J-1aFAA PWM HVAC REHAB FINAL DRAWINGS SIGNED.pdf
PDF 12 MB Posted
- Attached to
- Upgraded HVAC and Fire Life Safety Project at the Air Traffic Control Tower (ATCT) in Portland, ME
- Solicitation number
- 697DCK-24-R-00596
About this file
This document appears to be a set of final signed drawings for an HVAC rehabilitation project at the Air Traffic Control Tower (ATCT) in Portland, MA. The related federal contract opportunity is for the Upgraded HVAC and Fire Life Safety Project at the same ATCT facility.
The key details of the opportunity are: The project is primarily an equipment replacement and upgrade, including replacing the existing chiller, dry cooler, boiler, hot water and chilled water pumps, CRUs, RTU, and BAS system. New equipment will also be installed such as fan coil units and bathroom exhaust fans. Incidental work includes piping, insulation, framing, painting, electrical, and other construction activities. The solicitation number is 697DCK-24-R-00596, and the procuring agency is the Department of Transportation Federal Aviation Administration Southwestern Region. The opportunity type is a Solicitation, but no details are provided on response dates, award dates, pricing terms, or set asides.
View the file
Other files
Show all 33
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CHECKED
DESIGNED DATE
H
G
F
E
D
C
B
A
7 6 5 4 3 2 1
H
G
F
E
D
C
B
A
8 7 6 5 4 3 2 1
DRAWN
APPROVED BY
JCNISSUED BY
SUBMITTED BY
DRAWING NO
SCALES SHOWN FOR 22" X 34" SHEET. ADJUST SCALE FOR OTHER SIZES
REVIEWED BY
PWM-1302899-
DEPARTMENT OF TRANSPORTATION
FEDERAL AVIATION ADMINISTRATION
ATCT
ATO - TECHNICAL OPERATIONS EASTERN SERVICE AREA
PORTLAND ME(PORTLAND INTERNATIONAL JETPORT)
PROJECT ENGINEER MGR: ENGINEERING CENTER
PUBLIC AVAILABILITY TO BE DETERMINED UNDER 5 USC 552
FOR OFFICIAL USE ONLY
GENERAL
ENGINEERING SERVICES
TERMINAL
PROJECT NUMBER: 230041.00
5901 Peachtree Dunwoody Rd. | Bldg C | Suite 515 Atlanta, Georgia 30328-6055 phone 678.320.1888 | wileywilson.com
/2
/2
:0 :0
P
M
GMR
RAB
G000
1302899GMR
COVER SHEET
03/15/24
JUNE 28, 2024
HVAC REHABILITATION
(ARCHITECTURAL DRAWINGS)
PORTLAND INTERNATIONAL JETPORT
PORTLAND, ME
ATCT/TRACON FACILITY
REV
REV APPROVED
DATE
DESCRIPTION JCN REDLINE
DATE
APVD
06/28/2024
H
G
F
E
D
C
B
A
7 6 5 4 3 2 1
H
G
F
E
D
C
B
A
8 7 6 5 4 3 2 1
DRAWN
APPROVED BY
JCNISSUED BY
SUBMITTED BY
DRAWING NO
SCALES SHOWN FOR 22" X 34" SHEET. ADJUST SCALE FOR OTHER SIZES
REVIEWED BY
PWM-1302899-
DEPARTMENT OF TRANSPORTATION
FEDERAL AVIATION ADMINISTRATION
ATCT
ATO - TECHNICAL OPERATIONS EASTERN SERVICE AREA
PORTLAND ME(PORTLAND INTERNATIONAL JETPORT)
PROJECT ENGINEER MGR: ENGINEERING CENTER
PUBLIC AVAILABILITY TO BE DETERMINED UNDER 5 USC 552
FOR OFFICIAL USE ONLY
GENERAL
ENGINEERING SERVICES
TERMINAL
PROJECT NUMBER: 230041.00
5901 Peachtree Dunwoody Rd. | Bldg C | Suite 515 Atlanta, Georgia 30328-6055 phone 678.320.1888 | wileywilson.com
/2
/2
:1 :5
A
M
GMR
RAB
G001
1302899GMR
SHEET INDEX
03/15/24
SHEET INDEX
SHEET
NUMBER SHEET NAME
M802 CHILLED WATER SYSTEM CONTROLS
M803 HEATING WATER SYSTEM CONTROLS
M804 HEATING WATER SYSTEM CONTROLS
M805 AHU-1 CONTROLS
M806 AHU-1 CONTROLS
M807 FCU & VAV CONTROLS
M808 CRU & GLOBAL OUTDOOR AIR SENSOR CONTROLS
M809 EXHAUST FAN & HOT WATER UNIT HEATER CONTROLS
M810 AHU-4 & AHU-5 CONTROLS
M811 AHU-6 CONTROLS
M812 AHU-3 CONTROLS
M813 NATURAL GAS & NETWORK DIAGRAMS & METERING
CONTROLS
12 ELECTRICAL
E000 LEGEND, ABBREVIATIONS AND GENERAL NOTES
E101 BASE BUILDING - LEVEL 1 POWER PLAN
E102 LEVEL 2 POWER PLAN
E103 LEVEL 3 & LEVEL 4 POWER PLANS
E104 LEVEL 1 & LEVEL 4 PARTIAL LIGHTING PLANS
E105 BASE BUILDING - LEVEL 1 CONDUIT PLAN
E106 BASE BUIDLING - ROOF LIGHTNING PROTECTION PLAN
E401 ENLARGED PLANS
E501 ELECTRICAL DETAILS
E502 ELECTRICAL DETAILS
E601 PARTIAL ONE-LINE DIAGRAM
E701 PANEL SCHEDULES
E702 PANEL SCHEDULES
SHEET INDEX
SHEET
NUMBER SHEET NAME
1 GENERAL
G000 COVER SHEET
G001 SHEET INDEX
G010 ABBREVIATIONS (SHEET 1 OF 2)
G011 ABBREVIATIONS (SHEET 2 OF 2)
G020 PHASING
3 DEMOLITION
D120 BASE BUILDING REFLECTED CEILING DEMOLITION
D121 LEVEL 1, 2, AND 3 REFLECTED CEILING DEMOLITION
D122 LEVEL 4, 5 AND CAB LEVEL REFLECTED CEILING DEMOLITION
D140 ROOF DEMOLITION
D141 ROOF DETAILS DEMOLITION
D300 FIRST FLOOR MECHANICAL DEMOLITION PLAN
D301 SECOND FLOOR MECHANICAL DEMOLITION PLAN
D302 THIRD AND FOURTH FLOOR MECHANICAL DEMOLITION PLANS
D303 FIFTH FLOOR AND CAB MECHANICAL DEMOLITION PLANS
D304 ENLARGED MECHANICAL ROOM AND CHILLER YARD
DEMOLITION PLAN
D500 DEMOLITION LEGEND AND NOTES
D501 BASE BUIDLING - LEVEL 1 DEMOLITION PLAN
D502 LEVEL 2 DEMOLITION PLAN
D503 LEVEL 3 & LEVEL 4 DEMOLITION PLANS
D504 PARTIAL ONE-LINE DIAGRAM - DEMOLITION
D505 PANEL SCHEDULES - DEMOLITION
D506 PANEL SCHEDULES - DEMOLITION
7 ARCHITECTURAL
A000 LEGEND, SYMBOLS, AND NOTES
A120 BASE BUILDING REFLECTED CEILING PLAN
A121 LEVEL 1, 2 AND 3 REFLECTED CEILING PLAN
A122 LEVEL 4, 5 AND CAB LEVEL REFLECTED CEILING PLANS
A125 CATWALK ROOF PLAN
A140 PROPOSED BASE BUILDING ROOF LAYOUT
A141 TAPERING PLAN
A142 PROPOSED BASE BUILDING ROOF GUARDRAIL LAYOUT
A500 ROOM FINISH SCHEDULE
A610 ROOF DETAILS
A611 ROOF RAILING DETAILS
A612 CEILING DETAILS
8 STRUCTURAL
S612 BUILDING AND LINK ROOF RESTORATION WIND PRESSURES
11 MECHANICAL
M000 LEGEND, ABBREVIATIONS & GENERAL NOTES
M100 FIRST FLOOR MECHANICAL PLAN
M101 SECOND FLOOR MECHANICAL PLAN
M102 THIRD AND FOURTH FLOOR MECHANICAL PLANS
M103 FIFTH FLOOR AND CAB MECHANICAL PLANS
M300 MECHANICAL SECTIONS
M400 ENLARGED MECHANICAL ROOM
M401 ENLARGED CHILLER YARD PLAN
M500 SCHEDULES
M501 SCHEDULES
M600 PIPE DETAILS
M601 HANGER AND PAD DETAILS
M602 DUCTWORK DETAILS
M603 DUCTWORK & COIL CONNECTION DETAILS
M604 MECHANICAL EQUIPMENT DETAILS
M605 BOILER DETAILS
M606 MECHANICAL EQUIPMENT DETAILS
M607 MECHANICAL EQUIPMENT DETAILS
M630 SEISMIC DETAILS
M631 SEISMIC DETAILS
M632 SEISMIC DETAILS
M633 SEISMIC DETAILS
M634 SEISMIC DETAILS
M635 SEISMIC DETAILS
M800 CONTROLS LEGEND, ABBRIVIATIONS & GENERAL NOTES
M801 CHILLED WATER SYSTEM CONTROLS
REV
REV APPROVED
DATE
DESCRIPTION JCN REDLINE
DATE
A
A, AMP AMPERE
A/C AIR CONDITIONING
A/S AUDIBLE STROBE
AA AIR COOLED
AAV AUTOMATIC AIR VENT
ABG ABOVE FINISHED GRADE
AC ALTERNATING CURRENT, ABOVE CEILING
ACC AIR COOLED CHILLER
ACDFC AIR COOLED DRY FLUID COOLER
ACI AMERICAN CONCRETE INSTITUTE
ACM ASBESTOS CONTAINING MATERIAL
ACT ACOUSTICAL CEILING TILE, ACCESS CONTROL TERMINAL
AD ACCESS DOOR, AREA DRAIN
ADA AMERICANS WITH DISABILITIES ACT
ADJ ADJUSTABLE
AF AMPERE FRAME
AFF ABOVE FINISHED FLOOR
AFG ABOVE FINISHED GRADE
AFR ABOVE FINISHED ROOF
AFSSC AIRWAY FACILITIES SYSTEM SUPPORT CENTER
AGL ABOVE GROUND LEVEL
AH AIR HANDLER
AHJ AUTHORITY HAVING JURISDICTION
AHU AIR HANDLING UNIT
AI ANALOG INPUT
AIC AMPERE INTERRUPTING CAPACITY
AIR AMPS INTERRUPT RATING
AISC AMERICAN INSTITUTE OF STEEL CONSTRUCTION
AL AIRPORT LIGHTING, ALUMINUM
AL-GL ALUMINUM AND GLASS
ALUM ALUMINUM
AMM AMMETER
AMSL ABOVE MEAN SEA LEVEL
ANOD. ANODIZE
ANN ANNUNCIATOR
ANSI AMERICAN NATIONAL STANDARDS INSTITUTE
AO ANALOG OUTPUT
AOA AIRPORT OPERATIONS AREA
AP ANNUNCIATOR POINT, ACCESS PANEL
APD AIR PRESSURE DROP
APPROX APPROXIMATELY
ARCH ARCHITECT, ARCHITECTURAL
ARTS AUTOMATED RADAR
AS AIR SEPARATOR
ASHRAE AMERICAN SOCIETY OF HEATING, REFRIGERATION
AND AIR CONDITIONING ENGINEERS
ASME AMERICAN SOCIETY OF MECHANICAL ENGINEERS
AT AMPERE TRIP
ATBM AIRWAY/TERMINAL BUILDING MAINTENANCE FACILITY
ATC ACOUSTICAL TILE CEILING
ATC AIR TRAFFIC CONTROL
ATCT AIRPORT TRAFFIC CONTROL TOWER
ATS AUTOMATIC TRANSFER SWITCH
ATV ATMOSPHERIC VENT
AUX AUXILIARY
AV AUTOMATIC VENT
AVG AVERAGE
AWG AMERICAN WIRE GAGE
AWS AMERICAN WELDING SOCIETY
B
BAT CHGR BATTERY CHARGER
BBHWH BASEBOARD HOT WATER HEATER
BC BARE COPPER
BCKP BACKUP
BDD BACKDRAFT DAMPER
BF BELOW FLOOR (PIPE SIZE)
BFC BELOW FINISHED CEILING
BFP BACKFLOW PREVENTER
BI BACKWARD INCLINED
BITS BYPASS ISOLATION TRANSFER SWITCH
BLDG BUILDING
BLK BLACK
BM BEAM
BOD BOTTOM OF DUCT, BACKDRAFT DAMPER
BOF BOTTOM OF FIXTURE
BOP BOTTOM OF PIPING
BOT,BTM BOTTOM
BP BUSTER PUMP
BPU BREAKER PROGRAMMING UNIT
BSDC BARE SOFT DRAWN COPPER
BSMT BASEMENT
BTU BRITISH THERMAL UNIT
BTUH BRITISH THERMAL UNIT/HOUR
B.U. BACKUP
C
C CONDUIT
CAF COMBUSTION AIR FAN
CANT CANTILEVER
CAP CAPACITY
CAV CONSTANT AIR VOLUME
CB CIRCUIT BREAKER
CBCR CURVED BLADE CEILING REG.
