This document is a Heating, Ventilation and Air Conditioning (HVAC) System Report for the Motor Vessel Ranger IV, prepared by Loch Harbour Group for the U.S. Department of Transportation. The report provides comprehensive technical details for the vessel's HVAC system design, including ventilation calculations for various ship spaces such as the engine room, crew accommodations, pilot house, and auxiliary machinery rooms. The document includes detailed calculations for air changes per hour, heat load requirements, fan capacities, and air flow volumes for different compartments, with a focus on maintaining specific temperature ranges between 64°F and 80°F across different zones.

The HVAC system is designed as a multi-zone configuration with the ability to segregate passenger and crew/cargo zones, allowing for winterization and reduced cooling/heating loads during off-peak periods. The report specifies two boiler units capable of supplying full heating load, with fan systems providing ventilation for spaces like the engine room (requiring up to 26,399 cfm), crew areas, and mechanical spaces. The system is tailored to meet the vessel's specific requirements, including ABS notations for A1 Passenger Vessel, Great Lakes Service, Ice Class IE, AMS, HAB, and COMF classifications, with provisions for temperature control in passenger accommodations, recreation spaces, and critical mechanical areas.

View the file

Other files

File Type Posted
Sol_140PS125R0009_Amd_0004.pdf PDF
140PS125R0009_Amendment_004_Solicitation_Question_Response_0004.pdf PDF
140PS125R0009_Amendment_004_R4_ReeferSpaceConflict_0004.pdf PDF
DI-035_REV_8_BIDDING_SPECIFICATIONS_0004.pdf PDF
140PS125R0009_ISRO_Ranger_IV_Clause_Section__Amendment_Three_0003.pdf PDF
Sol_140PS125R0009_Amd_0003.pdf PDF
DI-004_REV5_DESIGN_SUMMARY_REPORT_0003.pdf PDF
140PS125R0009_Amendment_003_Solicitation_Question_Response_0003.pdf PDF
140PS125R0009_Amendment_002_Solicitation_Questions_Response_0002.pdf PDF
DI-035_REV_7_BIDDING_SPECIFICATIONS_0002.pdf PDF
Sol_140PS125R0009_Amd_0002.pdf PDF
Sol_140PS125R0009_Amd_0001.pdf PDF
DI-026-01_REV_6_GENERAL_ARRANGEMENT.pdf PDF
DI-019_REV_4_INTACT_AND_DAMAGE_STABILITY_REPORT_Pgs_601-1209.pdf PDF
J-9_Brand_Name_Justification_Ranger_IV_Honda.pdf PDF
DI-027-05_REV_1_AUTOMATION_CONTROL_AND_MONITORING_SYSTEM_REPORT.pdf PDF
DI-026-16_REV_7_ANCHORING_AND_MOORING_DRAWING.pdf PDF
DI-013_REV_3_SPEED_AND_POWER_REPORT.pdf PDF
DI-026-17_REV_0_STRUCTURAL_FIRE_PROTECTION_GUIDANCE_DRAWING.pdf PDF
J-4_Delivery_and_Acceptance_Certificate.pdf PDF
DI-017_REV_2_AIRBORNE_NOISE_REPORT.pdf PDF
J-8_Small_Business_Subcontracting_Plan.docx DOCX document
DI-006_REV_3_MASTER_EQUIPMENT_LIST.pdf PDF
DI-026-12_REV_4_PILOT_HOUSE-CHART_AREA_ARRANGEMENT.pdf PDF
DI-030_REV_5_ELECTRIC_POWER_LOAD_ANALYSIS.pdf PDF
DI-035_REV_6_BIDDING_SPECIFICATIONS.pdf PDF
DI-015_REV_2_MANEUVERING_PERFORMANCE_REPORT.pdf PDF
DI-029_REV_2_STACK_GAS_FLOW_ANALYSIS_REPORT.pdf PDF
DI-026-07_REV_1_SUPERSTRUCTURE_DRAWING-Published.pdf PDF
DI-011_REV_3_HULL_LINES_DRAWING.pdf PDF
DI-026-03_REV_2_MIDSHIP_SECTION_DRAWING-Published.pdf PDF
DI-026-04_REV_2_TYPICAL_SECTION_DRAWING-Published.pdf PDF
DI-023_REV_2_MODEL_TEST_REPORT.pdf PDF
DI-026-08_REV_3_MAST_AND_FLAGSTAFF_DRAWING.pdf PDF
DI-032_REV_2_PRELIMINARY_FAULT_CURRENT_ANALYSIS_REPORT.pdf PDF
DI-010_REV_1_ABS_ICE_CLASS_ANALYSIS.pdf PDF
DI-020_REV_2_WEIGHT_CONTROL_PLAN.pdf PDF
DI-026-13_REV_6_MACHINERY_ARRANGEMENT.pdf PDF
DI-012_REV_3_APPENDAGE_AND_CONTROL_SURFACE_DRAWING.pdf PDF
J-7_Past_Performance_Questionnaire.docx DOCX document
DI-026-07_REV_2_SUPERSTRUCTURE_DRAWING.pdf PDF
DI-004_REV_4_DESIGN_SUMMARY_REPORT.pdf PDF
J-6_Proposed_Equals_and_Salient_Characteristics.docx DOCX document
DI-007_REV_2_REQUIREMENTS_VERIFICATION_MATRIX.pdf PDF
DI-026-06_REV_3_DECK_AND_PLATFORM_DRAWING.pdf PDF
DI-031_REV_2_ELECTRICAL_SYSTEM_ONE_LINE_DIAGRAM.pdf PDF
J-5_Completion_and_Delivery_Certificate.pdf PDF
DI-014_REV_2_SEAKEEPING_PREFORMANCE_REPORT.pdf PDF
DI-026-15_REV_4_HANDLING_SYSTEMS_DRAWING.pdf PDF
J-1_List_of_Deliverables.pdf PDF
Show 40 more

Latest 50 of 68 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DI-034-00 Heating, Ventilation and Air Conditioning System Report Contract 6913G623P800007

Preliminary/Contract Design of Motor Vessel Ranger IV

HVAC System Report

Submitted by:

Loch Harbour Group

3060 Williams Drive, Suite 510

Fairfax, Virginia 22031

Preliminary/Contract Design of Motor Vessel Ranger IV

Contract No.: 6913G623P800007

CLIN-00100

DI-034-00 HEATING, VENTILATION AND

AIR CONDITIONING SYSTEM REPORT

Revision 6

Date: August 25, 2025

DISTRIBUTION Statement C: Distribution authorized to the U.S. Government agencies and their Contractors. Other request for this document shall be referred to US Department of Transportation Volpe Center.

DATA RIGHTS: This report, drawing, design, concept, and specification are the intellectual property of Loch Harbour

Group, LLC, and/or R.R.P CONSULTING ENGINEERS, L.L.C and contain information which is proprietary. The rights defined below are reserved by Loch Harbour Group, LLC, and/or R.R.P CONSULTING ENGINEERS, L.L.C.

The United States Government’s rights to use, modify, reproduce, release, perform, display, or disclose these technical data are unrestricted. Any reproduction of technical data or portions thereof marked with this legend must also reproduce the markings.

Preliminary/Contract Design of Motor Vessel Ranger IV

HVAC System Report

TABLE OF CONTENTS

REVISION TABLE

EXECUTIVE SUMMARY

A. DESCRIPTION

B. ATTACHMENTS

• Attachment 1 – DI-034_HVAC SYSTEM SCHEMATIC LAYOUTS

• Attachment 2 – DI-034_HVAC HEAT LOAD CALCULATIONS

• Attachment 3 – DI-034_HVAC- VENTILATION CALCULATIONS

C. REFERENCES

Preliminary/Contract Design of Motor Vessel Ranger IV

REVISION TABLE

HVAC System Report

REVISION DESCRIPTION DATE AUTHOR

0 Initial submission 04-19-2024 RRP 1 Updated to address government comments 07-26-2024 RRP 2 Updated to address government comments 08-13-2024 RRP 3 Updated to address government comments 08-28-2024 RRP 4 Updated to address Park comments 09-18-2024 RRP 5 Updated report and drawings 07-09-2025 VOLPE 6 Updated drawings 08-25-2025 VOLPE

Preliminary/Contract Design of Motor Vessel Ranger IV

HVAC System Report

EXECUTIVE SUMMARY

This document is submitted by Loch Harbour Group, 3060 Williams Drive, Suite 510, Fairfax, Virginia 22031, to satisfy CLIN 00100 DI-034-00 Heating, Ventilation and Air Conditioning

System Report, of Contract No. 6913G623P800007.

The purpose of this report will be to explain the level of details provided in the drawing along with the supporting calculations and representing the salient features and components of each HVAC system.

The report shall define the overall system configuration and will include preliminary supporting calculations for major system components, and system performance capability for each HVAC system in the next design phase.

Drawings have been prepared for each HVAC system identifying equipment and components, preliminary duct sizes, and material schedule for the next design phase.

The vessel shall be designed to have A1, Passenger Vessel, Great Lakes Service, Ice Class IE, AMS, HAB and COMF notations as per ABS.

Government REVIEW and COMMENT of this report is REQUIRED.

A. DESCRIPTION

Mechanical ventilation systems shall be provided in machinery spaces, crew accommodation areas, cargo areas, passenger spaces and other compartments or voids containing navigation and electronic equipment.

Individual and combined supply/exhaust fans were both incorporated in the design. Individual supply/exhaust fans were provided for the Aux machinery room, battery room, Engine room, main passenger deck 01 (level) and pilot house deck (02 level). Spaces other than those mentioned above have various combined supply/ exhaust fans based on the requirement.

The HVAC system is a multi-zone system capable of providing an adjustable range of air temperatures between 64 °F (17 °C) and 80 °F (26.5 °C). The system is split into passenger zones and crew/cargo zones. These zones shall have the ability to be segregated and allow for winterization to reduce the amount of cooling and heating load during winter lay-up months or periods without passengers and minimal crew. In all passenger accommodation and recreation spaces the temperature shall be maintained by temperature controllers. The Contractor shall be responsible for completing the detail design, final component selection and system commissioning. The installation shall be completed to the satisfaction of the NPS or their representative.

Preliminary/Contract Design of Motor Vessel Ranger IV

HVAC System Report

Table 1: Indoor Climate Requirements

Max. Summer Temp.

Limit

Relative Humidity Min. Winter Temp.

