ITB 12278 Attachment C PLANS AND DRAWINGS.pdf
PDF 12 MB Posted
- Solicitation number
- S-63400-00012818
- Issued by
- Jackson County, Cheshire CDP, Oregon
About this file
This file contains architectural and engineering drawings for the Collier Memorial State Park Improvements project by Oregon Parks & Recreation Department in Chiloquin, Oregon. The drawings detail construction plans for improvements including entrance loop modifications, RV cleanout facilities, utility building construction, registration kiosk installation, and trash compactor enclosure. The project involves approximately 1.6 acres of site disturbance and includes civil construction plans (sheets C1-C26) covering grading, utilities, erosion control, and details, as well as architectural plans (T1, G1, A1-A3) and structural plans (S1-S4.1) for the buildings and structures.
The drawings specify detailed construction requirements including pavement sections, concrete work, drainage improvements, electrical and plumbing systems, and structural elements. Key components include new asphalt paving having 3" thickness, installation of a new RV dump station with associated fixtures and utilities, construction of a trash compactor enclosure, installation of a registration kiosk, and various site improvements like signage, striping, and gates. The plans contain extensive technical specifications for materials, dimensions, and installation requirements that contractors must follow. Notable structural elements include concrete foundations, wood-framed walls and roof systems designed for local conditions, and utility connections coordinated with existing park infrastructure.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| ITB 12278 Attachment E-2 STRUCTURAL ENGINEERING CALCULATIONS.pdf | ||
| ITB 12278 Attachment B Technical Specifications Collier Memorial Park Improvement.pdf | ||
| ITB 12278 Attachment A- FORM A-2 Pricing Form~1.xlsx | XLSX spreadsheet | |
| Intent to Award OregonBuys~1.docx | DOCX document | |
| Addendum 1 ITB 12278.pdf | ||
| Pre-Bid Conference sign-in sheet.docx | DOCX document | |
| ITB 12278 Collier Campground Entrance Improvement Project _.docx | DOCX document | |
| ITB 12278 Attachment E-1 INADVERTENT DISCOVERY PLAN.docx | DOCX document | |
| ATT B TECHNICAL SPECIFICATIONS Collier Memorial SP Addendum 2 022825.pdf | ||
| ITB 12278 Bid Tabulation and Responsive PW PI.xlsx | XLSX spreadsheet | |
| ITB 12278 Addendum 2 and Question and Answer 022825.docx | DOCX document | |
| Preliminary Bid Results.docx | DOCX document |
Show all 12
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
VICINITY MAP
NOT TO SCALE
2022 COLLIER MEMORIAL PARK IMPROVEMENTS
DRAWING INDEX
LOCATION MAP
NOT TO SCALE
COLLIER MEMORIAL STATE PARK
46000 HIGHWAY 97 N
CHILOQUIN, OR 97624
PROJECT LOCATION:
CONTACTS
PROJECT MANAGER:
KEVIN JOHNSON
OREGON PARKS & RECREATION DEPT.
62976 OB RILEY ROAD,
BEND, OR 97703
PHONE: 541-306-9811
OWNER/APPLICANT:
OREGON PARKS & RECREATION DEPT.
725 SUMMER ST. NE, STE C
SALEM, OR 97301-1271
OFFICE: (503) 986-0707
PROJECT DATA
COLLIER MEMORIAL STATE PARK
Portland
Eugene
Newport
Astoria
Pendleton
Baker City
OntarioBend
Lakeview
Salem
STATE MAP
NOT TO SCALE
Coos Bay
Brookings Medford
KLAMATH COUNTY, OREGON
PARK MANAGER:
KAREN SPENCER
46000 HIGHWAY 97 N
CHILOQUIN, OR 97624
I-5
C1 TITLE SHEET
C2 GENERAL SITE PLAN
C3 EROSION AND SEDIMENT CONTROL NOTES
C4 EROSION AND SEDIMENT CONTROL PLANS
C5 EROSION AND SEDIMENT CONTROL DETAILS
C6 ENTRANCE LOOP DEMO
C7 ENTRANCE ROAD DEMO
C8 RV CLEANOUT DEMO
C9 ENTRANCE LOOP LAYOUT
C10 ENTRANCE ROAD LAYOUT
C11 RV DUMP SITE LAYOUT
C12 GRADING PLAN - ENTRANCE LOOP
C12.1 HORIZONTAL LAYOUT - ENTRANCE LOOP
C13 WELL HOUSE ROAD GRADING
C14 GRADING PLAN - RV CLEANOUT
C15 ENTRANCE LOOP UTILITIES
C16 RV CLEANOUT UTILITIES
C17-C23 DETAILS
C24-C25 TRASH COMPACTOR DETAILS
C26 FENCE DETAILS
CIVIL CONSTRUCTION PLANS
PROJECT
LOCATION
/3
0/
:0
P M
R
:\2
O re go n P ar ks a nd
R ec re at io n
D ep ar tm en t -
O P
R D
\2
2-
O
P R
D
C ol lie r M em or ia l S ta te
P ar k Im pr ov em en ts
2\
F in al
D es ig n\
D ra w in gs \D w g\
TI
TL
E S
H E
E T.
dw g
- D av id T ut tle 62
PROJECT
LOCATION
CHILOQUIN
COLLIER MEMORIAL
STATE PARK
101140
FALLS
KLAMATH
CHILOQUIN
PROJECT
LOCATION
COLLIER MEMORIAL
STATE PARK
T1 TITLE SHEET
G1 SCHEDULES
A1 FLOOR/ROOF PLAN
A2 ELEVATIONS
A3 CROSS SECTIONS
E1 ELECTRICAL/PLUMBING PLANS
ARCHITECTURAL PLANS
P:
-2
-8
O 'H
AR
E
PA
R
KW
AY
, S U
IT
E
M
ED
FO
R
D , O
R
EG
O N
1.6 ACRES
AREA OF DISTURBANCE:
S1 GENERAL STRUCTURAL NOTES
S2 TYPICAL DETAILS
S3 FOUNDATION PLAN
S4 LATERAL & ROOF FRAMING PLANS
S4.1 ROOF FRAMING DETAILS
STRUCTURAL PLANS
ABBREVIATIONS: CONTINUED: CONTINUED:CONTINUED:
AC ASPHALTIC CONCRETE
BC BACK OF CURB
BFP BACKFLOW PREVENTION DEVICE
BW BACK OFWALK
CATV CABLE TELEVISION
C&G CURB AND GUTTER
CF CURB FACE
C CENTERLINE
CO CLEAN OUT
CONC CONCRETE
DCV DETECTOR CHECK VALVE
DRWY DRIVEWAY
EC END OF CURVE
ECAB ELECTRIC CABINET
ELEC ELECTRIC
EM ELECTRIC METER
EMH ELECTRICIC MAN-HOLE
EP EDGE OF PAVEMENT
EPB ELECTRICAL PULL BOX
ESMT EASEMENT
FD FOUND
FDC FENCE
FL FLOWLINE
FP FINISH PAD ELEVATION
FS FINISH SURFACE
FW FRONT OF WALK
DIRECTION OF DRAINAGE FLOW
GS GAS LINE
GA GUY ANCHOR
GM GAS METER
GV GAS VALVE
HC HANDICAP
HCR HANDICAP RAMP
ICB IRRIGATION CONTROL BOX
ICV IRRIGATION CONTROL VALVE
INV INVERT
LF LINEAR FEET
LT STD LIGHT STANDARD
MH MANHOLE
NTS NOT TO SCALE
OH OVERHEAD
PB PULL BOX
PCC POINT COMPOUND CURVE
PED PEDESTAL
PI POINT OF INTERSECTION
PIV POST INDICATOR VALVE
PKWY PARKWAY
P PROPERTY LINE
P.O.C. POINT OF CONNECTION
PP POWER POLE
PRC POINT OF REVERSE CURVE
P.U.E. PUBLIC UTILITY EASEMENT
R RADIUS
R.C.B. REINFORCED CONCRETE BOX
RCLW RECLAIMED WATER LINE
RET RETAINING
R/W RIGHT OF WAY
