This document is a DI-006 Master Equipment List for the Preliminary/Contract Design of Motor Vessel Ranger IV under Contract 6913G623P800007, submitted by Loch Harbour Group. The comprehensive equipment list details critical and non-critical equipment for the vessel, including propulsion systems, electrical components, mechanical systems, and auxiliary equipment. Each item is categorized with specifications such as manufacturer, model, quantity, weight, capacity, electrical requirements, and estimated lead time, with all equipment requiring approval from ABS/USCG.

Key equipment includes main engines (Caterpillar CAT 3512E), diesel generator sets, reduction gear boxes, propulsion control systems, steering gear, anchoring equipment, rescue boats, environmental systems (ballast water treatment, sewage/grey water pumps), and various critical support systems like starting air compressors, hydraulic power units, and electrical switchboards. The equipment list indicates most items have estimated lead times between 4-20 weeks and are in the selection/design phase, with a revision date of 04/07/2025 and a note that brand name information has been removed in the latest revision.

View the file

Other files

File Type Posted
Sol_140PS125R0009_Amd_0004.pdf PDF
140PS125R0009_Amendment_004_Solicitation_Question_Response_0004.pdf PDF
140PS125R0009_Amendment_004_R4_ReeferSpaceConflict_0004.pdf PDF
DI-035_REV_8_BIDDING_SPECIFICATIONS_0004.pdf PDF
140PS125R0009_ISRO_Ranger_IV_Clause_Section__Amendment_Three_0003.pdf PDF
Sol_140PS125R0009_Amd_0003.pdf PDF
DI-004_REV5_DESIGN_SUMMARY_REPORT_0003.pdf PDF
140PS125R0009_Amendment_003_Solicitation_Question_Response_0003.pdf PDF
140PS125R0009_Amendment_002_Solicitation_Questions_Response_0002.pdf PDF
DI-035_REV_7_BIDDING_SPECIFICATIONS_0002.pdf PDF
Sol_140PS125R0009_Amd_0002.pdf PDF
Sol_140PS125R0009_Amd_0001.pdf PDF
DI-026-01_REV_6_GENERAL_ARRANGEMENT.pdf PDF
DI-019_REV_4_INTACT_AND_DAMAGE_STABILITY_REPORT_Pgs_601-1209.pdf PDF
J-9_Brand_Name_Justification_Ranger_IV_Honda.pdf PDF
DI-027-05_REV_1_AUTOMATION_CONTROL_AND_MONITORING_SYSTEM_REPORT.pdf PDF
DI-026-16_REV_7_ANCHORING_AND_MOORING_DRAWING.pdf PDF
DI-013_REV_3_SPEED_AND_POWER_REPORT.pdf PDF
DI-026-17_REV_0_STRUCTURAL_FIRE_PROTECTION_GUIDANCE_DRAWING.pdf PDF
J-4_Delivery_and_Acceptance_Certificate.pdf PDF
DI-017_REV_2_AIRBORNE_NOISE_REPORT.pdf PDF
J-8_Small_Business_Subcontracting_Plan.docx DOCX document
DI-026-12_REV_4_PILOT_HOUSE-CHART_AREA_ARRANGEMENT.pdf PDF
DI-034_REV_6_HVAC_SYSTEM_REPORT.pdf PDF
DI-030_REV_5_ELECTRIC_POWER_LOAD_ANALYSIS.pdf PDF
DI-035_REV_6_BIDDING_SPECIFICATIONS.pdf PDF
DI-015_REV_2_MANEUVERING_PERFORMANCE_REPORT.pdf PDF
DI-029_REV_2_STACK_GAS_FLOW_ANALYSIS_REPORT.pdf PDF
DI-026-07_REV_1_SUPERSTRUCTURE_DRAWING-Published.pdf PDF
DI-011_REV_3_HULL_LINES_DRAWING.pdf PDF
DI-026-03_REV_2_MIDSHIP_SECTION_DRAWING-Published.pdf PDF
DI-026-04_REV_2_TYPICAL_SECTION_DRAWING-Published.pdf PDF
DI-023_REV_2_MODEL_TEST_REPORT.pdf PDF
DI-026-08_REV_3_MAST_AND_FLAGSTAFF_DRAWING.pdf PDF
DI-032_REV_2_PRELIMINARY_FAULT_CURRENT_ANALYSIS_REPORT.pdf PDF
DI-010_REV_1_ABS_ICE_CLASS_ANALYSIS.pdf PDF
DI-020_REV_2_WEIGHT_CONTROL_PLAN.pdf PDF
DI-026-13_REV_6_MACHINERY_ARRANGEMENT.pdf PDF
DI-012_REV_3_APPENDAGE_AND_CONTROL_SURFACE_DRAWING.pdf PDF
J-7_Past_Performance_Questionnaire.docx DOCX document
DI-026-07_REV_2_SUPERSTRUCTURE_DRAWING.pdf PDF
DI-004_REV_4_DESIGN_SUMMARY_REPORT.pdf PDF
J-6_Proposed_Equals_and_Salient_Characteristics.docx DOCX document
DI-007_REV_2_REQUIREMENTS_VERIFICATION_MATRIX.pdf PDF
DI-026-06_REV_3_DECK_AND_PLATFORM_DRAWING.pdf PDF
DI-031_REV_2_ELECTRICAL_SYSTEM_ONE_LINE_DIAGRAM.pdf PDF
J-5_Completion_and_Delivery_Certificate.pdf PDF
DI-014_REV_2_SEAKEEPING_PREFORMANCE_REPORT.pdf PDF
DI-026-15_REV_4_HANDLING_SYSTEMS_DRAWING.pdf PDF
J-1_List_of_Deliverables.pdf PDF
Show 40 more

