J-1aFAA PWM HVAC REHAB FINAL DRAWINGS SIGNED.pdf

PDF 12 MB Posted

Attached to
Upgraded HVAC and Fire Life Safety Project at the Air Traffic Control Tower (ATCT) in Portland, ME
Solicitation number
697DCK-24-R-00596
Issued by

About this file

This document appears to be a set of final signed drawings for an HVAC rehabilitation project at the Air Traffic Control Tower (ATCT) in Portland, MA. The related federal contract opportunity is for the Upgraded HVAC and Fire Life Safety Project at the same ATCT facility.

The key details of the opportunity are: The project is primarily an equipment replacement and upgrade, including replacing the existing chiller, dry cooler, boiler, hot water and chilled water pumps, CRUs, RTU, and BAS system. New equipment will also be installed such as fan coil units and bathroom exhaust fans. Incidental work includes piping, insulation, framing, painting, electrical, and other construction activities. The solicitation number is 697DCK-24-R-00596, and the procuring agency is the Department of Transportation Federal Aviation Administration Southwestern Region. The opportunity type is a Solicitation, but no details are provided on response dates, award dates, pricing terms, or set asides.

View the file

Other files

File Type Posted
697DCK-24-R-00596_Amendment 07.pdf PDF
697DCK-24-R-00596_Amendment 06.pdf PDF
J-8_UPDATED QA for PWM HVAC and Fire Alarm_12_16_2024.pdf PDF
J-13_20241213_102801.jpg JPG image
J-14_20241213_102844.jpg JPG image
J-9_20241213_101951.jpg JPG image
J-11_20241213_102043.jpg JPG image
J-17_20241213_103520.jpg JPG image
697DCK-24-R-00596_Amendment 05.pdf PDF
J-18_20241213_104733.jpg JPG image
J-10_20241213_102014.jpg JPG image
J-19_PWM Plot layout with staging area and offices shown.pdf PDF
J-20_Utility Site Plan pwm-d-atct-c110-bl.pdf PDF
J-12_20241213_102514.jpg JPG image
J-16_20241213_103308.jpg JPG image
J-15_20241213_103246.jpg JPG image
J-6_PWM HVAC ADENDUM NOTES LIST.pdf PDF
J-5_Mobile_Office_PS1.pdf PDF
697DCK-24-R-00596_Amendment 04.pdf PDF
J-8_QA for PWM HVAC and Fire Alarm December 02 2024.pdf PDF
J-7_Restroom Trailer Spec Sheet.pdf PDF
697DCK-24-R-00596_Amendment 03.pdf PDF
PWM PreBid Walkthru 2024-10-29.pdf PDF
697DCK-24-R-00596_Amendment 02.pdf PDF
697DCK-24-R-00596_Amendment 01.pdf PDF
J-1_PWM HVAC FINAL SPECIFICATIONS 9.25.2024.pdf PDF
J-1 FINAL SPECIFICATIONS PWM HVAC 1302899.pdf PDF
J-1b Bid Alternate PWM ATCT FLS Upgrade F101 JLSB Signed.pdf PDF
697DCK-24-R-00596.pdf PDF
J-4_BLANK BID FORM E25_IGCE_ATCT_PWM_PWM-HVAC_1302899_001_638555123691731894.pdf PDF
J-2 Wage Determination.pdf PDF
J-3_Past Performance Questionnaire.pdf PDF
J-4a_ALTERNATE 1 BLANK BID FORM E25_IGCE_ATCT_PWM_PWM-HVAC_1302899_001_638555123691731894.pdf PDF
Show all 33

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

CHECKED

DESIGNED DATE

H

G

F

E

D

C

B

A

7 6 5 4 3 2 1

H

G

F

E

D

C

B

A

8 7 6 5 4 3 2 1

DRAWN

APPROVED BY

JCNISSUED BY

SUBMITTED BY

DRAWING NO

SCALES SHOWN FOR 22" X 34" SHEET. ADJUST SCALE FOR OTHER SIZES

REVIEWED BY

PWM-1302899-

DEPARTMENT OF TRANSPORTATION

FEDERAL AVIATION ADMINISTRATION

ATCT

ATO - TECHNICAL OPERATIONS EASTERN SERVICE AREA

PORTLAND ME(PORTLAND INTERNATIONAL JETPORT)

PROJECT ENGINEER MGR: ENGINEERING CENTER

PUBLIC AVAILABILITY TO BE DETERMINED UNDER 5 USC 552

FOR OFFICIAL USE ONLY

GENERAL

ENGINEERING SERVICES

TERMINAL

PROJECT NUMBER: 230041.00

5901 Peachtree Dunwoody Rd. | Bldg C | Suite 515 Atlanta, Georgia 30328-6055 phone 678.320.1888 | wileywilson.com

/2

/2

:0 :0

P

M

GMR

RAB

G000

1302899GMR

COVER SHEET

03/15/24

JUNE 28, 2024

HVAC REHABILITATION

(ARCHITECTURAL DRAWINGS)

PORTLAND INTERNATIONAL JETPORT

PORTLAND, ME

ATCT/TRACON FACILITY

REV

REV APPROVED

DATE

DESCRIPTION JCN REDLINE

DATE

APVD

06/28/2024

H

G

F

E

D

C

B

A

7 6 5 4 3 2 1

H

G

F

E

D

C

B

A

8 7 6 5 4 3 2 1

DRAWN

APPROVED BY

JCNISSUED BY

SUBMITTED BY

DRAWING NO

SCALES SHOWN FOR 22" X 34" SHEET. ADJUST SCALE FOR OTHER SIZES

REVIEWED BY

PWM-1302899-

DEPARTMENT OF TRANSPORTATION

FEDERAL AVIATION ADMINISTRATION

ATCT

ATO - TECHNICAL OPERATIONS EASTERN SERVICE AREA

PORTLAND ME(PORTLAND INTERNATIONAL JETPORT)

PROJECT ENGINEER MGR: ENGINEERING CENTER

PUBLIC AVAILABILITY TO BE DETERMINED UNDER 5 USC 552

FOR OFFICIAL USE ONLY

GENERAL

ENGINEERING SERVICES

TERMINAL

PROJECT NUMBER: 230041.00

5901 Peachtree Dunwoody Rd. | Bldg C | Suite 515 Atlanta, Georgia 30328-6055 phone 678.320.1888 | wileywilson.com

/2

/2

:1 :5

A

M

GMR

RAB

G001

1302899GMR

SHEET INDEX

03/15/24

SHEET INDEX

SHEET

NUMBER SHEET NAME

M802 CHILLED WATER SYSTEM CONTROLS

M803 HEATING WATER SYSTEM CONTROLS

M804 HEATING WATER SYSTEM CONTROLS

M805 AHU-1 CONTROLS

M806 AHU-1 CONTROLS

M807 FCU & VAV CONTROLS

M808 CRU & GLOBAL OUTDOOR AIR SENSOR CONTROLS

M809 EXHAUST FAN & HOT WATER UNIT HEATER CONTROLS

M810 AHU-4 & AHU-5 CONTROLS

M811 AHU-6 CONTROLS

M812 AHU-3 CONTROLS

M813 NATURAL GAS & NETWORK DIAGRAMS & METERING

CONTROLS

12 ELECTRICAL

E000 LEGEND, ABBREVIATIONS AND GENERAL NOTES

E101 BASE BUILDING - LEVEL 1 POWER PLAN

E102 LEVEL 2 POWER PLAN

E103 LEVEL 3 & LEVEL 4 POWER PLANS

E104 LEVEL 1 & LEVEL 4 PARTIAL LIGHTING PLANS

E105 BASE BUILDING - LEVEL 1 CONDUIT PLAN

E106 BASE BUIDLING - ROOF LIGHTNING PROTECTION PLAN

E401 ENLARGED PLANS

E501 ELECTRICAL DETAILS

E502 ELECTRICAL DETAILS

E601 PARTIAL ONE-LINE DIAGRAM

E701 PANEL SCHEDULES

E702 PANEL SCHEDULES

SHEET INDEX

SHEET

NUMBER SHEET NAME

1 GENERAL

G000 COVER SHEET

G001 SHEET INDEX

G010 ABBREVIATIONS (SHEET 1 OF 2)

G011 ABBREVIATIONS (SHEET 2 OF 2)

