ITB___32701-13874_Amdendment_3.pdf
PDF 170 KB Posted
- Attached to
- Savage Gulf S. P. Fuel Tanks - UPDATED
- Solicitation number
- Event 32701-13874
- Issued by
- Grainger County, Beech Bluff CDP, Tennessee
About this file
This is Amendment #3 to an Invitation to Bid (ITB #32701-13874) issued by the Tennessee Department of Environment and Conservation for fuel storage and dispensing equipment at Savage Gulf State Park in Beersheba Springs, Tennessee. The amendment updates the project schedule, with a questions and comments deadline of May 6, 2026, and a response deadline of May 15, 2026. The project requires furnishing and installation of two 1,000-gallon aboveground storage tanks—one for unleaded gasoline and one for off-road diesel—complete with attached fuel dispensers, underground electrical conduit, support footings, emergency shut-offs, safety controls, and a Fuel Master FMU-2500 Plus Fuel Management System. All on-site work must be completed by June 25, 2026. No prebid meeting or site visit is scheduled; however, bidders may arrange independent site visits to assess site conditions and take measurements. The amendment clarifies critical project specifications, including tank layout (end-to-end configuration), conduit installation requirements (all conduits to be installed empty and routed to the nearest point inside the building), commissioning requirements (to be included in the fuel system installation bid), and bollard placement (required only on the side adjacent to the fueling lane). The State confirmed that timeline extensions will be granted with proof of manufacturer lead times for tank delivery, which typically range from 12 to 16 weeks.
The amendment provides responses to 12 bidder inquiries addressing technical specifications and project logistics. Approved tank manufacturers are limited to Envirosafe Tank, Newberry, JME, Hughes, or pre-approved equivalents, and approved fuel dispenser brands are specified in the Specifications Document (excluding Wayne or Gasboy brands). The contractor must possess an active Tennessee Building Contractor license and must complete all preparatory work prior to tank delivery. A mandatory pre-construction conference with the Facilities Project Manager is required before work begins. The maximum project liability is capped at $130,000, and a payment bond equal to 25 percent of maximum liability ($32,500) is required. Contractors must maintain workers' compensation insurance with minimum coverage of $1,000,000 and commercial general liability insurance with minimum combined single-limit coverage of $1,000,000 per occurrence and $2,000,000 aggregate.
View the file
Other files
Show all 14
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ITB # 32701-13874 – Amendment # 3 Page 1 of 3
STATE OF TENNESSEE
Environment and Conservation
INVITATION TO BID # 32701-13874
AMENDMENT #3
FOR GOODS OR SAVAGE GULF S.P. FUEL TANKS
DATE: May 12, 2026
ITB # 32701-13874 IS AMENDED AS FOLLOWS:
1. This ITB Schedule of Events updates and confirms scheduled RFP dates. Any event, time, or date containing revised or new text is highlighted.
INSERT ITB SCHEDULE OF EVENTS
ITB POST DATE APRIL 8, 2026
QUESTIONS AND COMMENTS DEADLINE May 6th 2026 RESPONSE DEADLINE May 15th, 2026
2. State responses to questions and comments in the table below amend and clarify this RFP.
Any restatement of ITB text in the Question/Comment column shall NOT be construed as a change in the actual wording of the document.
ITB
SECTIO
N
PAG
E
Question
# QUESTION / COMMENT STATE RESPONSE
1 The Event Details state “***VERSION 2-
NO CHANGES HAVE BEEN MADE TO
THE SOLICITATION. THIS VERSION IS
CREATED TO ENSURE VISABILITY TO
RESPONDENTS”. Can you please clarify what this means?
There were technical difficulties when the first version was posted. To make sure this event was visible to all, a second version was created in our system. NOTE: The State is currently on Version 4 of the event.
2 Will there be a scheduled prebid meeting or site visit?
No, there will not be a prebid meeting or site visit.
3 If there will not be a scheduled prebid meeting or site visit, what arrangements do we need to make to visit the site and the proposed area for the new tanks?
As mentioned in response to question #2, there will not be a site visit.
ITB # 32701-13874 – Amendment # 3 Page 2 of 3
ITB
SECTIO
N
PAG
E
Question
# QUESTION / COMMENT STATE RESPONSE
4 Please refer to the General Scope of Work – New Work
a. Item 1) refers to clear, grub, and grade area for tank pads. There does not appear to be drawing indicating the location of this work.
Please provide a drawing indicating location of the tank system.
b. Item 2) indicates to provide and install an empty conduit the appropriate location for future electrical connection. Please provide a drawing indicating the location, routing, and lineal feet of conduit required.
Please see Attachment 1 of the aerial view representing 75-feet for bidding purposes to nearest point inside the building.
5 Is there a preferred layout for the tanks and dispensers (i.e. end-to-end or side-by side, capacity for fueling at both dispensers simultaneously)? See Potential Tank Layout Scenarios sketch embedded on following page.
End-to-end.
6 Are we to install all the conduits and leave them empty?
Yes
7 Should commissioning be included in the fuel system installation quote or will that be covered by the electrician?
Yes, the commissioning should be included in the bid
8 Will the electricians provide the E-stop contactors and enclosures?
No
9 Do you want all electrical items mounted on the exterior wall adjacent to the existing electrical panel, to avoid potential conflicts with future building renovations?
No, the conduit needs to be ran to the nearest point inside the building
ITB # 32701-13874 – Amendment # 3 Page 3 of 3
3. RFP Amendment Effective Date. The revisions set forth herein shall be effective upon release. All other terms and conditions of this RFP not expressly amended herein shall remain in full force and effect.
ITB
SECTIO
N
PAG
E
Question
# QUESTION / COMMENT STATE RESPONSE
10 Item 1 of the General Conditions states that the deadline for completion of site work is
6/25/26. Quoted ETA for shipment of the tank package is 12 to 16 weeks. Will an extension to the project deadline be granted?
Yes, with proof of lead times.
The contractor shall still complete all work possible prior to the delivery of the tanks.
11 Will Wayne or Gasboy dispensers be approved?
No, please see the approved brands on page 3 of the Specifications Document.
12 Will bollards be required on all 4 sides or only on the side adjacent to fueling lane?
Bollards are only required to be installed on the side adjacent to the fueling lane.