SS SANITARY SEWER
SCO SEWER CLEAN-OUT
SD STORM DRAIN
SDCO STORM CLEAN-OUT
SDMH STORM DRAIN MANHOLE
SE SOUTHEAST
SE'LY SOUTHEASTERLY
SF SQUARE FEET
SLCB STREET LIGHT CONTROL BOX
SLPB STREET LIGHT PULL BOX
SMH SEWER MANHOLE
SP SIGN POST
STD STANDARD
STLT STREET LIGHT
SW SIDEWALK
TC TOP OF CURB
TG TOP OF GRATE
10"TR 10" DEMETER TREE
TOE TOE OF SLOPE
TOP TOP OF SLOPE
TRANS TRANSFORMER
TW TOP OF WALL
TYP. TYPICAL
V VALVE
VG VALLEY GUTTER
VLT VAULT
W WATER LINE
WM WATER METER
WV WATER VALVE
EX. RETAINING WALLS
PROPOSED STORM
EX. GRAVEL SURFACE
PROPOSED SLOPE
PROPOSED SEWER
PROPOSED WATER
R/W
PROPERTY LINE
CENTER LINE
PUE
PROPOSED C & G
EXISTING STORM
EXISTING WATER
EXISTING SEWER
EXISTING FENCE
EXISTING GAS
EXISTING POWER
EXISTING PHONE
EXISTING PAVEMENT
EXISTING C & G
EXISTING SIDEWALK
EXISTING DITCH
XX” SD
XX” SS
LINES
SEWER MANHOLE
STORM DRAIN MANHOLE
CATCH BASIN
WATER VALVE
WATER METER
FIRE HYDRANT
POWER POLE
GUY ANCHOR
SYMBOLS
GAS VALVE
PROJECT CONTROL POINTS SET NAIL
SIGN
MAILBOX
TREE SCRUB
CLEAN-OUT
STREET LIGHT
AIR RELEASE VALVE
MB
TELECTRICAL TRANSFORMER
(ADDITIONAL CONTROL PTS UPON REQUEST)
EX. X" WATER
R
EG I N
E
N
12, AM
81061PE
OREGON
E
EXPIRATION DATE: 06/30/26
REG
I STERED PROFESS IONAL
R.DA V ID W . T UT T LE
AutoCAD SHX Text
NORTH
AutoCAD SHX Text COLOR CODES: RED - ELECTRICAL POWER LINES, CABLES, OR CONDUIT, AND LIGHTING CABLES - ELECTRICAL POWER LINES, CABLES, OR CONDUIT, AND LIGHTING CABLES ELECTRICAL POWER LINES, CABLES, OR CONDUIT, AND LIGHTING CABLES YELLOW - GAS, OIL, STEAM, PETROLEUM, OR OTHER HAZARDOUS LIQUID OR GASEOUS MATERIALS. - GAS, OIL, STEAM, PETROLEUM, OR OTHER HAZARDOUS LIQUID OR GASEOUS MATERIALS. GAS, OIL, STEAM, PETROLEUM, OR OTHER HAZARDOUS LIQUID OR GASEOUS MATERIALS. ORANGE - COMMUNICATIONS, CABLE TV, ALARM OR SIGNAL LINES, CABLES OR CONDUITS. - COMMUNICATIONS, CABLE TV, ALARM OR SIGNAL LINES, CABLES OR CONDUITS. COMMUNICATIONS, CABLE TV, ALARM OR SIGNAL LINES, CABLES OR CONDUITS. BLUE - WATER, IRRIGATION, AND SLURRY LINES. - WATER, IRRIGATION, AND SLURRY LINES. WATER, IRRIGATION, AND SLURRY LINES. GREEN - SEWERS, DRAINAGE FACILITIES OR OTHER DRAIN LINES. - SEWERS, DRAINAGE FACILITIES OR OTHER DRAIN LINES. SEWERS, DRAINAGE FACILITIES OR OTHER DRAIN LINES. WHITE - PRE-MARKING OF THE OUTER LIMITS OF THE PROPOSED EXCAVATION OR MARKING THE - PRE-MARKING OF THE OUTER LIMITS OF THE PROPOSED EXCAVATION OR MARKING THE PRE-MARKING OF THE OUTER LIMITS OF THE PROPOSED EXCAVATION OR MARKING THE CENTERLINE AND WIDTH OF PROPOSED LINEAL INSTALLATIONS OF BURIED FACILITIES. PINK - TEMPORARY SURVEY MARKINGS - TEMPORARY SURVEY MARKINGS TEMPORARY SURVEY MARKINGS PURPLE - SLURRY AND RECLAIMED- SLURRY AND RECLAIMEDSLURRY AND RECLAIMED
AutoCAD SHX Text ATTENTION: OREGON LAW REQUIRES YOU TO : OREGON LAW REQUIRES YOU TO OREGON LAW REQUIRES YOU TO FOLLOW RULES ADOPTED BY THE OREGON UTILITY NOTIFICATION CENTER. THOSE RULES ARE SET FORTH IN OAR 952-001-0010 THROUGH 952-001-0090. YOU MAY OBTAIN COPIES OF THE RULES BY CALLING THE CENTER. (NOTE: (NOTE: : THE ADMINSTRATIVE TELEPHONE NUMBER FOR THE OREGON UTILITY NOTIFICATION CENTER IS (503) 232-1987).
AutoCAD SHX Text
DESIGNED BY
AutoCAD SHX Text
APPROVED BY
AutoCAD SHX Text
CHECKED BY
AutoCAD SHX Text
DRAWN BY
AutoCAD SHX Text
DATE
AutoCAD SHX Text
REVISION
AutoCAD SHX Text
DATE
AutoCAD SHX Text
BY
AutoCAD SHX Text
OREGON PARKS AND RECREATION DEPARTMENT
AutoCAD SHX Text
SHEET:
AutoCAD SHX Text
OPRIS#:
AutoCAD SHX Text
OF
AutoCAD SHX Text
CONTRACT #:
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text C1
AutoCAD SHX Text
COLLIER MEMORIAL STATE PARK
AutoCAD SHX Text
2022 COLLIER PARK IMPROVEMENTS
AutoCAD SHX Text
TITLE SHEET
AutoCAD SHX Text 08/29/2024
AutoCAD SHX Text
DT
AutoCAD SHX Text
DT
AutoCAD SHX Text
MR
AutoCAD SHX Text
MB
AutoCAD SHX Text 00000
AutoCAD SHX Text
WV
AutoCAD SHX Text D
AutoCAD SHX Text Y
AutoCAD SHX Text H
AutoCAD SHX Text
GV
AutoCAD SHX Text
SD
AutoCAD SHX Text S
AutoCAD SHX Text co
AutoCAD SHX Text
AV
NO PARKING
12.00' 15.00'
17.25'
LAN
E
LAN
E
BACKING AREA
44.00'
12.00' 15.00'
LANE
LANE
.0
0'
LA
N E
15.00'
LANE
15.00'
LANE
.0
0'
12.00'LANE 15.00'LANE
12.00'
LAN
E 12.00'
LAN
E
27.00'
15.00'
MB
M B
SV
C
W
W
W
W
W
W
W
W wv wv wv
W
W
W
0/
1/
1:
A M
R
:\2
O re go n P ar ks a nd
R ec re at io n
D ep ar tm en t -
O P
R D
\2
2-
O
P R
D
C ol lie r M em or ia l S ta te
P ar k Im pr ov em en ts
2\
F in al
D es ig n\
D ra w in gs \D w g\
TI
TL
E S
H E
E T.
dw g
- D av id T ut tle
CONTRACTOR SHALL REMOVE EXISTING PAVEMENT, COMPACT EXISTING BASE
MATERIALS AND REPAVE WITH NEW ASPHALT PAVING HAVING A THICKNESS OF 3”
CONSTRUCT NEW PARKING OR ROADWAY PAVING SECTIONS PER THE APPROVED SOIL
REPORT AND DETAILS SHOWN WITHIN THIS PLAN SET.THE APPROXIMATE LIMITS ARE
SHOWN HEREON.
CONTRACTOR TO CONSTRUCT NEW RV DUMP STATION, INCLUDING ALL FIXTURES,
SIGNAGE AND ADJACENT PAVEMENT. THE APPROXIMATE LIMITS ARE SHOWN HEREON.
CONTRACTOR TO CONSTRUCT / INSTALL NEW TRASH COMPACTOR, RECYCLING
EQUIPMENT AND FENCED ENCLOSURE
CONTRACTOR SHALL CONSTRUCT ONE NEW UTILITY BUILDING INCLUDING SUPPORTING
UTILITIES.
CONTRACTOR SHALL INSTALL / CONSTRUCT NEW REGISTRATION KIOSK INCLUDING
SUPPORTING UTILITIES.
CONTRACTOR SHALL INSTALL ALL SIGNAGE AND STRIPING SHOWN
WITHIN THIS PLAN SET AND REFERENCED DETAILS.
SCHEDULES FOR THE IMPROVEMENTS ARE ESTIMATED AND SHOWN ON ONE OR MORE
OF THE FOLLOWING SHEETS.
INSTALL NEW SINGLE ARM GATE PROVIDED BY ORPD (ALTERNATE 1)
INSTALL NEW DOUBLE ARM GATE PROVIDED BY ORPD
REMOVE AND REPLACE IN-KIND EXISTING CMP, REPLACE WITH NEW CMP
ALL EQUIPMENT AND MATERIALS SHALL STAY WITHIN THE DESIGNATED CONSTRUCTION
LIMITS. NO EQUIPMENT OR MATERIALS WILL BE ALLOWED OUTSIDE OF THESE AREAS
WITHOUT AUTHORIZATION. COORDINATE WITH PROJECT MANAGER FOR EXACT LIMITS
FOR STAGING.