Limit

Living Quarters 73.5 ºF 30%-70% 72 ºF

Pilot House 72 ºF 30%-70% 64 ºF

Kitchen 86 ºF 30%-70% 64 ºF

The following spaces shall be temperature controlled via the HVAC system.

a) Pilothouse

b) All Crew Accommodations

c) Passenger Processing Area

d) Passenger Lounges

e) Passenger Heads

f) Passageways

g) Guest Staterooms

h) Engineering Compartment (ECR, Workshop, Engine Room)

i) Battery Room

j) Spaces containing main and ship service switchboards, and propulsion and thruster variable speed drives and converters, if installed.

k) IT Closet and other compartments or voids containing navigation and electronic equipment.

The air conditioning system, boiler units and electrical heaters provided shall be capable of maintaining the indoor climate requirements outlined in Table 1 and have the ability to isolate/winterize during the off season.

For Ranger IV, the Air Conditioning system is required to operate during the summer months when temperatures near the ports and islands rise rapidly. The system's capacity will be accurately determined during the Detailed Design and Construction (DD&C) phase with assistance from a specialized vendor.

Two boiler units (main and auxiliary) shall be provided. The boiler units shall be fuel fired and heat water in hydronic loops through individual HVAC zones. Each boiler unit shall be capable of supplying the full heating load of the vessel's hydronic heating system.

The heating system shall be capable of maintaining the indoor climate requirements outlined in Table 1 and have the ability to isolate/winterize.

Electric heaters may be incorporated in cargo or machinery areas for supplemental heating. Use of any electric heaters to satisfy climate requirements shall be approved by the NPS or their representative.

Preliminary/Contract Design of Motor Vessel Ranger IV

HVAC System Report

The below HVAC system depicts the major components with salient characteristics, preliminary ducting size, major vent trunks, space requirements and locations.

These calculations were performed based on preliminary inputs from available vendor information. The AC system's capacity will be determined during the Detailed Design and

Construction (DD&C) phase, which falls within the vendor's scope of work. Consequently, the relevant calculations and drawings are not included in this report.

B. ATTACHMENTS

The following serves as supporting documentation for this report.

• Attachment 1 – DI-034_HVAC SYSTEM SCHEMATIC LAYOUTS

• Attachment 2 – DI-034_HVAC HEAT LOAD CALCULATIONS

• Attachment 3 – DI-034_HVAC- VENTILATION CALCULATIONS

C. REFERENCES

• Appendix B - NPS VOLPE Ranger IV Basis of Design

• SNAME TECHNICAL AND RESEARCH BULLETIN

DISTRIBUTION Statement C: Distribution authorized to the U.S.

Government agencies and their Contractors. Other request for this document shall be referred to US Department of Transportation Volpe Center.

This report, drawing, design, concept, and specification are the intellectual property of Loch Harbour Group, LLC, and/or R.R.P CONSULTING ENGINEERS, L.L.C and contain information which is proprietary. The rights defined below are reserved by Loch Harbour Group, LLC, and/or R.R.P CONSULTING ENGINEERS, L.L.C. The United States Government’s rights to use, modify, reproduce, release, perform, display, or disclose these technical data are unrestricted. Any reproduction of technical data or portions thereof marked with this legend must also reproduce the markings.

SS

E E

65 60 55 50 45 40 35 30 25 20 15 10

UP

S S S S S

S

S S

S S S S S S S S S

E E E E

E

S

S S S S S S

E

70 65 60 55 50 45 40 35 30 25 20 15

DN

DNC

O N

SO

LE

E E

E E

E E

E E

E E

E

E E

EEEEEEEEEEEEEEEEEEEEEEE

EE

E

E

S

E E

S

S S

S S

S S

S S

S S

S S

S S

S S

S S

S S

S S

S S

S S

S

S S

S S

S

S

S S

S S

S

S

S S

S S

S S

S S

S S

S S

S S

S S

S S

S S

S S

S S

S S

S

S S

S S

S S

S

S S

S S

S S

S S

S S

S S

S S

S S

S S

S S

S

SSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSS

S

S S

S

SSSSSS

S S S S S

E

EEEEEEEEEEEEEE

S S

SSSSSSSSSSSSS

S S

S S

S S

S

S EEEEE

E E

E E

E E

E E

S S S S S S S S S S S S

S S

S S

E E E E E E E E E E E E

E E

E E

E E

E

E

E E

E E

E E

E E

E

UPDN

55 50 45 40 35 30 25 20 15 10 5 34

UP

UPDN

D N

S S

S S

S S

S S

SS

E

E E

E

S

S S

S S

S S

S

E

E E

E E

E E

E E

E E

EEEEEEEEEEE

S S

S S

S S

S S S S S S S S S S S S S S S S S S S S S S S S S S S S

S

60 55 50 45 40 35 30 25 20 15 10

DN UP

UP

DN

DN

EEEEEEEEEEEEE

E E

E E

E

E E E E E E E

E E

E E

E E

E

S S S S S S S S S S S S S S S S S S S S S S S S S S S

S S

S S

S S

S

60 55 50 45 40 35 30 25 20 15 10

DN

DN

DN

UP

DN

EEEEEEEEEEE

E

E

E

S S S S S S S S

SSSSSSSSSSSSSSSSS

S S

S S

S S

S S

S

S S

S

S S

S S

S S

S S

S

S S

S S

S

E E

E E

E E

E

E

S S

S S

S S

E E

R.R.P CONSULTING ENGINEERS, L.L.C

HEAT LOAD CALCULATIONS

REPORT

(RANGER IV)

PROJECT NO. 1277

Rev. 0

06-18-2024

This report, drawing, design, concept, and specification are the intellectual property of Loch

Harbour Group, LLC, and/or R.R.P CONSULTING ENGINEERS, L.L.C and contain information which is proprietary. The rights defined below are reserved by Loch Harbour Group, LLC, and/or R.R.P

CONSULTING ENGINEERS, L.L.C. The United States Government’s rights to use, modify, reproduce, release, perform, display, or disclose these technical data are unrestricted. Any reproduction of technical data or portions thereof marked with this legend must also reproduce the markings.

DI-034-00

Page13

LEGEND:

A = Boundary Area ft²

Q s = Head Load, Sensible Btu/hr

Q L = Heat Load, Latent Btu/hr

Q T = Heat Load, Total Btu/hr

Q W = Heat Load, Winter Btu/hr

U = Heat Transfer Coefficient Btu/hr/ft²

T = Space Design Temp. °F

T O = Temp. of Adjacent space/ Outside °F

∆T = Temperature Difference °F

SHF = Sensible Heat Fetor

LOAD KEY:

1 = Deck Over

2 = Deck Under

3 = Outboard Bulkhead/ Shell

4 = Forward Bulkhead

5 = Aft Bulkhead

6 = Inboard Bulkhead

7 = Lights

8 = Equipments

9 = Personnel

10 = Infiltration

KEY

Project Title:

1277- RANGER IV

Proj. no:

Subject:

HEAT LOAD CALCULATIONS

Date:

06-18-24

SYMBOLS

DI-034-00

Page1

Page14

73.5 °F 72 °F

Coeff Dir Coeff Dir Fwd Bhd-P.way 4 5 244.2 - - - ↔ - - - 20.0 52.0 0.354 ↔ 4495.2

Fwd Bhd-CL GR LKR 4 65 199.3 - - - ↔ - - - 18.0 54.0 0.200 ↔ 2152.7

Side Shell(P)-Solar 3 63 422.4 - - - ↔ - - - 17.6 54.4 0.900 ↔ 20680.7

Side Shell(S)-Solar 3 63 422.4 - - - ↔ - - - 17.6 54.4 0.900 ↔ 20680.7

Aft Bhd-Engine control room 5 65 196.7 - - - ↔ - - - 18.0 54.0 0.200 ↔ 2124.1

Aft Bhd-Crane pedestal 5 5 52.8 - - - ↔ - - - 17.6 54.4 0.354 ↔ 1016.8

Aft Bhd-Engineers Workshop 5 65 196.7 - - - ↔ - - - 18.0 54.0 0.200 ↔ 2124.1

Deck over-solar 1 63 1070.2 - - - ↑ - - - 17.6 54.4 0.900 ↓ 52397.0

Deck under-Inner bottom 2 63 1070.2 - - - ↓ - - - 17.6 54.4 0.200 ↑ 11643.8

Transmission Sub Total 0 0 0 117315

Lights (L.C=7) 1070.2 7491.4 0 7491.4

Equipment 12398.5 0 12398.5

Project Title:

1277 - RANGER IV

Proj. no:

Subject:

2ND DECK - HEAT LOAD CALCULATIONS

Date:

06-18-24

SPACE: ENGINE ROOM COOLING SEASON: T = HEATING SEASON: T =

T O ∆TAdjacent compartment Load key

Insul key

A T O ∆T U

QW

U

Q s Q L Q T

Page15

Personnel (2) 530 670 1200.0

Sensible Heat Sub Total 20420 117315

Latent Heat Sub Total 670

Total Heat (Btu/hr) 21090 117315

Total Heat (kW) 6.2 34.4

SHF= 0.968

Heat Load Total QW = 117315 BTU/hr

= 34.4 kW

Required Boiler Capacity = 34.4 kW

Notes: Glass solar Load = 160 Btu/hr/ft² x 0 =0 BTU/HR

Boiler requirement

Page16

Fwd Bhd-Engine room 4 5 113.2 - - - ↔ - - - 18 54.0 0.200 ↔ 1222.99

Side Shell(P)-Solar 3 63 118.6 - - - ↔ - - - 17.6 54.4 0.900 ↔ 5804.70

Aft Bhd-Ballast 5 65 40.3 - - - ↔ - - - 18 54.0 0.200 ↔ 435.02

Aft Bhd-Steering Gear 5 65 7.6 - - - ↔ - - - 18 54.0 0.200 ↔ 82.08 outboard Bhd-Engineers Workshop5 65 4.6 - - - ↔ - - - 20 52.0 0.200 ↔ 47.42 outboard Bhd-DEF tank 5 65 4.6 - - - ↔ - - - 20 52.0 0.200 ↔ 47.42 outboard Bhd-Crane Pedestal 5 65 3.0 - - - ↔ - - - 17.6 54.4 0.200 ↔ 33.08