CCTV CLOSED CIRCUIT TELEVISION
CD CEILING DIFFUSER, CONDENSATE DRAIN
CENT CENTRIFUGAL
CENTRIF CENTRIFUGAL
CF CUBIC FOOT/FEET
CFACC CENTRIF FAN AIR COOLED CONDENSER
CFM CUBIC FEET PER MINUTE
CH CHILLER
CHKD CHECKERED
CHW CHILLED WATER
CHWR CHILLED WATER RETURN
CHWS CHILLED WATER SUPPLY
C.I.P. CAST IN PLACE
CJ CONTROL JOINT
CKT CIRCUIT
CL CENTERLINE
CLF CURRENT LIMITING FUSE
CLG CEILING
CLR CLEAR
CM COMMUNICATION MANHOLE
CMU CONCRETE MASONRY UNIT
CO CLEANOUT, CONDUIT ONLY
COL COLUMN
COMM COMMUNICATIONS
CONC CONCRETE
COND CONDENSATE
CONFIG CONFIGURATION
CONN CONNECTION
CONST CONSTRUCTION
CONT CONTINUATION, CONTINUOUS
CONTR CONTRACTOR
COR CONTRACTING OFFICER'S REPRESENTATIVE
CPC CRITICAL POWER CENTER
CPT CARPET
CPU CENTRAL PROCESSING UNIT
CR CONTROL RELAY
CS CONTROL SWITCH
CSF CHEMICAL SHOT FEEDER
CT COOLING TOWER, CABLE TRAY,
CURRENT TRANSFORMER, CERAMIC TILE
CTL CONTROL
CU CONDENSING UNIT, COPPER
CU FT CUBIC FOOT/FEET
CV CONSTANT VOLUME, CONTROL VALVE
CVC CENTRAL VACUUM CLEANER
CW COLD (DOMESTIC) WATER
CWP CHILLED WATER PUMP
CWP CONDENSER WATER PUMP, CHILLED WATER PUMP
CWR CHILLED WATER RETURN
CWR CONDENSER WATER RETURN
CWS CHILLED WATER SUPPLY
CWS CONDENSER WATER SUPPLY
CWV COMBINATION WASTE AND VENT
CY YD CUBIC YARD
D
D DRAIN
D PNL DISTRIBUTION PANEL
DAMP DAMPER
DB DRY BULB, DIRECT BURIAL, DUCTBANK
DBA DEFORMED BAR ANCHOR
DBL DOUBLE
DC DIRECT CURRENT
DCV BFP DOUBLE CHECK VALVE BACKFLOW PREVENTOR
DDC DIRECT DIGITAL CONTROL
DEB DIRECT EARTH BURY
DEG DEGREE
DEMO DEMOLITION
DET DETAIL
DF DEGREES FAHRENHEIT
DG DOOR GRILLE
DHW DOMESTIC HOT WATER
DI DIGITAL INPUT
DIA DIAMETER
DIAG DIAGONAL
DIFF DIFFUSER
DIM DIMENSION
DISC DISCONNECT
D.L. DEAD LOAD
DM DEMAND METER
DN DOWN
DO DIGITAL OUTPUT
DP DIFFERENTIAL PRESSURE
DPDT DOUBLE POLE DOUBLE THROW
DPST DOUBLE POLE SINGLE THROW
DPT DIFFERENTIAL PRESSURE TRANSMITTER
DSF DESTRATIFICATION FAN
DT DOUBLE THROW, DIAPHRAM TANK, DOUBLE TEE
DTS DOUBLE THROW SWITCH
DWBP DOMESTIC WATER BOOSTER PUMP
DWDI DOUBLE WIDTH DOUBLE INLET
DWGS DRAWINGS
DWL DOWEL
E
E EAST
EA EACH, EXHAUST AIR
EAT ENTERING AIR TEMPERATURE
ECP ENGINE CONTROL PANEL
EDAM ELECTRICAL DATA ACQUISITION AND MONITORING
EDH ELECTRIC DUCT HEATER
E.E. EACH END
EES EARTH ELECTRODE SYSTEM
EF EXHAUST FAN, EACH FACE
EG, E/G ENGINE GENERATOR, EXHAUST GRILLE
EMERGENCY GENERATOR
EH ELECTRIC HEATER, ELECTRONIC HUMIDIFIER
EHC ELECTRIC HEATING COIL
EIFS EXTERIOR INSULATION FINISH SYSTEM
ELEC ELECTRIC
ELEV, EL ELEVATION, ELEVATOR
EMCS ENERGY MANAGEMENT AND CONTROL SYSTEM
EMERG EMERGENCY
EMI ELECTROMAGNETIC INTERFACE
EMS ENERGY MANAGEMENT SYSTEM
EMT ELECTRICAL METALLIC TUBING
ENT ENTERING
E.O.R. ENGINEER OF RECORD
E.O.S. EDGE OF SLAB
EPS EXPANDED POLYSTYRENE
EQ EQUAL
EQUIP EQUIPMENT
ER EXHAUST REGISTER
ERMS ENVIRONMENTAL REMOTE MONITORING SYSTEM
E.S. EACH SIDE
ESP EXTERNAL STATIC PRESSURE
ET EXPANSION TANK
EUH ELECTRIC UNIT HEATER
EW EACH WAY
EWC ELECTRICAL WATER COOLER
EWH ELECTRIC WALL HEATER, ELECTRIC WATER HEATER
EWT ENTERING WATER TEMPERATURE
EXH EXHAUST
EXIST EXISTING
EXP EXPOSED, EXPANSION
F
F FIRE WATER SUPPLY
^F DEGREES FAHRENHEIT
FA FIRE ALARM, FREE AREA, FAN COOLED, FRESH AIR
FAA FEDERAL AVIATION ADMINISTRATION
FACP FIRE ALARM CONTROL PANEL
FACT FACTORY
FC FACE OF CURB, FLEX CONNECTION, FOOT CANDLE
FCO FLOOR CLEANOUT
FCU FAN COIL UNIT
FCV FLOW CONTROL VALVE
FD FLOOR DRAIN, FIRE DAMPER
FDC FIRE DEPARTMENT CONNECTION
FDN FOUNDATION
FDR FEEDER
FE FIRE EXTINGUISHER
FEC FIRE EXTINGUISHER CABINET
FF FLY FAN, FINISHED FLOOR
FFE FINISHED FLOOR ELEVATION
FG FIBERGLASS
FH FIRE HYDRANT
FHC FIRE HOSE CABINET
FHV FIRE HOSE VALVE
FIG FIGURE
FIN FINISH
FLA FULL LOAD AMPERES
FLEX FLEXIBLE
FLR FLOOR
FLS FLOW SWITCH, FIRE AND LIFE SAFETY
FLUOR FLUORESCENT
FM FACTORY MUTUAL, FORCE MAIN
FO FIBER OPTIC
FOD FACE OPERATED DAMPER
FOG FUEL OIL GAGE
FOR FUEL OIL RETURN
FOS FUEL OIL SUPPLY
FOT FIBER OPTIC TERMINAL, FUEL OIL TRANSFER
FP FIRE PUMP, FLOOR PENETRATION
FPM FEET PER MINUTE
FPU FIELD PROGRAMMING UNIT
FRP FIBERGLASS REINFORCED POLY
FRT FIRE RETARDANT TREATED
FS FLOW SWITCH, FLOOR SINK, FAR SIDE
FSD FIRE/SMOKE DAMPER
FSS FUSIBLE SAFETY SWITCH
FT FEET
FTG FOOTING, FITTING
FV FULL VOLTAGE
FVC FIRE VALVE CABINET
FW FIRE WATER, FILTERED WATER
FWD FORWARD, FIRE SPRINKLER WATER DRAIN
FWS FIRE WATER SUPPLY
G
G GROUND
GA GAUGE, GAGE
GAL GALLON
GALV GALVANIZED
GEN GENERAL, GENERATOR
GFCI GROUND FAULT CIRCUIT INTERRUPTER
GFE GOVERNMENT FURNISHED EQUIPMENT
GFM GOVERNMENT FURNISHED MATERIAL
GND GROUND CONNECTOR
GOVT GOVERNMENT
GPH GALLONS PER HOUR
GPM GALLONS PER MINUTE
GRN GREEN
GRS GALVANIZED RIGID STEEL
GUH GAS FIRED UNIT HEATER
GWB GYPSUM WALLBOARD
GYP GYPSUM
H
HAZMAT HAZARDOUS MATERIALS
HB HOSE BIBB
HC HOLLOW CORE
HEX HEXAGONAL
HH HAND HOLE
HK HOOK
HM HOLLOW METAL
H. MET. HOLLOW METAL
HOA HAND-OFF-AUTOMATIC
HORIZ HORIZONTAL
HP HORSEPOWER
HPS HIGH PRESSURE SODIUM
HR HOUR
HS HIGH STRENGTH, HEADED STUD
HSB HIGH STRENGTH BOLT
HT HEIGHT
HTG HEATING
HTR HEATER
HU HUMIDIFIER
HVAC HEATING, VENTILATION AND AIR
CONDITIONING
HVY HEAVY
HWP HOT WATER PUMP
HWR HOT WATER RETURN
HWS HOT WATER SUPPLY
HWUH HOT WATER UNIT HEATER
HX HEAT EXCHANGER
HZ HERTZ
I
IC INTERCOMMUNICATION,
INTERCOM
ITEA INFORMATION TECHNOLOGY
EQUIPMENT AREA
ITER INFORMATION TECHNOLOGY
EQUIPMENT ROOM
IE INVERT ELEVATION
IN INCHES
INCAND INCANDESCENT
INCL INCLUDE
INDIC INDICATOR
INSUL INSULATED
INT INTERIOR
INV INVERT
IPS IRON PIN SET
IRF IRON ROD FOUND
ISMS INTEGRATED SECURITY
MANAGEMENT SYSTEM
ISO ISOCYANURATE
J
JB JUNCTION BOX
JP JOCKEY PUMP
JT JOINT
K
K KIPS
KA KILOAMPERES
KCMIL THOUSAND CIRCULAR MILLS
KSI 1000 POUNDS PER SQUARE INCH
KV KILOVOLT
KVA KILOVOLT AMPERES
KVAR KILOVOLT AMPERES-REACTIVE
KW KILOWATT
KWH KILOWATT HOUR
L
L&S LOUVER AND SCREEN
LAT LEAVING AIR TEMPERATURE
LBD LINEAR BAR DIFFUSER
LBG LINEAR BAR GRILLE
LBR LINEAR BAR RETURN
LBS POUNDS
LD LINEAR DIFFUSER
LF LINEAR FEET
LFS LIGHTING FIXTURE SCHEDULE
L.L. LIVE LOAD
LLH LONG LEG HORIZONTAL
LLV LONG LEG VERTICAL
LONG LONGITUDINAL
LOSP LOCAL OPERATING STATUS
PANEL
LP LOW POINT
LRA LOCKED ROTOR AMPERE
LRAG LINEAR RETURN AIR GRILLE
LRG LINEAR RETURN GRILLE
LS LIGHT STANDARD
LSD LINEAR SLOT DIFFUSER
LT LIQUID TIGHT
LTG LIGHTING
LV LOW VOLTAGE
LVL LEVEL
LWT LEAVING WATER TEMPERATURE
M
MAG MAGNETIC DOOR HOLD OPEN
MAINT MAINTENANCE
MAX MAXIMUM
MBH THOUSAND BTU/HOUR