PROJECT IMPROVEMENT NOTES:
7 8
.10
.9
LEGEND:
NEW PAVEMENT
3" OF PAVING OVER NEW AND EXISTING COMPACTED GRAVEL BASE
PROTECT EXISTING PAVING IN PLACE
P:
-2
-8
O 'H
AR
E
PA
R
KW
AY
, S U
IT
E
M
ED
FO
R
D , O
R
EG
O N
H W
Y
.11
NOTE
-ALL EQUIPMENT AND MATERIALS SHALL STAY WITHIN THE DESIGNATED CONSTRUCTION LIMITS. NO EQUIPMENT OR MATERIALS WILL BE ALLOWED OUTSIDE OF THESE AREAS WITHOUT AUTHORIZATION. COORDINATE WITH
PROJECT MANAGER FOR EXACT LIMITS FOR STAGING.
-STUMP REMOVAL INFORMATION ON DEMO SHEET C6
.12
R
EG I N
E
N
12, AM
81061PE
OREGON
E
EXPIRATION DATE: 06/30/26
REG
I STERED PROFESS IONAL
R.DA V ID W . T UT T LE
ALTERNATE 1
AutoCAD SHX Text S
AutoCAD SHX Text D
AutoCAD SHX Text S
AutoCAD SHX Text D
AutoCAD SHX Text co
AutoCAD SHX Text W
AutoCAD SHX Text H
AutoCAD SHX Text Y
AutoCAD SHX Text D
AutoCAD SHX Text W
AutoCAD SHX Text co
AutoCAD SHX Text co
AutoCAD SHX Text co
AutoCAD SHX Text co
AutoCAD SHX Text co
AutoCAD SHX Text co
AutoCAD SHX Text co
AutoCAD SHX Text co
AutoCAD SHX Text co
AutoCAD SHX Text co
AutoCAD SHX Text co
AutoCAD SHX Text co
AutoCAD SHX Text S
AutoCAD SHX Text S
AutoCAD SHX Text co
AutoCAD SHX Text co
AutoCAD SHX Text co
AutoCAD SHX Text co
AutoCAD SHX Text co
AutoCAD SHX Text
NORTH
AutoCAD SHX Text
NOT TO SCALE
AutoCAD SHX Text
DESIGNED BY
AutoCAD SHX Text
APPROVED BY
AutoCAD SHX Text
CHECKED BY
AutoCAD SHX Text
DRAWN BY
AutoCAD SHX Text
DATE
AutoCAD SHX Text
REVISION
AutoCAD SHX Text
DATE
AutoCAD SHX Text
BY
AutoCAD SHX Text
OREGON PARKS AND RECREATION DEPARTMENT
AutoCAD SHX Text
SHEET:
AutoCAD SHX Text
OPRIS#:
AutoCAD SHX Text
OF
AutoCAD SHX Text
CONTRACT #:
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text C2
AutoCAD SHX Text
COLLIER MEMORIAL STATE PARK
AutoCAD SHX Text
2022 COLLIER PARK IMPROVEMENTS
AutoCAD SHX Text
GENERAL SITE PLAN
AutoCAD SHX Text 08/29/2024
AutoCAD SHX Text
DT
AutoCAD SHX Text
DT
AutoCAD SHX Text
MR
AutoCAD SHX Text
MB
00000
1. HOLD A PRE-CONSTRUCTION MEETING OF PROJECT CONSTRUCTION PERSONNEL THAT INCLUDES THE INSPECTOR TO DISCUSS EROSION AND SEDIMENT CONTROL MEASURES AND CONSTRUCTION LIMITS. (SCHEDULE A.8.C.I.(3))
2. ALL INSPECTIONS MUST BE MADE IN ACCORDANCE WITH DEQ 1200-C PERMIT REQUIREMENTS. (SCHEDULE A.12.B
AND SCHEDULE B.1)
3. INSPECTION LOGS MUST BE KEPT IN ACCORDANCE WITH DEQ'S 1200-C PERMIT REQUIREMENTS. (SCHEDULE B.1.C
AND B.2)
4. RETAIN A COPY OF THE ESCP AND ALL REVISIONS ON SITE AND MAKE IT AVAILABLE ON REQUEST TO DEQ, AGENT, OR THE LOCAL MUNICIPALITY. DURING INACTIVE PERIODS OF GREATER THAN SEVEN (7) CONSECUTIVE CALENDAR DAYS, THE ABOVE RECORDS MUST BE RETAINED BY THE PERMIT REGISTRANT BUT DO NOT NEED TO BE AT THE
CONSTRUCTION SITE. (SCHEDULE B.2.C)
5. ALL PERMIT REGISTRANTS MUST IMPLEMENT THE ESCP. FAILURE TO IMPLEMENT ANY OF THE CONTROL MEASURES OR PRACTICES DESCRIBED IN THE ESCP IS A VIOLATION OF THE PERMIT. (SCHEDULE A 8.A)
6. THE ESCP MUST BE ACCURATE AND REFLECT SITE CONDITIONS. (SCHEDULE A.12.C.I)
7. SUBMISSION OF ALL ESCP REVISIONS IS NOT REQUIRED. SUBMITTAL OF THE ESCP REVISIONS IS ONLY UNDER SPECIFIC CONDITIONS. SUBMIT ALL NECESSARY REVISION TO DEQ OR AGENT WITHIN 10 DAYS. (SCHEDULE A.12.C.IV.
AND V)
8. PHASE CLEARING AND GRADING TO THE MAXIMUM EXTENT PRACTICAL TO PREVENT EXPOSED INACTIVE AREAS
FROM BECOMING A SOURCE OF EROSION. (SCHEDULE A.7.A.III)
9. IDENTIFY, MARK, AND PROTECT (BY CONSTRUCTION FENCING OR OTHER MEANS) CRITICAL RIPARIAN AREAS AND VEGETATION INCLUDING IMPORTANT TREES AND ASSOCIATED ROOTING ZONES, AND VEGETATION AREAS TO BE PRESERVED. IDENTIFY VEGETATIVE BUFFER ZONES BETWEEN THE SITE AND SENSITIVE AREAS (E.G., WETLANDS), AND OTHER AREAS TO BE PRESERVED, ESPECIALLY IN PERIMETER AREAS. (SCHEDULE A.8.C.I.(1) AND (2))
10.PRESERVE EXISTING VEGETATION WHEN PRACTICAL AND RE-VEGETATE OPEN AREAS. RE-VEGETATE OPEN AREAS WHEN PRACTICABLE BEFORE AND AFTER GRADING OR CONSTRUCTION. IDENTIFY THE TYPE OF VEGETATIVE SEED
MIX USED. (SCHEDULE A.7.A.V)
11.MAINTAIN AND DELINEATE ANY EXISTING NATURAL BUFFER WITHIN THE 50-FEET OF WATERS OF THE STATE.
(SCHEDULE A.7.B.I.AND (2(A)(B))
12.INSTALL PERIMETER SEDIMENT CONTROL, INCLUDING STORM DRAIN INLET PROTECTION AS WELL AS ALL SEDIMENT
BASINS, TRAPS, AND BARRIERS PRIOR TO LAND DISTURBANCE. (SCHEDULE A.8.C.I.(5))
13.CONTROL BOTH PEAK FLOW RATES AND TOTAL STORMWATER VOLUME, TO MINIMIZE EROSION AT OUTLETS AND
DOWNSTREAM CHANNELS AND STREAMBANKS. (SCHEDULE A.7.C)
14.CONTROL SEDIMENT AS NEEDED ALONG THE SITE PERIMETER AND AT ALL OPERATIONAL INTERNAL STORM DRAIN INLETS AT ALL TIMES DURING CONSTRUCTION, BOTH INTERNALLY AND AT THE SITE BOUNDARY. (SCHEDULE A.7.D.I)
15.ESTABLISH CONCRETE TRUCK AND OTHER CONCRETE EQUIPMENT WASHOUT AREAS BEFORE BEGINNING
CONCRETE WORK. (SCHEDULE A.8.C.I.(6))
16. APPLY TEMPORARY AND/OR PERMANENT SOIL STABILIZATION MEASURES IMMEDIATELY ON ALL DISTURBED AREAS AS GRADING PROGRESSES. TEMPORARY OR PERMANENT STABILIZATIONS MEASURES ARE NOT REQUIRED FOR AREAS THAT ARE INTENDED TO BE LEFT UNVEGETATED, SUCH AS DIRT ACCESS ROADS OR UTILITY POLE
PADS.(SCHEDULE A.8.C.II.(3))
17.ESTABLISH MATERIAL AND WASTE STORAGE AREAS, AND OTHER NON-STORMWATER CONTROLS. (SCHEDULE A.8.C.I.(7))
18.PREVENT TRACKING OF SEDIMENT ONTO PUBLIC OR PRIVATE ROADS USING BMPS SUCH AS: CONSTRUCTION ENTRANCE, GRAVELED (OR PAVED) EXITS AND PARKING AREAS, GRAVEL ALL UNPAVED ROADS LOCATED ONSITE, OR USE AN EXIT TIRE WASH. THESE BMPS MUST BE IN PLACE PRIOR TO LAND-DISTURBING ACTIVITIES. (SCHEDULE A
7.D.II AND A.8.C.I(4))