Latest 50 of 68 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DI-006 Master Equipment List Contract 6913G623P800007

Preliminary/Contract Design of Motor Vessel Ranger IV

Submitted by:

Loch Harbour Group

3060 Williams Drive, Suite 510 Fairfax, Virginia 22031

Contract No.: 6913G623P800007

CLIN-0010

DI-006 MASTER EQUIPMENT LIST

Revision 3

Date: 0 4/07/2025

DISTRIBUTION Statement C: Distribution authorized to the U.S. Government agencies and their Contractors. Other request for this document shall be referred to US Department of Transportation Volpe Center.

The Government is granted unlimited rights unless distributed to recipient directly by the U.S. Government. This drawing, design, concept, and specification are the intellectual property of TAI Engineers LLC. and contain information which is proprietary to TAI Engineers LLC. This information is furnished with the express understanding that the recipient recognizes the proprietary nature of this information and will not copy or alter it in any manner, nor transfer it, use it for manufacture, sell it, or use it in any way to detriment of TAI Engineers LLC. without the express written consent of this firm. The recipient further agrees not to disclose the information herein to any other party except for the purpose contracted for with TAI Engineers LLC.

REVISION DESCRIPTION DATE AUTHOR

0 Initial submission 04-29-2024 TAI 1 Updated per design development 06-19-2024 TAI 2 Updated per design development 07-01-2024 TAI 3 Removed brand name information 04-07-2025 VOLPE

REVISION TABLE

ESWBS NO MANUFACTURER MODEL # / TYPE CRITICAL/NON-

CRITICAL

DESIGNATION

DESCRIPTION/NOMENCLATURE QTY DIMENSION WEIGHT

(LBS)