G020 PHASING

3 DEMOLITION

D120 BASE BUILDING REFLECTED CEILING DEMOLITION

D121 LEVEL 1, 2, AND 3 REFLECTED CEILING DEMOLITION

D122 LEVEL 4, 5 AND CAB LEVEL REFLECTED CEILING DEMOLITION

D140 ROOF DEMOLITION

D141 ROOF DETAILS DEMOLITION

D300 FIRST FLOOR MECHANICAL DEMOLITION PLAN

D301 SECOND FLOOR MECHANICAL DEMOLITION PLAN

D302 THIRD AND FOURTH FLOOR MECHANICAL DEMOLITION PLANS

D303 FIFTH FLOOR AND CAB MECHANICAL DEMOLITION PLANS

D304 ENLARGED MECHANICAL ROOM AND CHILLER YARD

DEMOLITION PLAN

D500 DEMOLITION LEGEND AND NOTES

D501 BASE BUIDLING - LEVEL 1 DEMOLITION PLAN

D502 LEVEL 2 DEMOLITION PLAN

D503 LEVEL 3 & LEVEL 4 DEMOLITION PLANS

D504 PARTIAL ONE-LINE DIAGRAM - DEMOLITION

D505 PANEL SCHEDULES - DEMOLITION

D506 PANEL SCHEDULES - DEMOLITION

7 ARCHITECTURAL

A000 LEGEND, SYMBOLS, AND NOTES

A120 BASE BUILDING REFLECTED CEILING PLAN

A121 LEVEL 1, 2 AND 3 REFLECTED CEILING PLAN

A122 LEVEL 4, 5 AND CAB LEVEL REFLECTED CEILING PLANS

A125 CATWALK ROOF PLAN

A140 PROPOSED BASE BUILDING ROOF LAYOUT

A141 TAPERING PLAN

A142 PROPOSED BASE BUILDING ROOF GUARDRAIL LAYOUT

A500 ROOM FINISH SCHEDULE

A610 ROOF DETAILS

A611 ROOF RAILING DETAILS

A612 CEILING DETAILS

8 STRUCTURAL

S612 BUILDING AND LINK ROOF RESTORATION WIND PRESSURES

11 MECHANICAL

M000 LEGEND, ABBREVIATIONS & GENERAL NOTES

M100 FIRST FLOOR MECHANICAL PLAN

M101 SECOND FLOOR MECHANICAL PLAN

M102 THIRD AND FOURTH FLOOR MECHANICAL PLANS

M103 FIFTH FLOOR AND CAB MECHANICAL PLANS

M300 MECHANICAL SECTIONS

M400 ENLARGED MECHANICAL ROOM

M401 ENLARGED CHILLER YARD PLAN

M500 SCHEDULES

M501 SCHEDULES

M600 PIPE DETAILS

M601 HANGER AND PAD DETAILS

M602 DUCTWORK DETAILS

M603 DUCTWORK & COIL CONNECTION DETAILS

M604 MECHANICAL EQUIPMENT DETAILS

M605 BOILER DETAILS

M606 MECHANICAL EQUIPMENT DETAILS

M607 MECHANICAL EQUIPMENT DETAILS

M630 SEISMIC DETAILS

M631 SEISMIC DETAILS

M632 SEISMIC DETAILS

M633 SEISMIC DETAILS

M634 SEISMIC DETAILS

M635 SEISMIC DETAILS

M800 CONTROLS LEGEND, ABBRIVIATIONS & GENERAL NOTES

M801 CHILLED WATER SYSTEM CONTROLS

REV

REV APPROVED

DATE

DESCRIPTION JCN REDLINE

DATE

A

A, AMP AMPERE

A/C AIR CONDITIONING

A/S AUDIBLE STROBE

AA AIR COOLED

AAV AUTOMATIC AIR VENT

ABG ABOVE FINISHED GRADE

AC ALTERNATING CURRENT, ABOVE CEILING

ACC AIR COOLED CHILLER

ACDFC AIR COOLED DRY FLUID COOLER

ACI AMERICAN CONCRETE INSTITUTE

ACM ASBESTOS CONTAINING MATERIAL

ACT ACOUSTICAL CEILING TILE, ACCESS CONTROL TERMINAL

AD ACCESS DOOR, AREA DRAIN

ADA AMERICANS WITH DISABILITIES ACT

ADJ ADJUSTABLE

AF AMPERE FRAME

AFF ABOVE FINISHED FLOOR

AFG ABOVE FINISHED GRADE

AFR ABOVE FINISHED ROOF

AFSSC AIRWAY FACILITIES SYSTEM SUPPORT CENTER

AGL ABOVE GROUND LEVEL

AH AIR HANDLER

AHJ AUTHORITY HAVING JURISDICTION

AHU AIR HANDLING UNIT

AI ANALOG INPUT

AIC AMPERE INTERRUPTING CAPACITY

AIR AMPS INTERRUPT RATING

AISC AMERICAN INSTITUTE OF STEEL CONSTRUCTION

AL AIRPORT LIGHTING, ALUMINUM

AL-GL ALUMINUM AND GLASS

ALUM ALUMINUM

AMM AMMETER

AMSL ABOVE MEAN SEA LEVEL

ANOD. ANODIZE

ANN ANNUNCIATOR

ANSI AMERICAN NATIONAL STANDARDS INSTITUTE

AO ANALOG OUTPUT

AOA AIRPORT OPERATIONS AREA

AP ANNUNCIATOR POINT, ACCESS PANEL

APD AIR PRESSURE DROP

APPROX APPROXIMATELY

ARCH ARCHITECT, ARCHITECTURAL

ARTS AUTOMATED RADAR

AS AIR SEPARATOR

ASHRAE AMERICAN SOCIETY OF HEATING, REFRIGERATION

AND AIR CONDITIONING ENGINEERS

ASME AMERICAN SOCIETY OF MECHANICAL ENGINEERS

AT AMPERE TRIP

ATBM AIRWAY/TERMINAL BUILDING MAINTENANCE FACILITY

ATC ACOUSTICAL TILE CEILING

ATC AIR TRAFFIC CONTROL

ATCT AIRPORT TRAFFIC CONTROL TOWER

ATS AUTOMATIC TRANSFER SWITCH

ATV ATMOSPHERIC VENT

AUX AUXILIARY

AV AUTOMATIC VENT

AVG AVERAGE

AWG AMERICAN WIRE GAGE

AWS AMERICAN WELDING SOCIETY

B

BAT CHGR BATTERY CHARGER

BBHWH BASEBOARD HOT WATER HEATER

BC BARE COPPER

BCKP BACKUP

BDD BACKDRAFT DAMPER

BF BELOW FLOOR (PIPE SIZE)

BFC BELOW FINISHED CEILING

BFP BACKFLOW PREVENTER

BI BACKWARD INCLINED

BITS BYPASS ISOLATION TRANSFER SWITCH

BLDG BUILDING

BLK BLACK

BM BEAM

BOD BOTTOM OF DUCT, BACKDRAFT DAMPER

BOF BOTTOM OF FIXTURE

BOP BOTTOM OF PIPING

BOT,BTM BOTTOM

BP BUSTER PUMP

BPU BREAKER PROGRAMMING UNIT

BSDC BARE SOFT DRAWN COPPER

BSMT BASEMENT

BTU BRITISH THERMAL UNIT

BTUH BRITISH THERMAL UNIT/HOUR

B.U. BACKUP

C

C CONDUIT

CAF COMBUSTION AIR FAN

CANT CANTILEVER

CAP CAPACITY

CAV CONSTANT AIR VOLUME

CB CIRCUIT BREAKER

CBCR CURVED BLADE CEILING REG.

