request Form
This information was moved to Section 01 30 00 ADMINISTRATIVE REQUIREMENTS, paragraph 3.5.
Fire Protection
This information was not moved to Division 1. It is in the WHSBC Section 233.3 and NFPA 25, Chapter 15.
Landscape Excavation/Damage Repair Requirements
This information is included in SOW template section 2.2.12.
4.0 COST-SCHEDULE-INVOICE
This information was moved to Section 01 20 00 PRICE AND PAYMENT PROCEDURES and Section 01 32 01.00 10 PROJECT SCHEUDLE.
Progress Schedule
This information was moved to Section 01 32 01.00 10 PROJECT SCHEDULE.
Coordination with OGC Schedules
3.13.
5.0 QUALITY CONTROL & SAFETY
This information was moved to Section 01 45 00.00 10 QUALITY CONTROL in paragraph 3.2.
Design Quality Control Plan (DQC)
Construction Quality Control (CQC)
The following information was moved to Section 01 30 00 ADMINISTRATIVE REQUIREMENTS:
(3.14) Accident Prevention Plan (APP) and Activity Hazard Analysis (AHA) and Section 01 35 26 GOVERNMENTAL SAFETY REQUIREMENTS, paragraphs 1.7 and 1.8.
(3.14.1) Compliance Requirements:
(3.14.3) OGC’s Construction Zone:
(3.14.4) First Response Coordinator for Emergency Services (3.14.5) Safety man hour report.
Construction Daily Reports
Requirements for these reports are located in section 2.2.14 in SOW template.
6.0 DESIGN & CONSTRUCTION
This information was moved to Section 01 30 00 ADMINISTRATIVE REQUIREMENTS.
(3.17) Basis of Design (BOD) (3.18) Historic Approval Documents (3.19) Design Intent Documents (DIDs) (3.20) Design Document Submittals
Relevant information in this section has been moved to Section 01 33 00 SUBMITTAL
PROCEDURES.
Transfer & Acceptance of Military Real Property (DD Form 1354)
This requirement has been moved to Section 01 78 00 CLOSEOUT SUBMITTALS, see section 3.9 and SOW template Section 2.2.25.
Sustainability Design Requirements
Sustainability requirements have been moved to Section 01 33 29 SUSTAINABILITY REQUIREMENTS, see paragraph 1.6.1
Metering Requirements
The information on metering was moved to Section 2.2.13 of the SOW template.
Electrical
These requirements are located in section 2.2.6 of the SOW Template and relevant sections in Divisions 02-33.
Additional requirements are found in Division 26 and in the Pentagon Labelling Standard. Contractor must have all new or modified existing mechanical and electrical equipment location, and controls tied/added or modified on the BAS (Building Automation System). Any electrical system work that impacts remotely monitored equipment need to follow UFC 4-010-06 requirements for cybersecurity.
Fire Alarm System
These requirements were moved to Section 28 31 76 INTERIOR FIRE ALARM AND MASS NOTIFICATION SYSTEM. The Pentagon fire alarm system is manufactured by Simplex. Any fire alarm system work that impacts remotely monitored equipment need to follow UFC 4-010-06 requirements for cybersecurity.
Fire Protection
These requirements were moved to Section 21 13 13 WET PIPE SPRINKLER SYSTEMS, FIRE PROTECTION & Section 21 13 16 DRY PIPE SPRINKLER SYSTEMS, FIRE PROTECTION.
For replacement of fire sprinkler piping, any Schedule 10 piping must be replaced with schedule 40 piping. Design must be coordinated with OPFM and PBMO.
Limits of Work Affecting Historic Building Elements
These requirements were moved to Division 09 FINISHES.
The Contractor must adhere to the Attachment “Pentagon Reservation Exterior Standards Manual.”
Codes
These requirements were moved to Section 01 30 00 ADMINISTRATIVE REQUIREMENTS.
Unified Facilities Criteria (UFC) Requirements
Health and Safety Standards
These requirements were moved to SOW template Section 2.2.29.
Building Monitoring Systems
These requirements were moved to Division 25 INTEGRATED AUTOMATION
All building monitoring systems that are part of the SOW must be tied into the building Facilities Related Control System (FRCS) and follow the UFC requirements. Cybersecurity documents are in Section 25.
General Inspection Procedures
An appropriate location for this requirement in the PFGS should be determined.
Construction Daily Reports
The requirement to provide daily reports are in Section 2.2.14 of the SOW template. An appropriate location in the PFGS should be determined.
The report must be provided to the Government Representative (COR, CM, QA, and Scheduler).
Design Support During Construction
Moved to SOW template Section 2.2.26.
On-Site Drawings and Permits
Moved to SOW template Section 2.2.27.
Pentagon Reservation Sign Displacement
Moved to SOW template Section 2.2.28.
Demolition Requirements
Section contains capping requirements for any existing mechanical, electrical, and plumbing (MEP) and sprinkler system components being deconstructed and/or removed in conjunction with the execution of the work.
Outages
These requirements were moved to Section 01 30 00 ADMINISTRATIVE REQUIREMENTS, paragraph 3.9 and Section 01 11 00 SUMMARY OF WORK Section 1.9.1.
Soil Removal or Procurement
7.0 COMMISSIONING
Commissioning relationships and contractor requirements were moved to Section 01 91 00COMMISSIONING and SOW template Section 2.3. System specific commissioning requirements are in Product specifications.
Commissioning will be reflected within the project schedule, see Section 01 32 01.00 10 PROJECT
SCHEDULE.
8.0 CLOSEOUT
Relevant information was moved to Section 01 78 00 CLOSEOUT SUBMITTALS, 01 78 23 OPERATION AND MAINTENANCE DATA and 01 45 00.00 10 QUALITY CONTROL and SOW template Section 2.2.30.
Systems Operations and Maintenance Manuals (SOMMs)
Closeout data submittals processes have been moved to Section 01 83 50 Systems Operations & Maintenance Manuals, paragraph 1.5.
Operation & Maintenance Manuals (O&Ms)
Closeout data submittals processes have been moved to Section 01 78 23 OPERATION AND
MAINTENANCE DATA.
NFPA 72 Form-Record of Completion
Closeout submittals processes have been moved to SOW template Section 2.2.15.
NFPA 13 Contractor’s Material and Test Certificate for Aboveground Piping
Closeout submittals processes have been moved to SOW template Section 2.2.16.
Design Master Equipment List (DMEL)
Closeout submittals processes have been moved to Section 01 83 50 SYSTEM OPERATION AND
MAINTENANCE MANUALS.
As-Built Documents
As-built processes have been moved to Section 01 78 00 CLOSEOUT SUBMITTALS, paragraph 3.1.
Issue for Record As-Built Documents
Closeout submittals processes have been moved to Section 01 78 00 CLOSEOUT SUBMITTALS, paragraph 3.2 and SOW template Section 2.2.31.
Warranty Binder
Closeout submittals processes have been moved to Section 01 78 00 CLOSEOUT SUBMITTALS, paragraphs 1.8 and SOW template Section 2.2.32.
Waivers
Elevator and Escalator Certificates of Operation
The Elevator and Escalator Installation Contractor must arrange for third-party certification prior to turning over the equipment for Building use.
Attic Stock Delivered Inventory
Spare Parts information is in Section 01 78 00 CLOSEOUT SUBMITTALS, paragraph 1.6 and SOW template Section 2.2.33.
Certificate of Occupancy
Occupancy processes have been moved to SOW template Section 2.2.20.
Guiding Principles Checklist
Guiding Principles submittal processes have been moved to SOW template Section 2.2.21.
Substantial Completion
The information was moved to SOW template Section 2.2.23.
Final/Construction Completion
The information was moved to SOW template Section 2.2.24.
Contract Completion
The information was moved to Section 01 30 00 ADMINISTRATIVE REQUIREMENTS and SOW template Section 2.2.34.
Utility Room List
This requirement has been moved to Section 01 78 00 CLOSEOUT SUBMITTALS, paragraph 1.9 and SOW template Section 2.2.35.
Joint Use Rooms List
This requirement has been moved to Section 01 78 00 CLOSEOUT SUBMITTALS, paragraph 1.9 and SOW template Section 2.2.36.
Cost to Complete
The right to retain project funds was moved to Section 01 30 00 ADMINISTRATIVE REQUIREMENTS, paragraph 3.20.
Final Submittal Register
The submittal register requirement was moved to SOW template Section 2.2.22.