MBP MAINTENANCE BYPASS PANEL
MCB MOLDED CASE BREAKER
MCC MOTOR CONTROL CENTER
MCM THOUSAND CIRCULAR MILLS
MCP MOTOR CIRCUIT PROTECTOR
MD MANUAL DAMPER
MDF MEDIUM DENSITY FIBERBOARD
MDT MAIN DISTRIBUTION TERMINAL
MECH MECHANICAL
MED MEDIUM
MEMB MEMBRANE
MFR MANUFACTURER
MG MOTOR GENERATOR
MH MANHOLE
MIL THOUSANDTHS OF AN INCH
MIL ST MILITARY STANDARD
MIN MINIMAL, MINUTE, MINIMUM
MISC MISCELLANEOUS
MLO MAIN LUGS ONLY
MM MILLIMETER
MOD MOTOR OPERATED DAMPER
MPG MULTI-POINT GROUND
MPH MILES PER HOUR
MSL MEAN SEA LEVEL
MTD MOUNTED
MTL METAL
MUA MAKE-UP AIR
MUW MAKE-UP WATER
MV MANUAL VENT
MVA MEGAVOLT AMPERE
MVD MANUAL VOLUME DAMPER
CHECKED
DESIGNED DATE
H
G
F
E
D
C
B
A
7 6 5 4 3 2 1
H
G
F
E
D
C
B
A
8 7 6 5 4 3 2 1
DRAWN
APPROVED BY
JCNISSUED BY
SUBMITTED BY
DRAWING NO
SCALES SHOWN FOR 22" X 34" SHEET. ADJUST SCALE FOR OTHER SIZES
REVIEWED BY
PWM-1302899-
DEPARTMENT OF TRANSPORTATION
FEDERAL AVIATION ADMINISTRATION
ATCT
ATO - TECHNICAL OPERATIONS EASTERN SERVICE AREA
PORTLAND ME(PORTLAND INTERNATIONAL JETPORT)
PROJECT ENGINEER MGR: ENGINEERING CENTER
PUBLIC AVAILABILITY TO BE DETERMINED UNDER 5 USC 552
FOR OFFICIAL USE ONLY
GENERAL
ENGINEERING SERVICES
TERMINAL
PROJECT NUMBER: 230041.00
5901 Peachtree Dunwoody Rd. | Bldg C | Suite 515 Atlanta, Georgia 30328-6055 phone 678.320.1888 | wileywilson.com
/2
/2
:1 :5
A
M
GMR
RAB
G010
1302899GMR
ABBREVIATIONS (SHEET 1 OF 2)
03/15/24
REV
REV APPROVED
DATE
DESCRIPTION JCN REDLINE
DATE
N
N NORTH, NEUTRAL
NA NOT APPLICABLE
N.C. NORMALLY CLOSED
NC NOISE CRITERIA
NEC NATIONAL ELECTRIC CODE
NEG NEGATIVE
NEMA NATIONAL ELECTRICAL MANUFACTURERS' ASSOCIATION
NFHB NON-FREEZE HOSE BIB
NFPA NATIONAL FIRE PROTECTION ASSOCIATION
NG NATURAL GAS
NHC NO HUNG CEILING
NIC NOT IN CONTRACT
NK NECK
N.O. NORMALLY OPEN
NO NUMBER OF DESIGNATION
NOM NOMINAL
N.S. NEAR SIDE
NTE NOT TO EXCEED
NTS NOT TO SCALE
O
O/O OUT TO OUT
OA OUTSIDE AIR
OAF OUTSIDE AIR FAN
OBD OPPOSED BLADE DAMPER
OC ON CENTER
OD OUTSIDE DIAMETER, OVERFLOW DRAIN
ODP OPEN DRIP PROOF
OE OPEN END
OH OPPOSITE HAND, OVERHEAD
OPNG OPENING
OPP OPPOSITE
ORD OVERFLOW ROOF DRAIN
ORL OVERFLOW ROOF LEADER
OSA OUTSIDE SUPPLY AIR
OSCO OUTSIDE CLEANOUT
OVHD OVERHEAD
OZ OUNCES
P
P POLE, PAINT, PUMP
PABX PRIVATE AUTOMATIC BRANCH EXCHANGE
PAF(PINS) POWDER ACTIVATED FASTENERS
PART PARTITION
PB PULL BOX
PC POINT OF CURVANCE
PCF POUNDS PER CUBIC FOOT
PCHWR PRIMARY CHILLED WATER RETURN
PCHWS PRIMARY CHILLED WATER SUPPLY
PCMS POWER CONTROL MONITORING SYSTEM
PCS POWER CONDITIONING SYSTEM
PD PRESSURE DROP
PF POWER FACTOR
PFD PERFORATED FACE DIFFUSER
PFR PERFORATED FACE RETURN
PH ELECTRICAL PHASE
PI PRESSURE INDICATOR
PIU POWER INDUCTION UNIT
PJF PREFORMED JOINT FILLER
PL PLATE
P.LAM PLASTIC LAMINATE
PLBG PLUMBING
PLCS PLACES
PLYWD PLYWOOD
PM POWER MANHOLE
PMB POWER MIXING BOX
PNL PANEL, PANELBOARD
POB POINT OF BEGINNING
POC POINT OF CONNECTION
POS POSITIVE, POSITION
POT POINT OF TANGENCY
PP POWER POLE, PATCH PANEL
PREFAB PREFABRICATED
PRESS PRESSURE
PRMY PRIMARY
PROJ PROJECTION
PROP PROPELLER
PRSR PRESSURIZATION
PRV PRESSURE REDUCING VALVE
PS PRESSURE SWITCH
PSF POUNDS PER SQ. FOOT
PSI POUNDS PER SQ. INCH
PSIA POUNDS PER SQ.IN. ABSOLUTE
PSIG POUNDS PER SQ.IN. GAGE
PT PRESSURE TRANSMITTER, PRESSURE-TEMPERATURE PORT
PTAC PACKAGED TERMINAL AIR CONDITIONER
PTB POST TENSIONED BEAM
PVC POLYVINYL CHLORIDE, POINT OF VERTICAL CURVATURE
PVMT PAVEMENT
Q
QUA QUARTER
R
R RED, RISER, RADIATOR, RADIUS, REFRIGERANT
RA RETURN AIR, REMOTE ANNUNCIATOR
RACP REMOTE ACCESS CONTROL PANEL
RAD RADIUS
RAG RETURN AIR GRILLE
RAR RETURN AIR REGISTER
RB RUBBER BASE
RCB REINFORCED CONCRETE BEAM
RCP REINFORCED CONCRETE PIPE, REFLECTED CEILING PLAN
RD ROOF DRAIN
RDF RUBBER RAISED DISK FLOOR
RE RESIDENT ENGINEER
REBAR REINFORCING STEEL BAR
REC RECEPTACLE
REC'D RECEIVED
RECP RECEPTACLE
RECT RECTIFIER, RECEPTACLE
REF REFERENCE
REG REGISTER
REINF REINFORCEMENT, REINFORCED
REQ'D REQUIRED
RET RETURN
REV REVISION
RF RETURN FAN
RFI RADIO FREQUENCY INTERFERENCE
RG RETURN GRILLE
RGS RIGID GALVANIZED STEEL
RL RAIN LEADER
RM ROOM
RMH ROOF MOUNTED HOOD
RML RADAR MICROWAVE LINK
RMS ROOT MEAN SQUARE
RO REVERSE OSMOSIS
RP BP REDUCED PRESSURE BACKFLOW PREVENTER
RPM ROTATIONS PER MINUTE, REVOLUTIONS PER MINUTE
RPZ REDUCED PRESSURE ZONE
RPZ BFP REDUCED PRESSURE ZONE BACKFLOW PREVENTOR
RQMTS REQUIREMENTS
RTN RETURN
RTU ROOF TOP UNIT
RV RELIEF VALVE
S
S SOUTH, STAIN COLOR, SANITARY
SA SUPPLY AIR
SAN SANITARY
SC SPIN IN COLLAR WITH VOLUME DAMPER, SENSIBLE COOLING
S.C. SOLID CORE
SCC SECURITY CONTROL CENTER
SCHED SCHEDULE
SCHWP SECONDARY CHILLED WATER PUMP
SCHWR SECONDARY CHILLED WATER RETURN
SCHWS SECONDARY CHILLED WATER SUPPLY
SCND SECONDARY
SCP SYSTEM CONTROL PANEL, SMOKE CONTROL PANEL
SD SPLITTER DAMPER STORM DRAIN, SMOKE DETECTOR
S.D. SUPPLY DIFFUSER
SDSTSMS SELF DRILLING SELF TAPPING SHEET METAL SCREWS
SEC SECONDARY
SECT SECTION
SECY SECURITY
SENS SENSIBLE
SF SQUARE FEET
SG SUPPLY GRILLE
SGL SINGLE
SHDWN SHUT DOWN
SHLD SHIELDED
SHT SHEET
SIM SIMILAR
SMACNA SHEET METAL AND AIR CONDITIONING CONTRACTORS
NATIONAL ASSOCIATION
SOV SHUT-OFF VALVE
SP STATIC PRESSURE(IN W.G.), SINGLE POLE, SUMP PUMP
SPEC SPECIFICATION
SPF STAIRWELL PRESSURIZATION FAN
SPST SINGLE POLE SINGLE THROW
SPT STATIC PRESSURE TRANSMITTER
SPVR SUPERVISORY CONDITION
SQ SQUARE
SQ.FT. SQUARE FOOT/FEET
SR SUPPLY REGISTER
SRG SIGNAL REFERENCE GRID
SS STAINLESS STEEL, SANITARY SEWER
S/S START-STOP
ST SHUNT TRIP
STD STANDARD
STGP SIGNAL TRANSPORT GROUND PLANE
STL STEEL
STP SHIELDED TWISTED PAIR
STRUCT STRUCTURAL
SUBJ SUBJUNCTION
SUSP SUSPENDED
SW SWITCH, SELF WEIGHT
SWBD SWITCHBOARD
SWG SIDEWALL GRILLE
SWGR SWITCHGEAR
SWR SIDEWALL REGISTER
SWSI SINGLE WIDTH SINGLE INLET
SWSR SIDE WALL SUPPLY REGISTER
SY SQUARE YARD
SYM SYMMETRICAL
SYS SYSTEM
T
T TRANSDUCER
T&B TOP AND BOTTOM
T&P TEMPERATURE AND PRESSURE
T/ TOP OF
TB TERMINAL BOX, TERMINAL BOARD
TC TRIP COIL, TOTAL COOLING, TIME CLOCK
TD TIME DELAY, TRENCH DRAIN
TEF TOILET EXHAUST FAN
TEL TELEPHONE
TELCO TELEPHONE COMPANY
TEMP TEMPERATURE
TERM TERMINAL
TG TRANSFER GRILLE
THK THICK, THICKNESS
THRD THREAD
TOC TOP OF CONCRETE
TOD TOP OF DUCT
TOS,T/S TOP OF STEEL
TOWB ATCT AND ATTACHED BASE BUILDING
TP TRAP PRIMER, TWISTER PAIR
TRACO TERMINAL RADAR APPROACH CONTROL BUILDING
TRBL TROUBLE CONDITION
TS TWO SPEED