CCTV CLOSED CIRCUIT TELEVISION

CD CEILING DIFFUSER, CONDENSATE DRAIN

CENT CENTRIFUGAL

CENTRIF CENTRIFUGAL

CF CUBIC FOOT/FEET

CFACC CENTRIF FAN AIR COOLED CONDENSER

CFM CUBIC FEET PER MINUTE

CH CHILLER

CHKD CHECKERED

CHW CHILLED WATER

CHWR CHILLED WATER RETURN

CHWS CHILLED WATER SUPPLY

C.I.P. CAST IN PLACE

CJ CONTROL JOINT

CKT CIRCUIT

CL CENTERLINE

CLF CURRENT LIMITING FUSE

CLG CEILING

CLR CLEAR

CM COMMUNICATION MANHOLE

CMU CONCRETE MASONRY UNIT

CO CLEANOUT, CONDUIT ONLY

COL COLUMN

COMM COMMUNICATIONS

CONC CONCRETE

COND CONDENSATE

CONFIG CONFIGURATION

CONN CONNECTION

CONST CONSTRUCTION

CONT CONTINUATION, CONTINUOUS

CONTR CONTRACTOR

COR CONTRACTING OFFICER'S REPRESENTATIVE

CPC CRITICAL POWER CENTER

CPT CARPET

CPU CENTRAL PROCESSING UNIT

CR CONTROL RELAY

CS CONTROL SWITCH

CSF CHEMICAL SHOT FEEDER

CT COOLING TOWER, CABLE TRAY,

CURRENT TRANSFORMER, CERAMIC TILE

CTL CONTROL

CU CONDENSING UNIT, COPPER

CU FT CUBIC FOOT/FEET

CV CONSTANT VOLUME, CONTROL VALVE

CVC CENTRAL VACUUM CLEANER

CW COLD (DOMESTIC) WATER

CWP CHILLED WATER PUMP

CWP CONDENSER WATER PUMP, CHILLED WATER PUMP

CWR CHILLED WATER RETURN

CWR CONDENSER WATER RETURN

CWS CHILLED WATER SUPPLY

CWS CONDENSER WATER SUPPLY

CWV COMBINATION WASTE AND VENT

CY YD CUBIC YARD

D

D DRAIN

D PNL DISTRIBUTION PANEL

DAMP DAMPER

DB DRY BULB, DIRECT BURIAL, DUCTBANK

DBA DEFORMED BAR ANCHOR

DBL DOUBLE

DC DIRECT CURRENT

DCV BFP DOUBLE CHECK VALVE BACKFLOW PREVENTOR

DDC DIRECT DIGITAL CONTROL

DEB DIRECT EARTH BURY

DEG DEGREE

DEMO DEMOLITION

DET DETAIL

DF DEGREES FAHRENHEIT

DG DOOR GRILLE

DHW DOMESTIC HOT WATER

DI DIGITAL INPUT

DIA DIAMETER

DIAG DIAGONAL

DIFF DIFFUSER

DIM DIMENSION

DISC DISCONNECT

D.L. DEAD LOAD

DM DEMAND METER

DN DOWN

DO DIGITAL OUTPUT

DP DIFFERENTIAL PRESSURE

DPDT DOUBLE POLE DOUBLE THROW

DPST DOUBLE POLE SINGLE THROW

DPT DIFFERENTIAL PRESSURE TRANSMITTER

DSF DESTRATIFICATION FAN

DT DOUBLE THROW, DIAPHRAM TANK, DOUBLE TEE

DTS DOUBLE THROW SWITCH

DWBP DOMESTIC WATER BOOSTER PUMP

DWDI DOUBLE WIDTH DOUBLE INLET

DWGS DRAWINGS

DWL DOWEL

E

E EAST

EA EACH, EXHAUST AIR

EAT ENTERING AIR TEMPERATURE

ECP ENGINE CONTROL PANEL

EDAM ELECTRICAL DATA ACQUISITION AND MONITORING

EDH ELECTRIC DUCT HEATER

E.E. EACH END

EES EARTH ELECTRODE SYSTEM

EF EXHAUST FAN, EACH FACE

EG, E/G ENGINE GENERATOR, EXHAUST GRILLE

EMERGENCY GENERATOR

EH ELECTRIC HEATER, ELECTRONIC HUMIDIFIER

EHC ELECTRIC HEATING COIL

EIFS EXTERIOR INSULATION FINISH SYSTEM

ELEC ELECTRIC

ELEV, EL ELEVATION, ELEVATOR

EMCS ENERGY MANAGEMENT AND CONTROL SYSTEM

EMERG EMERGENCY

EMI ELECTROMAGNETIC INTERFACE

EMS ENERGY MANAGEMENT SYSTEM

EMT ELECTRICAL METALLIC TUBING

ENT ENTERING

E.O.R. ENGINEER OF RECORD

E.O.S. EDGE OF SLAB

EPS EXPANDED POLYSTYRENE

EQ EQUAL

EQUIP EQUIPMENT

ER EXHAUST REGISTER

ERMS ENVIRONMENTAL REMOTE MONITORING SYSTEM

E.S. EACH SIDE

ESP EXTERNAL STATIC PRESSURE

ET EXPANSION TANK

EUH ELECTRIC UNIT HEATER

EW EACH WAY

EWC ELECTRICAL WATER COOLER

EWH ELECTRIC WALL HEATER, ELECTRIC WATER HEATER

EWT ENTERING WATER TEMPERATURE

EXH EXHAUST

EXIST EXISTING

EXP EXPOSED, EXPANSION

F

F FIRE WATER SUPPLY

^F DEGREES FAHRENHEIT

FA FIRE ALARM, FREE AREA, FAN COOLED, FRESH AIR

FAA FEDERAL AVIATION ADMINISTRATION

FACP FIRE ALARM CONTROL PANEL

FACT FACTORY

FC FACE OF CURB, FLEX CONNECTION, FOOT CANDLE

FCO FLOOR CLEANOUT

FCU FAN COIL UNIT

FCV FLOW CONTROL VALVE

FD FLOOR DRAIN, FIRE DAMPER

FDC FIRE DEPARTMENT CONNECTION

FDN FOUNDATION

FDR FEEDER

FE FIRE EXTINGUISHER

FEC FIRE EXTINGUISHER CABINET

FF FLY FAN, FINISHED FLOOR

FFE FINISHED FLOOR ELEVATION

FG FIBERGLASS

FH FIRE HYDRANT

FHC FIRE HOSE CABINET

FHV FIRE HOSE VALVE

FIG FIGURE

FIN FINISH

FLA FULL LOAD AMPERES

FLEX FLEXIBLE

FLR FLOOR

FLS FLOW SWITCH, FIRE AND LIFE SAFETY

FLUOR FLUORESCENT

FM FACTORY MUTUAL, FORCE MAIN

FO FIBER OPTIC

FOD FACE OPERATED DAMPER

FOG FUEL OIL GAGE

FOR FUEL OIL RETURN

FOS FUEL OIL SUPPLY

FOT FIBER OPTIC TERMINAL, FUEL OIL TRANSFER

FP FIRE PUMP, FLOOR PENETRATION

FPM FEET PER MINUTE

FPU FIELD PROGRAMMING UNIT

FRP FIBERGLASS REINFORCED POLY

FRT FIRE RETARDANT TREATED

FS FLOW SWITCH, FLOOR SINK, FAR SIDE

FSD FIRE/SMOKE DAMPER

FSS FUSIBLE SAFETY SWITCH

FT FEET

FTG FOOTING, FITTING

FV FULL VOLTAGE

FVC FIRE VALVE CABINET

FW FIRE WATER, FILTERED WATER

FWD FORWARD, FIRE SPRINKLER WATER DRAIN

FWS FIRE WATER SUPPLY

G

G GROUND

GA GAUGE, GAGE

GAL GALLON

GALV GALVANIZED

GEN GENERAL, GENERATOR

GFCI GROUND FAULT CIRCUIT INTERRUPTER

GFE GOVERNMENT FURNISHED EQUIPMENT

GFM GOVERNMENT FURNISHED MATERIAL

GND GROUND CONNECTOR

GOVT GOVERNMENT

GPH GALLONS PER HOUR

GPM GALLONS PER MINUTE

GRN GREEN

GRS GALVANIZED RIGID STEEL

GUH GAS FIRED UNIT HEATER

GWB GYPSUM WALLBOARD

GYP GYPSUM

H

HAZMAT HAZARDOUS MATERIALS

HB HOSE BIBB

HC HOLLOW CORE

HEX HEXAGONAL

HH HAND HOLE

HK HOOK

HM HOLLOW METAL

H. MET. HOLLOW METAL

HOA HAND-OFF-AUTOMATIC

HORIZ HORIZONTAL

HP HORSEPOWER

HPS HIGH PRESSURE SODIUM

HR HOUR

HS HIGH STRENGTH, HEADED STUD

HSB HIGH STRENGTH BOLT

HT HEIGHT

HTG HEATING

HTR HEATER

HU HUMIDIFIER

HVAC HEATING, VENTILATION AND AIR

CONDITIONING

HVY HEAVY

HWP HOT WATER PUMP

HWR HOT WATER RETURN

HWS HOT WATER SUPPLY

HWUH HOT WATER UNIT HEATER

HX HEAT EXCHANGER

HZ HERTZ

I

IC INTERCOMMUNICATION,

INTERCOM

ITEA INFORMATION TECHNOLOGY

EQUIPMENT AREA

ITER INFORMATION TECHNOLOGY

EQUIPMENT ROOM

IE INVERT ELEVATION

IN INCHES

INCAND INCANDESCENT

INCL INCLUDE

INDIC INDICATOR

INSUL INSULATED

INT INTERIOR

INV INVERT

IPS IRON PIN SET

IRF IRON ROD FOUND

ISMS INTEGRATED SECURITY

MANAGEMENT SYSTEM

ISO ISOCYANURATE

J

JB JUNCTION BOX

JP JOCKEY PUMP

JT JOINT

K

K KIPS

KA KILOAMPERES

KCMIL THOUSAND CIRCULAR MILLS

KSI 1000 POUNDS PER SQUARE INCH

KV KILOVOLT

KVA KILOVOLT AMPERES

KVAR KILOVOLT AMPERES-REACTIVE

KW KILOWATT

KWH KILOWATT HOUR

L

L&S LOUVER AND SCREEN

LAT LEAVING AIR TEMPERATURE

LBD LINEAR BAR DIFFUSER

LBG LINEAR BAR GRILLE

LBR LINEAR BAR RETURN

LBS POUNDS

LD LINEAR DIFFUSER

LF LINEAR FEET

LFS LIGHTING FIXTURE SCHEDULE

L.L. LIVE LOAD

LLH LONG LEG HORIZONTAL

LLV LONG LEG VERTICAL

LONG LONGITUDINAL

LOSP LOCAL OPERATING STATUS

PANEL

LP LOW POINT

LRA LOCKED ROTOR AMPERE

LRAG LINEAR RETURN AIR GRILLE

LRG LINEAR RETURN GRILLE

LS LIGHT STANDARD

LSD LINEAR SLOT DIFFUSER

LT LIQUID TIGHT

LTG LIGHTING

LV LOW VOLTAGE

LVL LEVEL

LWT LEAVING WATER TEMPERATURE

M

MAG MAGNETIC DOOR HOLD OPEN

MAINT MAINTENANCE

MAX MAXIMUM

MBH THOUSAND BTU/HOUR

MBP MAINTENANCE BYPASS PANEL

MCB MOLDED CASE BREAKER

MCC MOTOR CONTROL CENTER

MCM THOUSAND CIRCULAR MILLS

MCP MOTOR CIRCUIT PROTECTOR

MD MANUAL DAMPER

MDF MEDIUM DENSITY FIBERBOARD

MDT MAIN DISTRIBUTION TERMINAL

MECH MECHANICAL

MED MEDIUM

MEMB MEMBRANE

MFR MANUFACTURER

MG MOTOR GENERATOR

MH MANHOLE

MIL THOUSANDTHS OF AN INCH

MIL ST MILITARY STANDARD

MIN MINIMAL, MINUTE, MINIMUM

MISC MISCELLANEOUS

MLO MAIN LUGS ONLY

MM MILLIMETER

MOD MOTOR OPERATED DAMPER

MPG MULTI-POINT GROUND

MPH MILES PER HOUR

MSL MEAN SEA LEVEL

MTD MOUNTED

MTL METAL

MUA MAKE-UP AIR

MUW MAKE-UP WATER

MV MANUAL VENT

MVA MEGAVOLT AMPERE

MVD MANUAL VOLUME DAMPER

CHECKED

DESIGNED DATE

H

G

F

E

D

C

B

A

7 6 5 4 3 2 1

H

G

F

E

D

C

B

A

8 7 6 5 4 3 2 1

DRAWN

APPROVED BY

JCNISSUED BY

SUBMITTED BY

DRAWING NO

SCALES SHOWN FOR 22" X 34" SHEET. ADJUST SCALE FOR OTHER SIZES

REVIEWED BY

PWM-1302899-

DEPARTMENT OF TRANSPORTATION

FEDERAL AVIATION ADMINISTRATION

ATCT

ATO - TECHNICAL OPERATIONS EASTERN SERVICE AREA

PORTLAND ME(PORTLAND INTERNATIONAL JETPORT)

PROJECT ENGINEER MGR: ENGINEERING CENTER

PUBLIC AVAILABILITY TO BE DETERMINED UNDER 5 USC 552

FOR OFFICIAL USE ONLY

GENERAL

ENGINEERING SERVICES

TERMINAL

PROJECT NUMBER: 230041.00

5901 Peachtree Dunwoody Rd. | Bldg C | Suite 515 Atlanta, Georgia 30328-6055 phone 678.320.1888 | wileywilson.com

/2

/2

:1 :5

A

M

GMR

RAB

G010

1302899GMR

ABBREVIATIONS (SHEET 1 OF 2)