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 1 OF 138 PAGES
Pentagon Facility Guide Specs
01 33 00 SD-01 Preconstruction Submittals
1.9 G DASubmittal Register
02 32 13 SD-02 Shop Drawings
3.12 GDrilling Log
SD-03 Product Data
1.5Permits, Certifications, and
Licenses
1.3.7.1 GSchedule of Drilling, Sampling, and Testing
02 41 00 SD-01 Preconstruction Submittals
1.2.2 GDemolition Plan
1.2.2 GDeconstruction Plan
1.10Existing Conditions
1.7.2 GTraffic Control Plan
SD-07 Certificates
1.7 GNotification
SD-11 Closeout Submittals
3.3.4Receipts
02 42 51 SD-01 Preconstruction Submittals
1.4.2 GDust-Control Measures
1.4.2 GPacking and Transportation
Measures
1.4.4 GSchedule of Carpet Reclamation
Activities
1.4.3 GCarpet Reclamation Agency
Records
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P H
C L A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
AUTH REMARKS
(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l) (m) (n) (o) (p) (q) (r)
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 2 OF 138 PAGES
02 42 91 SD-01 Preconstruction Submittals
1.2 GWork Plan
02 65 00 SD-01 Preconstruction Submittals
1.5.4 GWork Plan
1.5.4.1 GSite Safety and Health Plan
1.5.4.2 GExcavation and Material Handling
Plan
1.5.4.3 GField Sampling and Laboratory
Testing Plan
1.5.4.4 GTank and Piping Removal And
Disposal Plan
1.5.4.5 GSpill and Discharge Control Plan
1.5.1 GQualifications
1.5.2Laboratory Services
3.12.3State Licensed [Hazardous
]Waste Transporter
SD-06 Test Reports
3.15Laboratory and Field Testing
Reports
2.1Backfill Material
3.2Tank Contents Verification
3.5.2Contaminated Water Disposal
3.10Soil Examination, Testing, and
Analysis
3.11 GBackfilling
SD-11 Closeout Submittals
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 3 OF 138 PAGES
02 65 00 3.12.4 GSalvage Rights
3.15Tank Closure Report
3.15 GPhotographs
02 81 00 SD-01 Preconstruction Submittals
1.4.4 GTransportation Permits
SD-03 Product Data
2.1.1Packaging Notifications
3.1 GHazardous Waste Management
Plan
3.2 GOnsite Hazardous Waste
Management
3.3Notices of Non-Compliance and
Notices of Violation
SD-06 Test Reports
3.7 GRecordkeeping
3.7 GException Report
3.8Spill Response
SD-07 Certificates
1.4.1 GTransportation and Disposal
Coordinator
1.4.2 GTraining
1.4.3Certification
3.3.3 GShipping Documents and
Packagings Certification
3.3.4Security Plan
3.3.5Certificates of Disposal
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 4 OF 138 PAGES
02 81 00 3.6Waste Minimization
02 83 00 SD-01 Preconstruction Submittals
1.5.1.1 GCompetent Person
1.5.1.2 GTraining Certification
1.5.2.3 GOccupational and Environmental
Assessment Data Report
1.5.2.4 GMedical Examinations
1.5.2.8 GLead, Cadmium, Chromium
Waste Management Plan
1.5.4 GLicenses, Permits and
Notifications
1.5.5 GOccupant Protection Plan
1.5.2.2 GLead, Cadmium, Chromium
Compliance Plan
3.4.1.1 GInitial Sample Results
3.5.2.1 GWritten Evidence of TSD
Approval
SD-03 Product Data
1.6.1 GRespirators
1.6.4 GVacuum Filters
1.6.7 GNegative Air Pressure System
2.1 GMaterials and Equipment
2.1.1 GExpendable Supplies
3.1.1.5 GLocal Exhaust Equipment
3.1.1.5 GPressure Differential Automatic
Recording Instrument
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 5 OF 138 PAGES
02 83 00 3.1.1.6 GPressure Differential Log
