J-4_Delivery_and_Acceptance_Certificate.pdf
PDF 82 KB Posted
- Attached to
- NPS ISRO Ranger IV Vessel
- Solicitation number
- 140PS125R0009
About this file
This document is a Ranger IV Delivery and Acceptance Certificate for a contract between a contractor and the National Park Service. The certificate acknowledges the delivery and acceptance of a vessel, including its equipment, spare parts, operation manuals, and maintenance manuals. The contractor affirms its warranties regarding title, materials, and workmanship, and commits to correcting any listed exceptions. The document provides a template for formal transfer of the vessel, with designated spaces for the date, time, and place of acceptance, as well as signatures from the contractor's leadership and the Contracting Officers Representative.
View the file
Other files
Show 40 more
Latest 50 of 68 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
RANGER IV DELIVERY AND ACCEPTANCE CERTIFICATE
CONTRACT
FROM CONTRACTOR TO OWNER: National Park Service
EXCEPTIONS: (if additional space is needed an attachment is acceptable)
EXCEPT for the items noted on the attached list, if any, and subject to the Contractor’s warranty of title and warranties as to materials and workmanship as set forth in the above-referenced contract, the above referenced vessel and its equipment, spares parts, operation manuals and maintenance manuals are hereby delivered by the Contractor and accepted by the Government and deemed to be in compliance with this Contract. The Contractor hereby acknowledges its continuing duties and responsibilities relating to the vessel with respect to the Contractor’s warranty of title and warranties as to materials and workmanship, as provided in the contract.
The Contractor further acknowledges its ongoing obligation to correct all exceptions listed on the attached list, if any. The Owner hereby assumes risk of loss of or damage to the vessel occurring after the execution of this Certificate, subject to the Contractor’s obligations noted above.
DATE OF ACCEPTANCE TIME OF ACCEPTANCE
PLACE OF ACCEPTANCE
President/Vice President of Contractor
Contracting Officers Representative
Contracting Officer:
| Contract Number: |
| Exceptions: |
| Date of Acceptance: |
| Time of Acceptance: |
| Place of Acceptance: |
| Name Contractor: |
| Name of COR: |
| Name of CO: |