Deck over-solar 1 63 229.5 - - - ↑ - - - 17.6 54.4 0.11 ↓ 1373.33

Deck under-Inner bottom 2 63 229.5 - - - ↓ - - - 17.6 72.0 0.354 ↑ 5849.50

Transmission Sub Total 0 0 0 14896

Lights (L.C=7) 229.5 1606.5 0 1606.5

Equipment 2000.0 0 2000.0

Personnel (2) 530 670 1200.0

Sensible Heat Sub Total 4137 14896

Latent Heat Sub Total 670

Total Heat (Btu/hr) 4807 14896

Total Heat (kW) 1.4 4.4

Q s Q L Q T

Project Title:

1277 - RANGER IV

Proj. no:

Subject:

2ND DECK - HEAT LOAD CALCULATIONS

Date:

06-18-24

SPACE: ENGINE CONTROL ROOM COOLING SEASON: T = HEATING SEASON: T =

Adjacent compartment QWT O ∆T ULoad key Insul key

A T O ∆T U

Page17

SHF= 0.861

Heat Load Total QW = 14896 BTU/hr = 4.4 kW

Required Boiler Capacity = 4.4 kW

Notes: Glass solar Load = 160 Btu/hr/ft² x 0 =0 BTU/HR

Boiler requirement

Page18

Fwd Bhd-Engine room 4 5 113.2 - - - ↔ - - - 18.0 54.0 0.200 ↔ 1223.0

Side Shell(P)-Solar 3 63 118.6 - - - ↔ - - - 17.6 54.4 0.900 ↔ 5804.7

Aft Bhd-Steering Gear 5 65 140.6 - - - ↔ - - - 18.0 54.0 0.200 ↔ 1518.5 outboard Bhd-Engine Control Room4 5 45.6 - - - ↔ - - - 18.0 54.0 0.200 ↔ 492.5 outboard Bhd-DEF tank 5 65 4.6 - - - ↔ - - - 18.0 54.0 0.200 ↔ 49.2 outboard Bhd-Crane Pedestal 5 65 3.0 - - - ↔ - - - 17.6 54.4 0.200 ↔ 33.1

Deck over-solar 1 63 250.4 - - - ↑ - - - 17.6 54.4 0.11 ↓ 1498.4

Deck under-Inner bottom 2 63 250.4 - - - ↓ - - - 17.6 54.4 0.354 ↑ 4822.1

Transmission Sub Total - - - 15441

Lights (L.C=7) 250.4 1752.8 0 1752.8

Equipment 1000.0 0 1000.0

Personnel (2) 530 670 1200.0

Sensible Heat Sub Total 3283 15441

Latent Heat Sub Total 670

Total Heat (Btu/hr) 3953 15441

Total Heat (kW) 1.2 4.5

Project Title:

1277 - RANGER IV

Proj. no:

Subject:

2ND DECK - HEAT LOAD CALCULATIONS

Date:

06-18-24

QW

HEATING SEASON: T =

Adjacent compartment Load key

Insul key

A T O ∆T U

Q s Q L Q T T O ∆T U

SPACE: ENGINEERS WORKSHOP COOLING SEASON: T =

Page19

SHF= 0.830

Heat Load Total QW = 15441 BTU/hr = 4.5 kW

Required Boiler Capacity = 4.5 kW

Notes: Glass solar Load = 160 Btu/hr/ft² x 0 =0 BTU/HR

Boiler requirement

Page20

79.0 °F 72 °F

Aft Bhd- State Room 5 65 18.8 - - - ↔ - - - 18.0 54.0 0.200 ↔ 202.5

Inboard Bhd-T/S 6 5 13.6 - - - ↔ - - - 18.5 53.5 0.354 ↔ 257.6

Inboard Bhd-T/S 6 5 9.4 - - - ↔ - - - 18.5 53.5 0.354 ↔ 178.7

Aft Bhd-T/S 5 5 52.5 - - - ↔ - - - 18.5 53.5 0.354 ↔ 994.3

Inboard Bhd-P.way 6 5 44.3 - - - ↔ - - - 20.0 52.0 0.354 ↔ 814.6

Fwd Bhd-Bosuns Stores 5 65 57.0 - - - ↔ - - - 18.0 54.0 0.200 ↔ 615.6

Side Shell(P)-Solar 3 63 70.6 - - - ↔ - - - 17.6 54.4 0.900 ↔ 3458.1

Side Shell(P)-Solar 3

GLAS

S

2.12 - - - ↔ - - - 17.6 54.4 - ↔ 0.0

Deck Under- Un Assigned storage

2 92 56.0 - - - ↑ - - - 18.0 54.0 0.092 ↓ 278.0

Deck Over -P.Proce.area 1 92 56.0 - - - ↓ - - - 18.0 54.0 0.940 ↑ 2840.0

Transmission Sub Total - - - 9461

Lights (L.C=7) 7 56.0 391.7 0 391.7 0

Equipment 8 0.0 0 0.0 0

Personnel (2) 9 530 670 1200.0 0

Project Title:

1277 - RANGER IV

Proj. no:

Subject:

2nd DECK - HEAT LOAD CALCULATIONS

Date:

06-18-24

SPACE: STATE ROOM (FR 14 to 19-PORT ) COOLING SEASON: T = HEATING SEASON: T =

Adjacent compartment Load key

Insul key

A T O ∆T U

Q s Q L Q T T O ∆T U

QW

Page21

Sensible Heat Sub Total 922 9461

Latent Heat Sub Total 670 0

Total Heat (Btu/hr) 1592 9461

Total Heat (kW) 0 3

SHF= 0.579

Heat Load Total QW = 9461 BTU/hr = 2.8 kW

Required Boiler Capacity = 2.8 kW

Boiler requirement

Notes: Glass solar Load = 160 Btu/hr/ft² x 2.12 =339.2 BTU/HR

Page22

Aft Bhd-State room 5 65 87.0 - - - ↔ - - - 18.0 54.0 0.200 ↔ 939.6

Inboard Bhd-T/S 6 5 15.9 - - - ↔ - - - 18.5 53.5 0.354 ↔ 301.1

Fwd Bhd-T/S 4 5 56.3 - - - ↔ - - - 18.5 53.5 0.354 ↔ 1065.3

Inboard Bhd-P.way 6 5 39.0 - - - ↔ - - - 20.0 52.0 0.354 ↔ 717.9

Fwd Bhd-State Room 4 65 18.8 - - - ↔ - - - 18.0 54.0 0.200 ↔ 202.5

Side Shell(P)-Solar 3 63 60.1 - - - ↔ - - - 17.6 54.4 0.090 ↔ 294.4

Deck Under- Un Assigned storage 2 92 65.3 - - - ↑ - - - 18.0 54.0 0.920 ↓ 3244.1

Deck Over -P.Proce.area 1 92 65.3 - - - ↓ - - - 18.0 54.0 0.940 ↑ 3314.6 solar 3 Glass 2.1 - - - ↔ - - - 17.6 54.4 - ↔ 0.0

Transmission Sub Total - - - 10080

Lights (L.C=7) 7 65.3 457.1 0 457.1

Equipment 8 0.0 0 0.0

Personnel (2) 9 530 670 1200.0

Sensible Heat Sub Total 987 10080

Latent Heat Sub Total 670

Project Title:

1277 - RANGER IV Proj. no:

Subject:

2nd DECK - HEAT LOAD CALCULATIONS Date:

06-18-24

SPACE: STATE ROOM (FR 19 to 23-PORT ) COOLING SEASON: T = HEATING SEASON: T =

Adjacent compartment Load key

Insul key

A T O ∆T U

Q s Q L Q T T O ∆T U

QW

Page23

Total Heat (Btu/hr) 1657 10080

Total Heat (kW) 0.5 3.0

SHF= 0.596

Heat Load Total QW = 10080 BTU/hr = 3.0 kW

Required Boiler Capacity = 3.0 kW

Boiler requirement

Notes: Glass solar Load = 160 Btu/hr/ft² x 2.1 = 339.2 BTU/HR

Page24

Side Shell(P)-Solar 3 63 54.8 - - - ↔ - - - 17.6 54.4 0.090 ↔ 268.1

Fwd Bhd-State Room 4 65 23.3 - - - ↔ - - - 18.0 54.0 0.200 ↔ 251.1

Aft Bhd(P)-Meeting room 5 65 39.6 - - - ↔ - - - 18.0 54.0 0.200 ↔ 427.7

Inboard aft Bhd-Meeting room 6 65 3.8 - - - ↔ - - - 18.0 54.0 0.200 ↔ 40.5

Aft Bhd(P)-Meeting room 5 65 58.5 - - - ↔ - - - 18.0 54.0 0.200 ↔ 631.8

Inboard Bhd-P.way 6 5 27.0 - - - ↔ - - - 20.0 52.0 0.354 ↔ 497.0

Inboard Bhd-T/S 6 5 23.3 - - - ↔ - - - 18.5 53.5 0.354 ↔ 440.3

Fwd Bhd-T/S 4 5 58.5 - - - ↔ - - - 18.5 53.5 0.354 ↔ 1107.9

Deck Under- Battery room 2 92 63.9 - - - ↑ - - - 18.0 54.0 0.920 ↓ 3174.6

Deck Over -Interior Cargo Space 1 92 20.2 - - - ↓ - - - 18.0 54.0 0.940 ↑ 1023.8

Deck Over -T/S 1 92 46.8 - - - ↓ - - - 18.5 53.5 0.940 ↑ 2353.6

Deck Over -P.way 1 92 17.6 - - - ↓ - - - 20.0 52.0 0.940 ↑ 860.3

Transmission Sub Total - - - 11077

Lights (L.C=7) 7 84.6 592.0 0 592.0

Equipment 8 0.0 0 0.0

Personnel (2) 9 530 670 1200.0

Project Title:

1277 - RANGER IV

Proj. no:

Subject:

2nd DECK - HEAT LOAD CALCULATIONS

Date:

