J-4a_ALTERNATE 1 BLANK BID FORM E25_IGCE_ATCT_PWM_PWM-HVAC_1302899_001_638555123691731894.pdf

PDF 79 KB Posted

Attached to
Upgraded HVAC and Fire Life Safety Project at the Air Traffic Control Tower (ATCT) in Portland, ME
Solicitation number
697DCK-24-R-00596
Issued by

About this file

This document appears to be a bid form template for the Upgraded HVAC and Fire Life Safety Project at the Air Traffic Control Tower (ATCT) in Portland, MA. The project involves replacing and upgrading various HVAC equipment, fire systems, and building infrastructure. Key items include replacing the existing chiller, boiler, pumps, air handling units, and building automation system. The work also includes roof replacement, piping, insulation, electrical, and testing/commissioning. The bid form provides a line-item breakdown for materials, labor, equipment, and total costs. Additional costs for taxes, profit, overhead, bonds, and insurance are also included. The related federal contract opportunity, Solicitation Number 697DCK-24-R-00596, is being issued by the Department of Transportation Federal Aviation Administration Southwestern Region.

View the file

Other files

File Type Posted
697DCK-24-R-00596_Amendment 07.pdf PDF
697DCK-24-R-00596_Amendment 06.pdf PDF
J-8_UPDATED QA for PWM HVAC and Fire Alarm_12_16_2024.pdf PDF
J-13_20241213_102801.jpg JPG image
J-14_20241213_102844.jpg JPG image
J-9_20241213_101951.jpg JPG image
J-11_20241213_102043.jpg JPG image
J-17_20241213_103520.jpg JPG image
697DCK-24-R-00596_Amendment 05.pdf PDF
J-18_20241213_104733.jpg JPG image
J-10_20241213_102014.jpg JPG image
J-19_PWM Plot layout with staging area and offices shown.pdf PDF
J-20_Utility Site Plan pwm-d-atct-c110-bl.pdf PDF
J-12_20241213_102514.jpg JPG image
J-16_20241213_103308.jpg JPG image
J-15_20241213_103246.jpg JPG image
J-6_PWM HVAC ADENDUM NOTES LIST.pdf PDF
J-5_Mobile_Office_PS1.pdf PDF
697DCK-24-R-00596_Amendment 04.pdf PDF
J-8_QA for PWM HVAC and Fire Alarm December 02 2024.pdf PDF
J-7_Restroom Trailer Spec Sheet.pdf PDF
697DCK-24-R-00596_Amendment 03.pdf PDF
PWM PreBid Walkthru 2024-10-29.pdf PDF
697DCK-24-R-00596_Amendment 02.pdf PDF
697DCK-24-R-00596_Amendment 01.pdf PDF
J-1_PWM HVAC FINAL SPECIFICATIONS 9.25.2024.pdf PDF
J-1 FINAL SPECIFICATIONS PWM HVAC 1302899.pdf PDF
J-1aFAA PWM HVAC REHAB FINAL DRAWINGS SIGNED.pdf PDF
J-1b Bid Alternate PWM ATCT FLS Upgrade F101 JLSB Signed.pdf PDF
697DCK-24-R-00596.pdf PDF
J-4_BLANK BID FORM E25_IGCE_ATCT_PWM_PWM-HVAC_1302899_001_638555123691731894.pdf PDF
J-2 Wage Determination.pdf PDF
J-3_Past Performance Questionnaire.pdf PDF
Show all 33

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

a b c d Item Description $ Materials $ Labor $ Equipment $ Total

1 New Rated Separation and Door Detail -$ -$ -$ -$ 2 Fire / Smoke Damper Costs -$ -$ -$ -$ 3 Fire Alarm -$ -$ -$ -$ 4 Fire Stopping -$ -$ -$ -$ 5 Stair Pressurization System -$ -$ -$ -$ 6 -$ -$ -$ -$ 7 -$ -$ -$ -$ 8 -$ -$ -$ -$ 9 -$ -$ -$ -$ 10 Subtotals: -$ -$ -$ -$ 11 -$ -$

Percent Dollars 12 -$ 13 -$ 14 -$ 15 -$ 16 -$ 17 -$

ADDITIONAL COSTS:

Taxes applied to line 11:

PROFIT APPLIED TO LINE 11:

Overhead and G&A Applied to line 11:

PROJECT GRAND TOTAL (Total of lines 11, 12, 13, 14, 15 & 16):

Bonds and Insurance Applied to line 11

FAA Proposel Breakdown Form The contractor must furnish all materials, labor, supervision, equipment and everything else whatsoever (in

PRICE BREAKDOWN

Project Subtotal ALL Costs (same as 10d):

Workman's Comp Applied to Labor Line10b

File details come from the government source that posted it. Updated .