19. WHEN TRUCKING SATURATED SOILS FROM THE SITE, EITHER USE WATER-TIGHT TRUCKS OR DRAIN LOADS ON SITE.
(SCHEDULE A.7.D.II.(5))
20.CONTROL PROHIBITED DISCHARGES FROM LEAVING THE CONSTRUCTION SITE, I.E., CONCRETE WASH-OUT, WASTEWATER FROM CLEANOUT OF STUCCO, PAINT AND CURING COMPOUNDS. (SCHEDULE A.6)
21.USE BMPS TO PREVENT OR MINIMIZE STORMWATER EXPOSURE TO POLLUTANTS FROM SPILLS; VEHICLE AND EQUIPMENT FUELING, MAINTENANCE, AND STORAGE; OTHER CLEANING AND MAINTENANCE ACTIVITIES; AND WASTE HANDLING ACTIVITIES. THESE POLLUTANTS INCLUDE FUEL, HYDRAULIC FLUID, AND OTHER OILS FROM VEHICLES AND MACHINERY, AS WELL AS DEBRIS, FERTILIZER, PESTICIDES AND HERBICIDES, PAINTS, SOLVENTS, CURING
COMPOUNDS AND ADHESIVES FROM CONSTRUCTION OPERATIONS. (SCHEDULE A.7.E.I.(2))
22.IMPLEMENT THE FOLLOWING BMPS WHEN APPLICABLE: WRITTEN SPILL PREVENTION AND RESPONSE PROCEDURES, EMPLOYEE TRAINING ON SPILL
23.PREVENTION AND PROPER DISPOSAL PROCEDURES, SPILL KITS IN ALL VEHICLES, REGULAR MAINTENANCE SCHEDULE FOR VEHICLES AND MACHINERY, MATERIAL DELIVERY AND STORAGE CONTROLS, TRAINING AND SIGNAGE, AND COVERED STORAGE AREAS FOR WASTE AND SUPPLIES. (SCHEDULE A. 7.E.III.)
24.USE WATER, SOIL-BINDING AGENT OR OTHER DUST CONTROL TECHNIQUE AS NEEDED TO AVOID WIND-BLOWN SOIL.
(SCHEDULE A 7.A.IV)
25.THE APPLICATION RATE OF FERTILIZERS USED TO REESTABLISH VEGETATION MUST FOLLOW MANUFACTURER'S RECOMMENDATIONS TO MINIMIZE NUTRIENT RELEASES TO SURFACE WATERS. EXERCISE CAUTION WHEN USING
TIME-RELEASE FERTILIZERS WITHIN ANY WATERWAY RIPARIAN ZONE. (SCHEDULE A.9.B.III)
26.IF AN ACTIVE TREATMENT SYSTEM (FOR EXAMPLE, ELECTRO-COAGULATION, FLOCCULATION, FILTRATION, ETC.) FOR SEDIMENT OR OTHER POLLUTANT REMOVAL IS EMPLOYED, SUBMIT AN OPERATION AND MAINTENANCE PLAN (INCLUDING SYSTEM SCHEMATIC, LOCATION OF SYSTEM, LOCATION OF INLET, LOCATION OF DISCHARGE, DISCHARGE DISPERSION DEVICE DESIGN, AND A SAMPLING PLAN AND FREQUENCY) BEFORE OPERATING THE TREATMENT SYSTEM. OBTAIN PLAN APPROVAL BEFORE OPERATING THE TREATMENT SYSTEM. OPERATE AND MAINTAIN THE TREATMENT SYSTEM ACCORDING TO MANUFACTURER'S SPECIFICATIONS. (SCHEDULE A.9.D)
27.TEMPORARILY STABILIZE SOILS AT THE END OF THE SHIFT BEFORE HOLIDAYS AND WEEKENDS, IF NEEDED. THE REGISTRANT IS RESPONSIBLE FOR ENSURING THAT SOILS ARE STABLE DURING RAIN EVENTS AT ALL TIMES OF THE
YEAR. (SCHEDULE A 7.B)
28.AS NEEDED BASED ON WEATHER CONDITIONS, AT THE END OF EACH WORKDAY SOIL STOCKPILES MUST BE STABILIZED OR COVERED, OR OTHER BMPS MUST BE IMPLEMENTED TO PREVENT DISCHARGES TO SURFACE
WATERS OR CONVEYANCE SYSTEMS LEADING TO SURFACE WATERS. (SCHEDULE A 7.E.II.(2))
29.CONSTRUCTION ACTIVITIES MUST AVOID OR MINIMIZE EXCAVATION AND BARE GROUND ACTIVITIES DURING WET
WEATHER. (SCHEDULE A.7.A.I)
30.SEDIMENT FENCE: REMOVE TRAPPED SEDIMENT BEFORE IT REACHES ONE THIRD OF THE ABOVE GROUND FENCE
HEIGHT AND BEFORE FENCE REMOVAL. (SCHEDULE A.9.C.I)
31.OTHER SEDIMENT BARRIERS (SUCH AS BIOBAGS): REMOVE SEDIMENT BEFORE IT REACHES TWO INCHES DEPTH
ABOVE GROUND HEIGHT AND BEFORE BMP REMOVAL. (SCHEDULE A.9.C.I)
32.CATCH BASINS: CLEAN BEFORE RETENTION CAPACITY HAS BEEN REDUCED BY FIFTY PERCENT. SEDIMENT BASINS AND SEDIMENT TRAPS: REMOVE TRAPPED SEDIMENTS BEFORE DESIGN CAPACITY HAS BEEN REDUCED BY FIFTY
PERCENT AND AT COMPLETION OF PROJECT. (SCHEDULE A.9.C.III& IV)
33.WITHIN 24 HOURS, SIGNIFICANT SEDIMENT THAT HAS LEFT THE CONSTRUCTION SITE, MUST BE REMEDIATED.
INVESTIGATE THE CAUSE OF THE SEDIMENT RELEASE AND IMPLEMENT STEPS TO PREVENT A RECURRENCE OF THE DISCHARGE WITHIN THE SAME 24 HOURS. ANY IN-STREAM CLEAN-UP OF SEDIMENT SHALL BE PERFORMED ACCORDING TO THE OREGON DIVISION OF STATE LANDS REQUIRED TIMEFRAME. (SCHEDULE A.9.B.I)
34.THE INTENTIONAL WASHING OF SEDIMENT INTO STORM SEWERS OR DRAINAGE WAYS MUST NOT OCCUR.
VACUUMING OR DRY SWEEPING AND MATERIAL PICKUP MUST BE USED TO CLEANUP RELEASED SEDIMENTS.
(SCHEDULE A.9.B.II)
35.THE ENTIRE SITE MUST BE TEMPORARILY STABILIZED USING VEGETATION OR A HEAVY MULCH LAYER, TEMPORARY SEEDING, OR OTHER METHOD SHOULD ALL CONSTRUCTION ACTIVITIES CEASE FOR 30 DAYS OR MORE. (SCHEDULE A.7.F.I)
36.PROVIDE TEMPORARY STABILIZATION FOR THAT PORTION OF THE SITE WHERE CONSTRUCTION ACTIVITIES CEASE FOR 14 DAYS OR MORE WITH A COVERING OF BLOWN STRAW AND A TACKIFIER, LOOSE STRAW, OR AN ADEQUATE COVERING OF COMPOST MULCH UNTIL WORK RESUMES ON THAT PORTION OF THE SITE. (SCHEDULE A.7.F.II)
37.DO NOT REMOVE TEMPORARY SEDIMENT CONTROL PRACTICES UNTIL PERMANENT VEGETATION OR OTHER COVER OF EXPOSED AREAS IS ESTABLISHED. ONCE CONSTRUCTION IS COMPLETE AND THE SITE IS STABILIZED, ALL TEMPORARY EROSION CONTROLS AND RETAINED SOILS MUST BE REMOVED AND DISPOSED OF PROPERLY, UNLESS DOING SO CONFLICTS WITH LOCAL REQUIREMENTS. (SCHEDULE A.8.C.III(1) AND D.3.C.II AND III)
1. EROSION CONTROL FACILITIES AS SHOWN ARE OF MINIMUM REQUIREMENT AND SHOWN FOR CLARITY ONLY.
CONTRACTOR IS RESPONSIBLE FOR THE IMPLEMENTATION, CONSTRUCTION AND MAINTENANCE OF THIS OR ANY ADDITIONAL EROSION CONTROL MEASURES AS MAY BE REQUIRED THROUGHOUT THE COURSE OF THE PROJECT. INSTALLATION ALL EROSION AND SEDIMENT CONTROLS SHALL BE IN-PLACE PRIOR TO THE BEGIN
OF SITE WORK.
