This document is a DI-006 Master Equipment List for the Preliminary/Contract Design of Motor Vessel Ranger IV under Contract 6913G623P800007, submitted by Loch Harbour Group. The comprehensive equipment list details critical and non-critical equipment for the vessel, including propulsion systems, electrical components, mechanical systems, and auxiliary equipment. Each item is categorized with specifications such as manufacturer, model, quantity, weight, capacity, electrical requirements, and estimated lead time, with all equipment requiring approval from ABS/USCG.
Key equipment includes main engines (Caterpillar CAT 3512E), diesel generator sets, reduction gear boxes, propulsion control systems, steering gear, anchoring equipment, rescue boats, environmental systems (ballast water treatment, sewage/grey water pumps), and various critical support systems like starting air compressors, hydraulic power units, and electrical switchboards. The equipment list indicates most items have estimated lead times between 4-20 weeks and are in the selection/design phase, with a revision date of 04/07/2025 and a note that brand name information has been removed in the latest revision.
View the file
Other files
Show 40 more
Latest 50 of 68 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
DI-006 Master Equipment List Contract 6913G623P800007
Preliminary/Contract Design of Motor Vessel Ranger IV
Submitted by:
Loch Harbour Group
3060 Williams Drive, Suite 510 Fairfax, Virginia 22031
Contract No.: 6913G623P800007
CLIN-0010
DI-006 MASTER EQUIPMENT LIST
Revision 3
Date: 0 4/07/2025
DISTRIBUTION Statement C: Distribution authorized to the U.S. Government agencies and their Contractors. Other request for this document shall be referred to US Department of Transportation Volpe Center.
The Government is granted unlimited rights unless distributed to recipient directly by the U.S. Government. This drawing, design, concept, and specification are the intellectual property of TAI Engineers LLC. and contain information which is proprietary to TAI Engineers LLC. This information is furnished with the express understanding that the recipient recognizes the proprietary nature of this information and will not copy or alter it in any manner, nor transfer it, use it for manufacture, sell it, or use it in any way to detriment of TAI Engineers LLC. without the express written consent of this firm. The recipient further agrees not to disclose the information herein to any other party except for the purpose contracted for with TAI Engineers LLC.
REVISION DESCRIPTION DATE AUTHOR
0 Initial submission 04-29-2024 TAI 1 Updated per design development 06-19-2024 TAI 2 Updated per design development 07-01-2024 TAI 3 Removed brand name information 04-07-2025 VOLPE
REVISION TABLE
ESWBS NO MANUFACTURER MODEL # / TYPE CRITICAL/NON-
CRITICAL
DESIGNATION
DESCRIPTION/NOMENCLATURE QTY DIMENSION WEIGHT
(LBS)
CAPACITY /
RATING
ELECTRICAL
POWER
LOAD
SERVICE
REQUIREMENTS
REGULATORY
BODY
APPROVAL
ESTIMATED
LEAD TIME
202 EMERSON AVENTICS SERIES
MAREX OS II/III
CONTROL SYSTEM
CRITICAL PROPULSION CONTROL SYSTEM
WITH TYPE 230 CONTROL HEADS
1 Determined in selection/design phase
ABS/USCG 8-20 weeks
233 CATERPILLAR OR
EQUAL
CAT 3512E Critical MAIN ENGINE 2 15000 1502 BHP @
1600 RPM
--- Determined in selection/design phase
ABS/USCG 8-20 weeks
233 Critical DIESEL GENERATOR SET 2 3000 RESERVED;
ESTIMATED
200KW
3 PH, 480V
AC, 60 HZ
Determined in selection/design phase
ABS/USCG 8-20 weeks
233 Reintjes LAF 675 Critical REDUCTION GEAR BOX 2 2200 --- --- Determined in selection/design phase
ABS/USCG 6-16 weeks
233 VEM OR EQUAL IE4-W61R Critical REDUCTION GEAR BOX MOTOR 2 315 KW 3 PH, 400/690V
AC, 50 HZ
Determined in selection/design phase
ABS/USCG 6-16 weeks
233 Critical PROPELLER 2 --- Determined in selection/design phase
ABS/USCG 12-24 weeks
233 Critical PROPULSION SHAFTING 2 --- --- Determined in selection/design phase
ABS/USCG 12-24 weeks
233 Critical CPP SYSTEM 2 --- --- Determined in selection/design phase
ABS/USCG 12-24 weeks
256 Critical SEAWATER COOLING PUMP (PCP)
(STACKED)
2 8 GPM @ 15
PSI OR EQUAL
--- Determined in selection/design phase
ABS/USCG 6-12 weeks
256 Critical PRESSURE SET-HYDRO
PNEUMATIC COMPRESSION
TANK
1 1000 62 GAL
DIAPHRAGM
TANKS
--- Determined in selection/design phase
ABS/USCG 6-12 weeks
259 EPA TIER IV
CERTIFIED WITH
MAIN ENGINES
Critical SELECTIVE CATALYTIC
REDUCTION (SCR)
2 --- --- Determined in selection/design phase
ABS/USCG 8-20 weeks
259 SPARK ARRESTING
TYPE
Critical MAIN ENGINE EXHAUST
SILENCER
2 14" PIPE
CONNECTION
--- Determined in selection/design phase
ABS/USCG 6-12 weeks
259 SPARK ARRESTING
TYPE
Critical DIESEL GENERATOR SET EXHAUST
SILENCER
2 6" PIPE
CONNECTION
--- Determined in selection/design phase
ABS/USCG 6-12 weeks
259 Critical DEF AIR COMPRESSOR (STACKED) 2 125 14.27 CFM @
145 PSI
--- Determined in selection/design phase
ABS/USCG 6-12 weeks
DESIGNATION
DESCRIPTION/NOMENCLATURE QTY DIMENSION WEIGHT
(LBS)
CAPACITY /
RATING
ELECTRICAL
POWER
LOAD
SERVICE
REQUIREMENTS
REGULATORY
BODY
APPROVAL
ESTIMATED
LEAD TIME
259 Critical RECEIVER TANK 2 50 12 GAL @ 200
PSI
--- Determined in selection/design phase
ABS/USCG 4-8 weeks
259 Critical REFRIGERATED DRYER 2 100 25 SCFM @
200 PSI
--- Determined in selection/design phase
ABS/USCG 4-8 weeks
259 Critical DEF TRANSFER PUMP (STACKED) 2 180 GPH @
15 PSI
--- Determined in selection/design phase
ABS/USCG 6-12 weeks
259 Critical DEF DOSING CABINET 2 --- --- Determined in selection/design phase
ABS/USCG 6-12 weeks
262 Critical LUBE OIL TRANSFER PUMP 1 500 16 GPM @ 44
PSI
2 HP, 1200
RPM, 3 PH
Determined in selection/design phase
ABS/USCG 6-12 weeks
262 Critical USED OIL TRANSFER PUMP 1 500 16 GPM @ 44
PSI
2 HP, 1200
RPM, 3 PH
Determined in selection/design phase
ABS/USCG 6-12 weeks
304 Critical EMERGENCY DIESEL GENERATOR
SET
1 110 KW 480V Determined in selection/design phase
ABS/USCG 8-20 weeks
307 Critical SHIP SERVICE TRANSFORMER 2 3PH, 75 KVA 480V- 208Y/120V
60 HZ CU
Determined in selection/design phase
ABS/USCG 8-20 weeks
313 CORVUS ENERGY
OR EQUAL
ORCA E1650V1 Critical BATTERY BANK 2 125 543 kW AIR COOLED Determined in selection/design phase
ABS/USCG 4-10 weeks
324 Critical MAIN SWITCHBOARD 1 2500 480V, 3 PH, 60 HZ
--- Determined in selection/design phase
ABS/USCG 8-20 weeks
324 Critical SHIP SERVICE SWITCHBOARD 1 208/120V AC --- Determined in selection/design phase
ABS/USCG 8-20 weeks
324 Critical EMERGENCY SWITCHBOARD 1 1000 480V, 3 PH, 60 HZ
--- Determined in selection/design phase
ABS/USCG 8-20 weeks
324 Critical SWITCHBOARD FOR BATTERIES 1 --- --- Determined in selection/design phase
ABS/USCG 4-10 weeks
511 Non-Critical HEATER (ENGINEERS
WORKSHOP)
1 50 HSB/HC OR
EQUAL
--- Determined in selection/design
ABS/USCG 4-8 weeks
DESIGNATION
DESCRIPTION/NOMENCLATURE QTY DIMENSION WEIGHT
(LBS)
CAPACITY /
RATING
ELECTRICAL
POWER
LOAD
SERVICE
REQUIREMENTS
REGULATORY
BODY
APPROVAL
ESTIMATED
LEAD TIME
511 Non-Critical HEATER (ENGINE CONTROL
ROOM)
1 50 HSB/HC OR
EQUAL
--- Determined in selection/design phase
ABS/USCG 4-8 weeks
511 Non-Critical HEATER (ENGINE ROOM) 2 50 HSB/HC OR
EQUAL
--- Determined in selection/design phase
ABS/USCG 4-8 weeks
511 Non-Critical HEATER (CREW) 6 50 HSB/HC OR
EQUAL
--- Determined in selection/design phase
ABS/USCG 4-8 weeks
511 Non-Critical HEATER (CREW LOUNGE) 1 50 HSB/HC OR
EQUAL
--- Determined in selection/design phase
ABS/USCG 4-8 weeks
511 Non-Critical HEATER (OFFICER) 2 50 HSB/HC OR
EQUAL
--- Determined in selection/design phase
ABS/USCG 4-8 weeks
511 Non-Critical HEATER (STATE ROOM) 5 50 HSB/HC OR
EQUAL
--- Determined in selection/design phase
ABS/USCG 4-8 weeks
511 Non-Critical HEATER (MEETING ROOM) 1 50 HSB/HC OR
EQUAL
--- Determined in selection/design phase
ABS/USCG 4-8 weeks
511 Non-Critical HEATER (CREW DINING) 1 50 HSB/HC OR
EQUAL
--- Determined in selection/design phase
ABS/USCG 4-8 weeks
511 Non-Critical HEATER (PASSENGER
PROCESSING AREA)
2 50 HSB/HC OR
EQUAL
--- Determined in selection/design phase
ABS/USCG 4-8 weeks
512 Critical BATTERY ROOM SUPPLY FAN 1 175 1300 CFM, 1"
STATIC
PRESSURE OR
EQUAL
3 PH, 480 V,
60 HZ
Determined in selection/design phase
ABS/USCG 4-10 weeks
512 Critical BATTERY ROOM EXHAUST FAN 1 135 1300 CFM, 1"
STATIC
PRESSURE OR
EQUAL
3 PH, 480 V,
60 HZ
Determined in selection/design phase
ABS/USCG 4-10 weeks
512 Non-Critical CREW ACCOMMODATIONS
SPACES-2ND DECK SUPPLY FAN
1 135 1250 CFM, 1"
STATIC
PRESSURE OR
EQUAL
3 PH, 480 V,
60 HZ
Determined in selection/design phase
ABS/USCG 4-10 weeks
512 Non-Critical CREW ACCOMMODATIONS
SPACES-2ND DECK EXHAUST FAN
1 135 1250 CFM, 1"
STATIC
PRESSURE OR
EQUAL
3 PH, 480 V,
60 HZ
Determined in selection/design phase
ABS/USCG 4-10 weeks
512 Critical ENGINEERS WORKSHOP &
ENGINE CONTROL ROOM SUPPLY
FAN
1 135 750 CFM, 1"
STATIC
PRESSURE OR
EQUAL
3 PH, 480 V,
60 HZ
Determined in selection/design
ABS/USCG 4-10 weeks
DESIGNATION
DESCRIPTION/NOMENCLATURE QTY DIMENSION WEIGHT
(LBS)
CAPACITY /
RATING
ELECTRICAL
POWER
LOAD
SERVICE
REQUIREMENTS
REGULATORY
BODY
APPROVAL
ESTIMATED
LEAD TIME
512 Critical ENGINEERS WORKSHOP &
ENGINE CONTROL ROOM
EXHAUST FAN
1 135 750 CFM, 1"
STATIC
PRESSURE OR
EQUAL
3 PH, 480 V,
60 HZ
Determined in selection/design phase
ABS/USCG 4-10 weeks
512 Non-Critical MAIN PASSENGER DECK (01
LEVEL) SUPPLY FAN
1 135 2100 CFM, 1"
STATIC
PRESSURE OR
EQUAL
3 PH, 480 V,
60 HZ
Determined in selection/design phase
ABS/USCG 4-10 weeks
512 Non-Critical MAIN PASSENGER DECK (01
LEVEL) EXHAUST FAN
1 135 2100 CFM, 1"
STATIC
PRESSURE OR
EQUAL
3 PH, 480 V,
60 HZ
Determined in selection/design phase
ABS/USCG 4-10 weeks
512 Critical PILOT HOUSE DECK (02 LEVEL)
SUPPLY FAN
1 135 2100 CFM, 1"
STATIC
PRESSURE OR
EQUAL
3 PH, 480 V,
60 HZ
Determined in selection/design phase
ABS/USCG 4-10 weeks
512 Critical PILOT HOUSE DECK (02 LEVEL)
EXHAUST FAN
1 135 2100 CFM, 1"
STATIC
PRESSURE OR
EQUAL
3 PH, 480 V,
60 HZ
Determined in selection/design phase
ABS/USCG 4-10 weeks
513 Critical AUX MACHINERY ROOM-AFT
SUPPLY FAN
1 135 2500 CFM, 1"
STATIC
PRESSURE OR
EQUAL
3 PH, 480 V,
60 HZ
Determined in selection/design phase
ABS/USCG 4-10 weeks
513 Critical AUX MACHINERY ROOM-AFT
EXHAUST FAN
1 135 2500 CFM, 1"
STATIC
PRESSURE OR
EQUAL
3 PH, 480 V,
60 HZ
Determined in selection/design phase
ABS/USCG 4-10 weeks
513 Critical AUX MACHINERY ROOM-FWD, PASSENGER PROCESSING AREA
(MAIN DECK) AND CARGO
SPACES (MAIN DECK) SUPPLY
FAN
1 135 1000 CFM, 1"
STATIC
PRESSURE OR
EQUAL
3 PH, 480 V,
60 HZ
Determined in selection/design phase
ABS/USCG 4-10 weeks
513 Critical AUX MACHINERY ROOM-FWD, PASSENGER PROCESSING AREA
(MAIN DECK) AND CARGO
SPACES (MAIN DECK) EXHAUST
FAN
1 135 1000 CFM, 1"
STATIC
PRESSURE OR
EQUAL
3 PH, 480 V,
60 HZ
Determined in selection/design phase
ABS/USCG 4-10 weeks
513 Critical BOW THRUSTER ROOM &
BOSUN'S STORE SUPPLY FAN
1 135 500 CFM, 1"
STATIC
PRESSURE OR
EQUAL
3 PH, 480 V,
60 HZ
Determined in selection/design phase
ABS/USCG 4-10 weeks
513 Critical BOW THRUSTER ROOM &
BOSUN'S STORE EXHAUST FAN
1 135 500 CFM, 1"
STATIC
PRESSURE OR
EQUAL
3 PH, 480 V,
60 HZ
Determined in selection/design phase
ABS/USCG 4-10 weeks
513 Critical ENGINE ROOM SUPPLY FAN 2 175 15000 CFM, 1" STATIC
PRESSURE OR
EQUAL
3 PH, 480 V,
60 HZ
Determined in selection/design phase
ABS/USCG 4-10 weeks
513 Critical ENGINE ROOM EXHAUST FAN 2 175 15000 CFM, 1" STATIC
PRESSURE OR
EQUAL
3 PH, 480 V,
60 HZ
Determined in selection/design
DESIGNATION
DESCRIPTION/NOMENCLATURE QTY DIMENSION WEIGHT
(LBS)
CAPACITY /
RATING
ELECTRICAL
POWER
LOAD
SERVICE
REQUIREMENTS
REGULATORY
BODY
APPROVAL
ESTIMATED
LEAD TIME
516 Critical PROVISIONAL COOLING PLANT
(PCP)
1 7 KW, 8 GPM --- Determined in selection/design phase
ABS/USCG 6-12 weeks
516 Critical EVAPORATOR EV#1 1 --- --- Determined in selection/design phase
ABS/USCG 6-12 weeks
516 Critical EVAPORATOR EV#2 1 --- --- Determined in selection/design phase
ABS/USCG 6-12 weeks
521 Critical FIRE / BILGE PUMP 1 500 150 GPM @
190 FT (82.37
PSI)
15 HP, 1800
RPM, 3 PH
Determined in selection/design phase
ABS/USCG 6-12 weeks
529 Critical BILGE PUMP 1 500 150 GPM @
190 FT (82.37
PSI)
15 HP, 1800
RPM, 3 PH
Determined in selection/design phase
ABS/USCG 6-12 weeks
529 Critical BALLAST / BILGE / FIRE PUMP 1 500 150 GPM @
190 FT (82.37
PSI)
15 HP, 1800
RPM, 3 PH
Determined in selection/design phase
ABS/USCG 6-12 weeks
529 Critical BALLAST WATER TREATMENT
UNIT
1 1600 150 GPM
FLOW
1.4 KW,
208V
Determined in selection/design phase
ABS/USCG 8-20 weeks
533 Critical PRESSURE SET PUMP 2 500 7.5 GPM @
65 PSI
1.5 KW,
480V
Determined in selection/design phase
ABS/USCG 6-12 weeks
533 Critical UV DISINFECTION UNIT 1 500 11 GPM @ 94
% UVT
SENSOR
PROBE
WATER
PURIFIER
120 V, 60
HZ
Determined in selection/design phase
ABS/USCG 6-12 weeks
533 Critical WATER HEATER 2 500 40 GAL 12 KW, 480V
Determined in selection/design phase
ABS/USCG 4-8 weeks
533 Non-Critical HOT WATER CIRCULATION PUMP
(STACKED)
2 500 7.5 GPM @
65 PSI
--- Determined in selection/design phase
ABS/USCG 4-8 weeks
533 Critical BOILER 2 350 KW OR
EQUAL
Determined in selection/design phase
ABS/USCG 8-20 weeks
533 Critical BOILER FEED PUMP 2 105 GPM, 1750 RPM, 7.5"
IMPELLER
60 HZ, 3HP
OR EQUAL
Determined in selection/design phase
ABS/USCG 6-12 weeks
541 Critical FUEL OIL TRANSFER PUMP 2 250 110 GPM @
50 PSI
7.5 HP,
1800 RPM,
3 PH
Determined in selection/design
ABS/USCG 6-12 weeks
DESIGNATION
DESCRIPTION/NOMENCLATURE QTY DIMENSION WEIGHT
(LBS)
CAPACITY /
RATING
ELECTRICAL
POWER
LOAD
SERVICE
REQUIREMENTS
REGULATORY
BODY
APPROVAL
ESTIMATED
LEAD TIME
541 Critical FUEL OIL FILTER, COALESCING 1 250 50 GPM --- Determined in selection/design phase
ABS/USCG 4-10 weeks
551 Critical STARTING AIR COMPRESSOR
(STACKED)
2 250 550 FT3//HR
(9.2 CFM) @
435 PSI
3.7 KW,
480V
Determined in selection/design phase
ABS/USCG 6-12 weeks
551 Critical STARTING AIR RECEIVER
(STACKED)
2 500 130 GAL @
435 PSI
--- Determined in selection/design phase
ABS/USCG 6-12 weeks
551 Critical STARTING AIR DRYER 2 100 125 CFM @
100 PSI
--- Determined in selection/design phase
ABS/USCG 4-10 weeks
551 Non-Critical AIR RECEIVER (AIR HORN) 1 100 20 GAL @ 116
PSI
--- Determined in selection/design phase
ABS/USCG 4-8 weeks
561 Critical STEERING GEAR 2 2000 Determined in selection/design phase
ABS/USCG 8-20 weeks
568 FABRICATED Critical RUDDER 2 150 --- --- Determined in selection/design phase
ABS/USCG 8-20 weeks
568 Critical BOW THRUSTER 1 3000 RESERVED 480V Determined in selection/design phase
ABS/USCG 8-20 weeks
568 Critical HYDRAULIC CYLINDER 2 --- --- Determined in selection/design phase
ABS/USCG 6-12 weeks
568 Critical SINGLE ARM TILLER 2 --- --- Determined in selection/design phase
ABS/USCG 6-12 weeks
568 Critical HYDRAULIC POWER PACK UNIT
(HPU)
2 500 --- --- Determined in selection/design phase
ABS/USCG 6-12 weeks
573 Critical WINCH 1 9500 --- --- Determined in selection/design phase
ABS/USCG 8-20 weeks
573 Critical FULL BOOM CRANE 1 19500 8-10 TON
CAPACITY
55 KW, 480
V
Determined in selection/design phase
ABS/USCG 8-20 weeks
581 Critical ANCHOR 2 2510 --- --- Determined in selection/design
ABS/USCG 4-12 weeks
DESIGNATION
DESCRIPTION/NOMENCLATURE QTY DIMENSION WEIGHT
(LBS)
CAPACITY /
RATING
ELECTRICAL
POWER
LOAD
SERVICE
REQUIREMENTS
REGULATORY
BODY
APPROVAL
ESTIMATED
LEAD TIME
581 Critical ANCHOR WINDLASS 1 6500 --- 30 KW, 480V
Determined in selection/design phase
ABS/USCG 6-12 weeks
583 6 PERSONS Critical RESCUE BOAT 2 1600 --- --- Determined in selection/design phase
ABS/USCG 8-20 weeks
583 Critical RESCUE BOAT DAVIT 2 1600 --- --- Determined in selection/design phase
ABS/USCG 8-20 weeks
593 Critical OILY WATER PUMP 1 50 4.4 GPM @
30 PSI
--- Determined in selection/design phase
ABS/USCG 4-10 weeks
593 Critical OILY WATER SEPARATOR 1 150 5 GPM @ 15
PSI
1 PH, 115V,
60HZ
Determined in selection/design phase
ABS/USCG 4-10 weeks
593 Critical SLUDGE PUMP 1 50 8.8 GPM @
72 PSI
2 HP, 1150
RPM, 3 PH
Determined in selection/design phase
ABS/USCG 6-12 weeks
593 Critical TREATED FRESHWATER PUMP 1 16 GPM @ 23
PSI
--- Determined in selection/design phase
ABS/USCG 4-10 weeks
593 Critical SEWAGE COLLECTING TANK 1 50 60 GPM @ 90
FT
--- Determined in selection/design phase
ABS/USCG 6-12 weeks
593 Critical SEWAGE/GREY WATER TRANSFER
PUMP
2 50 26 GPM @ 30
PSI
2 HP, 2450
RPM, 3 PH
Determined in selection/design phase
ABS/USCG 4-10 weeks
593 Critical STANDALONE GREY WATER
TRANSFER PUMP
2 50 --- --- Determined in selection/design