03/15/24

REV

REV APPROVED

DATE

DESCRIPTION JCN REDLINE

DATE

N

N NORTH, NEUTRAL

NA NOT APPLICABLE

N.C. NORMALLY CLOSED

NC NOISE CRITERIA

NEC NATIONAL ELECTRIC CODE

NEG NEGATIVE

NEMA NATIONAL ELECTRICAL MANUFACTURERS' ASSOCIATION

NFHB NON-FREEZE HOSE BIB

NFPA NATIONAL FIRE PROTECTION ASSOCIATION

NG NATURAL GAS

NHC NO HUNG CEILING

NIC NOT IN CONTRACT

NK NECK

N.O. NORMALLY OPEN

NO NUMBER OF DESIGNATION

NOM NOMINAL

N.S. NEAR SIDE

NTE NOT TO EXCEED

NTS NOT TO SCALE

O

O/O OUT TO OUT

OA OUTSIDE AIR

OAF OUTSIDE AIR FAN

OBD OPPOSED BLADE DAMPER

OC ON CENTER

OD OUTSIDE DIAMETER, OVERFLOW DRAIN

ODP OPEN DRIP PROOF

OE OPEN END

OH OPPOSITE HAND, OVERHEAD

OPNG OPENING

OPP OPPOSITE

ORD OVERFLOW ROOF DRAIN

ORL OVERFLOW ROOF LEADER

OSA OUTSIDE SUPPLY AIR

OSCO OUTSIDE CLEANOUT

OVHD OVERHEAD

OZ OUNCES

P

P POLE, PAINT, PUMP

PABX PRIVATE AUTOMATIC BRANCH EXCHANGE

PAF(PINS) POWDER ACTIVATED FASTENERS

PART PARTITION

PB PULL BOX

PC POINT OF CURVANCE

PCF POUNDS PER CUBIC FOOT

PCHWR PRIMARY CHILLED WATER RETURN

PCHWS PRIMARY CHILLED WATER SUPPLY

PCMS POWER CONTROL MONITORING SYSTEM

PCS POWER CONDITIONING SYSTEM

PD PRESSURE DROP

PF POWER FACTOR

PFD PERFORATED FACE DIFFUSER

PFR PERFORATED FACE RETURN

PH ELECTRICAL PHASE

PI PRESSURE INDICATOR

PIU POWER INDUCTION UNIT

PJF PREFORMED JOINT FILLER

PL PLATE

P.LAM PLASTIC LAMINATE

PLBG PLUMBING

PLCS PLACES

PLYWD PLYWOOD

PM POWER MANHOLE

PMB POWER MIXING BOX

PNL PANEL, PANELBOARD

POB POINT OF BEGINNING

POC POINT OF CONNECTION

POS POSITIVE, POSITION

POT POINT OF TANGENCY

PP POWER POLE, PATCH PANEL

PREFAB PREFABRICATED

PRESS PRESSURE

PRMY PRIMARY

PROJ PROJECTION

PROP PROPELLER

PRSR PRESSURIZATION

PRV PRESSURE REDUCING VALVE

PS PRESSURE SWITCH

PSF POUNDS PER SQ. FOOT

PSI POUNDS PER SQ. INCH

PSIA POUNDS PER SQ.IN. ABSOLUTE

PSIG POUNDS PER SQ.IN. GAGE

PT PRESSURE TRANSMITTER, PRESSURE-TEMPERATURE PORT

PTAC PACKAGED TERMINAL AIR CONDITIONER

PTB POST TENSIONED BEAM

PVC POLYVINYL CHLORIDE, POINT OF VERTICAL CURVATURE

PVMT PAVEMENT

Q

QUA QUARTER

R

R RED, RISER, RADIATOR, RADIUS, REFRIGERANT

RA RETURN AIR, REMOTE ANNUNCIATOR

RACP REMOTE ACCESS CONTROL PANEL

RAD RADIUS

RAG RETURN AIR GRILLE

RAR RETURN AIR REGISTER

RB RUBBER BASE

RCB REINFORCED CONCRETE BEAM

RCP REINFORCED CONCRETE PIPE, REFLECTED CEILING PLAN

RD ROOF DRAIN

RDF RUBBER RAISED DISK FLOOR

RE RESIDENT ENGINEER

REBAR REINFORCING STEEL BAR

REC RECEPTACLE

REC'D RECEIVED

RECP RECEPTACLE

RECT RECTIFIER, RECEPTACLE

REF REFERENCE

REG REGISTER

REINF REINFORCEMENT, REINFORCED

REQ'D REQUIRED

RET RETURN

REV REVISION

RF RETURN FAN

RFI RADIO FREQUENCY INTERFERENCE

RG RETURN GRILLE

RGS RIGID GALVANIZED STEEL

RL RAIN LEADER

RM ROOM

RMH ROOF MOUNTED HOOD

RML RADAR MICROWAVE LINK

RMS ROOT MEAN SQUARE

RO REVERSE OSMOSIS

RP BP REDUCED PRESSURE BACKFLOW PREVENTER

RPM ROTATIONS PER MINUTE, REVOLUTIONS PER MINUTE

RPZ REDUCED PRESSURE ZONE

RPZ BFP REDUCED PRESSURE ZONE BACKFLOW PREVENTOR

RQMTS REQUIREMENTS

RTN RETURN

RTU ROOF TOP UNIT

RV RELIEF VALVE

S

S SOUTH, STAIN COLOR, SANITARY

SA SUPPLY AIR

SAN SANITARY

SC SPIN IN COLLAR WITH VOLUME DAMPER, SENSIBLE COOLING

S.C. SOLID CORE

SCC SECURITY CONTROL CENTER

SCHED SCHEDULE

SCHWP SECONDARY CHILLED WATER PUMP

SCHWR SECONDARY CHILLED WATER RETURN

SCHWS SECONDARY CHILLED WATER SUPPLY

SCND SECONDARY

SCP SYSTEM CONTROL PANEL, SMOKE CONTROL PANEL

SD SPLITTER DAMPER STORM DRAIN, SMOKE DETECTOR

S.D. SUPPLY DIFFUSER

SDSTSMS SELF DRILLING SELF TAPPING SHEET METAL SCREWS

SEC SECONDARY

SECT SECTION

SECY SECURITY

SENS SENSIBLE

SF SQUARE FEET

SG SUPPLY GRILLE

SGL SINGLE

SHDWN SHUT DOWN

SHLD SHIELDED

SHT SHEET

SIM SIMILAR

SMACNA SHEET METAL AND AIR CONDITIONING CONTRACTORS

NATIONAL ASSOCIATION

SOV SHUT-OFF VALVE

SP STATIC PRESSURE(IN W.G.), SINGLE POLE, SUMP PUMP

SPEC SPECIFICATION

SPF STAIRWELL PRESSURIZATION FAN

SPST SINGLE POLE SINGLE THROW

SPT STATIC PRESSURE TRANSMITTER

SPVR SUPERVISORY CONDITION

SQ SQUARE

SQ.FT. SQUARE FOOT/FEET

SR SUPPLY REGISTER

SRG SIGNAL REFERENCE GRID

SS STAINLESS STEEL, SANITARY SEWER

S/S START-STOP

ST SHUNT TRIP

STD STANDARD

STGP SIGNAL TRANSPORT GROUND PLANE

STL STEEL

STP SHIELDED TWISTED PAIR

STRUCT STRUCTURAL

SUBJ SUBJUNCTION

SUSP SUSPENDED

SW SWITCH, SELF WEIGHT

SWBD SWITCHBOARD

SWG SIDEWALL GRILLE

SWGR SWITCHGEAR

SWR SIDEWALL REGISTER

SWSI SINGLE WIDTH SINGLE INLET

SWSR SIDE WALL SUPPLY REGISTER

SY SQUARE YARD

SYM SYMMETRICAL

SYS SYSTEM

T

T TRANSDUCER

T&B TOP AND BOTTOM

T&P TEMPERATURE AND PRESSURE

T/ TOP OF

TB TERMINAL BOX, TERMINAL BOARD

TC TRIP COIL, TOTAL COOLING, TIME CLOCK

TD TIME DELAY, TRENCH DRAIN

TEF TOILET EXHAUST FAN

TEL TELEPHONE

TELCO TELEPHONE COMPANY

TEMP TEMPERATURE

TERM TERMINAL

TG TRANSFER GRILLE

THK THICK, THICKNESS

THRD THREAD

TOC TOP OF CONCRETE

TOD TOP OF DUCT

TOS,T/S TOP OF STEEL

TOWB ATCT AND ATTACHED BASE BUILDING

TP TRAP PRIMER, TWISTER PAIR

TRACO TERMINAL RADAR APPROACH CONTROL BUILDING

TRBL TROUBLE CONDITION

TS TWO SPEED

TSP TOTAL STATIC PRESSURE, TRAP SEAL PRIMER

T^STAT THERMOSTAT

TT TEMPERATURE TRANSMITTER

TTB TELEPHONE TERMINAL BOARD

TV TELEVISION, TEMPERING VALVE

TVSS TRANSIENT VOLTAGE SURGE SUPPRESSOR (GFM)

TW TEMPERED WATER

TWY TAXIWAY

TYP TYPICAL

U

UBC UNIFORM BUILDING CODE

UC UNDERCUT

UG UNDERGROUND

UGP UNDERGROUND POWER

UH UNIT HEATER

UL UNDERWRITER'S LABORATORY

UNF UNFUSED

UNO UNLESS NOTED OTHERWISE

UON UNLESS OTHERWISE NOTED

UPC UNIFORM PLUMBING CODE

UPS,U UNINTERUPTIBLE POWER SUPPLY

UTIL UTILITY

V

V VOLT, VOLTAGE, VENT

VA VOLT AMPERE, VOICE ALARM

VAC VACUUM

VAV VARIABLE AIR VOLUME

VB VACUUM BREAKER

VCT VINYL COMPOSITE TILE

VD VOLUME DAMPER - MANUAL

VDT VIDEO DISPLAY TERMINAL

VENT VENTILATION

VERT VERTICAL

VEST VESTIBULE

VFD VARIABLE FREQUENCY DRIVE

VM VOLTMETER

VPF VESTIBLE PRESSURIZATION FAN

VTR VENT THROUGH ROOF

W

W WEST, WIDTH, WATT

W/ WITH

W/C WATER TO CEMENT

W/O WITHOUT

WB WET BULB

WC WATER COLUMN, WATER CLOSET, WALL COVERING

WCO WALL CLEANOUT

WCR WITHSTAND AND CLOSING RATING

WG WATER GAGE

WH WATER HEATER, WALL HEATER, WALL HYDRANT

WHA WATER HAMMER ARRESTER

W.L. WIND LOAD

WM WATT METER

WMS WIRE MESH SCREEN

WP SUBSCRIPT "WP" APPLIED TO ANY SYMBOL INDICATES

WEATHERPROOF NEMA TYPE 3R OR EQUIVALENT, UON

W.P. WORKING POINT

WPD WATER PRESSURE DROP

WSW WASHDOWN SUPPLY WATER

WT WATER TANK, WEIGHT

WTR WATER

WWF WELDED WIRE FABRIC

X

X AUXILIARY RELAY

XDCR TRANSDUCER

XFMR TRANSFORMER

XFR TRANSFER

XMTR TRANSMITTER

XPS EXTRUDED POLYSTYRENE

Y

Y WYE

Y- WYE DELTA

Z

Z IMPEDANCE

CHECKED

DESIGNED DATE

H

G

F

E

D

C

B

A

7 6 5 4 3 2 1

H

G

F

E

D

C

B

A

8 7 6 5 4 3 2 1

DRAWN

APPROVED BY

JCNISSUED BY

SUBMITTED BY

DRAWING NO

SCALES SHOWN FOR 22" X 34" SHEET. ADJUST SCALE FOR OTHER SIZES

REVIEWED BY

PWM-1302899-

DEPARTMENT OF TRANSPORTATION

FEDERAL AVIATION ADMINISTRATION

ATCT

ATO - TECHNICAL OPERATIONS EASTERN SERVICE AREA

PORTLAND ME(PORTLAND INTERNATIONAL JETPORT)

PROJECT ENGINEER MGR: ENGINEERING CENTER

PUBLIC AVAILABILITY TO BE DETERMINED UNDER 5 USC 552

FOR OFFICIAL USE ONLY

GENERAL

ENGINEERING SERVICES

TERMINAL

PROJECT NUMBER: 230041.00

5901 Peachtree Dunwoody Rd. | Bldg C | Suite 515 Atlanta, Georgia 30328-6055 phone 678.320.1888 | wileywilson.com

/2

/2

:1 :5

A

M

GMR

RAB

G011

1302899GMR

ABBREVIATIONS (SHEET 2 OF 2)

03/15/24

REV

REV APPROVED

DATE

DESCRIPTION JCN REDLINE

DATE

A B C

LOCATE TEMPORARY LOW AMBIENT

CHILLER ON EXISTING DRY COOLER PAD.

ROUTE TEMPORARY PIPING TO 205-COMM

ROOM REMOVABLE PANEL LOCATED ON

THE EXTERIOR, PLAN SOUTH WALL.

TEMPORARY CHILLER SHALL AT LEAST

SERVE ALL HYDRONIC COOLING

EQUIPMENT SERVING CRITICAL SPACES TO

AVOID ANY SERVICE INTERRUPTIONS.

COORDINATE SPACES WITH FAA.

LOCATE TEMPORARY BOILER WITHIN

FENCED IN CHILLER YARD. ROUTE

TEMPORARY PIPING TO 205-COMM ROOM

REMOVABLE PANEL LOCATED ON THE

EXTERIOR, PLAN SOUTH WALL.

TEMPORARY BOILER SHALL AT LEAST

SERVE ALL HYDRONIC HEATING

EQUIPMENT SERVING CRITICAL SPACES TO

AVOID ANY SERVICE INTERRUPTIONS.

COORDINATE SPACES WITH FAA.

TELCO/LAN

CONFERENCE

ROOM

OFFICE

#1

SUPERVISOR'S

OFFICE

#2

10 CBI/TRAINING

AT

MANAGER

CORRIDOR

ADA

TOILET

2 TOILET

ROOM

2A

LINK

ELECT.

ROOM

TELCO

ROOM

MECHANICAL

ROOM

LOBBY

ELEV.

VESTIBULE

STAIR

CABLE

SHAFT

ELEV.

EQUIP.

EXISTING TO REMAIN

NATURAL GAS METER

NATURAL GAS TIE-IN

FOR TEMPORARY

BOILER

A B C

CONNECT

TEMPORARY

CHILLER AND

BOILER PIPING TO

RISER IN CHASE.

ROUTE TEMPORARY PIPING

FROM TEMPORARY CHILLER

AND BOILER THROUGH

REMOVABLE PANEL

COMM

ROOM

CABLE

CHASE

ELEV.

STAIR

PROVIDE ACCESS

PANEL TO CHASE FOR

TEMPORARY PIPING

N

CHECKED

DESIGNED DATE

H

G

F

E

D

C

B

A

7 6 5 4 3 2 1

H

G

F

E

D

C

B

A

8 7 6 5 4 3 2 1

DRAWN

APPROVED BY

JCNISSUED BY

SUBMITTED BY

DRAWING NO

SCALES SHOWN FOR 22" X 34" SHEET. ADJUST SCALE FOR OTHER SIZES

REVIEWED BY

PWM-1302899-

DEPARTMENT OF TRANSPORTATION

FEDERAL AVIATION ADMINISTRATION

ATCT

ATO - TECHNICAL OPERATIONS EASTERN SERVICE AREA

PORTLAND ME(PORTLAND INTERNATIONAL JETPORT)

PROJECT/SYSTEM ENGINEER ENGINEERING MANAGER

PUBLIC AVAILABILITY TO BE DETERMINED UNDER 5 USC 552

FOR OFFICIAL USE ONLY

GENERAL

ENGINEERING SERVICES

TERMINAL

PROJECT NUMBER: 230041.00

5901 Peachtree Dunwoody Rd. | Bldg C | Suite 515 Atlanta, Georgia 30328-6055 phone 678.320.1888 | wileywilson.com

/2

/2

:1

:5

P

M

ZMA

ALM

G020

1302899SWL

PHASING

06/28/24

1. THE BUILDING(S) WILL BE OCCUPIED AT ALL TIIMES DURING CONSTRUCTION. THE CONTRACTOR SHALL

COORDINATE WITH THE CONTRACTING OFFICER REGARD ALL INTERRUPTIONS OF UTILITIES,

TEMPORARY EXITS, DUST PARTITIONS, DELIVERIES, AND ALL OTHER JOB REQUIREMENTS.

2. PHASE DEMOLITION AND NEW WORK AS REQUIRED TO MAINTAIN BUILDING OPERATIONS. PROTECT BUILDING OCCUPANTS, AND MAINTAIN REQUIRED ENTRANCES AND EXITS THROUGHOUT THE DURATION OF THE PROJECT. SUBMIT PROPOSED PHASING PLAN THAT MEETS THE INTENT AND REQUIREMENTS

OUTLINED IN THE DRAWINGS FOR REVIEW AND APPROVAL PRIOR TO COMMENCING WORK.

3. PROVIDE TEMPORARY HEATING WATER WHILE THE BUILDING HEATING WATER SYSTEM IS

UNAVAILABLE. PROVIDE TEMPORARY BOILER WITH AN OUTPUT CAPACITY OF AT LEAST 285-MBH AND PUMP PACKAGE SIZED FOR 19.7 GPM AND 50 F.- H2O. THE TEMPORARY BOILER TIE-IN TO THE BUILDING DISRIBUTION SYSTEM SHALL OCCUR DURING AN APPROVED TIMEFRAME BY THE FAA AS WELL AS THE SWITCH BACK TO THE BUILDING HEATING WATER SYSTEM. ALL TEMPORARY HYDRONIC PIPING AND CONNECTIONS MUST BE ABOVE GRADE, INSULATED, AND ROUTED IN SUCH A WAY AS TO MAINTAIN CLEAR WALKING PATHS AND PREVENT TRIPPING HAZARDS. TEMPORARY BOILER MUST BE TESTED FOR

A MINIMUM OF A ONE WEEK PERIOD PRIOR TO THE DEMOLITION OF THE EXISTING BOILER.

4. PROVIDE TEMPORARY CHILLED WATER WHILE THE BUILDING CHILLED WATER SYSTEM IS

UNAVAILABLE. PROVIDE TEMPORARY CHILLER WITH A CAPACITY OF AT LEAST 40-TONS AND PUMP PACKAGE SIZED FOR AT LEAST 99 GPM AND 115 FT.-H2O.THE TEMPORARY CHILLER TIE-IN TO THE BUILDING DISTRIBUTION SYSTEM SHALL OCCUR DURING AN APPROVED TIMEFRAME BY THE FAA AS WELL AS THE SWITCH BACK TO THE BUILDING CHILLED WATER SYSTEM. ALL TEMPORARY HYDRONIC PIPING AND CONNECTIONS MUST BE ABOVE GRADE, INSULATED, AND ROUTED IN SUCH A WAY AS TO MAINTAIN

CLEAR WALKING PATHS AND PREVENT TRIPPING HAZARDS.