2. CONTRACTOR SHALL BE RESPONSIBLE FOR ALL MAINTENANCE / CLEANING OF EROSION AND SEDIMENT
CONTROL FACILITIES DURING THE COURSE OF THE PROJECT.
3. INLET PROTECTION DEVICES SHALL BE INSTALLED IMMEDIATELY UPON INDIVIDUAL INLETS BECOMING
FUNCTIONAL.
4. MAINTAIN ON THE SITE OR HAVE READILY AVAILABLE SUFFICIENT OIL AND GREASE ABSORBING MATERIALS
TO CONTAIN AND CLEANUP FUEL OR CHEMICAL SPILLS AND LEAKS.
5. FUGITIVE DUST BLOWING FROM THE SITE SHALL BE CONTROLLED BY SPRAYING WATER AND DUST CONTROL POLYMERS, AS NEEDED, ON DRY AREAS OF THE SITE. THE USE OF MOTOR OILS AND OTHER PETROLEUM
BASED OR TOXIC LIQUIDS FOR DUST SUPPRESSION OPERATIONS IS ABSOLUTELY PROHIBITED.
6. NO RUBBISH, TRASH, GARBAGE OR OTHER SUCH MATERIALS SHALL BE DISCHARGED INTO DRAINAGE
DITCHES OR WATERS OF THE STATE.
7. IF SOIL STOCKPILING IS EMPLOYED ON THE SITE, FILTER FENCES SHALL BE USED TO HELP CONTAIN THE
SEDIMENT TO THE STOCKPILE AREA.
8. ALL TEMPORARY EROSION AND SEDIMENT CONTROL MEASURES SHALL BE DISPOSED OF WITHIN 30 DAYS AFTER FINAL STABILIZATION. FINAL STABILIZATION HAS OCCURRED WHEN ALL SOIL DISTURBING ACTIVITIES ARE COMPLETED AND A UNIFORM PERENNIAL VEGETATIVE COVER WITH A DENSITY OF 70% OF THE COVER FOR UNPAVED AREAS AND AREAS NOT COVERED BY PERMANENT STRUCTURES HAS BEEN EMPLOYED.
9. CONTRACTOR SHALL BE RESPONSIBLE FOR ADJUSTING THE EROSION CONTROL MEASURES ( SILT FENCES, STRAW BALES, ETC.) DUE TO GRADE CHANGES DURING THE DEVELOPMENT OF THE PROJECT.
10. ALL EROSION CONTROL MEASURES SHALL BE MAINTAINED IN FULLY FUNCTIONAL CONDITION UNTIL FINAL STABILIZATION OF THE SITE. ALL EROSION AND SEDIMENTATION CONTROL MEASURES SHALL BE CHECKED BY A QUALIFIED PERSON AT LEAST ONCE EVERY SEVEN CALENDAR DAYS AND WITHIN 24 HOURS OF THE END OF A RAINFALL EVENT, AND SHOULD BE CLEANED AND REPAIRED IN ACCORDANCE WITH THE FOLLOWING.
A. INLET PROTECTION DEVICES AND BARRIERS SHALL BE FIXED OR REPLACED IF THEY SHOW SIGNS OF
CLOGGING.
B. FILTER FENCES SHALL BE REPAIRED TO THEIR ORIGINAL CONDITIONS IF DAMAGED. SEDIMENT SHALL BE REMOVED FROM THE SILT FENCES WHEN IT REACHES ONE-THIRD TO ONE-HALF THE HEIGHT OF THE SILT
FENCE.
C. ANY TEMPORARY PARKING AND STORAGE AREAS SHALL BE KEPT IN GOOD CONDITION (SUITABLE FOR PARKING AND STORAGE). THIS MAY REQUIRE TOP DRESSING OF THE TEMPORARY PARKING AREAS AS
CONDITIONS DEMAND.
D. OUTLET STRUCTURES IN THE SEDIMENTATION BASINS SHALL BE MAINTAINED IN OPERATIONAL CONDITIONS AT ALL TIMES, SEDIMENT IN THE SEDIMENTATION BASINS SHALL NOT EXCEED THE SEDIMENTATION
CLEANOUT LEVEL.
ADDITIONAL EROSION AND SEDIMENT CONTROL NOTES
1200-C STANDARD NOTES:
/2
3/
:4
P M
R
:\2
O re go n P ar ks a nd
R ec re at io n
D ep ar tm en t -
O P
R D
\2
2-
O
P R
D
C ol lie r M em or ia l S ta te
P ar k Im pr ov em en ts
2\
F in al
D es ig n\
D ra w in gs \D w g\
E R
O S
IO
N
C O
N
TR
O L
A N
D U
TI
LI
TI
E
S .d w g
- D av id T ut tle
P:
-2
-8
O 'H
AR
E
PA
R
KW
AY
, S U
IT
E
M
ED
FO
R
D , O
R
EG
O N
R
EG I N
E
N
12, AM
81061PE
OREGON
E
EXPIRATION DATE: 06/30/26
REG
I STERED PROFESS IONAL
R.DA V ID W . T UT T LE
R:
\2
O re go n
Pa rk s a nd
R ec re at io n
D ep ar tm en t -
O
PR
D \2
2-
O
PR
D
Co lli er M em or ia l S ta te
P ar k Im pr ov em en ts
2\
F in al
D es ig n\
D ra w in gs \D w g\
ER
O
SI
O
N C
O N
TR
O
L
AN
D U
TI
LI
TI
ES
.d w g, /2 3/
:4
1:
P M
AutoCAD SHX Text
DESIGNED BY
AutoCAD SHX Text
APPROVED BY
AutoCAD SHX Text
CHECKED BY
AutoCAD SHX Text
DRAWN BY
AutoCAD SHX Text
DATE
AutoCAD SHX Text
REVISION
AutoCAD SHX Text
DATE
AutoCAD SHX Text
BY
AutoCAD SHX Text
OREGON PARKS AND RECREATION DEPARTMENT
AutoCAD SHX Text
SHEET:
AutoCAD SHX Text
OPRIS#:
AutoCAD SHX Text
OF
AutoCAD SHX Text
CONTRACT #:
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text C3
AutoCAD SHX Text
COLLIER MEMORIAL STATE PARK
AutoCAD SHX Text
2022 COLLIER PARK IMPROVEMENTS
AutoCAD SHX Text
EROSION AND SEDIMENT CONTROL NOTES
AutoCAD SHX Text 08/29/2024
AutoCAD SHX Text
DT
AutoCAD SHX Text
DT
AutoCAD SHX Text
MR
AutoCAD SHX Text
MB
E
E
E
E
E
E E
E
E
W
W
W
W
W
W
W
W
T wv wv wv
W
E
NO PARKING
W
W
ENTRANCE LOOP
RV DUMP SITE
1" = '
SCALE IN FEET
15 30
1" = '
SCALE IN FEET
2.5 5
EROSION AND SEDIMENT CONTROL PLAN NOTES:
1 INSTALL MULCH SOCKS WHERE WATER CAN POND AND
ALLOW SEDIMENT TO SEPARATE FROM RUNOFF. PER DETAIL 1, 2, 3 SHOWN ON
SHEET C5, WET WEATHER ONLY
LEGEND:
MULCH SOCKS
PROJECT BMP'S:
WM-9 SANITARY/SEPTIC WASTE MANAGEMENT
WM-10 LIQUID WASTE MANAGEMENT
WM-9 SANITARY/SEPTIC MANAGEMENT
WM-8 CONCRETE WASTE MANAGEMENT
WM-5 SOLID WASTE MANAGEMENT
WM-3 STOCKPILE MANAGEMENT
WM-2 MATERIAL USE
WM-1 MATERIAL DELIVERY AND STORAGE
WE-1 WIND EROSION
TC-1 STABILIZED CONSTRUCTION ENTRANCE/EXIT
SE-10 3-BAG HIGH STORM DRAIN INLET PROTECTION
SE-8 2-BAG HIGH SANDBAG BARRIER
SE-7 STREET SWEEPING AND VACUUMING
SE-4 1-BAG SANDBAG VELOCITY REDUCER
NS-13 CONCRETE FINISHING
NS-6 ILLICIT CONNECTION/ILLEGAL DISCHARGE DETECTION REPORTING
NS-3 PAVING AND GRINDING OPERATIONS
NS-1 WATER CONSERVATION
ES-2 PRESERVATION OF EXISTING VEGETATION
EC-1 SCHEDULING
/2
3/
:4
P M
R
:\2
O re go n P ar ks a nd
R ec re at io n
D ep ar tm en t -
O P
R D
\2
2-
O
P R
D
C ol lie r M em or ia l S ta te
P ar k Im pr ov em en ts
2\
F in al
D es ig n\
D ra w in gs \D w g\
E R
O S
IO
N
C O
N
TR
O L
A N
D U
TI
LI
TI
E
S .d w g
- D av id T ut tle
P:
-2
-8
O 'H
AR
E
PA
R
KW
AY
, S U
IT
E
M
ED
FO
R
D , O
R
EG
O N
STRAW WATTLES
2 INSTALL STRAW WATTLES TO PROTECT EXISTING 18" CULVERT