TSP TOTAL STATIC PRESSURE, TRAP SEAL PRIMER
T^STAT THERMOSTAT
TT TEMPERATURE TRANSMITTER
TTB TELEPHONE TERMINAL BOARD
TV TELEVISION, TEMPERING VALVE
TVSS TRANSIENT VOLTAGE SURGE SUPPRESSOR (GFM)
TW TEMPERED WATER
TWY TAXIWAY
TYP TYPICAL
U
UBC UNIFORM BUILDING CODE
UC UNDERCUT
UG UNDERGROUND
UGP UNDERGROUND POWER
UH UNIT HEATER
UL UNDERWRITER'S LABORATORY
UNF UNFUSED
UNO UNLESS NOTED OTHERWISE
UON UNLESS OTHERWISE NOTED
UPC UNIFORM PLUMBING CODE
UPS,U UNINTERUPTIBLE POWER SUPPLY
UTIL UTILITY
V
V VOLT, VOLTAGE, VENT
VA VOLT AMPERE, VOICE ALARM
VAC VACUUM
VAV VARIABLE AIR VOLUME
VB VACUUM BREAKER
VCT VINYL COMPOSITE TILE
VD VOLUME DAMPER - MANUAL
VDT VIDEO DISPLAY TERMINAL
VENT VENTILATION
VERT VERTICAL
VEST VESTIBULE
VFD VARIABLE FREQUENCY DRIVE
VM VOLTMETER
VPF VESTIBLE PRESSURIZATION FAN
VTR VENT THROUGH ROOF
W
W WEST, WIDTH, WATT
W/ WITH
W/C WATER TO CEMENT
W/O WITHOUT
WB WET BULB
WC WATER COLUMN, WATER CLOSET, WALL COVERING
WCO WALL CLEANOUT
WCR WITHSTAND AND CLOSING RATING
WG WATER GAGE
WH WATER HEATER, WALL HEATER, WALL HYDRANT
WHA WATER HAMMER ARRESTER
W.L. WIND LOAD
WM WATT METER
WMS WIRE MESH SCREEN
WP SUBSCRIPT "WP" APPLIED TO ANY SYMBOL INDICATES
WEATHERPROOF NEMA TYPE 3R OR EQUIVALENT, UON
W.P. WORKING POINT
WPD WATER PRESSURE DROP
WSW WASHDOWN SUPPLY WATER
WT WATER TANK, WEIGHT
WTR WATER
WWF WELDED WIRE FABRIC
X
X AUXILIARY RELAY
XDCR TRANSDUCER
XFMR TRANSFORMER
XFR TRANSFER
XMTR TRANSMITTER
XPS EXTRUDED POLYSTYRENE
Y
Y WYE
Y- WYE DELTA
Z
Z IMPEDANCE
CHECKED
DESIGNED DATE
H
G
F
E
D
C
B
A
7 6 5 4 3 2 1
H
G
F
E
D
C
B
A
8 7 6 5 4 3 2 1
DRAWN
APPROVED BY
JCNISSUED BY
SUBMITTED BY
DRAWING NO
SCALES SHOWN FOR 22" X 34" SHEET. ADJUST SCALE FOR OTHER SIZES
REVIEWED BY
PWM-1302899-
DEPARTMENT OF TRANSPORTATION
FEDERAL AVIATION ADMINISTRATION
ATCT
ATO - TECHNICAL OPERATIONS EASTERN SERVICE AREA
PORTLAND ME(PORTLAND INTERNATIONAL JETPORT)
PROJECT ENGINEER MGR: ENGINEERING CENTER
PUBLIC AVAILABILITY TO BE DETERMINED UNDER 5 USC 552
FOR OFFICIAL USE ONLY
GENERAL
ENGINEERING SERVICES
TERMINAL
PROJECT NUMBER: 230041.00
5901 Peachtree Dunwoody Rd. | Bldg C | Suite 515 Atlanta, Georgia 30328-6055 phone 678.320.1888 | wileywilson.com
/2
/2
:1 :5
A
M
GMR
RAB
G011
1302899GMR
ABBREVIATIONS (SHEET 2 OF 2)
03/15/24
REV
REV APPROVED
DATE
DESCRIPTION JCN REDLINE
DATE
A B C
LOCATE TEMPORARY LOW AMBIENT
CHILLER ON EXISTING DRY COOLER PAD.
ROUTE TEMPORARY PIPING TO 205-COMM
ROOM REMOVABLE PANEL LOCATED ON
THE EXTERIOR, PLAN SOUTH WALL.
TEMPORARY CHILLER SHALL AT LEAST
SERVE ALL HYDRONIC COOLING
EQUIPMENT SERVING CRITICAL SPACES TO
AVOID ANY SERVICE INTERRUPTIONS.
COORDINATE SPACES WITH FAA.
LOCATE TEMPORARY BOILER WITHIN
FENCED IN CHILLER YARD. ROUTE
TEMPORARY PIPING TO 205-COMM ROOM
REMOVABLE PANEL LOCATED ON THE
EXTERIOR, PLAN SOUTH WALL.
TEMPORARY BOILER SHALL AT LEAST
SERVE ALL HYDRONIC HEATING
EQUIPMENT SERVING CRITICAL SPACES TO
AVOID ANY SERVICE INTERRUPTIONS.
COORDINATE SPACES WITH FAA.
TELCO/LAN
CONFERENCE
ROOM
OFFICE
#1
SUPERVISOR'S
OFFICE
#2
10 CBI/TRAINING
AT
MANAGER
CORRIDOR
ADA
TOILET
2 TOILET
ROOM
2A
LINK
ELECT.
ROOM
TELCO
ROOM
MECHANICAL
ROOM
LOBBY
ELEV.
VESTIBULE
STAIR
CABLE
SHAFT
ELEV.
EQUIP.
EXISTING TO REMAIN
NATURAL GAS METER
NATURAL GAS TIE-IN
FOR TEMPORARY
BOILER
A B C
CONNECT
TEMPORARY
CHILLER AND
BOILER PIPING TO
RISER IN CHASE.
ROUTE TEMPORARY PIPING
FROM TEMPORARY CHILLER
AND BOILER THROUGH
REMOVABLE PANEL
COMM
ROOM
CABLE
CHASE
ELEV.
STAIR
PROVIDE ACCESS
PANEL TO CHASE FOR
TEMPORARY PIPING
N
CHECKED
DESIGNED DATE
H
G
F
E
D
C
B
A
7 6 5 4 3 2 1
H
G
F
E
D
C
B
A
8 7 6 5 4 3 2 1
DRAWN
APPROVED BY
JCNISSUED BY
SUBMITTED BY
DRAWING NO
SCALES SHOWN FOR 22" X 34" SHEET. ADJUST SCALE FOR OTHER SIZES
REVIEWED BY
PWM-1302899-
DEPARTMENT OF TRANSPORTATION
FEDERAL AVIATION ADMINISTRATION
ATCT
ATO - TECHNICAL OPERATIONS EASTERN SERVICE AREA
PORTLAND ME(PORTLAND INTERNATIONAL JETPORT)
PROJECT/SYSTEM ENGINEER ENGINEERING MANAGER
PUBLIC AVAILABILITY TO BE DETERMINED UNDER 5 USC 552
FOR OFFICIAL USE ONLY
GENERAL
ENGINEERING SERVICES
TERMINAL
PROJECT NUMBER: 230041.00
5901 Peachtree Dunwoody Rd. | Bldg C | Suite 515 Atlanta, Georgia 30328-6055 phone 678.320.1888 | wileywilson.com
/2
/2
:1
:5
P
M
ZMA
ALM
G020
1302899SWL
PHASING
06/28/24
1. THE BUILDING(S) WILL BE OCCUPIED AT ALL TIIMES DURING CONSTRUCTION. THE CONTRACTOR SHALL
COORDINATE WITH THE CONTRACTING OFFICER REGARD ALL INTERRUPTIONS OF UTILITIES,
TEMPORARY EXITS, DUST PARTITIONS, DELIVERIES, AND ALL OTHER JOB REQUIREMENTS.
2. PHASE DEMOLITION AND NEW WORK AS REQUIRED TO MAINTAIN BUILDING OPERATIONS. PROTECT BUILDING OCCUPANTS, AND MAINTAIN REQUIRED ENTRANCES AND EXITS THROUGHOUT THE DURATION OF THE PROJECT. SUBMIT PROPOSED PHASING PLAN THAT MEETS THE INTENT AND REQUIREMENTS
OUTLINED IN THE DRAWINGS FOR REVIEW AND APPROVAL PRIOR TO COMMENCING WORK.
3. PROVIDE TEMPORARY HEATING WATER WHILE THE BUILDING HEATING WATER SYSTEM IS
UNAVAILABLE. PROVIDE TEMPORARY BOILER WITH AN OUTPUT CAPACITY OF AT LEAST 285-MBH AND PUMP PACKAGE SIZED FOR 19.7 GPM AND 50 F.- H2O. THE TEMPORARY BOILER TIE-IN TO THE BUILDING DISRIBUTION SYSTEM SHALL OCCUR DURING AN APPROVED TIMEFRAME BY THE FAA AS WELL AS THE SWITCH BACK TO THE BUILDING HEATING WATER SYSTEM. ALL TEMPORARY HYDRONIC PIPING AND CONNECTIONS MUST BE ABOVE GRADE, INSULATED, AND ROUTED IN SUCH A WAY AS TO MAINTAIN CLEAR WALKING PATHS AND PREVENT TRIPPING HAZARDS. TEMPORARY BOILER MUST BE TESTED FOR
A MINIMUM OF A ONE WEEK PERIOD PRIOR TO THE DEMOLITION OF THE EXISTING BOILER.
4. PROVIDE TEMPORARY CHILLED WATER WHILE THE BUILDING CHILLED WATER SYSTEM IS
UNAVAILABLE. PROVIDE TEMPORARY CHILLER WITH A CAPACITY OF AT LEAST 40-TONS AND PUMP PACKAGE SIZED FOR AT LEAST 99 GPM AND 115 FT.-H2O.THE TEMPORARY CHILLER TIE-IN TO THE BUILDING DISTRIBUTION SYSTEM SHALL OCCUR DURING AN APPROVED TIMEFRAME BY THE FAA AS WELL AS THE SWITCH BACK TO THE BUILDING CHILLED WATER SYSTEM. ALL TEMPORARY HYDRONIC PIPING AND CONNECTIONS MUST BE ABOVE GRADE, INSULATED, AND ROUTED IN SUCH A WAY AS TO MAINTAIN
CLEAR WALKING PATHS AND PREVENT TRIPPING HAZARDS.
5. THE CONTRACTOR IS RESPONSIBLE FOR ALL NECESSARY WORK AND COMPONENTS REQUIRED TO
MAKE TEMPORARY SYSTEMS WORK INCLUDING PIPING AND POWER. AFTER REMOVAL OF THE
TEMPORARY SYSTEMS, RETURN HARDSCAPES AND OTHER AFFECTED AREAS TO THEIR ORIGINAL
CONDITION.