5. THE CONTRACTOR IS RESPONSIBLE FOR ALL NECESSARY WORK AND COMPONENTS REQUIRED TO

MAKE TEMPORARY SYSTEMS WORK INCLUDING PIPING AND POWER. AFTER REMOVAL OF THE

TEMPORARY SYSTEMS, RETURN HARDSCAPES AND OTHER AFFECTED AREAS TO THEIR ORIGINAL

CONDITION.

6. THE CONTRACTOR IS RESPONSIBLE FOR OPERATION AND MAINTENANCE OF THE TEMPORARY

HEATING AND COOLING EQUIPMENT. IF A PROBLEM WITH THE TEMPORARY HEATING EQUIPMENT

OCCURS OR IS REPORTED, THE CONTRACTOR MUST RESPOND WITHIN FOUR HOURS. THE CONTRACTOR MUST ENSURE THE TEMPORARY HEATING EQUIPMENT IS NOT OUT OF SERVICE FOR MORE THAN EIGHT

HOURS.

7. AFTER CHILLER AND BOILER SYSTEMS ARE RUNNING, WORK ON THE BASE BUILDING SHALL

COMMENCE. COORDINATE WITH FAA ABOUT PERSONNEL RELOCATION.

8. PROVIDE SPOT COOLERS AND ELECTRIC HEATERS FOR ALL SPACES REQUIRING COOLING AND HEATING NOT ON THE TEMPORARY CHILLERS AND BOILERS. COORDINATE UNIT QUANTITIES AND

REQUIRED SPACES WITH FAA.

9. REPLACEMENT OF VALVES WITH 2-WAY BELIMO ENERGY VALVES SHALL OCCUR IN OFF HOURS TO

MINIMIZE INTERRUPTION.

10. THE CONTRACTOR IS RESPONSIBLE FOR PROVIDING TEMPORARY POWER, AND ALL SUPPORTING

TEMPORARY POWER INFRASTRUCTURE, TO SUPPORT OPERATION OF TEMPORARY HEATING AND

COOLING EQUIPMENT DURING CONSTRUCTION. TEMPORARY POWER INFRASTRUCTURE INCLUDES BUT IS NOT LIMITED TO: PANELBOARDS, DISCONNECT SWITCHES, WIRING, CONDUIT, RECEPTACLES & OTHER DEVICES REQUIRED TO MAINTAIN FACILITY OPERATIONS. CONTRACTOR MAY UTILIZE THE FACILITY ELECTRICAL SERVICE FROM DISTRIBUTION PANEL MDPE AVAILABLE SPACE(S) AND SPARE CIRCUIT

BREAKER(S) TO SUPPLY TEMPORARY EQUIPMENT, PROVIDED TEMPORARY EQUIPMENT DOES NOT

OVERLOAD ANY PORTION OF THE EXISTING ELECTRICAL SYSTEM. OTHERWISE, THE CONTRACTOR IS

RESPONSIBLE FOR PROVIDING A PORTABLE GENERATOR OF SUFFICIENT CAPACITY TO SUPPORT

TEMPORARY EQUIPMENT OPERATIONS.

11. PROVIDE TEMPORARY OFFICE TRAILER AND PORTABLE TOILET TRAILER FOR BASE BUILDING

PERSONNEL. COORDINATE LOCATION WITH CONTRACTOR.

GENERAL PHASING NOTES

SCALE: 3/16" = 1'-0"G020

1 FIRST FLOOR PHASING PLAN

SCALE: 3/16" = 1'-0"G020

2 SECOND FLOOR MECHANICAL PHASING PLAN

0' 4' 8' 12'

REV

REV APPROVED

DATE

DESCRIPTION JCN REDLINE

DATE

2 2A

WALL TO BE

INSTALLED BY

OTHERS

CEILING DEMOLITION SELECTED AREAS. REFER TO NOTES.

N

CHECKED

DESIGNED DATE

H

G

F

E

D

C

B

A

7 6 5 4 3 2 1

H

G

F

E

D

C

B

A

8 7 6 5 4 3 2 1

DRAWN

APPROVED BY

JCNISSUED BY

SUBMITTED BY

DRAWING NO

SCALES SHOWN FOR 22" X 34" SHEET. ADJUST SCALE FOR OTHER SIZES

REVIEWED BY

PWM-1302899-

DEPARTMENT OF TRANSPORTATION

FEDERAL AVIATION ADMINISTRATION

ATCT

ATO - TECHNICAL OPERATIONS EASTERN SERVICE AREA

PORTLAND ME(PORTLAND INTERNATIONAL JETPORT)

PROJECT ENGINEER MGR: ENGINEERING CENTER

PUBLIC AVAILABILITY TO BE DETERMINED UNDER 5 USC 552

FOR OFFICIAL USE ONLY

ARCHITECTURAL

ENGINEERING SERVICES

TERMINAL

PROJECT NUMBER: 230041.00

5901 Peachtree Dunwoody Rd. | Bldg C | Suite 515 Atlanta, Georgia 30328-6055 phone 678.320.1888 | wileywilson.com

/2

/2

:0 :5

P

M

GMR

NXE

D120

1302899GMR

BASE BUILDING REFLECTED CEILING DEMOLITION

03/15/24

SCALE: 3/16" = 1'-0"D120

BASE BUILDING REFLECTED CEILING

DEMOLITION

NOTES:

1. REMOVE EXISTING 2'X2' CEILING TILES AND GRID. COORDINATE WITH OTHER DISCIPLINES

BEFORE DEMOLITION TO ASSURE SAFETY AND PROJECT PHASING COORDINATION. REFER

TO HATCHED AREA ON RCP DEMOLITION. WALL TRACK TO BE REUSED WHEN POSSIBLE.

2. REFER TO OTHER DISCIPLINES FOR MECHANICAL AND ELECTRICAL DEMOLITION

ROOM SCHEDULE BASE BUILDING LEVEL 1

ROOM

NO ROOM NAME

1 ENTRY

2 ADA TOILET

2A TOILET ROOM

3 CORRIDOR

4 TELCO/LAN

5 CONFERENCE ROOM

6 SUPERVISOR'S

7 CBI/TRAINING

8 JANITOR'S

9 AT MANAGER

10 OFFICE #2

11 OFFICE #1

13 LINK

12'8'4'0'

SCALE: 3/16"=1'-0" REV

REV APPROVED

DATE

DESCRIPTION JCN REDLINE

DATE

EXPOSED CEILING EXPOSED CEILING

EXPOSED CEILING

EXPOSED CEILING

A B C

202 203

EXPOSED CEILING

A B C

302 303

EXISTING CEILING AND GRID TO

REMAIN, REMOVE AND REPLACE

CEILING TILES AS NEEDED,

CEILING MUST BE REINSTATED

TO "NORMAL" DAILY.

REFER TO NOTE 2

CEILING DEMOLITION SELECTED AREAS. REFER TO NOTES.

N

CHECKED

DESIGNED DATE

H

G

F

E

D

C

B

A

7 6 5 4 3 2 1

H

G

F

E

D

C

B

A

8 7 6 5 4 3 2 1

DRAWN

APPROVED BY

JCNISSUED BY

SUBMITTED BY

DRAWING NO

SCALES SHOWN FOR 22" X 34" SHEET. ADJUST SCALE FOR OTHER SIZES

REVIEWED BY

PWM-1302899-

DEPARTMENT OF TRANSPORTATION

FEDERAL AVIATION ADMINISTRATION

ATCT

ATO - TECHNICAL OPERATIONS EASTERN SERVICE AREA

PORTLAND ME(PORTLAND INTERNATIONAL JETPORT)

PROJECT ENGINEER MGR: ENGINEERING CENTER

PUBLIC AVAILABILITY TO BE DETERMINED UNDER 5 USC 552

FOR OFFICIAL USE ONLY

ARCHITECTURAL

ENGINEERING SERVICES

TERMINAL

PROJECT NUMBER: 230041.00

5901 Peachtree Dunwoody Rd. | Bldg C | Suite 515 Atlanta, Georgia 30328-6055 phone 678.320.1888 | wileywilson.com

/2

/2

:0 :5

P

M

GMR

NXE

D121

1302899GMR

LEVEL 1, 2, AND 3 REFLECTED CEILING DEMOLITION

03/15/24

SCALE: 3/16" = 1'-0"D121

1 LEVEL 1 REFLECTED CEILING DEMOLITION

SCALE: 3/16" = 1'-0"D121

2 LEVEL 2 REFLECTED CEILING DEMOLITION

SCALE: 3/16" = 1'-0"D121

3 LEVEL 3 REFLECTED CEILING DEMOLITION

NOTES:

1. REMOVE EXISTING 2'X2' CEILING TILES AND GRID. COORDINATE WITH OTHER

DISCIPLINES BEFORE DEMOLITION TO ASSURE SAFETY AND PROJECT PHASING

COORDINATION. REFER TO HATCHED AREA ON RCP DEMOLITION PLANS. WALL

TRACK TO BE REUSED WHEN POSSIBLE.

2. COORDINATE WITH FAA COR AND SITE FOR CEILINGS TO BE STORED AND RE-

INSTALLED

3. REFER TO OTHER DISCIPLINES FOR MECHANICAL AND ELECTRICAL DEMOLITION

ROOM SCHEDULE LEVEL 1, 2, & 3

ROOM

NO ROOM NAME

101 VESTIBULE

102 STAIR

103 CABLE SHAFT

104 LOBBY

105 ELEV.

106 ELEV. EQUIP.

107 ELECT. ROOM

108 TELCO ROOM

109 MECHANICAL ROOM

201 STAIR

202 CABLE CHASE

203 ELEV.

205 COMM ROOM

301 STAIR

302 CABLE SHAFT

303 ELEV

304 TRACON

305 STORAGE

306 MECHANICAL ROOM

307 TOILET

12'8'4'0'

SCALE: 3/16"=1'-0"

REFER TO NOTE 1

REV

REV APPROVED

DATE

DESCRIPTION JCN REDLINE

DATE

APVD

NOTE: NO ARCHITECTURAL WORK TO BE DONE ON THIS LEVEL

EXPOSED CEILING

404 405

REMOVE AND DISPOSE

EXISTING CEILING TILES

AND GRID

EXISTING CEILING TO

REMAIN. NO CEILING

WORK TO BE DONE IN

THIS ROOM

A B C

502 503

504 505

EXISTING CEILING TO

REMAIN. NO CEILING

WORK TO BE DONE IN

THIS ROOM

EXISTING CEILING AND GRID TO

REMAIN, REMOVE AND REPLACE

CEILING TILES AS NEEDED,

CEILING MUST BE REINSTATED

TO "NORMAL" DAILY.

REFER TO NOTE 2

REMOVE AND

DISPOSE EXISTING

GYPSUM CEILING

A B C

CAB

CEILING DEMOLITION SELECTED AREAS. REFER TO NOTES.