1.5.2.8 GTransportation Permit
SD-06 Test Reports
1.3.3 GSampling and Analysis
1.5.2.3 GOccupational and Environmental
Assessment Data Report
1.5.2.3 GSampling Results
1.5.3 GPressure Differential Recordings
For Local Exhaust System
SD-07 Certificates
1.5.1.3 GTesting Laboratory
1.5.1.4 GThird Party Consultant
Qualifications
3.1.1.1 GNotification of the
Commencement of [LBP] Hazard
Abatement
3.5.1.1 GClearance Certification
SD-11 Closeout Submittals
3.5.2.1 GHazardous Waste Manifest
3.5.2.1 GTurn-In Documents or Weight
Tickets
02 84 16 SD-01 Preconstruction Submittals
1.8.3 GPermits
SD-07 Certificates
1.8.1 GQualifications of CIH
1.8.1 GTraining Certification
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 6 OF 138 PAGES
02 84 16 1.8.2 GPCB and Lamp Removal Work
Plan
1.8.3 GPCB and Lamp Disposal Plan
SD-11 Closeout Submittals
3.5.2 GTransporter Certification
3.2.4Certification of Decontamination
3.5.2.1Certificate of Disposal and/or recycling
3.5.3.2DD Form 1348-1
3.3.1Testing Results
02 85 00 SD-01 Preconstruction Submittals
1.2.26 GVentilation System Mold
Remediator Qualifications
1.4.1.1 GPreliminary Visual Assessment
Report
1.4.1.2 GMicrobial Remediation Plan
1.4.1.3 GRespiratory Protection Program
1.4.1.4Worker Records
1.4.1.5 GCertified Industrial Hygienist
(CIH)/Industrial Hygienist (IH)
Qualifications
1.4.1.6 GMicrobial Remediation Supervisor
Qualifications
SD-03 Product Data
1.2.11 GDisinfectants or Biocide
Sanitizing Solutions
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 7 OF 138 PAGES
02 85 00 1.2.14 GFungicidal Agents, (EPA)
1.2.21 GPersonal Protective Equipment
(PPE)
1.2.24Pressure Differential Measuring
Instrument
2.2 GSafety Data Sheets (SDS) for All
Materials
3.1.4Dehumidifiers
3.1.5Air Filtration Units
SD-06 Test Reports
1.4.3 GIH Daily Reports
SD-11 Closeout Submittals
1.4.4 GSubmittals at Completion of
Remediation Work
03 01 00 SD-01 Preconstruction Submittals
1.5.3 GQualifications
1.5.5 GWork Plan
1.5.2 GQuality Control Plan
SD-03 Product Data
2.5Conventional Concrete
2.6Polymers
2.6Biobased Content
2.7Miscellaneous Materials And
Equipment
SD-04 Samples
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 8 OF 138 PAGES
03 01 00 2.4Reinforcement And
Reinforcement Supports
2.6[Polymers
2.7[Miscellaneous Materials And
Equipment]
SD-05 Design Data
3.1.3 GFormwork And Shoring
1.5.1 GRepair Procedures
2.8 GMixture Proportioning
SD-06 Test Reports
2.8Mixture Proportioning
3.1.5Quality Control
1.6.2[Tolerance Report]
2.4[Reinforcement And
Reinforcement Supports]
2.5[Conventional Concrete]
2.6[Polymers]
2.7[Miscellaneous Materials And
Equipment]
SD-07 Certificates
1.5.3Qualifications
2.4Reinforcement And
Reinforcement Supports
2.5[Conventional Concrete]
2.6[Polymers]
SD-08 Manufacturer’s Instructions
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 9 OF 138 PAGES
03 01 00 2.2[Equipment For Concrete
Preparation]
2.5[Conventional Concrete]
2.6[Polymers]
2.7[Miscellaneous Materials And
Equipment]
03 30 00 SD-01 Preconstruction Submittals
1.6.3.1Concrete Curing Plan
1.6.6 GQuality Control Plan
1.6.7 GQuality Control Personnel
Certifications
1.6.7Quality Control Organizational
Chart
1.6.9 GLaboratory Accreditation
1.6.2.1 GForm Removal Schedule
3.3.10Maturity Method Data
SD-02 Shop Drawings
1.6.2.1Formwork