06-18-24

SPACE: STATE ROOM (FR 23 to 26.5-PORT ) COOLING SEASON: T = HEATING SEASON: T =

T O ∆T U

QW∆T

U

Q s Q L Q TAdjacent compartment Load key

Insul key

A T O

Page25

Sensible Heat Sub Total 1122 11077

Latent Heat Sub Total 670

Total Heat (Btu/hr) 1792 11077

Total Heat (kW) 0.5 3.2

SHF= 0.626

Heat Load Total QW = 11077 BTU/hr = 3.2 kW

Required Boiler Capacity = 3.2 kW

Boiler requirement

Page26

Aft Bhd-Crew Lounge 5 65 102.0 - - - ↔ - - - 18.0 54.0 0.200 ↔ 1101.6

Side Shell(P)-Solar 3 63 50.3 - - - ↔ - - - 17.6 54.4 0.900 ↔ 2460.2

Inboard Bhd-P.Way 6 5 45.8 - - - ↔ - - - 20.0 52.0 0.354 ↔ 843.5

Fwd Bhd-Stater room 4 65 39.8 - - - ↔ - - - 18.0 54.0 0.200 ↔ 429.3

Fwd Bhd-Inboard meeting room

4 65 3.8 - - - ↔ - - - 18.0 54.0 0.200 ↔ 40.5

Fwd Bhd-Stater room 4 65 57.0 - - - ↔ - - - 18.0 54.0 0.200 ↔ 615.6

Deck Under- Battery room 2 92 72.8 - - - ↑ - - - 18.0 54.0 0.092 ↓ 361.7

Deck Over -Interior Cargo Space 1 92 76.5 - - - ↓ - - - 18.0 54.0 0.940 ↑ 3883.1

Deck Over -P.way 1 92 13.3 - - - ↓ - - - 20.0 52.0 0.940 ↑ 650.1

Transmission Sub Total - - - 10386

Lights (L.C=7) 7 89.8 628.6 0 628.6

Equipment 8 0.0 0 0.0

Personnel (2) 9 530 670 1200.0

Sensible Heat Sub Total 1159 10386

Latent Heat Sub Total 670

Proj. no:

Subject:

2nd DECK - HEATING & COOLING LOAD CALCULATIONS

Date:

06-18-24

SPACE: MEETING ROOM (FR 26.5 to 30.5 -PORT) COOLING SEASON: T = HEATING SEASON: T =

Project Title:

1277 - RANGER IV

T O ∆T U

QW∆T

U

Q s Q L Q TAdjacent compartment Load key

Insul key

A T O

Page27

Total Heat (Btu/hr) 1829 10386

Total Heat (kW) 0.5 3.0

SHF= 0.634

Heat Load Total QW = 10386 BTU/hr = 3.0 kW

Required Boiler Capacity = 3.0 kW

Boiler requirement

Page28

Aft Bhd(P)-Officer 5 65 108.0 - - - ↔ - - - 18.0 54.0 0.200 ↔ 1166.4

Side Shell(P)-Solar 3 63 67.5 - - - ↔ - - - 17.6 54.4 0.900 ↔ 3304.8

Inboard Bhd-P.Way 6 5 67.5 - - - ↔ - - - 20.0 52.0 0.354 ↔ 1242.5

Fwd Bhd-Meeting room 4 65 102.0 - - - ↔ - - - 18.0 54.0 0.200 ↔ 1101.6

Deck Under- Battery room 2 92 102.8 - - - ↑ - - - 18.0 54.0 0.092 ↓ 510.7

Deck Over -Interior Cargo Space

1 92 124.9 - - - ↓ - - - 18.0 54.0 0.940 ↑ 6339.9

Transmission Sub Total - - - 13666

Lights (L.C=9) 7 124.9 1124.1 0 1124.1

Equipment (Refrigerator) 8 1300.0 0 1300.0

Personnel (10) 9 2650 3350 6000.0

Sensible Heat Sub Total 5074 13666

Latent Heat Sub Total 3350

Total Heat (Btu/hr) 8424 13666

Total Heat (kW) 2.5 4.0

SHF= 0.602

Project Title:

1277 - RANGER IV

Proj. no:

Subject:

2nd DECK - HEATING & COOLING LOAD CALCULATIONS

Date:

06-18-24

SPACE:CREW LOUNGE (FR 30.5 to 35-PORT ) COOLING SEASON: T = HEATING SEASON: T =

Adjacent compartment Load key

Insul key

A T O ∆T U

Q s Q L Q T T O ∆T U

QW

Page29

Heat Load Total QW = 13666 BTU/hr = 4.0 kW

Required Boiler Capacity = 4.0 kW

Boiler requirement

Page30

Aft Bhd-Crew 5 65 111.8 - - - ↔ - - - 18.0 54.0 0.200 ↔ 1206.9

Side Shell(P)-Solar 3 63 75.0 - - - ↔ - - - 17.6 54.4 0.900 ↔ 3672.0

Fwd Bhd - Crew Lounge 4 65 52.1 - - - ↔ - - - 18.0 54.0 0.200 ↔ 563.0

Fwd Bhd-T/S 4 5 63.8 - - - ↔ - - - 18.5 53.5 0.354 ↔ 1207.4

Fwd Bhd-T/S inboard 4 5 25.5 - - - ↔ - - - 18.5 53.5 0.354 ↔ 482.9

Inboard Bhd-P.way 6 5 49.5 - - - ↔ - - - 20.0 52.0 0.354 ↔ 911.2

Deck Under-Sewage/grey water tank2 92 10.5 - - - ↑ - - - 18.0 54.0 0.092 ↓ 52.2

Deck Under-Fresh water tank 2 92 14.5 - - - ↑ - - - 18.0 54.0 0.092 ↓ 72.0

Deck Under-walk path/grating 2 92 72.9 - - - ↑ - - - 18.0 54.0 0.092 ↓ 362.1

Deck Over -Ref.Space 1 92 29.9 - - - ↓ - - - 18.0 54.0 0.940 ↑ 1517.7

Deck Over -Interior Cargo Space

1 92 88.0 - - - ↓ - - - 18.0 54.0 0.940 ↑ 4466.7

Transmission Sub Total - - - 14514

Lights (L.C=7) 7 117.9 825.3 0 825.3

Equipment 8 0.0 0 0.0

Personnel (1) 9 265 335 600.0

Sensible Heat Sub Total 1090 14514

Latent Heat Sub Total 335

Project Title:

1277 - RANGER IV

Proj. no:

Subject:

2nd DECK - HEATING & COOLING LOAD CALCULATIONS

Date:

06-18-24

SPACE: OFFICER (FR 35 to 40- PORT) COOLING SEASON: T = HEATING SEASON: T =

Q T T O ∆T U

QWAdjacent compartment Load key

Insul key

A T O ∆T U

Q s Q L

Page31

Total Heat (Btu/hr) 1425 14514

Total Heat (kW) 0.4 4.3

SHF= 0.765

Heat Load Total QW = 14514 BTU/hr = 4.3 kW

Required Boiler Capacity = 4.3 kW

Boiler requirement

Page32

Aft Bhd-Crew 5 65 55.2 - - - ↔ - - - 18.0 54.0 0.200 ↔ 596.2

Side Shell(P)-Solar 3 63 60.0 - - - ↔ - - - 17.6 54.4 0.900 ↔ 2937.6

Fwd Bhd - officer 4 65 111.8 - - - ↔ - - - 18.0 54.0 0.200 ↔ 1206.9

Inboard Bhd-P.Way 6 5 36.0 - - - ↔ - - - 20.0 52.0 0.354 ↔ 662.7

Aft Bhd-T/S 5 5 56.3 - - - ↔ - - - 18.5 53.5 0.354 ↔ 1065.3

Inboard -T/S 6 5 22.5 - - - ↔ - - - 18.5 53.5 0.354 ↔ 426.1

Deck Under-Do Tk. 2 92 36.0 - - - ↑ - - - 18.0 54.0 0.092 ↓ 178.8

Deck Under-Sewage/grey water tank2 92 11.9 - - - ↑ - - - 18.0 54.0 0.092 ↓ 59.1

Deck Under-walk way 2 92 32.6 - - - ↑ - - - 18.0 54.0 0.092 ↓ 162.0

Deck Over -Ref.Space 1 92 35.3 - - - ↓ - - - 18.0 54.0 0.940 ↑ 1791.8

Deck Over -Interior Cargo Space

1 92 55.8 - - - ↓ - - - 18.0 54.0 0.940 ↑ 2832.4

Transmission Sub Total - - - 11919

Lights (L.C=4) 7 91.1 364.4 0 364.4

Equipment 8 0.0 0 0.0

Personnel (2) 9 530 670 1200.0

Project Title:

1277 - RANGER IV

Proj. no:

Subject:

2nd DECK - HEATING & COOLING LOAD CALCULATIONS

Date:

06-18-24

SPACE: CREW (FR 40 to 44 - PORT) COOLING SEASON: T = HEATING SEASON: T =

Adjacent compartment Load key

Insul key

A T O ∆T U

Q s Q L Q T T O ∆T U

QW

Page33

Sensible Heat Sub Total 894 11919

Total Heat (Btu/hr) 1564 11919

Total Heat (kW) 0.5 3.5

SHF= 0.572

Heat Load Total QW = 11919 BTU/hr = 3.5 kW

Required Boiler Capacity = 3.5 kW

Boiler requirement

Page34

Aft Bhd-Crew 5 65 55.2 - - - ↔ - - - 18.0 54.0 0.200 ↔ 596.2

Side Shell(P)-Solar 3 63 60.0 - - - ↔ - - - 17.6 54.4 0.900 ↔ 2937.6

Fwd Bhd - crew 4 65 111.8 - - - ↔ - - - 18.0 54.0 0.200 ↔ 1206.9

Inboard Bhd-P.Way 6 5 36.0 - - - ↔ - - - 20.0 52.0 0.354 ↔ 662.7

Aft Bhd-T/S 5 5 56.3 - - - ↔ - - - 18.5 53.5 0.354 ↔ 1065.3

Inboard -T/S 6 5 22.5 - - - ↔ - - - 18.5 53.5 0.354 ↔ 426.1

Deck Under-Do Tk. 2 92 47.2 - - - ↑ - - - 18.0 54.0 0.092 ↓ 234.5

Deck Under-walk way 2 92 33.4 - - - ↑ - - - 18.0 54.0 0.092 ↓ 165.8

Deck Over -Ref.Space 1 92 35.3 - - - ↓ - - - 18.0 54.0 0.940 ↑ 1791.8

Deck Over -Interior Cargo Space

1 92 55.8 - - - ↓ - - - 18.0 54.0 0.940 ↑ 2832.4

Transmission Sub Total - - - 11919

Lights (L.C=4) 7 91.1 364.4 0 364.4

Equipment 8 0.0 0 0.0

Personnel (2) 9 530 670 1200.0

Sensible Heat Sub Total 894 11919

Latent Heat Sub Total 670

Project Title:

1277 - RANGER IV

Proj. no:

Subject:

