J-5_Completion_and_Delivery_Certificate.pdf

PDF 126 KB Posted

Attached to
NPS ISRO Ranger IV Vessel
Solicitation number
140PS125R0009
Issued by

About this file

This document is a Ranger IV Completion and Delivery Certificate for a vessel contract between a contractor and the National Park Service. The certificate requires the contractor to confirm six key points: (1) the vessel is fully completed, (2) all trials and inspections have been satisfactorily completed, (3) the vessel complies with the contract and is free from major defects, (4) the vessel's title is free of liens and encumbrances, (5) the vessel meets all government documentation requirements for a coastwise endorsement in the United States, and (6) all statements in the certificate are true and subject to the False Statements Act. The certificate provides space to list any minor defects, specify the date, time, and place of delivery, and requires a signature from the contractor's President or Vice President.

View the file

Other files

File Type Posted
Sol_140PS125R0009_Amd_0004.pdf PDF
140PS125R0009_Amendment_004_Solicitation_Question_Response_0004.pdf PDF
140PS125R0009_Amendment_004_R4_ReeferSpaceConflict_0004.pdf PDF
DI-035_REV_8_BIDDING_SPECIFICATIONS_0004.pdf PDF
140PS125R0009_ISRO_Ranger_IV_Clause_Section__Amendment_Three_0003.pdf PDF
Sol_140PS125R0009_Amd_0003.pdf PDF
DI-004_REV5_DESIGN_SUMMARY_REPORT_0003.pdf PDF
140PS125R0009_Amendment_003_Solicitation_Question_Response_0003.pdf PDF
140PS125R0009_Amendment_002_Solicitation_Questions_Response_0002.pdf PDF
DI-035_REV_7_BIDDING_SPECIFICATIONS_0002.pdf PDF
Sol_140PS125R0009_Amd_0002.pdf PDF
Sol_140PS125R0009_Amd_0001.pdf PDF
DI-026-01_REV_6_GENERAL_ARRANGEMENT.pdf PDF
DI-019_REV_4_INTACT_AND_DAMAGE_STABILITY_REPORT_Pgs_601-1209.pdf PDF
J-9_Brand_Name_Justification_Ranger_IV_Honda.pdf PDF
DI-027-05_REV_1_AUTOMATION_CONTROL_AND_MONITORING_SYSTEM_REPORT.pdf PDF
DI-026-16_REV_7_ANCHORING_AND_MOORING_DRAWING.pdf PDF
DI-013_REV_3_SPEED_AND_POWER_REPORT.pdf PDF
DI-026-17_REV_0_STRUCTURAL_FIRE_PROTECTION_GUIDANCE_DRAWING.pdf PDF
J-4_Delivery_and_Acceptance_Certificate.pdf PDF
DI-017_REV_2_AIRBORNE_NOISE_REPORT.pdf PDF
J-8_Small_Business_Subcontracting_Plan.docx DOCX document
DI-006_REV_3_MASTER_EQUIPMENT_LIST.pdf PDF
DI-026-12_REV_4_PILOT_HOUSE-CHART_AREA_ARRANGEMENT.pdf PDF
DI-034_REV_6_HVAC_SYSTEM_REPORT.pdf PDF
DI-030_REV_5_ELECTRIC_POWER_LOAD_ANALYSIS.pdf PDF
DI-035_REV_6_BIDDING_SPECIFICATIONS.pdf PDF
DI-015_REV_2_MANEUVERING_PERFORMANCE_REPORT.pdf PDF
DI-029_REV_2_STACK_GAS_FLOW_ANALYSIS_REPORT.pdf PDF
DI-026-07_REV_1_SUPERSTRUCTURE_DRAWING-Published.pdf PDF
DI-011_REV_3_HULL_LINES_DRAWING.pdf PDF
DI-026-03_REV_2_MIDSHIP_SECTION_DRAWING-Published.pdf PDF
DI-026-04_REV_2_TYPICAL_SECTION_DRAWING-Published.pdf PDF
DI-023_REV_2_MODEL_TEST_REPORT.pdf PDF
DI-026-08_REV_3_MAST_AND_FLAGSTAFF_DRAWING.pdf PDF
DI-032_REV_2_PRELIMINARY_FAULT_CURRENT_ANALYSIS_REPORT.pdf PDF
DI-010_REV_1_ABS_ICE_CLASS_ANALYSIS.pdf PDF
DI-020_REV_2_WEIGHT_CONTROL_PLAN.pdf PDF
DI-026-13_REV_6_MACHINERY_ARRANGEMENT.pdf PDF
DI-012_REV_3_APPENDAGE_AND_CONTROL_SURFACE_DRAWING.pdf PDF
J-7_Past_Performance_Questionnaire.docx DOCX document
DI-026-07_REV_2_SUPERSTRUCTURE_DRAWING.pdf PDF
DI-004_REV_4_DESIGN_SUMMARY_REPORT.pdf PDF
J-6_Proposed_Equals_and_Salient_Characteristics.docx DOCX document
DI-007_REV_2_REQUIREMENTS_VERIFICATION_MATRIX.pdf PDF
DI-026-06_REV_3_DECK_AND_PLATFORM_DRAWING.pdf PDF
DI-031_REV_2_ELECTRICAL_SYSTEM_ONE_LINE_DIAGRAM.pdf PDF
DI-014_REV_2_SEAKEEPING_PREFORMANCE_REPORT.pdf PDF
DI-026-15_REV_4_HANDLING_SYSTEMS_DRAWING.pdf PDF
J-1_List_of_Deliverables.pdf PDF
Show 40 more

Latest 50 of 68 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

RANGER IV COMPLETION AND DELIVERY CERTIFICATE

CONTRACT

FROM CONTRACTOR TO OWNER: National Park Service

The Contractor certifies (i) that the vessel has been completed; (ii) that all trials, inspections and tests have been satisfactorily completed; (iii) that the vessel complies with the contract and is free from known defects except the minor defects, which are listed below, if any; (iv) that the title of the vessel is free of all liens and encumbrances; (v) that the vessel is in compliance with any other document reasonably required by Government, by applicable law or by any Regulatory Authority in order for the Government to have the vessel documented in the Government’s name and to allow the vessel to commence operations with a coastwise endorsement in the United States; and (vi) that the statements set forth in this certificate are true and correct and subject to the False Statements Act.

LIST OF MINOR DEFECTS (If any):

DATE OF DELIVERY: TIME OF DELIVERY:

PLACE OF DELIVERY:

President/Vice President of Contractor:

Contract Number:
List of Mintor Details:
Date of Delivery:
Time of Delivery:
Place of Delivery:
Name: