J-4a_ALTERNATE 1 BLANK BID FORM E25_IGCE_ATCT_PWM_PWM-HVAC_1302899_001_638555123691731894.pdf
PDF 79 KB Posted
- Attached to
- Upgraded HVAC and Fire Life Safety Project at the Air Traffic Control Tower (ATCT) in Portland, ME
- Solicitation number
- 697DCK-24-R-00596
About this file
This document appears to be a bid form template for the Upgraded HVAC and Fire Life Safety Project at the Air Traffic Control Tower (ATCT) in Portland, MA. The project involves replacing and upgrading various HVAC equipment, fire systems, and building infrastructure. Key items include replacing the existing chiller, boiler, pumps, air handling units, and building automation system. The work also includes roof replacement, piping, insulation, electrical, and testing/commissioning. The bid form provides a line-item breakdown for materials, labor, equipment, and total costs. Additional costs for taxes, profit, overhead, bonds, and insurance are also included. The related federal contract opportunity, Solicitation Number 697DCK-24-R-00596, is being issued by the Department of Transportation Federal Aviation Administration Southwestern Region.
View the file
Other files
Show all 33
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
a b c d Item Description $ Materials $ Labor $ Equipment $ Total
1 New Rated Separation and Door Detail -$ -$ -$ -$ 2 Fire / Smoke Damper Costs -$ -$ -$ -$ 3 Fire Alarm -$ -$ -$ -$ 4 Fire Stopping -$ -$ -$ -$ 5 Stair Pressurization System -$ -$ -$ -$ 6 -$ -$ -$ -$ 7 -$ -$ -$ -$ 8 -$ -$ -$ -$ 9 -$ -$ -$ -$ 10 Subtotals: -$ -$ -$ -$ 11 -$ -$
Percent Dollars 12 -$ 13 -$ 14 -$ 15 -$ 16 -$ 17 -$
ADDITIONAL COSTS:
Taxes applied to line 11:
PROFIT APPLIED TO LINE 11:
Overhead and G&A Applied to line 11:
PROJECT GRAND TOTAL (Total of lines 11, 12, 13, 14, 15 & 16):
Bonds and Insurance Applied to line 11
FAA Proposel Breakdown Form The contractor must furnish all materials, labor, supervision, equipment and everything else whatsoever (in
PRICE BREAKDOWN
Project Subtotal ALL Costs (same as 10d):
Workman's Comp Applied to Labor Line10b
File details come from the government source that posted it. Updated .