2nd DECK - HEATING & COOLING LOAD CALCULATIONS

Date:

06-18-24

SPACE: CREW (FR 44 to 48 - PORT) COOLING SEASON: T = HEATING SEASON: T =

Q T T O ∆T U

QWAdjacent compartment Load key

Insul key

A T O ∆T U

Q s Q L

Page35

Total Heat (Btu/hr) 1564 11919

Total Heat (kW) 0.5 3.5

SHF= 0.572

Heat Load Total QW = 11919 BTU/hr = 3.5 kW

Required Boiler Capacity = 3.5 kW

Boiler requirement

Page36

Aft Bhd-P.way 5 5 55.2 - - - ↔ - - - 20.0 52.0 0.354 ↔ 1016.1

Side Shell(P)-Solar 3 63 60.0 - - - ↔ - - - 17.6 54.4 0.900 ↔ 2937.6

Fwd Bhd - crew 4 65 111.8 - - - ↔ - - - 18.0 54.0 0.200 ↔ 1206.9

Inboard Bhd-P.Way 6 5 36.0 - - - ↔ - - - 18.0 54.0 0.354 ↔ 688.2

Aft Bhd-T/S 5 5 56.3 - - - ↔ - - - 18.5 53.5 0.354 ↔ 1065.3

Inboard -T/S 6 5 22.5 - - - ↔ - - - 18.5 53.5 0.354 ↔ 426.1

Deck Under-Do Tk. 2 92 14.3 - - - ↓ - - - 18.0 54.0 0.940 ↑ 725.9

Deck Under-bunker Tk. 2 92 4.4 - - - ↓ - - - 18.0 54.0 0.940 ↑ 223.3

Deck Under-walk way 2 92 61.8 - - - ↓ - - - 18.0 54.0 0.092 ↓ 307.0

Deck Over -Interior Cargo Space

1 92 91.1 - - - ↑ - - - 18.0 54.0 0.092 ↓ 452.6

Transmission Sub Total - - - 9049

Lights (L.C=4) 7 91.1 364.4 0 364.4

Equipment 8 0.0 0 0.0

Personnel (2) 9 530 670 1200.0

Project Title:

1277 - RANGER IV

Proj. no:

Subject:

2nd DECK - HEATING & COOLING LOAD CALCULATIONS

Date:

06-18-24

SPACE: CREW (FR 48 to 52 - PORT) COOLING SEASON: T = HEATING SEASON: T =

Adjacent compartment Load key

Insul key

A T O ∆T U

Q s Q L Q T T O ∆T U

QW

Page37

Sensible Heat Sub Total 894 9049

Total Heat (Btu/hr) 1564 9049

Total Heat (kW) 0.5 2.7

SHF= 0.572

Heat Load Total QW = 9049 BTU/hr = 2.7 kW

Required Boiler Capacity = 2.7 kW

Boiler requirement

Page38

Aft Bhd-CL GR LKR 5 5 55.2 - - - ↔ - - - 18.0 54.0 0.354 ↔ 1055.2

Side Shell(P)-Solar 3 63 60.0 - - - ↔ - - - 17.6 54.4 0.900 ↔ 2937.6

Fwd Bhd - crew 4 65 111.8 - - - ↔ - - - 18.0 54.0 0.200 ↔ 1206.9

Inboard Bhd-P.Way 6 5 36.0 - - - ↔ - - - 20.0 52.0 0.354 ↔ 662.7

Aft Bhd-T/S 5 5 56.3 - - - ↔ - - - 18.5 53.5 0.354 ↔ 1065.3

Inboard -T/S 6 5 22.5 - - - ↔ - - - 18.5 53.5 0.354 ↔ 426.1

Deck Under-Do Tk. 2 92 14.3 - - - ↑ - - - 18.0 54.0 0.092 ↓ 71.0

Deck Under-bunker Tk. 2 92 4.4 - - - ↑ - - - 18.0 54.0 0.092 ↓ 21.9

Deck Under-walk way 2 92 61.8 - - - ↑ - - - 18.0 54.0 0.092 ↓ 307.0

Deck Over -Interior Cargo Space

1 92 91.1 - - - ↓ - - - 18.0 54.0 0.940 ↑ 4624.2

Transmission Sub Total - - - 12378

Lights (L.C=4) 7 91.1 364.4 0 364.4

Equipment 8 0.0 0 0.0

Personnel (2) 9 530 670 1200.0

Project Title:

1277 - RANGER IV

Proj. no:

Subject:

2nd DECK - HEATING & COOLING LOAD CALCULATIONS

Date:

06-18-24

SPACE: CREW (FR 48 to 52 - STBD) COOLING SEASON: T = HEATING SEASON: T =

Q T T O ∆T U

QWAdjacent compartment Load key

Insul key

A T O ∆T U

Q s Q L

Page39

Sensible Heat Sub Total 894 12378

Total Heat (Btu/hr) 1564 12378

Total Heat (kW) 0.5 3.6

SHF= 0.572

Heat Load Total QW = 12378 BTU/hr = 3.6 kW

Required Boiler Capacity = 3.6 kW

Boiler requirement

Page40

Aft Bhd-Crew 5 65 55.2 - - - ↔ - - - 18.0 54.0 0.200 ↔ 596.2

Side Shell(P)-Solar 3 63 60.0 - - - ↔ - - - 17.6 54.4 0.900 ↔ 2937.6

Fwd Bhd - crew 4 65 111.8 - - - ↔ - - - 18.0 54.0 0.200 ↔ 1206.9

Inboard Bhd-P.Way 6 5 36.0 - - - ↔ - - - 20.0 52.0 0.354 ↔ 662.7

Aft Bhd-T/S 5 5 56.3 - - - ↔ - - - 18.5 53.5 0.354 ↔ 1065.3

Inboard -T/S 6 5 22.5 - - - ↔ - - - 18.5 53.5 0.354 ↔ 426.1

Deck Under-Do Tk. 2 92 47.2 - - - ↑ - - - 18.0 54.0 0.092 ↓ 234.5

Deck Under-walk way 2 92 55.4 - - - ↑ - - - 18.0 54.0 0.092 ↓ 275.1

Deck Over -Ref.Space 1 92 35.3 - - - ↓ - - - 18.0 54.0 0.940 ↑ 1791.8

Deck Over -Interior Cargo Space

1 92 78.0 - - - ↓ - - - 18.0 54.0 0.940 ↑ 3957.2

Transmission Sub Total - - - 13153

Lights (L.C=4) 7 113.3 453.0 0 453.0

Equipment 8 0.0 0 0.0

Personnel (2) 9 530 670 1200.0

Project Title:

1277 - RANGER IV

Proj. no:

Subject:

2nd DECK - HEATING & COOLING LOAD CALCULATIONS

Date:

06-18-24

SPACE: CREW (FR 44 to 48 - STBD) COOLING SEASON: T = HEATING SEASON: T =

Adjacent compartment Load key

Insul key

A T O ∆T U

Q s Q L Q T T O ∆T U

QW

Page41

Sensible Heat Sub Total 983 13153

Total Heat (Btu/hr) 1653 13153

Total Heat (kW) 0.5 3.9

SHF= 0.595

Heat Load Total QW = 13153 BTU/hr = 3.9 kW

Required Boiler Capacity = 3.9 kW

Boiler requirement

Page42

Aft Bhd-Crew 5 65 55.2 - - - ↔ - - - 18.0 54.0 0.200 ↔ 596.2

Side Shell(P)-Solar 3 63 60.0 - - - ↔ - - - 17.6 54.4 0.900 ↔ 2937.6

Fwd Bhd - officer 4 65 111.8 - - - ↔ - - - 18.0 54.0 0.200 ↔ 1206.9

Inboard Bhd-P.Way 6 5 36.0 - - - ↔ - - - 20.0 52.0 0.354 ↔ 662.7

Aft Bhd-T/S 5 5 56.3 - - - ↔ - - - 18.5 53.5 0.354 ↔ 1065.3

Inboard -T/S 6 5 22.5 - - - ↔ - - - 18.5 53.5 0.354 ↔ 426.1

Deck Under-Do Tk. 2 92 36.0 - - - ↑ - - - 18.0 54.0 0.092 ↓ 178.8

Deck Under-Sewage/grey water tank2 92 11.9 - - - ↑ - - - 18.0 54.0 0.092 ↓ 59.1

Deck Under-walk way 2 92 53.4 - - - ↑ - - - 18.0 54.0 0.092 ↓ 265.3

Deck Over -Ref.Space 1 92 35.3 - - - ↓ - - - 18.0 54.0 0.940 ↑ 1791.8

Deck Over -Interior Cargo Space

1 92 78.0 - - - ↓ - - - 18.0 54.0 0.940 ↑ 3957.2

Transmission Sub Total - - - 13147

Lights (L.C=4) 7 113.3 792.8 0 792.8

Equipment 8 0.0 0 0.0

Personnel (2) 9 530 670 1200.0

Project Title:

1277 - RANGER IV

Proj. no:

Subject:

2nd DECK - HEATING & COOLING LOAD CALCULATIONS

Date:

06-18-24

SPACE: CREW (FR 40 to 44 - STBD) COOLING SEASON: T = HEATING SEASON: T =

Q T T O ∆T U

QWAdjacent compartment Load key

Insul key

A T O ∆T U

Q s Q L

Page43

Sensible Heat Sub Total 1323 13147

Total Heat (Btu/hr) 1993 13147

Total Heat (kW) 0.6 3.9

SHF= 0.664

Heat Load Total QW = 13147 BTU/hr = 3.9 kW

Required Boiler Capacity = 3.9 kW

Boiler requirement

Page44

Aft Bhd-Crew 5 65 111.8 - - - ↔ - - - 18.0 54.0 0.200 ↔ 1206.9

Side Shell(P)-Solar 3 63 75.0 - - - ↔ - - - 17.6 54.4 0.900 ↔ 3672.0

Fwd Bhd - Crew Lounge 4 65 52.1 - - - ↔ - - - 18.0 54.0 0.200 ↔ 563.0

Fwd Bhd-T/S 4 5 63.8 - - - ↔ - - - 18.5 53.5 0.354 ↔ 1207.4

Fwd Bhd-T/S inboard 4 5 25.5 - - - ↔ - - - 18.5 53.5 0.354 ↔ 482.9

Inboard Bhd-P.way 6 5 49.5 - - - ↔ - - - 20.0 52.0 0.354 ↔ 911.2

Deck Under-Sewage/grey water tank2 92 10.5 - - - ↑ - - - 18.0 54.0 0.092 ↓ 52.2

Deck Under-Fresh water tank 2 92 14.5 - - - ↑ - - - 18.0 54.0 0.092 ↓ 72.0

Deck Under-walk path/grating 2 92 72.9 - - - ↑ - - - 18.0 54.0 0.092 ↓ 362.1

Deck Over -Ref.Space 1 92 29.9 - - - ↓ - - - 18.0 54.0 0.940 ↑ 1517.7

Deck Over -Interior Cargo Space

1 92 88.0 - - - ↓ - - - 18.0 54.0 0.940 ↑ 4466.7

Transmission Sub Total - - - 14514

Lights (L.C=7) 7 117.9 825.3 0 825.3

Equipment 8 0.0 0 0.0

Personnel (1) 9 265 335 600.0

Project Title:

1277 - RANGER IV

Proj. no:

Subject:

2nd DECK - HEATING & COOLING LOAD CALCULATIONS

Date:

06-18-24

SPACE: OFFICER (FR 35 to 40- STBD) COOLING SEASON: T = HEATING SEASON: T =

Adjacent compartment Load key

Insul key

A T O ∆T U

Q s Q L Q T T O ∆T U

QW

Page45

Sensible Heat Sub Total 1090 14514

Latent Heat Sub Total 335

Total Heat (Btu/hr) 1425 14514

Total Heat (kW) 0.4 4.3

SHF= 0.765

Heat Load Total QW = 14514 BTU/hr = 4.3 kW

Required Boiler Capacity = 4.3 kW

Boiler requirement

Page46

Aft Bhd-Crew Galley 5 65 63.4 - - - ↔ - - - 18.0 54.0 0.200 ↔ 684.5

Side Shell(S)-Solar 3 63 97.5 - - - ↔ - - - 17.6 54.4 0.900 ↔ 4773.6

Aft Bhd - Officer 5 65 106.5 - - - ↔ - - - 18.0 54.0 0.200 ↔ 1150.2

Inboard Bhd-P.Way 6 5 57.0 - - - ↔ - - - 20.0 52.0 0.354 ↔ 1049.3

Inboard Bhd-P.Way 6 5 33.0 - - - ↔ - - - 20.0 52.0 0.354 ↔ 607.5

Inboard Bhd-P.Way 6 5 39.0 - - - ↔ - - - 20.0 52.0 0.354 ↔ 717.9

Deck Under-battery room 2 92 120.6 - - - ↑ - - - 18.0 54.0 0.092 ↓ 599.3

Deck Over -Freezer 1 92 33.3 - - - ↓ - - - 18.0 54.0 0.940 ↑ 1690.3

Deck Over -Cargo Space 1 92 83.7 - - - ↓ - - - 18.0 54.0 0.940 ↑ 4247.1

Transmission Sub Total - - - 15520

Lights (L.C=7) 7 117.0 818.8 0 818.8

Equipment 8 0.0 0 0.0

Personnel (1) 9 265 335 600.0

Sensible Heat Sub Total 1084 15520

Latent Heat Sub Total 335

Project Title:

1277 - RANGER IV

Proj. no:

Subject:

2nd DECK - HEATING & COOLING LOAD CALCULATIONS

Date:

06-18-24

SPACE: CREW DINING (FR 28.5 to 35- STBD) COOLING SEASON: T = HEATING SEASON: T =

Q T T O ∆T U

QWAdjacent compartment Load key

Insul key

A T O ∆T U

Q s Q L

Page47

Total Heat (Btu/hr) 1419 15520

Total Heat (kW) 0.4 4.5

SHF= 0.764

Heat Load Total QW = 15520 BTU/hr = 4.5 kW

Required Boiler Capacity = 4.5 kW

Boiler requirement

Page48

Aft Bhd-P.way 5 5 32.3 - - - ↔ - - - 20.0 52.0 0.354 ↔ 593.7

Aft Bhd-Crew galley 5 65 54.8 - - - ↔ - - - 18 54.0 0.200 ↔ 591.3

Inboard Bhd-T/S 6 5 15.9 - - - ↔ - - - 18.5 53.5 0.354 ↔ 301.1

Fwd Bhd-T/S 4 5 56.3 - - - ↔ - - - 18.5 53.5 0.354 ↔ 1065.3

Inboard Bhd-P.way 6 5 39.0 - - - ↔ - - - 20 52.0 0.354 ↔ 717.9

Fwd Bhd-State Room 4 65 18.8 - - - ↔ - - - 18 54.0 0.200 ↔ 202.5

Side Shell(P)-Solar 3 63 60.1 - - - ↔ - - - 17.6 54.4 0.900 ↔ 2944.0

Deck Under- Un Assigned storage 2 92 65.3 - - - ↑ - - - 18 54.0 0.092 ↓ 324.4

Deck Over -P.Proce.area 1 92 65.3 - - - ↓ - - - 18 54.0 0.940 ↑ 3314.6

Solar 3

GLAS

S

2.1 - - - ↔ - - - 20 52.0 - ↔ 0.0

Transmission Sub Total - - - 10055

Lights (L.C=7) 7 65.3 457.1 0 457.1

Equipment 8 0.0 0 0.0

Personnel (2) 9 530 670 1200.0

Sensible Heat Sub Total 987 10055

Latent Heat Sub Total 670

Project Title:

1277 - RANGER IV

Proj. no:

Subject:

2nd DECK - HEATING & COOLING LOAD CALCULATIONS

Date:

06-18-24

SPACE: STATE ROOM (FR 19 to 23-STBD ) COOLING SEASON: T = HEATING SEASON: T =

Q T T O ∆T U

QWAdjacent compartment Load key

Insul key

A T O ∆T U

Q s Q L

Page49

Total Heat (Btu/hr) 1657 10055

Total Heat (kW) 0.5 2.9

SHF= 0.596

Heat Load Total QW = 10055 BTU/hr = 2.9 kW

Required Boiler Capacity = 2.9 kW

Boiler requirement

Notes: Glass solar Load = 160 Btu/hr/ft² x 2.1 = 336 BTU/HR

Page50

79 °F 72 °F

Aft Bhd- State Room 5 65 18.8 - - - ↔ - - - 18.0 54.0 0.200 ↔ 202.5

Inboard Bhd-T/S 6 5 13.6 - - - ↔ - - - 18.5 53.5 0.354 ↔ 257.6

Inboard Bhd-T/S 6 5 9.4 - - - ↔ - - - 18.5 53.5 0.354 ↔ 178.7

Aft Bhd-T/S 5 5 52.5 - - - ↔ - - - 18.5 53.5 0.354 ↔ 994.3

Inboard Bhd-P.way 6 5 44.3 - - - ↔ - - - 20.0 52.0 0.354 ↔ 814.6

Fwd Bhd-Bosuns Stores 4 65 57.0 - - - ↔ - - - 18.0 54.0 0.200 ↔ 615.6

Side Shell(P)-Solar 3 63 70.63 - - - ↔ - - - 17.6 54.4 0.900 ↔ 3458.1

Solar-port 3

GLAS

S

2.1 - - - ↔ - - - 17.6 54.4 - ↔ 0.0

Deck Under- Un Assigned storage

2 92 56.0 - - - ↑ - - - 18.0 54.0 0.092 ↓ 278.0

Deck Over -P.Proce.area 1 92 56.0 - - - ↓ - - - 18.0 54.0 0.94 ↑ 2840.0

Transmission Sub Total - - - 9639

Lights (L.C=7) 7 56.0 391.7 0 391.7 0

Equipment 8 0.0 0 0.0 0

Personnel (2) 9 530 670 1200.0 0

Project Title:

1277 - RANGER IV

Proj. no:

Subject:

2nd DECK - HEATING & COOLING LOAD CALCULATIONS

Date:

06-18-24

QW

SPACE: STATE ROOM (FR 14 to 19-STBD ) COOLING SEASON: T = HEATING SEASON: T =

Adjacent compartment Load key

Insul key

A T O ∆T U

Q s Q L Q T T O ∆T U

Page51

Sensible Heat Sub Total 922 0

Latent Heat Sub Total 670 0

Total Heat (Btu/hr) 1592 9639

Total Heat (kW) 0 2.8

SHF= 0.579

Heat Load Total QW = 9639 BTU/hr = 2.8 kW

Required Boiler Capacity = 2.8 kW

Boiler requirement

Notes: Glass solar Load = 160 Btu/hr/ft² x 2.12 =339.2 BTU/HR

Page52

Fwd Bhd-Passenger Processing area

4 5 18.1 - - - ↔ - - - 18.0 54.0 0.200 ↔ 195.0

Inboard BHD (FWD)-head room 6 65 55.0 - - - ↔ - - - 18.5 53.5 0.354 ↔ 1042.4

Fwd Bhd-Head room 4 65 63.6 - - - ↔ - - - 18.5 53.5 0.354 ↔ 1205.3

Fwd Bhd-P.way 4 5 67.9 - - - ↔ - - - 20.0 52.0 0.354 ↔ 1250.6

Inboard BHD-P.way 6 5 51.6 - - - ↔ - - - 20.0 52.0 0.354 ↔ 949.9

Inboard BHD (FWD)-Freezer 6 65 67.9 - - - ↔ - - - 17.6 54.4 0.200 ↔ 739.2

Inboard BHD-Freezer 6 65 300.1 - - - ↔ - - - 17.6 54.4 0.200 ↔ 3265.5

Aft BHD-Freezer 5 65 67.9 - - - ↔ - - - 17.6 54.4 0.200 ↔ 739.2

Inboard BHD-Freezer 6 65 300.1 - - - ↔ - - - 17.6 54.4 0.200 ↔ 3265.5

Inboard BHD-Crew Ladderwell 6 5 147.1 - - - ↔ - - - 20.0 52.0 0.354 ↔ 2707.1

Fwd Bhd-Passenger Processing area

4 65 27.5 - - - ↔ - - - 18.0 54.0 0.200 ↔ 297.2

Inboard BHD-File cabinet 6 65 3.4 - - - ↔ - - - 18.0 54.0 0.200 ↔ 37.2

Fwd Bhd-File cabinet 4 65 56.8 - - - ↔ - - - 18.0 54.0 0.200 ↔ 613.0

Side shell (p)-solar 3 63 540.9 - - - ↔ - - - 17.6 54.4 0.900 ↔ 26484.4

Side shell (s)-solar 3 63 511.7 - - - ↔ - - - 17.6 54.4 0.900 ↔ 25052.8

Deck over-solar 1 63 1517.8 - - - ↑ - - - 17.6 54.4 0.900 ↓ 74311.5

Deck under-Inner bottom 2 63 1517.8 - - - ↓ - - - 17.6 54.4 0.092 ↑ 7596.3 solar (P) 3 Glass 100.1 - - - ↔ - - - 17.6 54.4 - ↔ 0.0