N

CHECKED

DESIGNED DATE

H

G

F

E

D

C

B

A

7 6 5 4 3 2 1

H

G

F

E

D

C

B

A

8 7 6 5 4 3 2 1

DRAWN

APPROVED BY

JCNISSUED BY

SUBMITTED BY

DRAWING NO

SCALES SHOWN FOR 22" X 34" SHEET. ADJUST SCALE FOR OTHER SIZES

REVIEWED BY

PWM-1302899-

DEPARTMENT OF TRANSPORTATION

FEDERAL AVIATION ADMINISTRATION

ATCT

ATO - TECHNICAL OPERATIONS EASTERN SERVICE AREA

PORTLAND ME(PORTLAND INTERNATIONAL JETPORT)

PROJECT ENGINEER MGR: ENGINEERING CENTER

PUBLIC AVAILABILITY TO BE DETERMINED UNDER 5 USC 552

FOR OFFICIAL USE ONLY

ARCHITECTURAL

ENGINEERING SERVICES

TERMINAL

PROJECT NUMBER: 230041.00

5901 Peachtree Dunwoody Rd. | Bldg C | Suite 515 Atlanta, Georgia 30328-6055 phone 678.320.1888 | wileywilson.com

/2

/2

:0 :0

P

M

GMR

NXE

D122

1302899GMR

LEVEL 4, 5 AND CAB LEVEL REFLECTED CEILING

DEMOLITION

03/15/24

SCALE: 3/16" = 1'-0"D122

1 LEVEL 4 REFLECTED CEILING DEMOLITION

SCALE: 3/16" = 1'-0"D122

2 LEVEL 5 REFLECTED CEILING DEMOLITION

SCALE: 3/16" = 1'-0"D122

3 CAB LEVEL REFLECTED CEILING DEMOLITION

NOTES:

1. REMOVE EXISTING 2'X2' CEILING TILES AND GRID. COORDINATE WITH OTHER

DISCIPLINES BEFORE DEMOLITION TO ASSURE SAFETY AND PROJECT PHASING

COORDINATION. REFER TO HATCHED AREA ON RCP DEMOLITION PLANS.

2. COORDINATE WITH FAA COR AND SITE FOR CEILINGS TO BE STORED AND RE-

INSTALLED

3. REFER TO OTHER DISCIPLINES FOR MECHANICAL AND ELECTRICAL DEMOLITION

ROOM SCHEDULE LEVEL 4 & 5

ROOM

NO ROOM NAME

401 STAIR / LOBBY

402 CABLE SHAFT

403 ELEV.

404 EQUIP ROOM

405 LAN ROOM

407 TOILET

408 MECHANICAL ROOM

501 STAIR

502 CABLE SHAFT

503 ELEV.

504 LOUNGE

505 KITCHEN

506 CORRIDOR

507 STAIR

508 TOILET

509 MECHANICAL ROOM

CAB STAIR

12'8'4'0'

SCALE: 3/16"=1'-0"

NO WORK TO BE DONE ON THIS LEVEL

REV

REV APPROVED

DATE

DESCRIPTION JCN REDLINE

DATE

APVD

7'-9"

6'-2 1/2"

1/4" FT

1/4" FT

/4

F

T

1/4" FT

1/4" FT 1/4" FT

H P

EXISTING

CRICKET

H P

AHU-1

EXISTING

SCUPPER

(10"x8")

EXISTING

SCUPPER

(10"x8")

EXISTING

LIGHTNING

PROTECTION

CONNECTION TO

FLASHING CAP

EXISTING WALL

MOUNTED

LADDER (28"x8")

EXISTING LINE

OF FOUNDATION

BELOW

EXISTING

CANOPY

EXISTING 3"

SANITARY

VENT

EXISTING FACE OF ATCT

1" TO 1/2" GAS

FROM METER

EXISTING 16"x8"

SCUPPER

EXISTING AIR

TERMINAL,

24" TYP

EXISTING

LIGHTNING

PROTECTION

CONNECTION TO

FLASHING CAP

EXISTING

SCUPPER

(10"x8")

EXISTING

BALLASTED

MEMBRANE

ROOF (TYPICAL)

TO BE REMOVED

WITH ALL

ACCESORIES

EXISTING

BALLASTED

MEMBRANE

ROOF (TYPICAL)

EXISTING

ATCT

A

B

C

D

E

E

D141

D141

D141

D141

EXISTING

AHU TO BE

REMOVED

DEMOLITION ITEM

N

CHECKED

DESIGNED DATE

H

G

F

E

D

C

B

A

7 6 5 4 3 2 1

H

G

F

E

D

C

B

A

8 7 6 5 4 3 2 1

DRAWN

APPROVED BY

JCNISSUED BY

SUBMITTED BY

DRAWING NO

SCALES SHOWN FOR 22" X 34" SHEET. ADJUST SCALE FOR OTHER SIZES

REVIEWED BY

PWM-1302899-

DEPARTMENT OF TRANSPORTATION

FEDERAL AVIATION ADMINISTRATION

ATCT

ATO - TECHNICAL OPERATIONS EASTERN SERVICE AREA

PORTLAND ME(PORTLAND INTERNATIONAL JETPORT)

PROJECT ENGINEER MGR: ENGINEERING CENTER

PUBLIC AVAILABILITY TO BE DETERMINED UNDER 5 USC 552

FOR OFFICIAL USE ONLY

ARCHITECTURAL

ENGINEERING SERVICES

TERMINAL

PROJECT NUMBER: 230041.00

5901 Peachtree Dunwoody Rd. | Bldg C | Suite 515 Atlanta, Georgia 30328-6055 phone 678.320.1888 | wileywilson.com

/2

/2

:0 :0

P

M

GMR

NXE

D140

1302899FAA

ROOF DEMOLITION

03/15/24

SCALE: 3/16" = 1'-0"D140

1 EXISTING BASE BUILDING ROOF LAYOUT

DEMOLITION LEGEND

KEYNOTES NOTES

A AHU-1 68"X42"

B DEMO GAS METER , COORDINATE WITH GAS COMPANY

C 3" SANITATION VENT

D EF-1 1.13"X13" PENETRATION WITH 20" ROUND FAN 2. 24" AIR TERMINAL ON TOP

E LIGHTNING PROTECTION EQUIPMENT, REFER TO ELECTRICAL WORK

12'8'4'0'

SCALE: 3/16"=1'-0"

NOTES:

1. COORDINATE DEMOLITION OF ROOFING AND EXISTING EQUIPMENT WITH

INSTALLATION OF NEW RTU CURB AND ROOFING. AT NO TIME SHOULD ROOF DECK

OR OPENINGS BE EXPOSED TO WEATHER.

2. DEMOLISH LIGHTNING PROTECTION SYSTEM AIR TERMINALS AND ROOF

CONDUCTORS FROM BASE BUILDING ROOFTOP PRIOR TO DEMOLITION OF

ROOFING. DISCONNECT DOWN CONDUCTOR TERMINATIONS AT ROOFTOP AND

RETAIN DOWN CONDUCTORS FOR RENOVATION WORK. COORDINATE LIGHTNING

PROTECTION SYSTEM WORK WITH ROOF LIGHTING PROTECTION PLAN ON E106.

REV

REV APPROVED

DATE

DESCRIPTION JCN REDLINE

DATE

APVD

EXISTING TO REMAIN SCUPPER

EXISTING TO

REMAIN

CONDUCTOR HEAD

EXISTING TO REMAIN

DOWNSPOUT

EXISTING

INSULATED

METAL PANEL

TO REMAIN

EXISTING WALL COPING

TO BE REMOVED

REMOVE EXISTING ROOF

ASSEMBLY DOWN TO DECK.

EXISTING SLOPED METAL EDGE

SEE NOTE 1

EXISTING TO BE REMOVED STONE BALLAST

EXISTING TO REMAIN

CONC ON METAL DECK

EXISTING WALL

COPING TO BE

REMOVED

REMOVE EXISTING ROOF

ASSEMBLY DOWN TO DECK.

EXISTING

INSULATED

METAL PANEL

TO REMAIN

CANT STRIP

SEE NOTE 1

EXISTING STONE

BALLAST TO BE

REMOVED

EXISTING ROOF COPING AND

FLASHING TO BE REMOVED

EXISTING INSULATED

METAL PANEL TO

REMAIN. TYP.

REMOVE EXISTING

ROOF ASSEMBLY

DOWN TO DECK.

EXISTING CANT STRIP, SEE NOTE 1

EXISTING STONE BALLAST TO BE REMOVED

EXISTING ROOF COPING AND

FLASHING TO BE REMOVED

REMOVE EXISTING ROOF

ASSEMBLY DOWN TO DECK.

EXISTING

INSULATED METAL

PANEL TO REMAIN

CHECKED

DESIGNED DATE

H

G

F

E

D

C

B

A

7 6 5 4 3 2 1

H

G

F

E

D

C

B

A

8 7 6 5 4 3 2 1

DRAWN

APPROVED BY

JCNISSUED BY

SUBMITTED BY

DRAWING NO

SCALES SHOWN FOR 22" X 34" SHEET. ADJUST SCALE FOR OTHER SIZES

REVIEWED BY

PWM-1302899-

DEPARTMENT OF TRANSPORTATION

FEDERAL AVIATION ADMINISTRATION

ATCT

ATO - TECHNICAL OPERATIONS EASTERN SERVICE AREA

PORTLAND ME(PORTLAND INTERNATIONAL JETPORT)

PROJECT ENGINEER MGR: ENGINEERING CENTER

PUBLIC AVAILABILITY TO BE DETERMINED UNDER 5 USC 552

FOR OFFICIAL USE ONLY

ARCHITECTURAL

ENGINEERING SERVICES

TERMINAL

PROJECT NUMBER: 230041.00

5901 Peachtree Dunwoody Rd. | Bldg C | Suite 515 Atlanta, Georgia 30328-6055 phone 678.320.1888 | wileywilson.com

/2

/2

:0 :0

P

M

GMR

NXE

D141

1302899FAA

ROOF DETAILS DEMOLITION

03/15/24

SCALE: 1 1/2" = 1'-0"D141

1 EXISTING ROOF SCUPPER DETAIL

SCALE: 1 1/2" = 1'-0"D141

2 EXISTING ROOF EAVE DETAIL

SCALE: 1" = 1'-0"D141

3 EXISTING LINK CROSS SECTION

SCALE: 1" = 1'-0"D141

4 EXISTING LINK SILL

2'1'6"0'

SCALE: 1"=1'-0"

18"1'6"0'

SCALE: 1-1/2"=1'-0"

NOTES

1. REMOVE CANT STRIP OR METAL EDGE AN REPLACE WITH WOOD NAILERS

TO MATCH DETAIL 4/A141 OR APPROVED EQUAL. ASSEMBLY MUST BE ABLE TO

WITHSTAND ASCE 7-16 DESIGN MAXIMUM WIND PRESSURE. SEE DRAWING

S612

2. COORDINATE DEMOLITION OF ROOFING AND EXISTING EQUIPMENT WITH

INSTALLATION OF NEW RTU CURB AND ROOFING. AT NO TIME SHOULD ROOF

DECK OR OPENINGS BE EXPOSED TO WEATHER.

THIS PROJECT COPY IS BASED ON

DRAWING NE-D-26977-A04

REVISION 2 . DATED 11/08/1996

REV

REV APPROVED

DATE

DESCRIPTION JCN REDLINE

DATE

APVD

M

D304

VESTIBULE

LOBBY

18"ø

8"ø10"ø

8"ø

16"ø

8"ø

8"ø8"ø

12"ø

8"ø

8"ø

8"ø

6"ø

6"ø

6"ø

6"ø

8"ø8"ø

10"ø

CONFERENCE

ROOM

SUPERVISOR'S

SUPERVISOR'S

OFFICE

#1

TELCO/LAN

OFFICE

#2

10 CBI/TRAINING

AT

MANAGER

ENTRY

CORRIDOR

JANITOR'S

ADA

TOILET

TOILET

ROOM

2A

ELECT.

ROOM

TELCO

ROOM

ELEV.

EQUIP.

CABLE

SHAFT

ELEV.