R
EG I N
E
N
12, AM
81061PE
OREGON
E
EXPIRATION DATE: 06/30/26
REG
I STERED PROFESS IONAL
R.DA V ID W . T UT T LE
R:
\2
O re go n
Pa rk s a nd
R ec re at io n
D ep ar tm en t -
O
PR
D \2
2-
O
PR
D
Co lli er M em or ia l S ta te
P ar k Im pr ov em en ts
2\
F in al
D es ig n\
D ra w in gs \D w g\
ER
O
SI
O
N C
O N
TR
O
L
AN
D U
TI
LI
TI
ES
.d w g, /2 3/
:4
2:
P M
AutoCAD SHX Text co
AutoCAD SHX Text co
AutoCAD SHX Text co
AutoCAD SHX Text co
AutoCAD SHX Text co
AutoCAD SHX Text co
AutoCAD SHX Text co
AutoCAD SHX Text co
AutoCAD SHX Text co
AutoCAD SHX Text co
AutoCAD SHX Text co
AutoCAD SHX Text co
AutoCAD SHX Text co
AutoCAD SHX Text co
AutoCAD SHX Text
NORTH
AutoCAD SHX Text
NORTH
AutoCAD SHX Text
DESIGNED BY
AutoCAD SHX Text
APPROVED BY
AutoCAD SHX Text
CHECKED BY
AutoCAD SHX Text
DRAWN BY
AutoCAD SHX Text
DATE
AutoCAD SHX Text
REVISION
AutoCAD SHX Text
DATE
AutoCAD SHX Text
BY
AutoCAD SHX Text
OREGON PARKS AND RECREATION DEPARTMENT
AutoCAD SHX Text
SHEET:
AutoCAD SHX Text
OPRIS#:
AutoCAD SHX Text
OF
AutoCAD SHX Text
CONTRACT #:
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text C4
AutoCAD SHX Text
COLLIER MEMORIAL STATE PARK
AutoCAD SHX Text
2022 COLLIER PARK IMPROVEMENTS
AutoCAD SHX Text
EROSION AND SEDIMENT CONTROL PLANS
AutoCAD SHX Text 08/29/2024
AutoCAD SHX Text
DT
AutoCAD SHX Text
DT
AutoCAD SHX Text
MR
AutoCAD SHX Text
MB
0/
1/
1:
A M
R
:\2
O re go n P ar ks a nd
R ec re at io n
D ep ar tm en t -
O P
R D
\2
2-
O
P R
D
C ol lie r M em or ia l S ta te
P ar k Im pr ov em en ts
2\
F in al
D es ig n\
D ra w in gs \D w g\
D E
TA
IL
S .d w g
- D av id T ut tle
P:
-2
-8
O 'H
AR
E
PA
R
KW
AY
, S U
IT
E
M
ED
FO
R
D , O
R
EG
O N
ER
OS
IO
N
AN
D
SE
DI
ME
NT
C
ON
TR
OL
D
ET
AI
LS
/29
/20
DT
DTMRMB
50' MIN
PROVIDE FULL
WIDTH OF INGRESS/
EGRESS AREA12" MIN
DEPTH
SUBGRADE
REINFORCEMENT
GEOTEXTILE
R = 25' MIN
AREA DRAIN, CATCH BASIN
OR SWALE INLET
BURLAP SACKS TO
OVERLAP EDGES OF SWALE
SPILLWAY FROM SWALE
GRAVEL FILLED
SANDBAGS
STACKED TIGHTLY
NOTES:
1. ACTUAL LAYOUT TO BE
DETERMINED IN THE FIELD.
2. A CONCRETE WASHOUT SIGN
SHALL BE INSTALLED WITHIN 10m
OF THE TEMPORARY CONCRETE
WASHOUT FACILITY.
INLET PIPE
RAISED 1.5'
TYP.
BURLAP SACKS TO
OVERLAP EDGES OF SWALE
SPILLWAY FROM FLOWLINE
GRAVEL FILLED
SANDBAGS
STACKED TIGHTLY
EXISTING DITCH
N.T.S.
4 CONSTRUCTION ENTRANCE
N.T.S.
5 CATCH BASIN DRAIN INLET PROTECTION
N.T.S.
6 CONCRETE WASHOUT AREA
N.T.S.
7 INSPECTION FREQUENCY TABLE
N.T.S.
8 DRAINAGE INLET PROTECTION (PLAN VIEW)
C5
C5 C5 C5
C5
N.T.S.
1 MULCH SOCK DETAIL (PROFILE VIEW)
C5
2"X2"X36" WOOD STAKE
COMPOST FILTER SOCK (12" TYPICAL)
BLOWN/PLACED FILTER MEDIA
12" M
IN
3" M
IN
4" M
AX
FLOW
WORK
AREA
AREA TO BE
PROTECTED
N.T.S.
2 MULCH SOCK DETAIL (PLAN VIEW)
C5
FLOW
WORK
AREA
AREA TO BE
PROTECTED
2"X2"X36" WOOD STAKE PLACED 10' O.C.
N.T.S.
3 MULCH SOCK DETAIL (OVERLAP)
C5
FL
O
W
AREA TO BE
PROTECTED
R
EG I N
E
N
12, AM
81061PE
OREGON
E
EXPIRATION DATE: 06/30/26
REG
I STERED PROFESS IONAL
R.DA V ID W . T UT T LE
AutoCAD SHX Text
DESIGNED BY
AutoCAD SHX Text
APPROVED BY
AutoCAD SHX Text
CHECKED BY
AutoCAD SHX Text
DRAWN BY
AutoCAD SHX Text
DATE
AutoCAD SHX Text
REVISION
AutoCAD SHX Text
DATE
AutoCAD SHX Text
BY
AutoCAD SHX Text
OREGON PARKS AND RECREATION DEPARTMENT
AutoCAD SHX Text
SHEET:
AutoCAD SHX Text
OPRIS#:
AutoCAD SHX Text
OF
AutoCAD SHX Text
CONTRACT #:
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text C5
AutoCAD SHX Text
COLLIER MEMORIAL STATE PARK
AutoCAD SHX Text
2022 COLLIER PARK IMPROVEMENTS
E
E
E
E
E
W
W
W
W
W
T wv wv wv
W
E
(10190 SF)
EXISTING POWER
(20490 SF) .
1" = '
SCALE IN FEET
10 20
CLEAR AND GRUB EXISTING GRASS AREA. THE PROJECT SITE SHALL BE CLEARED OF ALL VEGETATION, DEBRIS AND
OTHER DELETERIOUS MATERIAL.
SAW CUT EXISTING PAVING SECTION TO AT LEAST 1 FOOT INSIDE EXISTING EDGE OF PAVEMENT TO PROVIDE A SMOOTH EDGE TO JOIN NEW IMPROVEMENT. ALL EDGES SHALL BE SMOOTH AT THE BEGIN OF THE INSTALLATION OF NEW
PAVING.
REMOVE EXISTING GRAVEL ROAD.
PULVERIZE EXISTING ASPHALT TO A 3" DEPTH AND REMOVE MILLING SPOILS.
REMOVE AND CAP EXISTING WATER CONNECTION.
REMOVE BOX AND ABANDON TELECOMMUNICATION LINE IN PLACE
REMOVE EXISTING TREES
REMOVE EXISTING SANITARY CLEANOUT BY CUTTING 12" BELOW GROUND AND INSTALLING WATER TIGHT CAP.
REMOVE EXISTING 18" CMP CULVERT, REMOVE EXISTING PAVING BASE AND SUBGRADE IN PREPARATION OF
INSTALLATION OF NEW CMP.
REMOVE EXISTING STUMPS, SEE STUMP COUNT THIS SHEET
PROVIDE SMOOTH TRANSITION BETWEEN FULL DEPTH RECONSTRUCTION AND 3" OVERLAY.
DEMOLITION NOTES:
KEY NOTES
PROTECT IN PLACE AS NOTED1
HATCH AND SYMBOL LEGEND
INDICATES CLEAR AND GRUB AREA PER DEMOLITION NOTE NO. 1
INDICATES REMOVE EXISTING GRAVEL ROAD PER DEMOLITION NOTE NO. 3
INDICATES REMOVE EXISTING PAVEMENT PER DEMOLITION NOTE NO. 4
0/
1/
1:
A M
R
:\2
O re go n P ar ks a nd
R ec re at io n
D ep ar tm en t -
O P
R D
\2
2-
O
P R
D
C ol lie r M em or ia l S ta te
P ar k Im pr ov em en ts
2\
F in al
D es ig n\
D ra w in gs \D w g\
D E
M O
S H
E E
TS
.d w g
- D av id T ut tle
P:
-2
-8
O 'H
AR
E
PA
R
KW
AY
, S U
IT
E
M
ED
FO
R
D , O
R
EG
O N
LIMITS OF WORK
LIMITS OF WORK
(5660 SF) .1
SEE S
HEET C
.8
STUMP COUNT TO BE REMOVED OR GROUND
STUMP DIAMETER SIZE
0'-1'
1'-3'
3'+
NOTE: STUMP COUNTS TO BE REMOVED BASED ON SITE SURVEY AND
BEST AVAILABLE KNOWLEDGE, ACTUAL REMOVAL QUANTITIES
IN FIELD MAY BE DIFFERENT.