1.6.2.2 GReinforcing Steel
SD-03 Product Data
2.4.8Joint Sealants
2.4.7Joint Filler
2.1Formwork Materials
2.3.3.3Recycled Aggregate Materials
2.3.1Cementitious Materials
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 10 OF 138 PAGES
03 30 00 2.4.9Vapor Retarder [and Vapor
Barrier]
2.4.1Concrete Curing Materials
2.4.1Biobased Content
2.6Reinforcement
2.4.3.1Liquid Chemical Floor Hardeners and Sealers
2.3.4Admixtures
2.6.6Reinforcing Fibers
2.6.2Mechanical Reinforcing Bar
Connectors
2.2.2Waterstops
1.8.1Local/Regional Materials
2.2.3Biodegradable Form Release
Agent
1.6.3.2Pumping Concrete
1.6.3.4Finishing Plan
2.4.2Nonshrink Grout
SD-04 Samples
1.6.5.1Slab Finish Sample
1.6.5.2Surface Finish Samples
SD-05 Design Data
1.6.1.2 GConcrete Mix Design
1.6.1.1Formwork Calculations
SD-06 Test Reports
1.6.1.2 GConcrete Mix Design
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 11 OF 138 PAGES
03 30 00 1.6.4.1Fly Ash
1.6.4.1Pozzolan
1.6.4.2Slag Cement
1.6.4.3Aggregates
1.6.4.4 GFiber-Reinforced Concrete
3.10.3.1Tolerance Report
3.14.3.3 GCompressive Strength Tests
3.14.3.5Unit Weight of Structural
Concrete
3.14.3.6Chloride Ion Concentration
3.14.3.4Air Content
3.14.3.1Slump Tests
2.3.2Water
SD-07 Certificates
2.6.1Reinforcing Bars
1.9Welder Qualifications
1.6.3.3Silica Fume Manufacturer's
Representative
2.3.4Admixtures
1.6.3.5VOC Content for Form Release
Agents, Curing Compounds, and
Concrete Penetrating Sealers
1.6.3.6Safety Data Sheets
1.8.2Forest Stewardship Council
(FSC) Certification
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 12 OF 138 PAGES
03 30 00 1.6.7.2Field Testing Technician and
Testing Agency
2.4.1Joint Certification
2.4.1Sealer Compatibility with Access
Flooring Adhesive
SD-08 Manufacturer’s Instructions
2.4.3.1Liquid Chemical Floor Hardeners and Sealers
2.4.8Joint Sealants
2.4.1Curing Compound
03 30 53 SD-02 Shop Drawings
1.5 GInstallation Drawings
SD-03 Product Data
2.2.3.1Air-Entraining Admixture
2.2.3.2Accelerating Admixture
2.2.3.3Water-Reducing or Retarding
Admixture
2.2.11Curing Materials
2.2.6Expansion Joint Filler Strips, Premolded
2.2.7Joint Sealants - Field Molded
Sealants
2.4.1Waterstops
2.4.2Chemical Floor Hardener
3.1.4.3Batching and Mixing Equipment
3.2Conveying and Placing Concrete
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 13 OF 138 PAGES
03 30 53 2.2.8Formwork
2.3 GMix Design Data
2.3Ready-Mix Concrete
2.4.3Curing Compound
2.2.5Mechanical Reinforcing Bar
Connectors
SD-06 Test Reports
2.2.2Aggregates
2.1.3 GConcrete Mixture Proportions
3.3.3.2Measurement of Floor Tolerances
3.9.3 GCompressive Strength Testing
3.9.3 GSlump
3.9.3Air Content
2.2.4Water
SD-07 Certificates
2.2.1Cementitious Materials
2.2.1.2Pozzolan
1.5.1CPG for recycled materials or appropriate Waiver Form
2.2.2Aggregates
2.3Delivery Tickets
SD-08 Manufacturer’s Instructions
2.4.2Chemical Floor Hardener
2.4.3Curing Compound
03 33 00 SD-02 Shop Drawings
1.4.1Detail Drawings
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 14 OF 138 PAGES
03 33 00 SD-04 Samples
2.1Materials
1.4.2Panels
03 45 00 SD-01 Preconstruction Submittals
1.12.5Pre-Installation Meeting
SD-02 Shop Drawings
1.12.1 GPrecast Drawings
SD-03 Product Data
2.3 GCast-In Embedded Items And
Connectors
2.3.2 GConnection Devices
2.2.6Admixtures
2.5Gasket