CAPACITY /

RATING

ELECTRICAL

POWER

LOAD

SERVICE

REQUIREMENTS

REGULATORY

BODY

APPROVAL

ESTIMATED

LEAD TIME

202 EMERSON AVENTICS SERIES

MAREX OS II/III

CONTROL SYSTEM

CRITICAL PROPULSION CONTROL SYSTEM

WITH TYPE 230 CONTROL HEADS

1 Determined in selection/design phase

ABS/USCG 8-20 weeks

233 CATERPILLAR OR

EQUAL

CAT 3512E Critical MAIN ENGINE 2 15000 1502 BHP @

1600 RPM

--- Determined in selection/design phase

ABS/USCG 8-20 weeks

233 Critical DIESEL GENERATOR SET 2 3000 RESERVED;

ESTIMATED

200KW

3 PH, 480V

AC, 60 HZ

Determined in selection/design phase

ABS/USCG 8-20 weeks

233 Reintjes LAF 675 Critical REDUCTION GEAR BOX 2 2200 --- --- Determined in selection/design phase

ABS/USCG 6-16 weeks

233 VEM OR EQUAL IE4-W61R Critical REDUCTION GEAR BOX MOTOR 2 315 KW 3 PH, 400/690V

AC, 50 HZ

Determined in selection/design phase

ABS/USCG 6-16 weeks

233 Critical PROPELLER 2 --- Determined in selection/design phase

ABS/USCG 12-24 weeks

233 Critical PROPULSION SHAFTING 2 --- --- Determined in selection/design phase

ABS/USCG 12-24 weeks

233 Critical CPP SYSTEM 2 --- --- Determined in selection/design phase

ABS/USCG 12-24 weeks

256 Critical SEAWATER COOLING PUMP (PCP)

(STACKED)

2 8 GPM @ 15

PSI OR EQUAL

--- Determined in selection/design phase

ABS/USCG 6-12 weeks

256 Critical PRESSURE SET-HYDRO

PNEUMATIC COMPRESSION

TANK

1 1000 62 GAL

DIAPHRAGM

TANKS

--- Determined in selection/design phase

ABS/USCG 6-12 weeks

259 EPA TIER IV

CERTIFIED WITH

MAIN ENGINES

Critical SELECTIVE CATALYTIC

REDUCTION (SCR)

2 --- --- Determined in selection/design phase

ABS/USCG 8-20 weeks

259 SPARK ARRESTING

TYPE

Critical MAIN ENGINE EXHAUST

SILENCER

2 14" PIPE

CONNECTION

--- Determined in selection/design phase

ABS/USCG 6-12 weeks

259 SPARK ARRESTING

TYPE

Critical DIESEL GENERATOR SET EXHAUST

SILENCER

2 6" PIPE

CONNECTION

--- Determined in selection/design phase

ABS/USCG 6-12 weeks

259 Critical DEF AIR COMPRESSOR (STACKED) 2 125 14.27 CFM @

145 PSI

--- Determined in selection/design phase

ABS/USCG 6-12 weeks

DESIGNATION

DESCRIPTION/NOMENCLATURE QTY DIMENSION WEIGHT

(LBS)

CAPACITY /

RATING

ELECTRICAL

POWER

LOAD

SERVICE

REQUIREMENTS

REGULATORY

BODY

APPROVAL

ESTIMATED

LEAD TIME

259 Critical RECEIVER TANK 2 50 12 GAL @ 200

PSI

--- Determined in selection/design phase

ABS/USCG 4-8 weeks

259 Critical REFRIGERATED DRYER 2 100 25 SCFM @

200 PSI

--- Determined in selection/design phase

ABS/USCG 4-8 weeks

259 Critical DEF TRANSFER PUMP (STACKED) 2 180 GPH @

15 PSI

--- Determined in selection/design phase

ABS/USCG 6-12 weeks

259 Critical DEF DOSING CABINET 2 --- --- Determined in selection/design phase

ABS/USCG 6-12 weeks

262 Critical LUBE OIL TRANSFER PUMP 1 500 16 GPM @ 44

PSI

2 HP, 1200

RPM, 3 PH

Determined in selection/design phase

ABS/USCG 6-12 weeks

262 Critical USED OIL TRANSFER PUMP 1 500 16 GPM @ 44

PSI

2 HP, 1200

RPM, 3 PH

Determined in selection/design phase

ABS/USCG 6-12 weeks

304 Critical EMERGENCY DIESEL GENERATOR

SET

1 110 KW 480V Determined in selection/design phase

ABS/USCG 8-20 weeks

307 Critical SHIP SERVICE TRANSFORMER 2 3PH, 75 KVA 480V- 208Y/120V

60 HZ CU

Determined in selection/design phase

ABS/USCG 8-20 weeks

313 CORVUS ENERGY

OR EQUAL

ORCA E1650V1 Critical BATTERY BANK 2 125 543 kW AIR COOLED Determined in selection/design phase