Solar (S) 3 Glass 100.1 - - - ↔ - - - 17.6 54.4 - ↔ 0.0

Transmission Sub Total - - - 149752

Lights (L.C=7) 1517.8 10625 0 10624.6

U Q s Q L Q T T O

Project Title:

1277 - RANGER IV

Proj. no:

Subject:

MAIN DECK - HEATING CALCULATIONS

Date:

06-18-24

COOLING SEASON: T =

HEATING SEASON:

T =

SPACE: CARGO SPACES

U QW∆TAdjacent compartment

Load key

Insul key

A T O ∆T

Page53

Equipment 0.0 0 0.0

Personnel (2) 530 670 1200.0

Sensible Heat Sub Total 11155 149752

Latent Heat Sub Total 670

Total Heat (Btu/hr) 11825 149752

Total Heat (kW) 3.5 43.9

SHF= 0.943

Heat Load Total QW = 149752 BTU/hr = 43.9 kW

Required Heater Capacity = 43.9 kW

Notes: Glass solar Load = 160 Btu/hr/ft² x 0 =0 BTU/HR

Boiler requirement

Page54

Fwd Bhd- Solar 4 63 151.4 - - - ↔ - - - 17.6 54.4 0.900 ↔ 7410.6

Fwd Bhd (p)-Solar 4 63 95.4 - - - ↔ - - - 17.6 54.4 0.900 ↔ 4670.4

Fwd Bhd (S)-Solar 4 63 108.3 - - - ↔ - - - 17.6 54.4 0.900 ↔ 5303.6

Shell(p)-Solar 3 63 44.7 - - - ↔ - - - 17.6 54.4 0.900 ↔ 2189.5

Shell (S)-Solar 3 63 44.7 - - - ↔ - - - 17.6 54.4 0.900 ↔ 2189.5

Inboard Bhd(AFT)-Cargo space 6 65 2.6 - - - ↔ - - - 18.0 54.0 0.200 ↔ 27.9

In board(AFT) -T/s 6 5 67.1 - - - ↔ - - - 18.5 53.5 0.354 ↔ 1270.4

In board(P) -T/s 6 5 57.6 - - - ↔ - - - 18.5 53.5 0.354 ↔ 1091.3

Inboard Bhd(P)-Cargo space 6 65 27.5 - - - ↔ - - - 18.0 54.0 0.200 ↔ 297.2

Inboard Bhd(AFT)-Cargo space 6 65 64.7 - - - ↔ - - - 18.0 54.0 0.200 ↔ 698.9

Inboard Bhd(S)-Crew ladderwell 6 5 86.0 - - - ↔ - - - 20.0 52.0 0.354 ↔ 1583.1

Inboard Bhd(AFT)-Crew ladderwell

6 5 35.3 - - - ↔ - - - 20.0 52.0 0.354 ↔ 649.1

Inboard Bhd(s)-Passageway 6 5 12.9 - - - ↔ - - - 20.0 52.0 0.354 ↔ 237.5

Inboard Bhd(aft)-Passageway 6 5 31.8 - - - ↔ - - - 18.0 54.0 0.354 ↔ 608.3

Inboard Bhd(aft)-files cabinet room

6 65 53.3 - - - ↔ - - - 18.0 54.0 0.200 ↔ 575.9

Deck Under- state room 2 92 374.4 - - - ↑ - - - 18.0 54.0 0.092 ↓ 1859.8

Deck Under- P way 2 92 88.6 - - - ↑ - - - 18.5 53.5 0.092 ↓ 436.2

Deck Over -FWD seating 1 92 520.9 - - - ↓ - - - 18.0 54.0 0.940 ↑ 26440.9 solar (P) 3 Glass 25.9 - - - ↔ - - - 17.6 54.4 - ↔ 0.0

Solar (S) 3 Glass 12.9 - - - ↔ - - - 17.6 54.4 - ↔ 0.0

Boarding gate Glass (P) 3 Glass 3.6 - - - ↔ - - - 17.6 54.4 - ↔ 0.0

Boarding gate Glass (S) 3 Glass 3.6 - - - ↔ - - - 17.6 54.4 - ↔ 0.0

- - - 57540

U

QW

Project Title:

1277 - RANGER IV

Subject:

MAIN DECK - HEATING CALCULATIONS

Date:

06-18-24

Proj. no:

SPACE: PASSENGER PROCESSING AREA COOLING SEASON: T =

HEATING SEASON:

T =

Adjacent compartment Load key

Insul key

A Q T T O ∆TT O ∆T

U

Q s Q L

Page55

Lights (L.C=7) 7 88.6 576.0 0 576.0

Equipment (Coffee maker, coffee warmer, Ice cube maker, refrigerator (up to 20cu.ft))

8 9330.0 0 9330.0

Personnel (8) 9 2400 2400 4800.0

Sensible Heat Sub Total 12306 57540

Latent Heat Sub Total 2400

Total Heat (Btu/hr) 14706 57540

Total Heat (kW) 4.3 16.9

Heat Load Total QW = 57540 BTU/hr = 16.9 kW

Required Heater Capacity = 16.9 kW

Notes: Glass solar Load = 160 Btu/hr/ft² x 46 =7367 BTU/HR Boiler requirement

Page56

R.R.P CONSULTING ENGINEERS, L.L.C

hvac- VENTILATION CALCULATIONS

REPORT

(RANGER IV)

PROJECT NO. 1277

Rev. 0

06-18-2024

This report, drawing, design, concept, and specification are the intellectual property of Loch

Harbour Group, LLC, and/or R.R.P CONSULTING ENGINEERS, L.L.C and contain information which is proprietary. The rights defined below are reserved by Loch Harbour Group, LLC, and/or R.R.P

CONSULTING ENGINEERS, L.L.C. The United States Government’s rights to use, modify, reproduce, release, perform, display, or disclose these technical data are unrestricted. Any reproduction of technical data or portions thereof marked with this legend must also reproduce the markings.

Page57

Proj. no:

Date:

06-18-24

BOW THRUSTER ROOM FR 6 TO 14

BOSUN'S STORE FR 6 TO 14

AUX MACHINERY ROOM FWD

(UNASSIGNED STORAGE),

FR 14 TO 23

PASSENGER PROCESSING AREA AND

CARGO SPACES

FR 14 TO 55

BATTERY ROOM FR 23 TO 35 1300 1300

AUX MACHINERY ROOM AFT FR 49 TO 55 2500 2500

ENGINE ROOM FR 55 TO 71 2 X 15000 2 X 15000

ENGINEERS WORKSHOP &

ENGINE CONTROL ROOM

FR 71 TO 79 (P&S) 750 750

CREW ACCOMMODATIONS SPACES &

CL GR LKR

FR 52 TO 54.5 (S) 1250 1250

PILOT HOUSE, IT SPACES, OFFICER

STATE ROOM, LOUNGE SEATING

FR 13 TO 47 2100 2100

LOUNGE SEATING FR 11 TO 55 2100 2100

REMARKS

Project Title:

1277 - RANGER IV

Subject:

DECK WISE - HEATING & AIR CONDITIONING ANALYSIS

DECK SPACE NAME

01 LEVEL

FRAME

Supply Fan capacity

CFM

Exhaust Fan capacity

CFM

2nd DECK

MAIN DECK

TANK PLAN

1000 1000

TANK PLAN

TANK PLAN

500 500

TANK PLAN

2ND DECK

PILOT HOUSE DECK

Page58

1.0 EXTRACTS FROM GENERAL ARRANGEMENT

Aux Machinery Room Length, L 40 ft

Aux Machinery Room Breadth, B 30.5 ft

Aux Machinery Room Depth, D 8.00 ft (Appendix-1)

2.0 CALCULATE MINIMUM SUPPLY FAN CAPACITY

2.1 Minimum Supply Fan Capacity based on Air Changes

Minimum Required air changes for Aux Machinery Room 15 Air changes/hr (Appendix-2)

The quantity of air required for Aux Machinery Room #1, QA = AMRL*AMRB*AMRD*Air changes

= 2440 cfm

2.2 Minimum Supply Fan Capacity based on Evacuation of Heat

2.2.2 Air flow for Evacuation of Heat, Q H

Heat from electrical apparatus, he = 113.74 BTU/min (Approx)

Project Title:

1277 - RANGER IV

Proj. no:

Subject:

VENTILATION CALCULATIONS -

AUX MACH ROOM AFT (Tank Plan)

Date:

06-17-24

QH =

he cfm ρ x C x DT

(As per SNAME Technical and Research Bulletin 4-16 (Table 2-1) Minimum of one air change per 4 minute required for Elev. & Mach. Room)

Page59

Density of air , ρ = 0.0722 lbm /cu.ft

Specific heat of Air , C = 0.24 BTU/lbm- F

Temperature difference, DT = 39.5 O F

Outside Temperature, TO = 73.5 O F

Aux Machinery Room Temperature, TE = 113 O F

Air flow for Evacuation of Heat, QH = 166.2 cfm

a) Where full details are available, heat emission can be taken as sum of individual items b)

3.0 SUPPLY AIR CALCULATION

3.1 Total Intake Air Quantity = 2440 cfm

3.2 Supply fan capacity calculation

Number of fans to be provided = 1

Minimum Capacity of Each Supply Fan = 2500 cfm @ 1" Static Pressure

For conventional ships , heat emission is taken as 20% of rated power of electrical apparatus and lighting that are in use at sea

Note: Heat emission from electrical installations may be assumed in one of the following methods in the decreasing order of preference, Page60

4.0 EXHAUST AIR CALCULATION

4.1 Total Exhaust Air Quantity (108% of mechanical supply)

= 2440 cfm

Total Exhaust Air Quantity 2635.2

4.2 Exhaust fan capacity calculation

Number of fans to be provided = 1

Minimum Capacity of Each Exhaust Fan = 2500 cfm @ 1" Static Pressure

5.0 SUPPLY AIR CLEAR OPENING AREA SIZING

Clear opening area required for supply air = 1.39 sq.ft

Louver cut out size = 2.31 sq.ft

(Assumed 40 % of cutout occupied by louvers and 60% available for clear opening area)

6.0 EXHAUST AIR CLEAR OPENING AREA SIZING

Clear opening area required for exhaust air = 1.39 sq.ft

Louver cut out size = 2.31 sq.ft

(Assumed 40 % of cutout occupied by louvers and 60% available for clear opening area)

Ref:

Appendix-1: VESSEL SPECIFICATION.