EXISTING TREE STUMPS
EXISTING TREES
EXISTING TREES 1
TYP10
TYP10
TYP 10
.8
EXISTING TREE1
REMOVE COUNT
GRIND COUNT
= GRIND STUMP= STUMP REMOVAL
R
EG I N
E
N
12, AM
81061PE
OREGON
E
EXPIRATION DATE: 06/30/26
REG
I STERED PROFESS IONAL
R.DA V ID W . T UT T LE
EXISTING CMR
REMOVE AND
RELOCATE
ACCORDING TO
OWNER
M
ATC
H
LIN
E SEE ABO
VE
M
AT
C H
L
IN
E
SE
E
BE
LO
W
(30550 SF)1
.7
CONSTRUCTION STAGING AND
STORAGE AREA
CONFIRM WITH ORPD FOR EXACT
LIMITS
AutoCAD SHX Text co
AutoCAD SHX Text co
AutoCAD SHX Text co
AutoCAD SHX Text co
AutoCAD SHX Text co
AutoCAD SHX Text co
AutoCAD SHX Text co
AutoCAD SHX Text co
AutoCAD SHX Text co
AutoCAD SHX Text co
AutoCAD SHX Text co
AutoCAD SHX Text
NORTH
AutoCAD SHX Text
DESIGNED BY
AutoCAD SHX Text
APPROVED BY
AutoCAD SHX Text
CHECKED BY
AutoCAD SHX Text
DRAWN BY
AutoCAD SHX Text
DATE
AutoCAD SHX Text
REVISION
AutoCAD SHX Text
DATE
AutoCAD SHX Text
BY
AutoCAD SHX Text
OREGON PARKS AND RECREATION DEPARTMENT
AutoCAD SHX Text
SHEET:
AutoCAD SHX Text
OPRIS#:
AutoCAD SHX Text
OF
AutoCAD SHX Text
CONTRACT #:
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text C6
AutoCAD SHX Text
COLLIER MEMORIAL STATE PARK
AutoCAD SHX Text
2022 COLLIER PARK IMPROVEMENTS
AutoCAD SHX Text
ENTRANCE LOOP DEMO
AutoCAD SHX Text 08/29/2024
AutoCAD SHX Text
DT
AutoCAD SHX Text
DT
AutoCAD SHX Text
MR
AutoCAD SHX Text
MB
1" = '
SCALE IN FEET
10 20
0/
1/
2:
P M
R
:\2
O re go n P ar ks a nd
R ec re at io n
D ep ar tm en t -
O P
R D
\2
2-
O
P R
D
C ol lie r M em or ia l S ta te
P ar k Im pr ov em en ts
2\
F in al
D es ig n\
D ra w in gs \D w g\
D E
M O
S H
E E
TS
.d w g
- D av id T ut tle
P:
-2
-8
O 'H
AR
E
PA
R
KW
AY
, S U
IT
E
M
ED
FO
R
D , O
R
EG
O N
DEMOLITION NOTES:
LIMITS OF WORK
LIMITS OF WORK
LIMITS OF WORK
LIMITS OF WORK
HATCH AND SYMBOL LEGEND
INDICATES REMOVAL OF PAVEMENT PER DEMOLITION NOTE NO. 1
KEY NOTES
PROTECT IN PLACE AS NOTED1
.1 EXISTING CMT WITHIN ISLAND
SEE SHEET C6
PULVERIZE EXISTING ASPHALT TO A 3" DEPTH AND REMOVE MILLING SPOILS.
SAW CUT EXISTING PAVING SECTION TO PROVIDE A SMOOTH EDGE TO JOIN NEW IMPROVEMENT. ALL EDGES SHALL BE
SMOOTH AT THE BEGIN OF THE INSTALLATION OF NEW PAVING.
REMOVE EXISTING TREE
PROTECT AND RELOCATE STORED CONCRETE WHEEL STOPS TO AN AREA OUTSIDE OF ADJACENT LIMITS OF WORK
COORDINATE WITH PROJECT MANAGER FOR SPECIFIC RELOCATION (ALTERNATE 1)
CONTRACTOR TO CLEAR ALL DEBRIS, TRASH, AND ORGANICS PRIOR TO RECOMPACTING THE EXISTING GRAVEL (ALTERNATE 1)
PROVIDE SMOOTH TRANSITION BETWEEN FULL DEPTH RECONSTRUCTION AND 3" OVERLAY.
.1 EXISTING FULL DEPTH CURB AND ISLAND
.1 EXISTING COMMUNICATION INFRASTRUCTURE
.1
.1 EXISTING CMT
.1 EXISTING CMT
EXISTING TREE STUMPS
EXISTING TREES
.3
.1
.1 ELECTRICAL CONDUIT
WELL HOUSE
.4
.5
DIRT ACCESS ROAD NOT
PART OF SCOPE OF WORK
.1
.1 (ALL) EXISTING TREES AND ROOT STRUCTURES NOT
SPECIFICALLY MARKED FOR REMOVAL
(ALL) EXISTING TREES AND ROOT STRUCTURES NOT
SPECIFICALLY MARKED FOR REMOVAL
(ALL) EXISTING TREES AND ROOT STRUCTURES NOT
SPECIFICALLY MARKED FOR REMOVAL
EXISTING GRAVEL
R
EG I N
E
N
12, AM
81061PE
OREGON
E
EXPIRATION DATE: 06/30/26
REG
I STERED PROFESS IONAL
R.DA V ID W . T UT T LE
AL
TE
R N
AT
E
AutoCAD SHX Text co
AutoCAD SHX Text co
AutoCAD SHX Text
NORTH
AutoCAD SHX Text
DESIGNED BY
AutoCAD SHX Text
APPROVED BY
AutoCAD SHX Text
CHECKED BY
AutoCAD SHX Text
DRAWN BY
AutoCAD SHX Text
DATE
AutoCAD SHX Text
REVISION
AutoCAD SHX Text
DATE
AutoCAD SHX Text
BY
AutoCAD SHX Text
OREGON PARKS AND RECREATION DEPARTMENT
AutoCAD SHX Text
SHEET:
AutoCAD SHX Text
OPRIS#:
AutoCAD SHX Text
OF
AutoCAD SHX Text
CONTRACT #:
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text C7
AutoCAD SHX Text
COLLIER MEMORIAL STATE PARK
AutoCAD SHX Text
2022 COLLIER PARK IMPROVEMENTS
AutoCAD SHX Text
ENTRANCE ROAD DEMO
AutoCAD SHX Text 08/29/2024
AutoCAD SHX Text
DT
AutoCAD SHX Text
DT
AutoCAD SHX Text
MR
AutoCAD SHX Text
MB
W
(300 SF) .
. (660 SF)
EXISTING SANITARY SEWER STRUCTURES
1" = '
SCALE IN FEET
2.5 5
CLEAR AND GRUB EXISTING GRASS AREA. THE PROJECT SITE SHALL BE CLEARED OF ALL
VEGETATION, DEBRIS AND OTHER DELETERIOUS MATERIAL.
SAW CUT EXISTING PAVING SECTION TO PROVIDE A SMOOTH EDGE TO JOIN NEW IMPROVEMENT. ALL EDGES SHALL BE SMOOTH AT THE BEGIN OF THE INSTALLATION OF NEW PAVING.PROVIDE NEW ROCK
SECTION TO THE EXTENT OF THE REMOVAL LIMITS.
REMOVE EXISTING CONCRETE.
REMOVE EXISTING PAVEMENT.
DEMOLITION NOTES:
KEY NOTES
PROTECT IN PLACE AS NOTED1
LEGEND
INDICATES CLEAR AND GRUB AREA PER DEMOLITION NOTE NO. 1
INDICATES REMOVE EXISTING CONCRETE PER DEMOLITION NOTE NO. 3
INDICATES REMOVE PAVEMENT PER DEMOLITION NOTE NO. 4
.2
REMOVE EXISTING WATER FEATURE AND CAP WATER LINE .
REMOVE EXISTING PAY BOX.
REMOVE EXISTING SIGN.
REMOVE EXISTING SANITARY CLEANOUT BY CUTTING 12" BELOW GROUND AND INSTALLING WATER
TIGHT CAP.