2.6.1Thin Brick Veneer
2.7Bearing Pads
SD-04 Samples
1.12.2 GConcrete Wall Panel Surface
Finish
1.12.4Mock-up
2.6.1Brick Color Chips
2.6.1Form Liner
1.12.2Full Size Sample Wall Panel
SD-05 Design Data
1.5.4 GDesign Calculations
2.1.1 GContractor-Furnished Mix Design
2.4.9 GRepair of Surface Defects
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 15 OF 138 PAGES
03 45 00 1.5.5 GThermal Calculations
SD-06 Test Reports
1.11.2 GStrength Tests
1.11.2Slump
1.11.2Air Content
1.11.1Test for Concrete Materials
2.2.7Water
3.6.4Testing Precast Units for Strength
SD-07 Certificates
1.4 GManufacturer's Qualifications
1.8.1Fabricator Quality Certifications
1.9Erector Certification
SD-08 Manufacturer’s Instructions
3.3 GInstallation
3.8 GCleaning
2.6.1Thin Brick
SD-11 Closeout Submittals
1.12.3 GBatch Ticket Information
2.2.1 SRecycled Content for Fly Ash and
Pozzolan
2.2.1 SRecycled Content for Ground Iron
Blast-Furnace Slag
2.2.1 SRecycled Content for Silica Fume
04 03 00 SD-01 Preconstruction Submittals
1.5.1 GQuality Control Plan
1.5.1 GProject Training Program
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 16 OF 138 PAGES
04 03 00 1.5.2 GQualifications
SD-02 Shop Drawings
1.5.5Photographic Documentation
3.5.1 GStructural Upgrades
SD-03 Product Data
1.5.2Qualifications
1.5.6 GCleaning and Restoration
Methods
2.1 GCleaning Materials
2.1.4Biocides
2.2.2.2 GReplacement Mortar And Stucco
2.4 GMortar Mix
3.4.8.3 GWater Repellents Infiltration
3.4.8.4 GStone Consolidants
SD-04 Samples
1.5.7.1 GMock-ups
SD-05 Design Data
3.5.1 GStructural Upgrades
SD-06 Test Reports
2.2.2.1Testing and Matching
3.5.2Existing Sealants for Asbestos and PCBs
SD-07 Certificates
2.2Repair Materials
04 20 00 SD-02 Shop Drawings
3.3.5.1 GCut CMU
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 17 OF 138 PAGES
04 20 00 3.4.1.1 GDetail Drawings
SD-03 Product Data
1.5.1 GHot Weather Procedures
1.5.2 GCold Weather Procedures
2.2.2 GClay or Shale Brick
2.2.2.5 GSalvaged Brick
2.2.3.2.1 GCement
2.4.1.1 GCementitious Materials
2.6.8 GInsulation
SD-04 Samples
1.3.1 GMock-Up Panels
2.2.2 GClay or Shale Brick
2.2.3.2 GConcrete Masonry Units (CMU)
2.2.3.7 GConcrete Brick
2.2.5 GDimension Stone Units
2.4.1.4 GAdmixtures for Masonry Mortar
2.6.2 GAnchors, Ties, and Bar
Positioners
2.6.3 GJoint Reinforcement
2.6.6 GClay Masonry Expansion-Joint
Materials
2.6.8 GInsulation
SD-05 Design Data
2.1.2 GMasonry Compressive Strength
2.2.3.5Fire-Rated Concrete Masonry
Units
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 18 OF 138 PAGES
04 20 00 3.2.6 GBracing Calculations
SD-06 Test Reports
2.2.2.1.4Efflorescence Test
2.2.3.5Fire-Rated Concrete Masonry
Units
3.6.1.1Field Testing of Mortar
3.6.1.2Field Testing of Grout
3.6.1.4Prism Tests
3.6.1.5Single-Wythe Masonry Wall
Water Penetration Test
SD-07 Certificates
1.3.2Special Masonry Inspector
Qualifications
2.2.2Clay or Shale Brick
2.2.3.2Concrete Masonry Units (CMU)
2.2.3.7Concrete Brick
2.2.4Precast Concrete Units
2.4.1.1Cementitious Materials
2.4.1.2Hydrated Lime
2.2.3.1Aggregates
2.4.1.4Admixtures for Masonry Mortar
2.4.2.2Admixtures for Grout
2.6.2Anchors, Ties, and Bar
Positioners
2.6.3Joint Reinforcement
2.6.8Insulation
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 19 OF 138 PAGES
04 20 00 2.6.8Insulation