6. THE CONTRACTOR IS RESPONSIBLE FOR OPERATION AND MAINTENANCE OF THE TEMPORARY
HEATING AND COOLING EQUIPMENT. IF A PROBLEM WITH THE TEMPORARY HEATING EQUIPMENT
OCCURS OR IS REPORTED, THE CONTRACTOR MUST RESPOND WITHIN FOUR HOURS. THE CONTRACTOR MUST ENSURE THE TEMPORARY HEATING EQUIPMENT IS NOT OUT OF SERVICE FOR MORE THAN EIGHT
HOURS.
7. AFTER CHILLER AND BOILER SYSTEMS ARE RUNNING, WORK ON THE BASE BUILDING SHALL
COMMENCE. COORDINATE WITH FAA ABOUT PERSONNEL RELOCATION.
8. PROVIDE SPOT COOLERS AND ELECTRIC HEATERS FOR ALL SPACES REQUIRING COOLING AND HEATING NOT ON THE TEMPORARY CHILLERS AND BOILERS. COORDINATE UNIT QUANTITIES AND
REQUIRED SPACES WITH FAA.
9. REPLACEMENT OF VALVES WITH 2-WAY BELIMO ENERGY VALVES SHALL OCCUR IN OFF HOURS TO
MINIMIZE INTERRUPTION.
10. THE CONTRACTOR IS RESPONSIBLE FOR PROVIDING TEMPORARY POWER, AND ALL SUPPORTING
TEMPORARY POWER INFRASTRUCTURE, TO SUPPORT OPERATION OF TEMPORARY HEATING AND
COOLING EQUIPMENT DURING CONSTRUCTION. TEMPORARY POWER INFRASTRUCTURE INCLUDES BUT IS NOT LIMITED TO: PANELBOARDS, DISCONNECT SWITCHES, WIRING, CONDUIT, RECEPTACLES & OTHER DEVICES REQUIRED TO MAINTAIN FACILITY OPERATIONS. CONTRACTOR MAY UTILIZE THE FACILITY ELECTRICAL SERVICE FROM DISTRIBUTION PANEL MDPE AVAILABLE SPACE(S) AND SPARE CIRCUIT
BREAKER(S) TO SUPPLY TEMPORARY EQUIPMENT, PROVIDED TEMPORARY EQUIPMENT DOES NOT
OVERLOAD ANY PORTION OF THE EXISTING ELECTRICAL SYSTEM. OTHERWISE, THE CONTRACTOR IS
RESPONSIBLE FOR PROVIDING A PORTABLE GENERATOR OF SUFFICIENT CAPACITY TO SUPPORT
TEMPORARY EQUIPMENT OPERATIONS.
11. PROVIDE TEMPORARY OFFICE TRAILER AND PORTABLE TOILET TRAILER FOR BASE BUILDING
PERSONNEL. COORDINATE LOCATION WITH CONTRACTOR.
GENERAL PHASING NOTES
SCALE: 3/16" = 1'-0"G020
1 FIRST FLOOR PHASING PLAN
SCALE: 3/16" = 1'-0"G020
2 SECOND FLOOR MECHANICAL PHASING PLAN
0' 4' 8' 12'
REV
REV APPROVED
DATE
DESCRIPTION JCN REDLINE
DATE
2 2A
WALL TO BE
INSTALLED BY
OTHERS
CEILING DEMOLITION SELECTED AREAS. REFER TO NOTES.
N
CHECKED
DESIGNED DATE
H
G
F
E
D
C
B
A
7 6 5 4 3 2 1
H
G
F
E
D
C
B
A
8 7 6 5 4 3 2 1
DRAWN
APPROVED BY
JCNISSUED BY
SUBMITTED BY
DRAWING NO
SCALES SHOWN FOR 22" X 34" SHEET. ADJUST SCALE FOR OTHER SIZES
REVIEWED BY
PWM-1302899-
DEPARTMENT OF TRANSPORTATION
FEDERAL AVIATION ADMINISTRATION
ATCT
ATO - TECHNICAL OPERATIONS EASTERN SERVICE AREA
PORTLAND ME(PORTLAND INTERNATIONAL JETPORT)
PROJECT ENGINEER MGR: ENGINEERING CENTER
PUBLIC AVAILABILITY TO BE DETERMINED UNDER 5 USC 552
FOR OFFICIAL USE ONLY
ARCHITECTURAL
ENGINEERING SERVICES
TERMINAL
PROJECT NUMBER: 230041.00
5901 Peachtree Dunwoody Rd. | Bldg C | Suite 515 Atlanta, Georgia 30328-6055 phone 678.320.1888 | wileywilson.com
/2
/2
:0 :5
P
M
GMR
NXE
D120
1302899GMR
BASE BUILDING REFLECTED CEILING DEMOLITION
03/15/24
SCALE: 3/16" = 1'-0"D120
BASE BUILDING REFLECTED CEILING
DEMOLITION
NOTES:
1. REMOVE EXISTING 2'X2' CEILING TILES AND GRID. COORDINATE WITH OTHER DISCIPLINES
BEFORE DEMOLITION TO ASSURE SAFETY AND PROJECT PHASING COORDINATION. REFER
TO HATCHED AREA ON RCP DEMOLITION. WALL TRACK TO BE REUSED WHEN POSSIBLE.
2. REFER TO OTHER DISCIPLINES FOR MECHANICAL AND ELECTRICAL DEMOLITION
ROOM SCHEDULE BASE BUILDING LEVEL 1
ROOM
NO ROOM NAME
1 ENTRY
2 ADA TOILET
2A TOILET ROOM
3 CORRIDOR
4 TELCO/LAN
5 CONFERENCE ROOM
6 SUPERVISOR'S
7 CBI/TRAINING
8 JANITOR'S
9 AT MANAGER
10 OFFICE #2
11 OFFICE #1
13 LINK
12'8'4'0'
SCALE: 3/16"=1'-0" REV
REV APPROVED
DATE
DESCRIPTION JCN REDLINE
DATE
EXPOSED CEILING EXPOSED CEILING
EXPOSED CEILING
EXPOSED CEILING
A B C
202 203
EXPOSED CEILING
A B C
302 303
EXISTING CEILING AND GRID TO
REMAIN, REMOVE AND REPLACE
CEILING TILES AS NEEDED,
CEILING MUST BE REINSTATED
TO "NORMAL" DAILY.
REFER TO NOTE 2
CEILING DEMOLITION SELECTED AREAS. REFER TO NOTES.
N
CHECKED
DESIGNED DATE
H
G
F
E
D
C
B
A
7 6 5 4 3 2 1
H
G
F
E
D
C
B
A
8 7 6 5 4 3 2 1
DRAWN
APPROVED BY
JCNISSUED BY
SUBMITTED BY
DRAWING NO
SCALES SHOWN FOR 22" X 34" SHEET. ADJUST SCALE FOR OTHER SIZES
REVIEWED BY
PWM-1302899-
DEPARTMENT OF TRANSPORTATION
FEDERAL AVIATION ADMINISTRATION
ATCT
ATO - TECHNICAL OPERATIONS EASTERN SERVICE AREA
PORTLAND ME(PORTLAND INTERNATIONAL JETPORT)
PROJECT ENGINEER MGR: ENGINEERING CENTER
PUBLIC AVAILABILITY TO BE DETERMINED UNDER 5 USC 552
FOR OFFICIAL USE ONLY
ARCHITECTURAL
ENGINEERING SERVICES
TERMINAL
PROJECT NUMBER: 230041.00
5901 Peachtree Dunwoody Rd. | Bldg C | Suite 515 Atlanta, Georgia 30328-6055 phone 678.320.1888 | wileywilson.com
/2
/2
:0 :5
P
M
GMR
NXE
D121
1302899GMR
LEVEL 1, 2, AND 3 REFLECTED CEILING DEMOLITION
03/15/24
SCALE: 3/16" = 1'-0"D121
1 LEVEL 1 REFLECTED CEILING DEMOLITION
SCALE: 3/16" = 1'-0"D121
2 LEVEL 2 REFLECTED CEILING DEMOLITION
SCALE: 3/16" = 1'-0"D121
3 LEVEL 3 REFLECTED CEILING DEMOLITION
NOTES:
1. REMOVE EXISTING 2'X2' CEILING TILES AND GRID. COORDINATE WITH OTHER
DISCIPLINES BEFORE DEMOLITION TO ASSURE SAFETY AND PROJECT PHASING
COORDINATION. REFER TO HATCHED AREA ON RCP DEMOLITION PLANS. WALL
TRACK TO BE REUSED WHEN POSSIBLE.
2. COORDINATE WITH FAA COR AND SITE FOR CEILINGS TO BE STORED AND RE-
INSTALLED
3. REFER TO OTHER DISCIPLINES FOR MECHANICAL AND ELECTRICAL DEMOLITION
ROOM SCHEDULE LEVEL 1, 2, & 3
ROOM
NO ROOM NAME
101 VESTIBULE
102 STAIR
103 CABLE SHAFT
104 LOBBY
105 ELEV.
106 ELEV. EQUIP.
107 ELECT. ROOM
108 TELCO ROOM
109 MECHANICAL ROOM
201 STAIR
202 CABLE CHASE
203 ELEV.
205 COMM ROOM
301 STAIR
302 CABLE SHAFT
303 ELEV
304 TRACON
305 STORAGE
306 MECHANICAL ROOM
307 TOILET
12'8'4'0'
SCALE: 3/16"=1'-0"
REFER TO NOTE 1
REV
REV APPROVED
DATE
DESCRIPTION JCN REDLINE
DATE
APVD
NOTE: NO ARCHITECTURAL WORK TO BE DONE ON THIS LEVEL
EXPOSED CEILING
404 405
REMOVE AND DISPOSE
EXISTING CEILING TILES
AND GRID
EXISTING CEILING TO
REMAIN. NO CEILING
WORK TO BE DONE IN
THIS ROOM
A B C
502 503
504 505
EXISTING CEILING TO
REMAIN. NO CEILING
WORK TO BE DONE IN
THIS ROOM
EXISTING CEILING AND GRID TO
REMAIN, REMOVE AND REPLACE
CEILING TILES AS NEEDED,
CEILING MUST BE REINSTATED
TO "NORMAL" DAILY.
REFER TO NOTE 2
REMOVE AND
DISPOSE EXISTING
GYPSUM CEILING
A B C
CAB
CEILING DEMOLITION SELECTED AREAS. REFER TO NOTES.
N
CHECKED
DESIGNED DATE
H
G
F
E
D
C
B
A
7 6 5 4 3 2 1
H
G
F
E
D
C
B
A
8 7 6 5 4 3 2 1
DRAWN
APPROVED BY
JCNISSUED BY
SUBMITTED BY
DRAWING NO
SCALES SHOWN FOR 22" X 34" SHEET. ADJUST SCALE FOR OTHER SIZES
REVIEWED BY
PWM-1302899-
DEPARTMENT OF TRANSPORTATION
FEDERAL AVIATION ADMINISTRATION
ATCT
ATO - TECHNICAL OPERATIONS EASTERN SERVICE AREA
PORTLAND ME(PORTLAND INTERNATIONAL JETPORT)
PROJECT ENGINEER MGR: ENGINEERING CENTER
PUBLIC AVAILABILITY TO BE DETERMINED UNDER 5 USC 552
FOR OFFICIAL USE ONLY
ARCHITECTURAL
ENGINEERING SERVICES
TERMINAL
PROJECT NUMBER: 230041.00
5901 Peachtree Dunwoody Rd. | Bldg C | Suite 515 Atlanta, Georgia 30328-6055 phone 678.320.1888 | wileywilson.com
/2
/2
:0 :0
P
M
GMR
NXE
D122
1302899GMR
LEVEL 4, 5 AND CAB LEVEL REFLECTED CEILING
DEMOLITION
03/15/24
SCALE: 3/16" = 1'-0"D122
1 LEVEL 4 REFLECTED CEILING DEMOLITION
SCALE: 3/16" = 1'-0"D122
2 LEVEL 5 REFLECTED CEILING DEMOLITION
SCALE: 3/16" = 1'-0"D122
3 CAB LEVEL REFLECTED CEILING DEMOLITION
NOTES:
1. REMOVE EXISTING 2'X2' CEILING TILES AND GRID. COORDINATE WITH OTHER
DISCIPLINES BEFORE DEMOLITION TO ASSURE SAFETY AND PROJECT PHASING
COORDINATION. REFER TO HATCHED AREA ON RCP DEMOLITION PLANS.