Appendix-2: SNAME TECHNICAL AND RESEARCH BULLETIN 4-16.

Total Supply air

Page61

Battery room Length, L 24 ft

Battery room Breadth, B 24.8 ft

Battery room Depth, D 8.30 ft (Appendix-1)

2.0 CALCULATE MINIMUM SUPPLY FAN CAPACITY

2.1 Minimum Supply Fan Capacity based on Air Changes

Minimum Required air changes for Battery Room 15 Air changes/hr (Appendix-2)

The quantity of air required for Battery Room, QA = SSRL*SSRB*SSRD*Air changes

= 1235 cfm

2.2 Minimum Supply Fan Capacity based on Evacuation of Heat

2.2.2 Air flow for Evacuation of Heat, Q H

Heat from electrical apparatus, he = 90.99 BTU/min (Estimated)

Density of air , ρ = 0.0722 lbm /cu.ft

(As per SNAME Technical and Research Bulletin 4-16 (Table 2-1) Minimum of one air change per 4 minute required for Battery Room)

Project Title:

1277 - RANGER IV

Proj. no:

Subject:

VENTILATION CALCULATIONS - BATTERY ROOM (Tank Plan) Date:

06-18-24

QH =

he cfm ρ x C x DT

Page62

Specific heat of Air , C = 0.24 BTU/lbm- F

Temperature difference, DT = 27 O F

Outside Temperature, TO = 86 O F (Estimated)

Battery Room Temperature, TE = 113 O F (Estimated)

Air flow for Evacuation of Heat, QH = 194.51 cfm

a) Where full details are available, heat emission can be taken as sum of individual items b)

3.0 SUPPLY AIR CALCULATION

3.1 Total Intake Air Quantity = 1235 cfm

3.2 Supply fan capacity calculation

Number of fans to be provided = 1 (Estimated)

Minimum Capacity of Each Supply Fan = 1300 cfm @ 1" Static Pressure

4.0 EXHAUST AIR CALCULATION

4.1 Total Exhaust Air Quantity (108% of mechanical supply)

Total Supply air = 1235 cfm

Total Exhaust Air Quantity = 1333.8 cfm

Note: Heat emission from electrical installations may be assumed in one of the following methods in the decreasing order of preference, For conventional ships , heat emission is taken as 20% of rated power of electrical apparatus and lighting that are in use at sea

Page63

4.2 Exhaust fan capacity calculation

Number of fans to be provided = 1 (Estimated)

Minimum Capacity of Each Exhaust Fan = 1300 cfm @ 1" Static Pressure

5.0 SUPPLY AIR CLEAR OPENING AREA SIZING

Clear opening area required for supply air = 0.72 sq.ft

Louver cut out size = 1.20 sq.ft

(Assumed 40 % of cutout occupied by louvers and 60% available for clear opening area)

6.0 EXHAUST AIR CLEAR OPENING AREA SIZING

Clear opening area required for exhaust air = 0.72 sq.ft

Louver cut out size = 1.20 sq.ft

(Assumed 40 % of cutout occupied by louvers and 60% available for clear opening area)

Ref:

Appendix-1: VESSEL SPECIFICATION.

Appendix-2: SNAME TECHNICAL AND RESEARCH BULLETIN 4-16.

Page64

AUX MACH Room Length, L 18 ft Tank Plan

AUX MACH Room Breadth, B 16.83 ft Tank Plan

AUX MACH Room Depth, D 8.00 ft Tank Plan (Appendix-1)

Passenger Processing Area Room Length, L 18 ft Main Deck

Passenger Processing Area Room Breadth, B 26.50 ft Main Deck

Passenger Processing Area Room Depth, D 8.50 ft Main Deck

Cargo spaces (walkway) Length, L 61 ft Main Deck

Cargo spaces (walkway) Breadth, B 6.60 ft Main Deck

Cargo spaces (walkway) Depth, D 8.50 ft Main Deck

2.0 CALCULATE MINIMUM SUPPLY FAN CAPACITY

2.1 Minimum Supply Fan Capacity based on Air Changes

Minimum Required air changes for rooms 6 Air changes/hr (Appendix-2)

The quantity of air required for Room, QA = BTRL*BTRB*BTRD*Air changes

= 989.94 cfm

Project Title:

1277 - RANGER IV

Proj. no:

Subject:

VENTILATION CALCULATIONS -

AUX MACHINERY ROOM FWD, PASSENGER PROCESSING AREA

& CARGO SPACES

Date:

06-18-24

(As per SNAME Technical and Research Bulletin 4-16 (Table 2-1) Minimum of one air change per 10 minute required for Bonded stores)

Page65

2.2 Minimum Supply Fan Capacity based on Evacuation of Heat

2.2.2 Air flow for Evacuation of Heat, Q H

Heat from electrical apparatus, he = 176.30 Btu/min (Estimated)

Density of air , ρ = 0.0722 lbm /cu.ft

Specific heat of Air , C = 0.24 BTU/lbm- F

Temperature difference, DT = 27 O F

Outside Temperature, TO = 86 O F (Estimated)

Room Temperature, TE = 113 O F (Estimated)

Air flow for Evacuation of Heat, QH = 376.87 cfm

a) Where full details are available, heat emission can be taken as sum of individual items b)

3.0 SUPPLY AIR CALCULATION

3.1 Total Intake Air Quantity = 989.94 cfm

For conventional ships , heat emission is taken as 20% of rated power of electrical apparatus and lighting that are in use at sea

QH =

he cfm ρ x C x DT

Note: Heat emission from electrical installations may be assumed in one of the following methods in the decreasing order of preference, Page66

3.2 Supply fan capacity calculation

Minimum Capacity of Each Supply Fan = 1000 cfm @ 1" Static Pressure

4.0 EXHAUST AIR CALCULATION

4.1 Total Exhaust Air Quantity (108% of mechanical supply)

Total Supply air = 989.94 cfm

Total Exhaust Air Quantity = 1069.1 cfm

4.2 Exhaust fan capacity calculation

Number of fans to be provided = 1 (Estimated)

Minimum Capacity of Each Exhaust Fan = 1000 cfm @ 1" Static Pressure

5.0 SUPPLY AIR CLEAR OPENING AREA SIZING

Clear opening area required for supply air = 0.56 sq.ft

Louver cut out size = 0.93 sq.ft

(Assumed 40 % of cutout occupied by louvers and 60% available for clear opening area)

6.0 EXHAUST AIR CLEAR OPENING AREA SIZING

Clear opening area required for exhaust air = 0.56 sq.ft

Louver cut out size = 0.93 sq.ft

(Assumed 40 % of cutout occupied by louvers and 60% available for clear opening area)

Ref:

Appendix-1: VESSEL SPECIFICATION.

Appendix-2: SNAME TECHNICAL AND RESEARCH BULLETIN 4-16.

Page67

Bow Thruster Room Length, L 16 ft

Bow Thruster Room Breadth, B 7.20 ft

Bow Thruster Room Depth, D 8.00 ft (Appendix-1)

BOSUN'S STORE Room Length, L 16 ft

BOSUN'S STORE Room Breadth, B 13.00 ft

BOSUN'S STORE Room Depth, D 7.60 ft

2.0 CALCULATE MINIMUM SUPPLY FAN CAPACITY

2.1 Minimum Supply Fan Capacity based on Air Changes

Minimum Required air changes for Bow Thruster Room 10 Air changes/hr (Appendix-2)

The quantity of air required for Bow Thruster Room, QA = BTRL*BTRB*BTRD*Air changes

= 417.07 cfm

2.2 Minimum Supply Fan Capacity based on Evacuation of Heat

2.2.2 Air flow for Evacuation of Heat, Q H

(As per SNAME Technical and Research Bulletin 4-16 (Table 2-1) Minimum of one air change per 6 minute required for Bow Thruster Room)

Project Title:

1277 - RANGER IV

Proj. no:

Subject:

VENTILATION CALCULATIONS -

BOW THRUSTER ROOM & BOSUN'S STORE ROOM

Date:

06-18-24

2ND DECK

TANK PLAN

TANK PLAN

TANK PLAN

2ND DECK

2ND DECK

Page68

Heat from electrical apparatus, he = 176.30 Btu/min (Approx)

Specific heat of Air , C = 0.24 BTU/lbm- F

Temperature difference, DT = 27 O F

Outside Temperature, TO = 86 O F (Estimated)

Bow Thruster Room Temperature, TE = 113 O F (Estimated)

Air flow for Evacuation of Heat, QH = 376.87 cfm

a) Where full details are available, heat emission can be taken as sum of individual items b)

3.0 SUPPLY AIR CALCULATION

3.1 Total Intake Air Quantity = 417.07 cfm

3.2 Supply fan capacity calculation

Number of fans to be provided = 1 (Estimated)

Minimum Capacity of Each Supply Fan = 500 cfm @ 1" Static Pressure

For conventional ships , heat emission is taken as 20% of rated power of electrical apparatus and lighting that are in use at sea

QH =

he cfm ρ x C x DT

Note: Heat emission from electrical installations may be assumed in one of the following methods in the decreasing order of preference, Page69

4.1 Total Exhaust Air Quantity (108% of mechanical supply)

Total Supply air = 417.07 cfm

Total Exhaust Air Quantity = 450.43 cfm

4.2 Exhaust fan capacity calculation

Number of fans to be provided = 1 (Estimated)

Minimum Capacity of Each Exhaust Fan = 500 cfm @ 1" Static Pressure

5.0 SUPPLY AIR CLEAR OPENING AREA SIZING

Clear opening area required for supply air = 0.28 sq.ft

Louver cut out size = 0.46 sq.ft

(Assumed 40 % of cutout occupied by louvers and 60% available for clear opening area)

6.0 EXHAUST AIR CLEAR OPENING AREA SIZING

Clear opening area required for exhaust air = 0.28 sq.ft

Louver cut out size = 0.46…