SD-08 Manufacturer’s Instructions
2.4.1.4Admixtures for Masonry Mortar
2.4.2.2Admixtures for Grout
SD-10 Operation and Maintenance
Data
3.8Take-Back Program
SD-11 Closeout Submittals
2.2.2.1.3 SClay Units
2.2.3.2.2 SRecycled Content
05 05 23.16 SD-01 Preconstruction Submittals
3.2 GWelding Quality Assurance Plan
SD-03 Product Data
1.3 GWelding Procedure Qualifications
1.3.4Welder, Welding Operator, and
Tacker Qualification
1.3.2Previous Qualifications
1.3.3 GPre-Qualified Procedures
2.2Welding Electrodes and Rods
SD-06 Test Reports
3.3Nondestructive Testing
3.2Weld Inspection Log
SD-07 Certificates
1.3.1Certified Welding Procedure
Specifications (WPS)
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 20 OF 138 PAGES
05 05 23.16 1.3.1Certified Brazing Procedure
Specifications (BPS)
1.3.1Certified Procedure Qualification
Records (PQR)
1.3.1Certified Welder Performance
Qualifications (WPQ)
1.3.1Certified Brazer Performance
Qualifications (BPQ)
1.3.5Certified Welding Inspector
1.3.5Nondestructive Testing Personnel
05 50 13 SD-02 Shop Drawings
2.14 GStructural Steel Door Frames
2.5 GCover Plates and Frames
2.6 GExpansion Joint Covers
2.7 GFloor Gratings
2.7 GRoof Walkways
2.8 GBollards/Pipe Guards
2.15 GWheel Guards
2.17 GWindow[ and Door] Guards
2.10 GAngles and Plates
2.16 GRoof Hatches
SD-03 Product Data
2.4Corner Guards
2.5 GCover Plates and Frames
2.6 GExpansion Joint Covers
2.7 GFloor Gratings
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 21 OF 138 PAGES
05 50 13 2.7 GRoof Walkways
2.14 GStructural Steel Door Frames
2.15Wheel Guards
2.17 GWindow[ and Door] Guards
2.16 GRoof Hatches
2.9 GDownspout Terminations
2.1 SRecycled Content
SD-04 Samples
2.6Expansion Joint Covers
SD-05 Design Data
2.7Floor Gratings
2.7Roof Walkways
2.14Structural Steel Door Frames
2.1 GCertificates of Compliance
2.2 GCertified Mill
05 51 00 SD-02 Shop Drawings
2.1 GIron and Steel Hardware
2.1 GSteel Shapes, Plates, Bars, and
Strips
2.2.1 GMetal Stair System
SD-03 Product Data
2.4.1 GStructural Steel Plates, Shapes, and Bars
2.4.2 GStructural Steel Tubing
2.4.5 GHot-Rolled Carbon Steel Sheets
and Strips
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 22 OF 138 PAGES
05 51 00 2.4.4 GCold-Finished Steel Bars
2.4.3 GHot-Rolled Carbon Steel Bars
2.4.6 GCold-Rolled Carbon Steel Sheets
2.4.7 GGalvanized Carbon Steel Sheets
2.4.8 GCold-Drawn Steel Tubing
2.4.9 GGray Iron Castings
2.4.10 GMalleable Iron Castings
2.3.5 GConcrete Inserts
2.3.6 GMasonry Anchorage Devices
2.2.4 GProtective Coating
2.2.2 GSteel Pan Stairs
2.3.1 GSteel Stairs
2.3.2 GSteel Stairs, Circular
SD-07 Certificates
1.3.1 GWelding Procedures
1.3.1 GWelder Qualification
SD-08 Manufacturer’s Instructions
2.4.1 GStructural Steel Plates, Shapes, and Bars
2.4.2 GStructural Steel Tubing
2.4.5 GHot-Rolled Carbon Steel Sheets
and Strips
2.4.4 GCold-Finished Steel Bars
2.4.3 GHot-Rolled Carbon Steel Bars
2.4.6 GCold-Rolled Carbon Steel Sheets
2.4.7 GGalvanized Carbon Steel Sheets
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 23 OF 138 PAGES
05 51 00 2.4.8 GCold-Drawn Steel Tubing
2.4.9 GGray Iron Castings
2.4.10 GMalleable Iron Castings
2.2.4 GProtective Coating
2.3.6 GMasonry Anchorage Devices
05 51 33 SD-02 Shop Drawings
2.4Ladders
2.4.3Ship's Ladder
SD-03 Product Data
2.4Ladders
2.4.3Ship's Ladder
2.4.2Ladder Safety Devices
SD-07 Certificates
1.3Fabricator Certification for Ladder
Assembly
1.3Fabricator Certification for Ships
Ladder Assembly
05 52 00 SD-02 Shop Drawings
1.2.1 GFabrication Drawings
3.2 GIron and Steel Hardware
3.2 GSteel Shapes, Plates, Bars and
Strips
SD-03 Product Data
2.2.1 GStructural-Steel Plates, Shapes, and Bars
2.2.2 GStructural-Steel Tubing
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 24 OF 138 PAGES
05 52 00 2.2.4 GCold-Finished Steel Bars
2.2.3 GHot-Rolled Carbon Steel Bars
2.2.5 GCold-Drawn Steel Tubing
2.2.7 GConcrete Inserts
2.2.8 GMasonry Anchorage Devices
2.1.3 GProtective Coating
2.2.10 GSteel Railings and Handrails
2.2.11 GAluminum Railings and Handrails
1.2.1 GAnchorage and Fastening
Systems
SD-07 Certificates
1.4.1 GWelding Procedures
1.4.2 GWelder Qualification
SD-08 Manufacturer’s Instructions
3.2Installation Instructions
06 10 00 SD-02 Shop Drawings
2.2.3 GStructural Glued Laminated
2.5.6 GTrussed Rafters
2.5.7 GTrussed Joists
1.9.1 GFabricated Structural Members
1.9.2 GModifications of Structural
Members
2.2.2 GNailing Strips
SD-03 Product Data
2.1.3Salvaged Lumber
2.1.4Recovered Lumber
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 25 OF 138 PAGES
06 10 00 2.4Underlayment
2.1.6Plastic Lumber
2.5.2Fiberboard Wall Sheathing
2.5.5Cellulose Honeycomb Panels
1.8Fire-retardant Treatment
1.4.4Structural-use and OSB Panels
2.3.3.2Structural-use and OSB Panels
2.3Oriented Strand Board
2.5.10Adhesives
2.4.6 SBiobased Content for Strawboard
Panels
2.4.7 SBiobased Content for Cork
Underlayment
2.1.6 SRecycled Content for Plastic
Lumber
2.4.5 SRecycled Content for Fiberboard
Underlayment
2.4.7 SRecycled Content for Cork
Underlayment
2.5.2 SRecycled Content for Fiberboard
Wall Sheathing
2.5.5 SRecycled Content for Cellulose
Honeycomb Panels
SD-05 Design Data
1.9.2 GModifications of Structural
Members
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM
CONTR
DATE FWD
TO OTHER
REVIEWER
DATE RCD
FROM OTH
REVIEWER
A C T I O N
C O D E
DATE
OF
ACTION
MAILED
TO
CONTR/
DATE RCD
FRM APPR
SUBMITTAL FORM,Jan 96 PREVIOUS EDITION IS OBSOLETE PAGE 26 OF 138 PAGES
06 10 00 SD-06 Test Reports
1.4.5Preservative-treated
SD-07 Certificates
1.11.1Certificates of Grade
2.1.2 SCertified Sustainably Harvested
Virgin Lumber
2.1.5 SCertified Sustainably Harvested
Natural-decay and Insect-resistant
Wood
2.2.2 SCertified Sustainably Harvested
Framing Lumber
2.2.3 SCertified Sustainably Harvested
Structural Glued Laminated Timber
2.3.1.1 SCertified Sustainably Harvested
Plywood Subflooring
2.3.1.2 SCertified Sustainably Harvested
Structural-use and OSB Panel
Subfloor Sheathing
2.3.2.1 SCertified Sustainably Harvested
Plywood Combination Subfloor
Underlayment
2.3.3.1 SCertified Sustainably Harvested
Plywood Wall Sheathing
2.3.3.2 SCertified Sustainably Harvested
Structural-use and OSB Panel
Wall Sheathing
SUBMITTAL REGISTER
CONTRACT NO.
TITLE AND LOCATION CONTRACTOR
CONTRACTOR:
SCHEDULE DATES
CONTRACTOR
ACTION
APPROVING AUTHORITY
A C T I V I T Y
N O
T R A N S M I T T A L
N O
S P E C
S E C T
DESCRIPTION
ITEM SUBMITTED
P A R A G R A P
A S S I F I C A T I O N
G O V T
O R
A E
R E V W
R SUBMIT
APPROVAL
NEEDED
BY
MATERIAL
NEEDED
BY
A C T I O N
C O D E
DATE
OF
ACTION
DATE FWD
TO APPR
AUTH/
DATE RCD
FROM