ABS/USCG 4-10 weeks

324 Critical MAIN SWITCHBOARD 1 2500 480V, 3 PH, 60 HZ

--- Determined in selection/design phase

ABS/USCG 8-20 weeks

324 Critical SHIP SERVICE SWITCHBOARD 1 208/120V AC --- Determined in selection/design phase

ABS/USCG 8-20 weeks

324 Critical EMERGENCY SWITCHBOARD 1 1000 480V, 3 PH, 60 HZ

--- Determined in selection/design phase

ABS/USCG 8-20 weeks

324 Critical SWITCHBOARD FOR BATTERIES 1 --- --- Determined in selection/design phase

ABS/USCG 4-10 weeks

511 Non-Critical HEATER (ENGINEERS

WORKSHOP)

1 50 HSB/HC OR

EQUAL

--- Determined in selection/design

ABS/USCG 4-8 weeks

DESIGNATION

DESCRIPTION/NOMENCLATURE QTY DIMENSION WEIGHT

(LBS)

CAPACITY /

RATING

ELECTRICAL

POWER

LOAD

SERVICE

REQUIREMENTS

REGULATORY

BODY

APPROVAL

ESTIMATED

LEAD TIME

511 Non-Critical HEATER (ENGINE CONTROL

ROOM)

1 50 HSB/HC OR

EQUAL

--- Determined in selection/design phase

ABS/USCG 4-8 weeks

511 Non-Critical HEATER (ENGINE ROOM) 2 50 HSB/HC OR

EQUAL

--- Determined in selection/design phase

ABS/USCG 4-8 weeks

511 Non-Critical HEATER (CREW) 6 50 HSB/HC OR

EQUAL

--- Determined in selection/design phase

ABS/USCG 4-8 weeks

511 Non-Critical HEATER (CREW LOUNGE) 1 50 HSB/HC OR

EQUAL

--- Determined in selection/design phase

ABS/USCG 4-8 weeks

511 Non-Critical HEATER (OFFICER) 2 50 HSB/HC OR

EQUAL

--- Determined in selection/design phase

ABS/USCG 4-8 weeks

511 Non-Critical HEATER (STATE ROOM) 5 50 HSB/HC OR

EQUAL

--- Determined in selection/design phase

ABS/USCG 4-8 weeks

511 Non-Critical HEATER (MEETING ROOM) 1 50 HSB/HC OR

EQUAL

--- Determined in selection/design phase

ABS/USCG 4-8 weeks

511 Non-Critical HEATER (CREW DINING) 1 50 HSB/HC OR

EQUAL

--- Determined in selection/design phase

ABS/USCG 4-8 weeks

511 Non-Critical HEATER (PASSENGER

PROCESSING AREA)

2 50 HSB/HC OR

EQUAL

--- Determined in selection/design phase

ABS/USCG 4-8 weeks

512 Critical BATTERY ROOM SUPPLY FAN 1 175 1300 CFM, 1"

STATIC

PRESSURE OR

EQUAL

3 PH, 480 V,

60 HZ

Determined in selection/design phase

ABS/USCG 4-10 weeks

512 Critical BATTERY ROOM EXHAUST FAN 1 135 1300 CFM, 1"

STATIC

PRESSURE OR

EQUAL

3 PH, 480 V,

60 HZ

Determined in selection/design phase

ABS/USCG 4-10 weeks

512 Non-Critical CREW ACCOMMODATIONS

SPACES-2ND DECK SUPPLY FAN

1 135 1250 CFM, 1"

STATIC

PRESSURE OR

EQUAL

3 PH, 480 V,

60 HZ

Determined in selection/design phase

ABS/USCG 4-10 weeks

512 Non-Critical CREW ACCOMMODATIONS

SPACES-2ND DECK EXHAUST FAN

1 135 1250 CFM, 1"