2. COORDINATE WITH FAA COR AND SITE FOR CEILINGS TO BE STORED AND RE-
INSTALLED
3. REFER TO OTHER DISCIPLINES FOR MECHANICAL AND ELECTRICAL DEMOLITION
ROOM SCHEDULE LEVEL 4 & 5
ROOM
NO ROOM NAME
401 STAIR / LOBBY
402 CABLE SHAFT
403 ELEV.
404 EQUIP ROOM
405 LAN ROOM
407 TOILET
408 MECHANICAL ROOM
501 STAIR
502 CABLE SHAFT
503 ELEV.
504 LOUNGE
505 KITCHEN
506 CORRIDOR
507 STAIR
508 TOILET
509 MECHANICAL ROOM
CAB STAIR
12'8'4'0'
SCALE: 3/16"=1'-0"
NO WORK TO BE DONE ON THIS LEVEL
REV
REV APPROVED
DATE
DESCRIPTION JCN REDLINE
DATE
APVD
7'-9"
6'-2 1/2"
1/4" FT
1/4" FT
/4
F
T
1/4" FT
1/4" FT 1/4" FT
H P
EXISTING
CRICKET
H P
AHU-1
EXISTING
SCUPPER
(10"x8")
EXISTING
SCUPPER
(10"x8")
EXISTING
LIGHTNING
PROTECTION
CONNECTION TO
FLASHING CAP
EXISTING WALL
MOUNTED
LADDER (28"x8")
EXISTING LINE
OF FOUNDATION
BELOW
EXISTING
CANOPY
EXISTING 3"
SANITARY
VENT
EXISTING FACE OF ATCT
1" TO 1/2" GAS
FROM METER
EXISTING 16"x8"
SCUPPER
EXISTING AIR
TERMINAL,
24" TYP
EXISTING
LIGHTNING
PROTECTION
CONNECTION TO
FLASHING CAP
EXISTING
SCUPPER
(10"x8")
EXISTING
BALLASTED
MEMBRANE
ROOF (TYPICAL)
TO BE REMOVED
WITH ALL
ACCESORIES
EXISTING
BALLASTED
MEMBRANE
ROOF (TYPICAL)
EXISTING
ATCT
A
B
C
D
E
E
D141
D141
D141
D141
EXISTING
AHU TO BE
REMOVED
DEMOLITION ITEM
N
CHECKED
DESIGNED DATE
H
G
F
E
D
C
B
A
7 6 5 4 3 2 1
H
G
F
E
D
C
B
A
8 7 6 5 4 3 2 1
DRAWN
APPROVED BY
JCNISSUED BY
SUBMITTED BY
DRAWING NO
SCALES SHOWN FOR 22" X 34" SHEET. ADJUST SCALE FOR OTHER SIZES
REVIEWED BY
PWM-1302899-
DEPARTMENT OF TRANSPORTATION
FEDERAL AVIATION ADMINISTRATION
ATCT
ATO - TECHNICAL OPERATIONS EASTERN SERVICE AREA
PORTLAND ME(PORTLAND INTERNATIONAL JETPORT)
PROJECT ENGINEER MGR: ENGINEERING CENTER
PUBLIC AVAILABILITY TO BE DETERMINED UNDER 5 USC 552
FOR OFFICIAL USE ONLY
ARCHITECTURAL
ENGINEERING SERVICES
TERMINAL
PROJECT NUMBER: 230041.00
5901 Peachtree Dunwoody Rd. | Bldg C | Suite 515 Atlanta, Georgia 30328-6055 phone 678.320.1888 | wileywilson.com
/2
/2
:0 :0
P
M
GMR
NXE
D140
1302899FAA
ROOF DEMOLITION
03/15/24
SCALE: 3/16" = 1'-0"D140
1 EXISTING BASE BUILDING ROOF LAYOUT
DEMOLITION LEGEND
KEYNOTES NOTES
A AHU-1 68"X42"
B DEMO GAS METER , COORDINATE WITH GAS COMPANY
C 3" SANITATION VENT
D EF-1 1.13"X13" PENETRATION WITH 20" ROUND FAN 2. 24" AIR TERMINAL ON TOP
E LIGHTNING PROTECTION EQUIPMENT, REFER TO ELECTRICAL WORK
12'8'4'0'
SCALE: 3/16"=1'-0"
NOTES:
1. COORDINATE DEMOLITION OF ROOFING AND EXISTING EQUIPMENT WITH
INSTALLATION OF NEW RTU CURB AND ROOFING. AT NO TIME SHOULD ROOF DECK
OR OPENINGS BE EXPOSED TO WEATHER.
2. DEMOLISH LIGHTNING PROTECTION SYSTEM AIR TERMINALS AND ROOF
CONDUCTORS FROM BASE BUILDING ROOFTOP PRIOR TO DEMOLITION OF
ROOFING. DISCONNECT DOWN CONDUCTOR TERMINATIONS AT ROOFTOP AND
RETAIN DOWN CONDUCTORS FOR RENOVATION WORK. COORDINATE LIGHTNING
PROTECTION SYSTEM WORK WITH ROOF LIGHTING PROTECTION PLAN ON E106.
REV
REV APPROVED
DATE
DESCRIPTION JCN REDLINE
DATE
APVD
EXISTING TO REMAIN SCUPPER
EXISTING TO
REMAIN
CONDUCTOR HEAD
EXISTING TO REMAIN
DOWNSPOUT
EXISTING
INSULATED
METAL PANEL
TO REMAIN
EXISTING WALL COPING
TO BE REMOVED
REMOVE EXISTING ROOF
ASSEMBLY DOWN TO DECK.
EXISTING SLOPED METAL EDGE
SEE NOTE 1
EXISTING TO BE REMOVED STONE BALLAST
EXISTING TO REMAIN
CONC ON METAL DECK
EXISTING WALL
COPING TO BE
REMOVED
REMOVE EXISTING ROOF
ASSEMBLY DOWN TO DECK.
EXISTING
INSULATED
METAL PANEL
TO REMAIN
CANT STRIP
SEE NOTE 1
EXISTING STONE
BALLAST TO BE
REMOVED
EXISTING ROOF COPING AND
FLASHING TO BE REMOVED
EXISTING INSULATED
METAL PANEL TO
REMAIN. TYP.
REMOVE EXISTING
ROOF ASSEMBLY
DOWN TO DECK.
EXISTING CANT STRIP, SEE NOTE 1
EXISTING STONE BALLAST TO BE REMOVED
EXISTING ROOF COPING AND
FLASHING TO BE REMOVED
REMOVE EXISTING ROOF
ASSEMBLY DOWN TO DECK.
EXISTING
INSULATED METAL
PANEL TO REMAIN
CHECKED
DESIGNED DATE
H
G
F
E
D
C
B
A
7 6 5 4 3 2 1
H
G
F
E
D
C
B
A
8 7 6 5 4 3 2 1
DRAWN
APPROVED BY
JCNISSUED BY
SUBMITTED BY
DRAWING NO
SCALES SHOWN FOR 22" X 34" SHEET. ADJUST SCALE FOR OTHER SIZES
REVIEWED BY
PWM-1302899-
DEPARTMENT OF TRANSPORTATION
FEDERAL AVIATION ADMINISTRATION
ATCT
ATO - TECHNICAL OPERATIONS EASTERN SERVICE AREA
PORTLAND ME(PORTLAND INTERNATIONAL JETPORT)
PROJECT ENGINEER MGR: ENGINEERING CENTER
PUBLIC AVAILABILITY TO BE DETERMINED UNDER 5 USC 552
FOR OFFICIAL USE ONLY
ARCHITECTURAL
ENGINEERING SERVICES
TERMINAL
PROJECT NUMBER: 230041.00
5901 Peachtree Dunwoody Rd. | Bldg C | Suite 515 Atlanta, Georgia 30328-6055 phone 678.320.1888 | wileywilson.com
/2
/2
:0 :0
P
M
GMR
NXE
D141
1302899FAA
ROOF DETAILS DEMOLITION
03/15/24
SCALE: 1 1/2" = 1'-0"D141
1 EXISTING ROOF SCUPPER DETAIL
SCALE: 1 1/2" = 1'-0"D141
2 EXISTING ROOF EAVE DETAIL
SCALE: 1" = 1'-0"D141
3 EXISTING LINK CROSS SECTION
SCALE: 1" = 1'-0"D141
4 EXISTING LINK SILL
2'1'6"0'
SCALE: 1"=1'-0"
18"1'6"0'
SCALE: 1-1/2"=1'-0"
NOTES
1. REMOVE CANT STRIP OR METAL EDGE AN REPLACE WITH WOOD NAILERS
TO MATCH DETAIL 4/A141 OR APPROVED EQUAL. ASSEMBLY MUST BE ABLE TO
WITHSTAND ASCE 7-16 DESIGN MAXIMUM WIND PRESSURE. SEE DRAWING
S612
2. COORDINATE DEMOLITION OF ROOFING AND EXISTING EQUIPMENT WITH
INSTALLATION OF NEW RTU CURB AND ROOFING. AT NO TIME SHOULD ROOF
DECK OR OPENINGS BE EXPOSED TO WEATHER.
THIS PROJECT COPY IS BASED ON
DRAWING NE-D-26977-A04
REVISION 2 . DATED 11/08/1996
REV
REV APPROVED
DATE
DESCRIPTION JCN REDLINE
DATE
APVD
M
D304
VESTIBULE
LOBBY
18"ø
8"ø10"ø
8"ø
16"ø
8"ø
8"ø8"ø
12"ø
8"ø
8"ø
8"ø
6"ø
6"ø
6"ø
6"ø
8"ø8"ø
10"ø
CONFERENCE
ROOM
SUPERVISOR'S
SUPERVISOR'S
OFFICE
#1
TELCO/LAN
OFFICE
#2
10 CBI/TRAINING
AT
MANAGER
ENTRY
CORRIDOR
JANITOR'S
ADA
TOILET
TOILET
ROOM
2A
ELECT.
ROOM
TELCO
ROOM
ELEV.
EQUIP.
CABLE
SHAFT
ELEV.
STAIR
MECHANICAL
ROOM
8"ø
(E) 3/4" HWR
3/4" 1 1/4"
1 1/4"
1" 1"
1 1/4" 1 1/4" 1"
1"
(E) UH
8 EXISTING TO REMAIN
NATURAL GAS METER
EXISTING TO REMAIN FENCE
AROUND CHILLER YARD
N
CHECKED
DESIGNED DATE
H
G
F
E
D
C
B
A
7 6 5 4 3 2 1
H
G
F
E
D
C
B
A
8 7 6 5 4 3 2 1
DRAWN
APPROVED BY
JCNISSUED BY
SUBMITTED BY
DRAWING NO
SCALES SHOWN FOR 22" X 34" SHEET. ADJUST SCALE FOR OTHER SIZES
REVIEWED BY
PWM-1302899-
DEPARTMENT OF TRANSPORTATION
FEDERAL AVIATION ADMINISTRATION
ATCT
ATO - TECHNICAL OPERATIONS EASTERN SERVICE AREA
PORTLAND ME(PORTLAND INTERNATIONAL JETPORT)
PROJECT/SYSTEM ENGINEER ENGINEERING MANAGER
PUBLIC AVAILABILITY TO BE DETERMINED UNDER 5 USC 552
FOR OFFICIAL USE ONLY
MECHANICAL
ENGINEERING SERVICES
TERMINAL
PROJECT NUMBER: 230041.00
5901 Peachtree Dunwoody Rd. | Bldg C | Suite 515 Atlanta, Georgia 30328-6055 phone 678.320.1888 | wileywilson.com
/2
/2
:1
:4
P
M
ZMA
ALM
D300
1302899SWL
FIRST FLOOR MECHANICAL DEMOLITION PLAN
06/28/24
SCALE: 3/16" = 1'-0"D300
1 FIRST FLOOR DUCTWORK DEMOLITION PLAN
KEYNOTE LEGEND
KEY DESCRIPTION
1 REMOVE 1.5-TON FAN COIL UNIT, DUCTWORK, PIPING, INSULATION,
SUPPORTS, DIFFUSERS, GRILLES, AND ASSOCIATED ACCESSORIES
SERVING FCU-1.
