J-4_BLANK BID FORM E25_IGCE_ATCT_PWM_PWM-HVAC_1302899_001_638555123691731894.pdf

PDF 82 KB Posted

Attached to
Upgraded HVAC and Fire Life Safety Project at the Air Traffic Control Tower (ATCT) in Portland, ME
Solicitation number
697DCK-24-R-00596
Issued by

About this file

This document appears to be a Bid Form or Pricing Template related to a federal contract opportunity. It provides a detailed breakdown of estimated costs for various line items associated with the Upgraded HVAC and Fire Life Safety Project at the Air Traffic Control Tower (ATCT) in Portland, MA. The key details include:

The project scope involves replacing the existing HVAC equipment, controls, and roofing system at the ATCT facility. This includes new chillers, boilers, pumps, air handlers, VAV boxes, BAS controls, and incidental work such as piping, insulation, and electrical. The Solicitation Number is 697DCK-24-R-00596, and the contract is being procured by the Department of Transportation Federal Aviation Administration Southwestern Region. Offerors must submit pricing in the format provided, which includes labor, material, and equipment costs broken down by major work components. Further cost breakdowns may be requested during negotiations. The successful contractor will be required to hold these pricing rates for future contract modifications.

View the file

Other files

File Type Posted
697DCK-24-R-00596_Amendment 07.pdf PDF
697DCK-24-R-00596_Amendment 06.pdf PDF
J-8_UPDATED QA for PWM HVAC and Fire Alarm_12_16_2024.pdf PDF
J-13_20241213_102801.jpg JPG image
J-14_20241213_102844.jpg JPG image
J-9_20241213_101951.jpg JPG image
J-11_20241213_102043.jpg JPG image
J-17_20241213_103520.jpg JPG image
697DCK-24-R-00596_Amendment 05.pdf PDF
J-18_20241213_104733.jpg JPG image
J-10_20241213_102014.jpg JPG image
J-19_PWM Plot layout with staging area and offices shown.pdf PDF
J-20_Utility Site Plan pwm-d-atct-c110-bl.pdf PDF
J-12_20241213_102514.jpg JPG image
J-16_20241213_103308.jpg JPG image
J-15_20241213_103246.jpg JPG image
J-6_PWM HVAC ADENDUM NOTES LIST.pdf PDF
J-5_Mobile_Office_PS1.pdf PDF
697DCK-24-R-00596_Amendment 04.pdf PDF
J-8_QA for PWM HVAC and Fire Alarm December 02 2024.pdf PDF
J-7_Restroom Trailer Spec Sheet.pdf PDF
697DCK-24-R-00596_Amendment 03.pdf PDF
PWM PreBid Walkthru 2024-10-29.pdf PDF
697DCK-24-R-00596_Amendment 02.pdf PDF
697DCK-24-R-00596_Amendment 01.pdf PDF
J-1_PWM HVAC FINAL SPECIFICATIONS 9.25.2024.pdf PDF
J-1 FINAL SPECIFICATIONS PWM HVAC 1302899.pdf PDF
J-1aFAA PWM HVAC REHAB FINAL DRAWINGS SIGNED.pdf PDF
J-1b Bid Alternate PWM ATCT FLS Upgrade F101 JLSB Signed.pdf PDF
697DCK-24-R-00596.pdf PDF
J-2 Wage Determination.pdf PDF
J-3_Past Performance Questionnaire.pdf PDF
J-4a_ALTERNATE 1 BLANK BID FORM E25_IGCE_ATCT_PWM_PWM-HVAC_1302899_001_638555123691731894.pdf PDF
Show all 33

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

a b c d Item Description $ Materials $ Labor $ Equipment $ Total

1 Temporary Utilities -$ -$ -$ -$ 2 Field Personnel -$ -$ -$ -$ 3 Mob and Demob -$ -$ -$ -$ 4 Office -$ -$ -$ -$

5 CNSTR -$ -$ -$ -$

6 Existing Cond -$ -$ -$ -$ 7 Metals -$ -$ -$ -$ 8 Thermal Moisture Protection -$ -$ -$ -$ 9 Finishes -$ -$ -$ -$ 10 Plumbing -$ -$ -$ -$ 11 HVAC Units -$ -$ -$ -$ 12 Electrical -$ -$ -$ -$ 13 HVAC Demo -$ -$ -$ -$ 14 Electrical Demo -$ -$ -$ -$ 15 Subtotals: -$ -$ -$ -$ 16 -$

Percent Dollars 18 -$ 19 -$ 20 -$ 21 -$ 22 -$ 23 -$

ADDITIONAL COSTS:

Estimator

1 OVERHEAD %

2 PROFIT %

3 INSURANCE %

4 BONDING %

FAA Proposel Breakdown Form The contractor must furnish all materials, labor, supervision, equipment and everything else whatsoever (in accordance with

PRICE BREAKDOWN

Project Subtotal ALL Costs (same as 10d):

Workman's Comp Applied to Labor Line10b Bonds and Insurance Applied to line 11 Taxes applied to line 11:

PROFIT APPLIED TO LINE 11:

Overhead and G&A Applied to line 11:

PROJECT GRAND TOTAL (Total of lines 11, 12, 13, 14, 15 & 16):

FUTURE MODIFICATION PRICING

(successful contractor will be held to these rates for

NOTES:

1. Offers must be submitted in the format requested in this section. Offers not submitted in the format requested may be deemed non-responsive and eliminated from consideration for award.

2. During negotiations the Contracting Officer (CO) may request a further breakdown of some or all of the costs listed in this section. By submitting an offer the offeror agrees to provide all information requested by the CO or risk being deemed non-responsive and eliminated from consideration of award

File details come from the government source that posted it. Updated .