J-10_20241213_102014.jpg
JPG image 3 MB Posted
- Attached to
- Upgraded HVAC and Fire Life Safety Project at the Air Traffic Control Tower (ATCT) in Portland, ME
- Solicitation number
- 697DCK-24-R-00596
About this file
This image shows an electrical panel labeled "MDPE" that appears to be part of an HVAC control system. The panel contains circuit breakers arranged in two vertical columns with numbered labels ranging from 2-65. Key components visible include elevator controls, a chiller section, and what appears to be building automation system (BAS) components. The panel correlates with the solicitation's scope of work for HVAC upgrades at Portland ME Air Traffic Control Tower, specifically the control and electrical infrastructure that will support the new chillers, boilers, and Schneider Electric EcoStruxure BAS system described in the contract opportunity.
The technical documentation in the image aligns with the broader HVAC modernization project requirements outlined in the solicitation (697DCK-24-R-00596), which includes replacing existing chillers, boilers, pumps, and control systems. The electrical panel shown would be a critical component interfacing with the new HVAC equipment installations and controls upgrades planned for the facility.
View the file
Other files
Show all 33
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
File details come from the government source that posted it. Updated .