J-4_BLANK BID FORM E25_IGCE_ATCT_PWM_PWM-HVAC_1302899_001_638555123691731894.pdf
PDF 82 KB Posted
- Attached to
- Upgraded HVAC and Fire Life Safety Project at the Air Traffic Control Tower (ATCT) in Portland, ME
- Solicitation number
- 697DCK-24-R-00596
About this file
This document appears to be a Bid Form or Pricing Template related to a federal contract opportunity. It provides a detailed breakdown of estimated costs for various line items associated with the Upgraded HVAC and Fire Life Safety Project at the Air Traffic Control Tower (ATCT) in Portland, MA. The key details include:
The project scope involves replacing the existing HVAC equipment, controls, and roofing system at the ATCT facility. This includes new chillers, boilers, pumps, air handlers, VAV boxes, BAS controls, and incidental work such as piping, insulation, and electrical. The Solicitation Number is 697DCK-24-R-00596, and the contract is being procured by the Department of Transportation Federal Aviation Administration Southwestern Region. Offerors must submit pricing in the format provided, which includes labor, material, and equipment costs broken down by major work components. Further cost breakdowns may be requested during negotiations. The successful contractor will be required to hold these pricing rates for future contract modifications.
View the file
Other files
Show all 33
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
a b c d Item Description $ Materials $ Labor $ Equipment $ Total
1 Temporary Utilities -$ -$ -$ -$ 2 Field Personnel -$ -$ -$ -$ 3 Mob and Demob -$ -$ -$ -$ 4 Office -$ -$ -$ -$
5 CNSTR -$ -$ -$ -$
6 Existing Cond -$ -$ -$ -$ 7 Metals -$ -$ -$ -$ 8 Thermal Moisture Protection -$ -$ -$ -$ 9 Finishes -$ -$ -$ -$ 10 Plumbing -$ -$ -$ -$ 11 HVAC Units -$ -$ -$ -$ 12 Electrical -$ -$ -$ -$ 13 HVAC Demo -$ -$ -$ -$ 14 Electrical Demo -$ -$ -$ -$ 15 Subtotals: -$ -$ -$ -$ 16 -$
Percent Dollars 18 -$ 19 -$ 20 -$ 21 -$ 22 -$ 23 -$
ADDITIONAL COSTS:
Estimator
1 OVERHEAD %
2 PROFIT %
3 INSURANCE %
4 BONDING %
FAA Proposel Breakdown Form The contractor must furnish all materials, labor, supervision, equipment and everything else whatsoever (in accordance with
PRICE BREAKDOWN
Project Subtotal ALL Costs (same as 10d):
Workman's Comp Applied to Labor Line10b Bonds and Insurance Applied to line 11 Taxes applied to line 11:
PROFIT APPLIED TO LINE 11:
Overhead and G&A Applied to line 11:
PROJECT GRAND TOTAL (Total of lines 11, 12, 13, 14, 15 & 16):
FUTURE MODIFICATION PRICING
(successful contractor will be held to these rates for
NOTES:
1. Offers must be submitted in the format requested in this section. Offers not submitted in the format requested may be deemed non-responsive and eliminated from consideration for award.
2. During negotiations the Contracting Officer (CO) may request a further breakdown of some or all of the costs listed in this section. By submitting an offer the offeror agrees to provide all information requested by the CO or risk being deemed non-responsive and eliminated from consideration of award