STATIC

PRESSURE OR

EQUAL

3 PH, 480 V,

60 HZ

Determined in selection/design phase

ABS/USCG 4-10 weeks

512 Critical ENGINEERS WORKSHOP &

ENGINE CONTROL ROOM SUPPLY

FAN

1 135 750 CFM, 1"

STATIC

PRESSURE OR

EQUAL

3 PH, 480 V,

60 HZ

Determined in selection/design

ABS/USCG 4-10 weeks

DESIGNATION

DESCRIPTION/NOMENCLATURE QTY DIMENSION WEIGHT

(LBS)

CAPACITY /

RATING

ELECTRICAL

POWER

LOAD

SERVICE

REQUIREMENTS

REGULATORY

BODY

APPROVAL

ESTIMATED

LEAD TIME

512 Critical ENGINEERS WORKSHOP &

ENGINE CONTROL ROOM

EXHAUST FAN

1 135 750 CFM, 1"

STATIC

PRESSURE OR

EQUAL

3 PH, 480 V,

60 HZ

Determined in selection/design phase

ABS/USCG 4-10 weeks

512 Non-Critical MAIN PASSENGER DECK (01

LEVEL) SUPPLY FAN

1 135 2100 CFM, 1"

STATIC

PRESSURE OR

EQUAL

3 PH, 480 V,

60 HZ

Determined in selection/design phase

ABS/USCG 4-10 weeks

512 Non-Critical MAIN PASSENGER DECK (01

LEVEL) EXHAUST FAN

1 135 2100 CFM, 1"

STATIC

PRESSURE OR

EQUAL

3 PH, 480 V,

60 HZ

Determined in selection/design phase

ABS/USCG 4-10 weeks

512 Critical PILOT HOUSE DECK (02 LEVEL)

SUPPLY FAN

1 135 2100 CFM, 1"

STATIC

PRESSURE OR

EQUAL

3 PH, 480 V,

60 HZ

Determined in selection/design phase

ABS/USCG 4-10 weeks

512 Critical PILOT HOUSE DECK (02 LEVEL)

EXHAUST FAN

1 135 2100 CFM, 1"

STATIC

PRESSURE OR

EQUAL

3 PH, 480 V,

60 HZ

Determined in selection/design phase

ABS/USCG 4-10 weeks

513 Critical AUX MACHINERY ROOM-AFT

SUPPLY FAN

1 135 2500 CFM, 1"

STATIC

PRESSURE OR

EQUAL

3 PH, 480 V,

60 HZ

Determined in selection/design phase

ABS/USCG 4-10 weeks

513 Critical AUX MACHINERY ROOM-AFT

EXHAUST FAN

1 135 2500 CFM, 1"

STATIC

PRESSURE OR

EQUAL

3 PH, 480 V,

60 HZ

Determined in selection/design phase

ABS/USCG 4-10 weeks

513 Critical AUX MACHINERY ROOM-FWD, PASSENGER PROCESSING AREA

(MAIN DECK) AND CARGO

SPACES (MAIN DECK) SUPPLY

FAN

1 135 1000 CFM, 1"

STATIC

PRESSURE OR

EQUAL

3 PH, 480 V,

60 HZ

Determined in selection/design phase

ABS/USCG 4-10 weeks

513 Critical AUX MACHINERY ROOM-FWD, PASSENGER PROCESSING AREA

(MAIN DECK) AND CARGO

SPACES (MAIN DECK) EXHAUST

FAN

1 135 1000 CFM, 1"

STATIC

PRESSURE OR

EQUAL

3 PH, 480 V,

60 HZ

Determined in selection/design phase

ABS/USCG 4-10 weeks

513 Critical BOW THRUSTER ROOM &

BOSUN'S STORE SUPPLY FAN

1 135 500 CFM, 1"

STATIC

PRESSURE OR

EQUAL

3 PH, 480 V,

60 HZ

Determined in selection/design phase

ABS/USCG 4-10 weeks

513 Critical BOW THRUSTER ROOM &

BOSUN'S STORE EXHAUST FAN

1 135 500 CFM, 1"