STAIR

MECHANICAL

ROOM

8"ø

(E) 3/4" HWR

3/4" 1 1/4"

1 1/4"

1" 1"

1 1/4" 1 1/4" 1"

1"

(E) UH

8 EXISTING TO REMAIN

NATURAL GAS METER

EXISTING TO REMAIN FENCE

AROUND CHILLER YARD

N

CHECKED

DESIGNED DATE

H

G

F

E

D

C

B

A

7 6 5 4 3 2 1

H

G

F

E

D

C

B

A

8 7 6 5 4 3 2 1

DRAWN

APPROVED BY

JCNISSUED BY

SUBMITTED BY

DRAWING NO

SCALES SHOWN FOR 22" X 34" SHEET. ADJUST SCALE FOR OTHER SIZES

REVIEWED BY

PWM-1302899-

DEPARTMENT OF TRANSPORTATION

FEDERAL AVIATION ADMINISTRATION

ATCT

ATO - TECHNICAL OPERATIONS EASTERN SERVICE AREA

PORTLAND ME(PORTLAND INTERNATIONAL JETPORT)

PROJECT/SYSTEM ENGINEER ENGINEERING MANAGER

PUBLIC AVAILABILITY TO BE DETERMINED UNDER 5 USC 552

FOR OFFICIAL USE ONLY

MECHANICAL

ENGINEERING SERVICES

TERMINAL

PROJECT NUMBER: 230041.00

5901 Peachtree Dunwoody Rd. | Bldg C | Suite 515 Atlanta, Georgia 30328-6055 phone 678.320.1888 | wileywilson.com

/2

/2

:1

:4

P

M

ZMA

ALM

D300

1302899SWL

FIRST FLOOR MECHANICAL DEMOLITION PLAN

06/28/24

SCALE: 3/16" = 1'-0"D300

1 FIRST FLOOR DUCTWORK DEMOLITION PLAN

KEYNOTE LEGEND

KEY DESCRIPTION

1 REMOVE 1.5-TON FAN COIL UNIT, DUCTWORK, PIPING, INSULATION,

SUPPORTS, DIFFUSERS, GRILLES, AND ASSOCIATED ACCESSORIES

SERVING FCU-1.

2 REMOVE 2.5-TON CEILING HUNG COMPUTER ROOM UNIT AND

ASSOCIATED PIPING.

3 REMOVE BOILER FLUE.

4 REMOVE EXHAUST GRILLE, DUCTWORK, AND ACCESSORIES UP TO

EXHAUST FAN.

5 REMOVE CONTROL PANEL.

6 CONTRACTOR TO DEMOLISH DUCTWORK, INSULATION, SUPPORTS,

DIFFUSERS, AND GRILLES SERVING AHU-1.

7 REMOVE IN WALL PACKAGED TERMINAL AIR CONDITIONER AND

PATCH WALL. SEE ARCHITECTURAL DETAIL 1/A500.

8 REMOVE HOT WATER PIPING TO UNIT HEATER TO ALLOW

REROUTING TO MINIMIZE CROSSOVER WITH ELECTRICAL CONDUIT.

0' 4' 8' 12'

X

1. REMOVE ALL MECHANICAL HVAC EQUIPMENT, EXISTING DUCTWORK, DUCTWORK ACCESSORIES, ASSOCIATED SUPPORTS, AND TERMINALS AS SHOWN.

2. REMOVE ALL EXISTING PIPING, PIPING ACCESSORIES, AND ASSOCIATED SUPPORTS AS SHOWN.

3. REMOVE ALL EXISTING CONTROLS AND THERMOSTATS.

4. PATCH AND SEAL TO MATCH EXISTING ALL BUILDING PENETRATIONS CREATED DURING DEMOLITION

AND NOT RE-USED. REFER TO ARCHITECTURAL FOR PATCHING DETAILS.

5. TEST DRAINED GLYCOL FOR FULL CHEMICAL ANALYSIS AND REPLACE WITH NEW SOLUTION TO MEET

DESIRED 40% PROPYLENE GLYCOL MIX.

6. ONLY FAA SSC PERSONNEL CAN OPERATE CIRCUIT BREAKERS.

GENERAL DEMOLITION NOTES

REV

REV APPROVED

DATE

DESCRIPTION JCN REDLINE

DATE

1" 2" 2"

1"

24"x24"

(E) 24"x20" SA

(E) 14"x12" SA

(E) 12"x8" SA

(E) 8"x8" SA

(E) 12"x8" SA

(E) 14"x12" SA

(E) 18"x12" SA

(E) 24"x12" SA

(E) 14"x12" SA(E) 12"x12" SA

(E) 24"x12" SA

(E) 18"x12" SA(E) 14"x12" SA(E) 12"x12" SA

COMM

ROOM

CABLE

CHASE

ELEV.

STAIR

(E) 24"x24" SA

N

CHECKED

DESIGNED DATE

H

G

F

E

D

C

B

A

7 6 5 4 3 2 1

H

G

F

E

D

C

B

A

8 7 6 5 4 3 2 1

DRAWN

APPROVED BY

JCNISSUED BY

SUBMITTED BY

DRAWING NO

SCALES SHOWN FOR 22" X 34" SHEET. ADJUST SCALE FOR OTHER SIZES

REVIEWED BY

PWM-1302899-

DEPARTMENT OF TRANSPORTATION

FEDERAL AVIATION ADMINISTRATION

ATCT

ATO - TECHNICAL OPERATIONS EASTERN SERVICE AREA

PORTLAND ME(PORTLAND INTERNATIONAL JETPORT)

PROJECT/SYSTEM ENGINEER ENGINEERING MANAGER

PUBLIC AVAILABILITY TO BE DETERMINED UNDER 5 USC 552

FOR OFFICIAL USE ONLY

MECHANICAL

ENGINEERING SERVICES

TERMINAL

PROJECT NUMBER: 230041.00

5901 Peachtree Dunwoody Rd. | Bldg C | Suite 515 Atlanta, Georgia 30328-6055 phone 678.320.1888 | wileywilson.com

/2

/2

:1

:4

P

M

ZMA

ALM

D301

1302899SWL

SECOND FLOOR MECHANICAL DEMOLITION PLAN

06/28/24

SCALE: 3/16" = 1'-0"D301

1 SECOND FLOOR DEMOLITION PLAN

KEYNOTE LEGEND

KEY DESCRIPTION

1 REMOVE 5-TON PACKAGED ROOFTOP UNIT AND ASSOCIATED CURB.

PATCH UNUSED PENETRATIONS. SEE ARCHITECTURAL PLANS.

2 REMOVE EXHAUST FAN.

3 REMOVE 12-TON COMPUTER ROOM UNIT AND ASSOCIATED PIPING.

4 REMOVE CONTROL PANEL.

5 REMOVE NATURAL GAS LINE BACK TO METER. CONTRACTOR TO

COORDINATE WITH UTILITY COMPANY FOR REMOVAL OF METER AND

SERVICE AT THIS LOCATION.

6 DEMOLISH PIPING UP TO TEMPORARY TEES WITHIN THE SECOND

FLOOR CHASE.

X

0' 4' 8' 12'

GENERAL DEMOLITION NOTES

1. REMOVE ALL MECHANICAL HVAC EQUIPMENT, EXISTING DUCTWORK, DUCTWORK ACCESSORIES, ASSOCIATED SUPPORTS, AND TERMINALS AS SHOWN.

2. REMOVE ALL EXISTING PIPING, PIPING ACCESSORIES, AND ASSOCIATED SUPPORTS AS SHOWN.

3. REMOVE ALL EXISTING CONTROLS AND THERMOSTATS.

4. PATCH AND SEAL TO MATCH EXISTING ALL BUILDING PENETRATIONS CREATED DURING DEMOLITION

AND NOT RE-USED. REFER TO ARCHITECTURAL FOR PATCHING DETAILS.

5. TEST DRAINED GLYCOL FOR FULL CHEMICAL ANALYSIS AND REPLACE WITH NEW WATER TO MEET

DESIRED 40% PROPYLENE GLYCOL MIX.

6. ONLY FAA SSC PERSONNEL CAN OPERATE CIRCUIT BREAKERS.

REV

REV APPROVED

DATE

DESCRIPTION JCN REDLINE

DATE

(E) VAV-3

(E) AHU-31

1 2

(E

"x

S A

20"x20"

(E) 25"x20" RA

(E) 20"x16" SA(E) 14"x9" SA

(E) 24"x20" SA

(E) 9"x9" SA

(E) 20"x16" SA(E) 18"x14" SA(E) 16"x14" SA

STORAGE

TRACON

CABLE

SHAFT

ELEV

STAIR

TOILET

MECHANICAL

ROOM

A B C

(E) AHU-4

(E) AHU-6

EQUIP

ROOM

CABLE

SHAFT

ELEV.

STAIR /

LOBBY

LAN

ROOM

MECHANICAL

ROOM

TOILET

(E) 10"x7" SA

(E) 14"x9" SA

(E) 17"x10" SA

(E) 8"x5" SA

(E) 8"x5" SA

(E) 12"ø OA

(E) 25"x19" SA

(E) 10"ø OA

(E) 8"ø OA

(E) 36"x12" RA99

(E) OUTSIDE AIR FAN

OA DUCT FILTER ACCESS DOOR

(E) LOUVER

8" DIA OA

DUCT UP

AHU-6 SA DUCT

UP TO CAB

N

CHECKED

DESIGNED DATE

H

G

F

E

D

C

B

A

7 6 5 4 3 2 1

H

G

F

E

D

C

B

A

8 7 6 5 4 3 2 1

DRAWN

APPROVED BY

JCNISSUED BY

SUBMITTED BY

DRAWING NO

SCALES SHOWN FOR 22" X 34" SHEET. ADJUST SCALE FOR OTHER SIZES

REVIEWED BY

PWM-1302899-

DEPARTMENT OF TRANSPORTATION

FEDERAL AVIATION ADMINISTRATION

ATCT

ATO - TECHNICAL OPERATIONS EASTERN SERVICE AREA

PORTLAND ME(PORTLAND INTERNATIONAL JETPORT)

PROJECT/SYSTEM ENGINEER ENGINEERING MANAGER

PUBLIC AVAILABILITY TO BE DETERMINED UNDER 5 USC 552

FOR OFFICIAL USE ONLY

MECHANICAL

ENGINEERING SERVICES

TERMINAL

PROJECT NUMBER: 230041.00

5901 Peachtree Dunwoody Rd. | Bldg C | Suite 515 Atlanta, Georgia 30328-6055 phone 678.320.1888 | wileywilson.com

/2

/2

:1

:4

P

M

ZMA

ALM

D302

1302899SWL

THIRD AND FOURTH FLOOR MECHANICAL DEMOLITION

PLANS

06/28/24

SCALE: 3/16" = 1'-0"D302

THIRD FLOOR MECHANICAL DEMOLITION

PLAN

SCALE: 3/16" = 1'-0"D302

FOURTH FLOOR MECHANICAL DEMOLITION

PLAN

KEYNOTE LEGEND

KEY DESCRIPTION

1 REMOVE 3-WAY VALVE ON HEATING HOT WATER PIPING.

2 REMOVE 3-WAY VALVE ON CHILLED WATER PIPING.

3 REMOVE BRANCH PIPING TO BYPASS AND CAP TO PROVIDE FILTER

ACCESS. RELOCATE BYPASS UPSTREAM.

4 REMOVE WALL MOUNTED HUMIDIFIER AND ASSOCIATED DUCT

MOUNTED DISPERSION TUBE AND PIPING.

5 REMOVE CONTROL PANEL.

6 EXISTING TO REMAIN 16"X24" LOUVER.

7 (E) 1-1/2" CHS/R AND 1" HWS/R PIPING UP.

8 (E) 1-1/4" CHS/R AND 1" HWS/R.

9 DEMOLISH DIFFUSERS AND FLEX DUCT BACK TO MAIN. CONTRACTOR

TO MEASURE UNIT AIRFLOWS PRIOR TO DEMOLITION.

10 REMOVE 2-WAY MODULATING VALVE ON HEATING HOT WATER

PIPING.

X

0' 4' 8' 12'

GENERAL DEMOLITION NOTES

1. REMOVE ALL MECHANICAL HVAC EQUIPMENT, EXISTING DUCTWORK, DUCTWORK ACCESSORIES, ASSOCIATED SUPPORTS, AND TERMINALS AS SHOWN.

2. REMOVE ALL EXISTING PIPING, PIPING ACCESSORIES, AND ASSOCIATED SUPPORTS AS SHOWN.

3. REMOVE ALL EXISTING CONTROLS AND THERMOSTATS.

4. PATCH AND SEAL TO MATCH EXISTING ALL BUILDING PENETRATIONS CREATED DURING DEMOLITION

AND NOT RE-USED. REFER TO ARCHITECTURAL FOR PATCHING DETAILS.

5. TEST DRAINED GLYCOL FOR FULL CHEMICAL ANALYSIS AND REPLACE WITH NEW WATER TO MEET

DESIRED 40% PROPYLENE GLYCOL MIX.