2 REMOVE 2.5-TON CEILING HUNG COMPUTER ROOM UNIT AND
ASSOCIATED PIPING.
3 REMOVE BOILER FLUE.
4 REMOVE EXHAUST GRILLE, DUCTWORK, AND ACCESSORIES UP TO
EXHAUST FAN.
5 REMOVE CONTROL PANEL.
6 CONTRACTOR TO DEMOLISH DUCTWORK, INSULATION, SUPPORTS,
DIFFUSERS, AND GRILLES SERVING AHU-1.
7 REMOVE IN WALL PACKAGED TERMINAL AIR CONDITIONER AND
PATCH WALL. SEE ARCHITECTURAL DETAIL 1/A500.
8 REMOVE HOT WATER PIPING TO UNIT HEATER TO ALLOW
REROUTING TO MINIMIZE CROSSOVER WITH ELECTRICAL CONDUIT.
0' 4' 8' 12'
X
1. REMOVE ALL MECHANICAL HVAC EQUIPMENT, EXISTING DUCTWORK, DUCTWORK ACCESSORIES, ASSOCIATED SUPPORTS, AND TERMINALS AS SHOWN.
2. REMOVE ALL EXISTING PIPING, PIPING ACCESSORIES, AND ASSOCIATED SUPPORTS AS SHOWN.
3. REMOVE ALL EXISTING CONTROLS AND THERMOSTATS.
4. PATCH AND SEAL TO MATCH EXISTING ALL BUILDING PENETRATIONS CREATED DURING DEMOLITION
AND NOT RE-USED. REFER TO ARCHITECTURAL FOR PATCHING DETAILS.
5. TEST DRAINED GLYCOL FOR FULL CHEMICAL ANALYSIS AND REPLACE WITH NEW SOLUTION TO MEET
DESIRED 40% PROPYLENE GLYCOL MIX.
6. ONLY FAA SSC PERSONNEL CAN OPERATE CIRCUIT BREAKERS.
GENERAL DEMOLITION NOTES
REV
REV APPROVED
DATE
DESCRIPTION JCN REDLINE
DATE
1" 2" 2"
1"
24"x24"
(E) 24"x20" SA
(E) 14"x12" SA
(E) 12"x8" SA
(E) 8"x8" SA
(E) 12"x8" SA
(E) 14"x12" SA
(E) 18"x12" SA
(E) 24"x12" SA
(E) 14"x12" SA(E) 12"x12" SA
(E) 24"x12" SA
(E) 18"x12" SA(E) 14"x12" SA(E) 12"x12" SA
COMM
ROOM
CABLE
CHASE
ELEV.
STAIR
(E) 24"x24" SA
N
CHECKED
DESIGNED DATE
H
G
F
E
D
C
B
A
7 6 5 4 3 2 1
H
G
F
E
D
C
B
A
8 7 6 5 4 3 2 1
DRAWN
APPROVED BY
JCNISSUED BY
SUBMITTED BY
DRAWING NO
SCALES SHOWN FOR 22" X 34" SHEET. ADJUST SCALE FOR OTHER SIZES
REVIEWED BY
PWM-1302899-
DEPARTMENT OF TRANSPORTATION
FEDERAL AVIATION ADMINISTRATION
ATCT
ATO - TECHNICAL OPERATIONS EASTERN SERVICE AREA
PORTLAND ME(PORTLAND INTERNATIONAL JETPORT)
PROJECT/SYSTEM ENGINEER ENGINEERING MANAGER
PUBLIC AVAILABILITY TO BE DETERMINED UNDER 5 USC 552
FOR OFFICIAL USE ONLY
MECHANICAL
ENGINEERING SERVICES
TERMINAL
PROJECT NUMBER: 230041.00
5901 Peachtree Dunwoody Rd. | Bldg C | Suite 515 Atlanta, Georgia 30328-6055 phone 678.320.1888 | wileywilson.com
/2
/2
:1
:4
P
M
ZMA
ALM
D301
1302899SWL
SECOND FLOOR MECHANICAL DEMOLITION PLAN
06/28/24
SCALE: 3/16" = 1'-0"D301
1 SECOND FLOOR DEMOLITION PLAN
KEYNOTE LEGEND
KEY DESCRIPTION
1 REMOVE 5-TON PACKAGED ROOFTOP UNIT AND ASSOCIATED CURB.
PATCH UNUSED PENETRATIONS. SEE ARCHITECTURAL PLANS.
2 REMOVE EXHAUST FAN.
3 REMOVE 12-TON COMPUTER ROOM UNIT AND ASSOCIATED PIPING.
4 REMOVE CONTROL PANEL.
5 REMOVE NATURAL GAS LINE BACK TO METER. CONTRACTOR TO
COORDINATE WITH UTILITY COMPANY FOR REMOVAL OF METER AND
SERVICE AT THIS LOCATION.
6 DEMOLISH PIPING UP TO TEMPORARY TEES WITHIN THE SECOND
FLOOR CHASE.
X
0' 4' 8' 12'
GENERAL DEMOLITION NOTES
1. REMOVE ALL MECHANICAL HVAC EQUIPMENT, EXISTING DUCTWORK, DUCTWORK ACCESSORIES, ASSOCIATED SUPPORTS, AND TERMINALS AS SHOWN.
2. REMOVE ALL EXISTING PIPING, PIPING ACCESSORIES, AND ASSOCIATED SUPPORTS AS SHOWN.
3. REMOVE ALL EXISTING CONTROLS AND THERMOSTATS.
4. PATCH AND SEAL TO MATCH EXISTING ALL BUILDING PENETRATIONS CREATED DURING DEMOLITION
AND NOT RE-USED. REFER TO ARCHITECTURAL FOR PATCHING DETAILS.
5. TEST DRAINED GLYCOL FOR FULL CHEMICAL ANALYSIS AND REPLACE WITH NEW WATER TO MEET
DESIRED 40% PROPYLENE GLYCOL MIX.
6. ONLY FAA SSC PERSONNEL CAN OPERATE CIRCUIT BREAKERS.
REV
REV APPROVED
DATE
DESCRIPTION JCN REDLINE
DATE
(E) VAV-3
(E) AHU-31
1 2
(E
"x
S A
20"x20"
(E) 25"x20" RA
(E) 20"x16" SA(E) 14"x9" SA
(E) 24"x20" SA
(E) 9"x9" SA
(E) 20"x16" SA(E) 18"x14" SA(E) 16"x14" SA
STORAGE
TRACON
CABLE
SHAFT
ELEV
STAIR
TOILET
MECHANICAL
ROOM
A B C
(E) AHU-4
(E) AHU-6
EQUIP
ROOM
CABLE
SHAFT
ELEV.
STAIR /
LOBBY
LAN
ROOM
MECHANICAL
ROOM
TOILET
(E) 10"x7" SA
(E) 14"x9" SA
(E) 17"x10" SA
(E) 8"x5" SA
(E) 8"x5" SA
(E) 12"ø OA
(E) 25"x19" SA
(E) 10"ø OA
(E) 8"ø OA
(E) 36"x12" RA99
(E) OUTSIDE AIR FAN
OA DUCT FILTER ACCESS DOOR
(E) LOUVER
8" DIA OA
DUCT UP
AHU-6 SA DUCT
UP TO CAB
N
CHECKED
DESIGNED DATE
H
G
F
E
D
C
B
A
7 6 5 4 3 2 1
H
G
F
E
D
C
B
A
8 7 6 5 4 3 2 1
DRAWN
APPROVED BY
JCNISSUED BY
SUBMITTED BY
DRAWING NO
SCALES SHOWN FOR 22" X 34" SHEET. ADJUST SCALE FOR OTHER SIZES
REVIEWED BY
PWM-1302899-
DEPARTMENT OF TRANSPORTATION
FEDERAL AVIATION ADMINISTRATION
ATCT
ATO - TECHNICAL OPERATIONS EASTERN SERVICE AREA
PORTLAND ME(PORTLAND INTERNATIONAL JETPORT)
PROJECT/SYSTEM ENGINEER ENGINEERING MANAGER
PUBLIC AVAILABILITY TO BE DETERMINED UNDER 5 USC 552
FOR OFFICIAL USE ONLY
MECHANICAL
ENGINEERING SERVICES
TERMINAL
PROJECT NUMBER: 230041.00
5901 Peachtree Dunwoody Rd. | Bldg C | Suite 515 Atlanta, Georgia 30328-6055 phone 678.320.1888 | wileywilson.com
/2
/2
:1
:4
P
M
ZMA
ALM
D302
1302899SWL
THIRD AND FOURTH FLOOR MECHANICAL DEMOLITION
PLANS
06/28/24
SCALE: 3/16" = 1'-0"D302
THIRD FLOOR MECHANICAL DEMOLITION
PLAN
SCALE: 3/16" = 1'-0"D302
FOURTH FLOOR MECHANICAL DEMOLITION
PLAN
KEYNOTE LEGEND
KEY DESCRIPTION
1 REMOVE 3-WAY VALVE ON HEATING HOT WATER PIPING.
2 REMOVE 3-WAY VALVE ON CHILLED WATER PIPING.
3 REMOVE BRANCH PIPING TO BYPASS AND CAP TO PROVIDE FILTER
ACCESS. RELOCATE BYPASS UPSTREAM.
4 REMOVE WALL MOUNTED HUMIDIFIER AND ASSOCIATED DUCT
MOUNTED DISPERSION TUBE AND PIPING.
5 REMOVE CONTROL PANEL.
6 EXISTING TO REMAIN 16"X24" LOUVER.
7 (E) 1-1/2" CHS/R AND 1" HWS/R PIPING UP.
8 (E) 1-1/4" CHS/R AND 1" HWS/R.
9 DEMOLISH DIFFUSERS AND FLEX DUCT BACK TO MAIN. CONTRACTOR
TO MEASURE UNIT AIRFLOWS PRIOR TO DEMOLITION.
10 REMOVE 2-WAY MODULATING VALVE ON HEATING HOT WATER
PIPING.
X
0' 4' 8' 12'
GENERAL DEMOLITION NOTES
1. REMOVE ALL MECHANICAL HVAC EQUIPMENT, EXISTING DUCTWORK, DUCTWORK ACCESSORIES, ASSOCIATED SUPPORTS, AND TERMINALS AS SHOWN.
2. REMOVE ALL EXISTING PIPING, PIPING ACCESSORIES, AND ASSOCIATED SUPPORTS AS SHOWN.
3. REMOVE ALL EXISTING CONTROLS AND THERMOSTATS.
4. PATCH AND SEAL TO MATCH EXISTING ALL BUILDING PENETRATIONS CREATED DURING DEMOLITION
AND NOT RE-USED. REFER TO ARCHITECTURAL FOR PATCHING DETAILS.
5. TEST DRAINED GLYCOL FOR FULL CHEMICAL ANALYSIS AND REPLACE WITH NEW WATER TO MEET
DESIRED 40% PROPYLENE GLYCOL MIX.
6. ONLY FAA SSC PERSONNEL CAN OPERATE CIRCUIT BREAKERS.
REV
REV APPROVED
DATE
DESCRIPTION JCN REDLINE
DATE
(E)AHU-5
KITCHEN
LOUNGE
ELEV.