STATIC

PRESSURE OR

EQUAL

3 PH, 480 V,

60 HZ

Determined in selection/design phase

ABS/USCG 4-10 weeks

513 Critical ENGINE ROOM SUPPLY FAN 2 175 15000 CFM, 1" STATIC

PRESSURE OR

EQUAL

3 PH, 480 V,

60 HZ

Determined in selection/design phase

ABS/USCG 4-10 weeks

513 Critical ENGINE ROOM EXHAUST FAN 2 175 15000 CFM, 1" STATIC

PRESSURE OR

EQUAL

3 PH, 480 V,

60 HZ

Determined in selection/design

DESIGNATION

DESCRIPTION/NOMENCLATURE QTY DIMENSION WEIGHT

(LBS)

CAPACITY /

RATING

ELECTRICAL

POWER

LOAD

SERVICE

REQUIREMENTS

REGULATORY

BODY

APPROVAL

ESTIMATED

LEAD TIME

516 Critical PROVISIONAL COOLING PLANT

(PCP)

1 7 KW, 8 GPM --- Determined in selection/design phase

ABS/USCG 6-12 weeks

516 Critical EVAPORATOR EV#1 1 --- --- Determined in selection/design phase

ABS/USCG 6-12 weeks

516 Critical EVAPORATOR EV#2 1 --- --- Determined in selection/design phase

ABS/USCG 6-12 weeks

521 Critical FIRE / BILGE PUMP 1 500 150 GPM @

190 FT (82.37

PSI)

15 HP, 1800

RPM, 3 PH

Determined in selection/design phase

ABS/USCG 6-12 weeks

529 Critical BILGE PUMP 1 500 150 GPM @

190 FT (82.37

PSI)

15 HP, 1800

RPM, 3 PH

Determined in selection/design phase

ABS/USCG 6-12 weeks

529 Critical BALLAST / BILGE / FIRE PUMP 1 500 150 GPM @

190 FT (82.37

PSI)

15 HP, 1800

RPM, 3 PH

Determined in selection/design phase

ABS/USCG 6-12 weeks

529 Critical BALLAST WATER TREATMENT

UNIT

1 1600 150 GPM

FLOW

1.4 KW,

208V

Determined in selection/design phase

ABS/USCG 8-20 weeks

533 Critical PRESSURE SET PUMP 2 500 7.5 GPM @

65 PSI

1.5 KW,

480V

Determined in selection/design phase

ABS/USCG 6-12 weeks

533 Critical UV DISINFECTION UNIT 1 500 11 GPM @ 94

% UVT

SENSOR

PROBE

WATER

PURIFIER

120 V, 60

HZ

Determined in selection/design phase

ABS/USCG 6-12 weeks

533 Critical WATER HEATER 2 500 40 GAL 12 KW, 480V

Determined in selection/design phase

ABS/USCG 4-8 weeks

533 Non-Critical HOT WATER CIRCULATION PUMP

(STACKED)

2 500 7.5 GPM @

65 PSI

--- Determined in selection/design phase

ABS/USCG 4-8 weeks

533 Critical BOILER 2 350 KW OR

EQUAL

Determined in selection/design phase

ABS/USCG 8-20 weeks

533 Critical BOILER FEED PUMP 2 105 GPM, 1750 RPM, 7.5"

IMPELLER

60 HZ, 3HP

OR EQUAL

Determined in selection/design phase

ABS/USCG 6-12 weeks

541 Critical FUEL OIL TRANSFER PUMP 2 250 110 GPM @

50 PSI

7.5 HP,

1800 RPM,

3 PH

Determined in selection/design

ABS/USCG 6-12 weeks

DESIGNATION

DESCRIPTION/NOMENCLATURE QTY DIMENSION WEIGHT

(LBS)

CAPACITY /

RATING

ELECTRICAL

POWER

LOAD

SERVICE

REQUIREMENTS

REGULATORY

BODY

APPROVAL

ESTIMATED

LEAD TIME

541 Critical FUEL OIL FILTER, COALESCING 1 250 50 GPM --- Determined in selection/design phase

ABS/USCG 4-10 weeks

551 Critical STARTING AIR COMPRESSOR

(STACKED)