6. ONLY FAA SSC PERSONNEL CAN OPERATE CIRCUIT BREAKERS.

REV

REV APPROVED

DATE

DESCRIPTION JCN REDLINE

DATE

(E)AHU-5

KITCHEN

LOUNGE

ELEV.

CABLE

SHAFT

TOILET

STAIR

CORRIDOR

STAIR

MECHANICAL

ROOM

(E) 17"x10" SA

(E) 11"x6" SA(E) 11"x6" SA

(E) 11"x6" SA

(E) 11"x6" SA

(E) 8"ø OA

4(E) 20"x12" RA

(E) 1 1/2" CHR

(E) 1 1/2" CHS

(E) 1" HWR

(E) 1" HWS

(E) AHU-6 SA

DUCT UP TO CAB

(E) AHU-6 RA

DUCT DOWN

TOILET

EXAUST

SYSTEM

EXISTING

TO REMAIN

A B C

STAIR

CAB

N

CHECKED

DESIGNED DATE

H

G

F

E

D

C

B

A

7 6 5 4 3 2 1

H

G

F

E

D

C

B

A

8 7 6 5 4 3 2 1

DRAWN

APPROVED BY

JCNISSUED BY

SUBMITTED BY

DRAWING NO

SCALES SHOWN FOR 22" X 34" SHEET. ADJUST SCALE FOR OTHER SIZES

REVIEWED BY

PWM-1302899-

DEPARTMENT OF TRANSPORTATION

FEDERAL AVIATION ADMINISTRATION

ATCT

ATO - TECHNICAL OPERATIONS EASTERN SERVICE AREA

PORTLAND ME(PORTLAND INTERNATIONAL JETPORT)

PROJECT/SYSTEM ENGINEER ENGINEERING MANAGER

PUBLIC AVAILABILITY TO BE DETERMINED UNDER 5 USC 552

FOR OFFICIAL USE ONLY

MECHANICAL

ENGINEERING SERVICES

TERMINAL

PROJECT NUMBER: 230041.00

5901 Peachtree Dunwoody Rd. | Bldg C | Suite 515 Atlanta, Georgia 30328-6055 phone 678.320.1888 | wileywilson.com

/2

/2

:1

:4

P

M

ZMA

ALM

D303

1302899SWL

FIFTH FLOOR AND CAB MECHANICAL DEMOLITION

PLANS

06/28/24

SCALE: 3/16" = 1'-0"D303

1 FIFTH FLOOR MECHANICAL DEMOLITION PLAN

SCALE: 3/16" = 1'-0"D303

2 CAB MECHANICAL DEMOLITION PLAN

KEYNOTE LEGEND

KEY DESCRIPTION

1 EXISTING TO REMAIN SPLIT SYSTEM INDOOR UNIT.

2 EXISTING TO REMAIN SPLIT SYSTEM OUTDOOR UNIT.

3 REMOVE WALL MOUNTED HUMIDIFIER IN PLENUM AND ASSOCIATED

DUCT MOUNTED DISPERSION TUBE AND PIPING.

4 REMOVE 3-WAY VALVE ON CHILLED WATER PIPING.

5 1-1/2" CHS/R AND 1" HWS/R PIPING DOWN.

6 REMOVE 2-WAY MODULATING VALVE ON HEATING HOT WATER

PIPING.

X

0' 4' 8' 12'

GENERAL DEMOLITION NOTES

1. REMOVE ALL MECHANICAL HVAC EQUIPMENT, EXISTING DUCTWORK, DUCTWORK ACCESSORIES, ASSOCIATED SUPPORTS, AND TERMINALS AS SHOWN.

2. REMOVE ALL EXISTING PIPING, PIPING ACCESSORIES, AND ASSOCIATED SUPPORTS AS SHOWN.

3. REMOVE ALL EXISTING CONTROLS AND THERMOSTATS.

4. PATCH AND SEAL TO MATCH EXISTING ALL BUILDING PENETRATIONS CREATED DURING DEMOLITION

AND NOT RE-USED. REFER TO ARCHITECTURAL FOR PATCHING DETAILS.

5. TEST DRAINED GLYCOL FOR FULL CHEMICAL ANALYSIS AND REPLACE WITH NEW WATER TO MEET

DESIRED 40% PROPYLENE GLYCOL MIX.

6. ONLY FAA SSC PERSONNEL CAN OPERATE CIRCUIT BREAKERS.

REV

REV APPROVED

DATE

DESCRIPTION JCN REDLINE

DATE

M

B C

4"

4"

4"

4" 1 1/4"

1 1/4"

1" 1"

3/4"

2"

1"

8"ø

8"ø

1 1/2"

3"

1" 1 1/4"

1 1/4"

4"

4"

4"

3"

1 1/2"

2"

4" 1 1/4"

2"

1" 1"

2"

2"

4"

4"

4"

2"

3/4"

3/4"

(E) 3/4" HWS

(E) 3/4" HWR

(E) 2" HWR

(E) 2" HWS

(E) 3" CHR

(E) 3" CHS

2"

1"13

MECHANICAL

ROOM

LOBBY

M300

(E) 16"x24" LOUVER

EXISTING TO REMAIN FENCE

ALONG PLAN WEST, SOUTH, AND

EAST SIDES OF EXISTING PAD

N

CHECKED

DESIGNED DATE

H

G

F

E

D

C

B

A

7 6 5 4 3 2 1

H

G

F

E

D

C

B

A

8 7 6 5 4 3 2 1

DRAWN

APPROVED BY

JCNISSUED BY

SUBMITTED BY

DRAWING NO

SCALES SHOWN FOR 22" X 34" SHEET. ADJUST SCALE FOR OTHER SIZES

REVIEWED BY

PWM-1302899-

DEPARTMENT OF TRANSPORTATION

FEDERAL AVIATION ADMINISTRATION

ATCT

ATO - TECHNICAL OPERATIONS EASTERN SERVICE AREA

PORTLAND ME(PORTLAND INTERNATIONAL JETPORT)

PROJECT/SYSTEM ENGINEER ENGINEERING MANAGER

PUBLIC AVAILABILITY TO BE DETERMINED UNDER 5 USC 552

FOR OFFICIAL USE ONLY

MECHANICAL

ENGINEERING SERVICES

TERMINAL

PROJECT NUMBER: 230041.00

5901 Peachtree Dunwoody Rd. | Bldg C | Suite 515 Atlanta, Georgia 30328-6055 phone 678.320.1888 | wileywilson.com

/2

/2

:1

:5

P

M

ZMA

ALM

D304

1302899SWL

ENLARGED MECHANICAL ROOM AND CHILLER YARD

DEMOLITION PLAN

06/28/24

SCALE: 1/2" = 1'-0"D304

ENLARGED MECHANICAL ROOM AND CHILLER

YARD DEMOLITION PLAN

KEYNOTE LEGEND

KEY DESCRIPTION

1 REMOVE 70-TON CHILLER AND ASSOCIATED PIPING.

2 REMOVE 50-TON DRY COOLER AND ASSOCIATED PIPING.

3 REMOVE 2-HP HOT WATER PUMP AND ASSOCIATED PIPING.

4 REMOVE UNIT HEATER, DUCTWORK, GRILLES, ASSOCIATED PIPING

AND ACCESSORIES. PATCH UNUSED PENETRATIONS. SEE

ARCHITECTURE FOR PATCH DETAIL.

5 REMOVE AIR SEPARATOR.

6 REMOVE EXPANSION TANK.

7 REMOVE GLYCOL TANK.

8 REMOVE CHEMICAL SHOT FEEDER.

9 REMOVE EXHAUST FAN.

10 REMOVE 7.5-HP CHILLED WATER PUMP, CONCRETE PAD, AND

ASSOCIATED PIPING.

11 REMOVE NATURAL GAS PIPING BACK TO METER.

12 REMOVE 3-HP CHILLED WATER PUMP AND ASSOCIATED PIPING.

13 REMOVE HOUSEKEEPING PAD.

14 REMOVE CONTROL PANEL.

15 REMOVE BOILER, ASSOCIATED PIPING, AND ACCESSORIES.

16 DEMOLISH PIPING UP TO TEMPORARY TEES WITHIN THE SECOND

FLOOR CHASE.

17 EXISTING TO REMAIN 3/4" HWS/R PIPING TO ELECTRICAL ROOM UNIT

HEATER.

X

1' 2' 4'0'

GENERAL DEMOLITION NOTES

1. REMOVE ALL MECHANICAL HVAC EQUIPMENT, EXISTING DUCTWORK, DUCTWORK ACCESSORIES, ASSOCIATED SUPPORTS, AND TERMINALS AS SHOWN.

2. REMOVE ALL EXISTING PIPING, PIPING ACCESSORIES, AND ASSOCIATED SUPPORTS AS SHOWN.

3. REMOVE ALL EXISTING CONTROLS AND THERMOSTATS.

4. PATCH AND SEAL TO MATCH EXISTING ALL BUILDING PENETRATIONS CREATED DURING DEMOLITION

AND NOT RE-USED. REFER TO ARCHITECTURAL FOR PATCHING DETAILS.

5. TEST DRAINED GLYCOL FOR FULL CHEMICAL ANALYSIS AND REPLACE WITH NEW WATER TO MEET

DESIRED 40% PROPYLENE GLYCOL MIX.

6. ONLY FAA SSC PERSONNEL CAN OPERATE CIRCUIT BREAKERS.

REV

REV APPROVED

DATE

DESCRIPTION JCN REDLINE

DATE

E

L

N

DT

U **AT

M

TVSS

HATCHING INDICATES BUILDING AREA TO BE DEMOLISHED.

REFER TO PROJECT DEMOLITION NOTES.

REMOVE DEVICES, EQUIPMENT, IN ACCORDANCE

WITH THE PROJECT DEMOLITION NOTES.

TAG PREFIX DESIGNATOR LIST:

(E) = EXISTING TO REMAIN

(R) = RELOCATE

INDICATES DEVICE AND EQUIPMENT STATUS.

REFER TO IDENTIFICATION TAG PREFIX

DESIGNATOR LIST BELOW.

DEMOLITION LEGEND

1. PERFORM DEMOLITION IN PHASES WHERE INDICATED OR REQUIRED. PROVIDE TEMPORARY SERVICES TO

AFFECTED SYSTEMS FROM SOURCES OUTSIDE AFFECTED AREA TO MAINTAIN SERVICE WHERE REQUIRED.

2. THE CONTRACTOR SHALL VISIT THE PROJECT LOCATION AND FIELD-VERIFY THE EXISTING CONDITIONS PRIOR TO BEGINNING WORK. FAILURE BY THE CONTRACTOR TO HAVE ACQUAINTED HIM/HERSELF WITH AVAILABLE INFORMATION CONCERNING EXISTING CONDITIONS, INCLUDING EXISTING DRAWINGS, SHALL NOT RELIEVE THE CONTRACTOR OF RESPONSIBILITIES OF PERFORMANCE OF WORK IN ACCORDANCE WITH

REQUIREMENTS OF THE CONTRACT DOCUMENTS.

3. DEMOLITION WORK SHALL BE COORDINATED WITH THE OWNER OR THE OWNER'S REPRESENTATIVE AND SHALL NOT INTERFERE WITH ACTIVITIES IN OTHER BUILDING AREAS. DEMOLISHED MATERIALS, UNLESS SPECIFICALLY INDICATED TO REMAIN OR BE TURNED OVER TO THE OWNER, SHALL BE PROMPTLY AND APPROPRIATELY REMOVED DISPOSED OF, PARTICULARLY MATERIALS CONTAINING HAZARDOUS MATERIALS SUCH AS LAMPS CONTAINING MERCURY OR TRANSFORMERS CONTAINING PCB’S. CONTRACTOR SHALL COORDINATE APPROPRIATE STAGING AREA WITH THE OWNER. COORDINATE WITH OWNER FOR OWNER-

REMOVAL OF PROPERTY FROM THE PROJECT LOCATION.

4. ALL DEMOLITION WORK SHALL BE COORDINATED WITH HAZMAT…

This is the start of the file's text. The full file is on GovTribe.