CABLE
SHAFT
TOILET
STAIR
CORRIDOR
STAIR
MECHANICAL
ROOM
(E) 17"x10" SA
(E) 11"x6" SA(E) 11"x6" SA
(E) 11"x6" SA
(E) 11"x6" SA
(E) 8"ø OA
4(E) 20"x12" RA
(E) 1 1/2" CHR
(E) 1 1/2" CHS
(E) 1" HWR
(E) 1" HWS
(E) AHU-6 SA
DUCT UP TO CAB
(E) AHU-6 RA
DUCT DOWN
TOILET
EXAUST
SYSTEM
EXISTING
TO REMAIN
A B C
STAIR
CAB
N
CHECKED
DESIGNED DATE
H
G
F
E
D
C
B
A
7 6 5 4 3 2 1
H
G
F
E
D
C
B
A
8 7 6 5 4 3 2 1
DRAWN
APPROVED BY
JCNISSUED BY
SUBMITTED BY
DRAWING NO
SCALES SHOWN FOR 22" X 34" SHEET. ADJUST SCALE FOR OTHER SIZES
REVIEWED BY
PWM-1302899-
DEPARTMENT OF TRANSPORTATION
FEDERAL AVIATION ADMINISTRATION
ATCT
ATO - TECHNICAL OPERATIONS EASTERN SERVICE AREA
PORTLAND ME(PORTLAND INTERNATIONAL JETPORT)
PROJECT/SYSTEM ENGINEER ENGINEERING MANAGER
PUBLIC AVAILABILITY TO BE DETERMINED UNDER 5 USC 552
FOR OFFICIAL USE ONLY
MECHANICAL
ENGINEERING SERVICES
TERMINAL
PROJECT NUMBER: 230041.00
5901 Peachtree Dunwoody Rd. | Bldg C | Suite 515 Atlanta, Georgia 30328-6055 phone 678.320.1888 | wileywilson.com
/2
/2
:1
:4
P
M
ZMA
ALM
D303
1302899SWL
FIFTH FLOOR AND CAB MECHANICAL DEMOLITION
PLANS
06/28/24
SCALE: 3/16" = 1'-0"D303
1 FIFTH FLOOR MECHANICAL DEMOLITION PLAN
SCALE: 3/16" = 1'-0"D303
2 CAB MECHANICAL DEMOLITION PLAN
KEYNOTE LEGEND
KEY DESCRIPTION
1 EXISTING TO REMAIN SPLIT SYSTEM INDOOR UNIT.
2 EXISTING TO REMAIN SPLIT SYSTEM OUTDOOR UNIT.
3 REMOVE WALL MOUNTED HUMIDIFIER IN PLENUM AND ASSOCIATED
DUCT MOUNTED DISPERSION TUBE AND PIPING.
4 REMOVE 3-WAY VALVE ON CHILLED WATER PIPING.
5 1-1/2" CHS/R AND 1" HWS/R PIPING DOWN.
6 REMOVE 2-WAY MODULATING VALVE ON HEATING HOT WATER
PIPING.
X
0' 4' 8' 12'
GENERAL DEMOLITION NOTES
1. REMOVE ALL MECHANICAL HVAC EQUIPMENT, EXISTING DUCTWORK, DUCTWORK ACCESSORIES, ASSOCIATED SUPPORTS, AND TERMINALS AS SHOWN.
2. REMOVE ALL EXISTING PIPING, PIPING ACCESSORIES, AND ASSOCIATED SUPPORTS AS SHOWN.
3. REMOVE ALL EXISTING CONTROLS AND THERMOSTATS.
4. PATCH AND SEAL TO MATCH EXISTING ALL BUILDING PENETRATIONS CREATED DURING DEMOLITION
AND NOT RE-USED. REFER TO ARCHITECTURAL FOR PATCHING DETAILS.
5. TEST DRAINED GLYCOL FOR FULL CHEMICAL ANALYSIS AND REPLACE WITH NEW WATER TO MEET
DESIRED 40% PROPYLENE GLYCOL MIX.
6. ONLY FAA SSC PERSONNEL CAN OPERATE CIRCUIT BREAKERS.
REV
REV APPROVED
DATE
DESCRIPTION JCN REDLINE
DATE
M
B C
4"
4"
4"
4" 1 1/4"
1 1/4"
1" 1"
3/4"
2"
1"
8"ø
8"ø
1 1/2"
3"
1" 1 1/4"
1 1/4"
4"
4"
4"
3"
1 1/2"
2"
4" 1 1/4"
2"
1" 1"
2"
2"
4"
4"
4"
2"
3/4"
3/4"
(E) 3/4" HWS
(E) 3/4" HWR
(E) 2" HWR
(E) 2" HWS
(E) 3" CHR
(E) 3" CHS
2"
1"13
MECHANICAL
ROOM
LOBBY
M300
(E) 16"x24" LOUVER
EXISTING TO REMAIN FENCE
ALONG PLAN WEST, SOUTH, AND
EAST SIDES OF EXISTING PAD
N
CHECKED
DESIGNED DATE
H
G
F
E
D
C
B
A
7 6 5 4 3 2 1
H
G
F
E
D
C
B
A
8 7 6 5 4 3 2 1
DRAWN
APPROVED BY
JCNISSUED BY
SUBMITTED BY
DRAWING NO
SCALES SHOWN FOR 22" X 34" SHEET. ADJUST SCALE FOR OTHER SIZES
REVIEWED BY
PWM-1302899-
DEPARTMENT OF TRANSPORTATION
FEDERAL AVIATION ADMINISTRATION
ATCT
ATO - TECHNICAL OPERATIONS EASTERN SERVICE AREA
PORTLAND ME(PORTLAND INTERNATIONAL JETPORT)
PROJECT/SYSTEM ENGINEER ENGINEERING MANAGER
PUBLIC AVAILABILITY TO BE DETERMINED UNDER 5 USC 552
FOR OFFICIAL USE ONLY
MECHANICAL
ENGINEERING SERVICES
TERMINAL
PROJECT NUMBER: 230041.00
5901 Peachtree Dunwoody Rd. | Bldg C | Suite 515 Atlanta, Georgia 30328-6055 phone 678.320.1888 | wileywilson.com
/2
/2
:1
:5
P
M
ZMA
ALM
D304
1302899SWL
ENLARGED MECHANICAL ROOM AND CHILLER YARD
DEMOLITION PLAN
06/28/24
SCALE: 1/2" = 1'-0"D304
ENLARGED MECHANICAL ROOM AND CHILLER
YARD DEMOLITION PLAN
KEYNOTE LEGEND
KEY DESCRIPTION
1 REMOVE 70-TON CHILLER AND ASSOCIATED PIPING.
2 REMOVE 50-TON DRY COOLER AND ASSOCIATED PIPING.
3 REMOVE 2-HP HOT WATER PUMP AND ASSOCIATED PIPING.
4 REMOVE UNIT HEATER, DUCTWORK, GRILLES, ASSOCIATED PIPING
AND ACCESSORIES. PATCH UNUSED PENETRATIONS. SEE
ARCHITECTURE FOR PATCH DETAIL.
5 REMOVE AIR SEPARATOR.
6 REMOVE EXPANSION TANK.
7 REMOVE GLYCOL TANK.
8 REMOVE CHEMICAL SHOT FEEDER.
9 REMOVE EXHAUST FAN.
10 REMOVE 7.5-HP CHILLED WATER PUMP, CONCRETE PAD, AND
ASSOCIATED PIPING.
11 REMOVE NATURAL GAS PIPING BACK TO METER.
12 REMOVE 3-HP CHILLED WATER PUMP AND ASSOCIATED PIPING.
13 REMOVE HOUSEKEEPING PAD.
14 REMOVE CONTROL PANEL.
15 REMOVE BOILER, ASSOCIATED PIPING, AND ACCESSORIES.
16 DEMOLISH PIPING UP TO TEMPORARY TEES WITHIN THE SECOND
FLOOR CHASE.
17 EXISTING TO REMAIN 3/4" HWS/R PIPING TO ELECTRICAL ROOM UNIT
HEATER.
X
1' 2' 4'0'
GENERAL DEMOLITION NOTES
1. REMOVE ALL MECHANICAL HVAC EQUIPMENT, EXISTING DUCTWORK, DUCTWORK ACCESSORIES, ASSOCIATED SUPPORTS, AND TERMINALS AS SHOWN.
2. REMOVE ALL EXISTING PIPING, PIPING ACCESSORIES, AND ASSOCIATED SUPPORTS AS SHOWN.
3. REMOVE ALL EXISTING CONTROLS AND THERMOSTATS.
4. PATCH AND SEAL TO MATCH EXISTING ALL BUILDING PENETRATIONS CREATED DURING DEMOLITION
AND NOT RE-USED. REFER TO ARCHITECTURAL FOR PATCHING DETAILS.
5. TEST DRAINED GLYCOL FOR FULL CHEMICAL ANALYSIS AND REPLACE WITH NEW WATER TO MEET
DESIRED 40% PROPYLENE GLYCOL MIX.
6. ONLY FAA SSC PERSONNEL CAN OPERATE CIRCUIT BREAKERS.
REV
REV APPROVED
DATE
DESCRIPTION JCN REDLINE
DATE
E
L
N
DT
U **AT
M
TVSS
HATCHING INDICATES BUILDING AREA TO BE DEMOLISHED.
REFER TO PROJECT DEMOLITION NOTES.
REMOVE DEVICES, EQUIPMENT, IN ACCORDANCE
WITH THE PROJECT DEMOLITION NOTES.
TAG PREFIX DESIGNATOR LIST:
(E) = EXISTING TO REMAIN
(R) = RELOCATE
INDICATES DEVICE AND EQUIPMENT STATUS.
REFER TO IDENTIFICATION TAG PREFIX
DESIGNATOR LIST BELOW.
DEMOLITION LEGEND
1. PERFORM DEMOLITION IN PHASES WHERE INDICATED OR REQUIRED. PROVIDE TEMPORARY SERVICES TO
AFFECTED SYSTEMS FROM SOURCES OUTSIDE AFFECTED AREA TO MAINTAIN SERVICE WHERE REQUIRED.
2. THE CONTRACTOR SHALL VISIT THE PROJECT LOCATION AND FIELD-VERIFY THE EXISTING CONDITIONS PRIOR TO BEGINNING WORK. FAILURE BY THE CONTRACTOR TO HAVE ACQUAINTED HIM/HERSELF WITH AVAILABLE INFORMATION CONCERNING EXISTING CONDITIONS, INCLUDING EXISTING DRAWINGS, SHALL NOT RELIEVE THE CONTRACTOR OF RESPONSIBILITIES OF PERFORMANCE OF WORK IN ACCORDANCE WITH
REQUIREMENTS OF THE CONTRACT DOCUMENTS.
3. DEMOLITION WORK SHALL BE COORDINATED WITH THE OWNER OR THE OWNER'S REPRESENTATIVE AND SHALL NOT INTERFERE WITH ACTIVITIES IN OTHER BUILDING AREAS. DEMOLISHED MATERIALS, UNLESS SPECIFICALLY INDICATED TO REMAIN OR BE TURNED OVER TO THE OWNER, SHALL BE PROMPTLY AND APPROPRIATELY REMOVED DISPOSED OF, PARTICULARLY MATERIALS CONTAINING HAZARDOUS MATERIALS SUCH AS LAMPS CONTAINING MERCURY OR TRANSFORMERS CONTAINING PCB’S. CONTRACTOR SHALL COORDINATE APPROPRIATE STAGING AREA WITH THE OWNER. COORDINATE WITH OWNER FOR OWNER-
REMOVAL OF PROPERTY FROM THE PROJECT LOCATION.
4. ALL DEMOLITION WORK SHALL BE COORDINATED WITH HAZMAT…
This is the start of the file's text. The full file is on GovTribe.