2 250 550 FT3//HR

(9.2 CFM) @

435 PSI

3.7 KW,

480V

Determined in selection/design phase

ABS/USCG 6-12 weeks

551 Critical STARTING AIR RECEIVER

(STACKED)

2 500 130 GAL @

435 PSI

--- Determined in selection/design phase

ABS/USCG 6-12 weeks

551 Critical STARTING AIR DRYER 2 100 125 CFM @

100 PSI

--- Determined in selection/design phase

ABS/USCG 4-10 weeks

551 Non-Critical AIR RECEIVER (AIR HORN) 1 100 20 GAL @ 116

PSI

--- Determined in selection/design phase

ABS/USCG 4-8 weeks

561 Critical STEERING GEAR 2 2000 Determined in selection/design phase

ABS/USCG 8-20 weeks

568 FABRICATED Critical RUDDER 2 150 --- --- Determined in selection/design phase

ABS/USCG 8-20 weeks

568 Critical BOW THRUSTER 1 3000 RESERVED 480V Determined in selection/design phase

ABS/USCG 8-20 weeks

568 Critical HYDRAULIC CYLINDER 2 --- --- Determined in selection/design phase

ABS/USCG 6-12 weeks

568 Critical SINGLE ARM TILLER 2 --- --- Determined in selection/design phase

ABS/USCG 6-12 weeks

568 Critical HYDRAULIC POWER PACK UNIT

(HPU)

2 500 --- --- Determined in selection/design phase

ABS/USCG 6-12 weeks

573 Critical WINCH 1 9500 --- --- Determined in selection/design phase

ABS/USCG 8-20 weeks

573 Critical FULL BOOM CRANE 1 19500 8-10 TON

CAPACITY

55 KW, 480

V

Determined in selection/design phase

ABS/USCG 8-20 weeks

581 Critical ANCHOR 2 2510 --- --- Determined in selection/design

ABS/USCG 4-12 weeks

DESIGNATION

DESCRIPTION/NOMENCLATURE QTY DIMENSION WEIGHT

(LBS)

CAPACITY /

RATING

ELECTRICAL

POWER

LOAD

SERVICE

REQUIREMENTS

REGULATORY

BODY

APPROVAL

ESTIMATED

LEAD TIME

581 Critical ANCHOR WINDLASS 1 6500 --- 30 KW, 480V

Determined in selection/design phase

ABS/USCG 6-12 weeks

583 6 PERSONS Critical RESCUE BOAT 2 1600 --- --- Determined in selection/design phase

ABS/USCG 8-20 weeks

583 Critical RESCUE BOAT DAVIT 2 1600 --- --- Determined in selection/design phase

ABS/USCG 8-20 weeks

593 Critical OILY WATER PUMP 1 50 4.4 GPM @

30 PSI

--- Determined in selection/design phase

ABS/USCG 4-10 weeks

593 Critical OILY WATER SEPARATOR 1 150 5 GPM @ 15

PSI

1 PH, 115V,

60HZ

Determined in selection/design phase

ABS/USCG 4-10 weeks

593 Critical SLUDGE PUMP 1 50 8.8 GPM @

72 PSI

2 HP, 1150

RPM, 3 PH

Determined in selection/design phase

ABS/USCG 6-12 weeks

593 Critical TREATED FRESHWATER PUMP 1 16 GPM @ 23

PSI

--- Determined in selection/design phase

ABS/USCG 4-10 weeks

593 Critical SEWAGE COLLECTING TANK 1 50 60 GPM @ 90

FT

--- Determined in selection/design phase

ABS/USCG 6-12 weeks

593 Critical SEWAGE/GREY WATER TRANSFER

PUMP

2 50 26 GPM @ 30

PSI

2 HP, 2450

RPM, 3 PH

Determined in selection/design phase

ABS/USCG 4-10 weeks

593 Critical STANDALONE GREY WATER

TRANSFER PUMP

2 50 --- --- Determined in selection/design

File details come from the government source that posted it. Updated .