.5
.6
0/
1/
1:
A M
R
:\2
O re go n P ar ks a nd
R ec re at io n
D ep ar tm en t -
O P
R D
\2
2-
O
P R
D
C ol lie r M em or ia l S ta te
P ar k Im pr ov em en ts
2\
F in al
D es ig n\
D ra w in gs \D w g\
D E
M O
S H
E E
TS
.d w g
- D av id T ut tle
P:
-2
-8
O 'H
AR
E
PA
R
KW
AY
, S U
IT
E
M
ED
FO
R
D , O
R
EG
O N
EXISTING SS CLEANOUT 1
EXISTING TREE STUMPS
EXISTING TREES
LIMITS OF WORK
LIMITS OF WORK
NOTE
-ALL EQUIPMENT AND MATERIALS SHALL STAY WITHIN THE DESIGNATED CONSTRUCTION LIMITS. NO EQUIPMENT OR MATERIALS WILL BE ALLOWED OUTSIDE OF THESE AREAS WITHOUT AUTHORIZATION. COORDINATE WITH
PROJECT MANAGER FOR EXACT LIMITS FOR STAGING SHOWN ON SHEET C7
R
EG I N
E
N
12, AM
81061PE
OREGON
E
EXPIRATION DATE: 06/30/26
REG
I STERED PROFESS IONAL
R.DA V ID W . T UT T LE
AutoCAD SHX Text S
AutoCAD SHX Text S
AutoCAD SHX Text co
AutoCAD SHX Text co
AutoCAD SHX Text co
AutoCAD SHX Text
NORTH
AutoCAD SHX Text
DESIGNED BY
AutoCAD SHX Text
APPROVED BY
AutoCAD SHX Text
CHECKED BY
AutoCAD SHX Text
DRAWN BY
AutoCAD SHX Text
DATE
AutoCAD SHX Text
REVISION
AutoCAD SHX Text
DATE
AutoCAD SHX Text
BY
AutoCAD SHX Text
OREGON PARKS AND RECREATION DEPARTMENT
AutoCAD SHX Text
SHEET:
AutoCAD SHX Text
OPRIS#:
AutoCAD SHX Text
OF
AutoCAD SHX Text
CONTRACT #:
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text C8
AutoCAD SHX Text
COLLIER MEMORIAL STATE PARK
AutoCAD SHX Text
2022 COLLIER PARK IMPROVEMENTS
AutoCAD SHX Text
RV CLEANOUT DEMO
AutoCAD SHX Text 08/29/2024
AutoCAD SHX Text
DT
AutoCAD SHX Text
DT
AutoCAD SHX Text
MR
AutoCAD SHX Text
MB
E
E
E
W
W
W
W
W
NO PARKING
12.00' 15.00'
17.25'
LAN
E
LAN
E
BACKING AREA
44.00'
12.00' 15.00'
LANE
LANE
.0
0'
LA
N E
15.00'
LANE
15.00'
LANE
.0
0'
12.00'LANE 15.00'LANE
12.00'
LAN
E 12.00'
LAN
E
27.00'
15.00'
1. CONTRACTOR TO VERIFY ALL PROJECT LIMITS, DEMOLITION AND
CONSTRUCTION WITH THE PROJECT MANAGER PRIOR TO STARTING WORK.
2. CONTRACTOR IS RESPONSIBLE FOR ALL TRAFFIC CONTROL AND WORK ZONE
SAFETY.
3. CONTRACTOR IS RESPONSIBLE FOR ALL EROSION AND POLLUTION CONTROL
MEASURES. INSPECTION SERVICES FOR EROSION CONTROL WILL BE
PROVIDED BY THE OWNER.
4. CONTRACTOR IS RESPONSIBLE FOR LOCATING AND PROTECTION OF EXISTING
AND NEWLY CONSTRUCTED UTILITIES.
5. CONTRACTOR IS RESPONSIBLE FOR REMOVAL AND LEGAL DISPOSAL OF ALL
CONSTRUCTION DEBRIS, UNLESS OTHERWISE NOTED.
6. CONTRACTOR SHALL COORDINATE WORK ITEMS WITH KLAMATH COUNTY
BUILDING AND PUBLIC WORKS AND OBTAIN ALL REQUIRED PERMITS TO DO
THIS WORK.
GENERAL CONSTRUCTION NOTES:
THRU LANE
THRU LANE
1" = '
SCALE IN FEET
10 20
NEW WOOD/STORAGE BUILDING, FOR DETAILS SEE ARCHITECTURAL AND STRUCTURAL PLANS.
STUB ELECTRICAL CONDUIT FOR FUTURE E. VEHICLE CHARGING STATION.
NEW FENCED IN TRASH/RECYCLE AREA, FOR DETAILS SEE SHEETS C24 AND C25.
NEW HOST/SHOP AREA CONCRETE PAD.
INSTALL 12” WIDE x 10' LONG THERMOPLASTIC STOP BAR, SIGN POSTS AND STOP SIGN. COORDINATE
LOCATION WITH PROJECT MANAGER BEFORE INSTALLING. SEE DETAILS 2 AND 6, SHEET C19.
INSTALL PAVEMENT MARKINGS, SIGN POSTS AND YIELD SIGN. COORDINATE LOCATION WITH PROJECT MANAGER
BEFORE INSTALLING. SEE SHEET C19.
CONTRACTOR TO INSTALL NEW DOUBLE ARMED MAINTENANCE GATE AND GATE ARM HOLDERS TO BE PROVIDED
BY OWNER. COORDINATE EXACT LOCATION WITH OWNER. SEE SHEET C23 FOR DETAILS.
INSTALL NEW "SHORT TERM PARKING FOR REGISTRATION" SIGN. COORDINATE LOCATION WITH PROJECT
MANAGER BEFORE INSTALLING. SIGN TO BE SUPPLIED BY OWNER.
INSTALL NEW "SHORT TERM PARKING FOR TRASH DROP OFF" SIGN. COORDINATE LOCATION WITH PROJECT
MANAGER BEFORE INSTALLING. SIGN TO BE SUPPLIED BY OWNER.
INSTALL NEW REGISTRATION KIOSK AND CONCRETE PAD. KIOSK WILL BE PROVIDED BY ORPD. FOR DETAILS
SEE SHEET C21
CONTRACTOR SHALL INSTALL ONE (1) 3” DIAMETER SCHEDULE 40 PVC PIPE AS PROTECTIVE SLEEVE FOR THE FUTURE IRRIGATION SYSTEM. LENGTH OF THE SLEEVE SHALL EXTEND TO 1.5' BEYOND THE EDGE OF THE PROPOSED SIDEWALK. ENDS OF PIPE SHALL BE CAPPED AND MARKED WITH A WOOD STAKE AT BOTH ENDS FOR
FUTURE RECOVERY. DEPTH SHALL BE ONE (1) FOOT BELOW SIDEWALK SUBGRADE.
IMPROVEMENT NOTES:
0/
1/
1:
A M
R
:\2
O re go n P ar ks a nd
R ec re at io n
D ep ar tm en t -
O P
R D
\2
2-
O
P R
D
C ol lie r M em or ia l S ta te
P ar k Im pr ov em en ts
2\
F in al
D es ig n\
D ra w in gs \D w g\
C
IV
IL
S
H E
E
TS
.d w g
- D av id
T ut tle
P:
-2
-8
O 'H
AR
E
PA
R
KW
AY
, S U
IT
E
M
ED
FO
R
D , O
R
EG
O N
LIMITS OF
WORK
LIMITS OF
WORK
KEY NOTES
PROTECT IN PLACE AS NOTED1
12 INSTALL PAVEMENT MARKING AND WHEEL STOPS. INCLUDE ONE ADA PARKING SPOT AND REQUIRED SIGN.
COORDINATE LOCATION WITH PROJECT MANAGER DURING CONSTRUCTION. SEE SHEET C19.
INSTALL SHOULDER AGGREGATE AT THE EDGE OF PAVEMENT TO ELIMINATE VERTICAL DROPS AND TRIP HAZARDS.
SEE DETAILS, SHEET C18.
CONTRACTOR TO CONSTRUCT NEW SIDEWALK. SEE DETAIL 4, SHEET C18
CONTRACTOR TO INSTALL NEW 47' LONG 18" CMP CULVERT, MAINTAIN LOCATION AND ELEVATIONS OF EXISTING 18"
CMP CULVERT. SEE BELOW FOR BEDDING DETAIL.
CONTRACTOR TO PROVIDE A SMOOTH TRANSITION TO EXISTING GROUND.
INSTALL NEW WHITE DIRECTIONAL ARROW, COORDINATE LOCATION WITH PROJECT MANAGER BEFORE
INSTALLING, SEE SHEET C19 FOR DETAILS.
CONTRACTOR SHALL CONSTRUCT NEW DRAINAGE SWALE PER DETAIL 7 ON SHEET C19.
SEE GRADING SHEET C12.
.14
.12
.13
LIMITS OF
WORK
LIMITS OF
WORK
15'
10' (TYP)
TY
P)
' (T
YP)
28' (TYP)
15'
.5
12' 15'
27'
.16
41.1'
50'
.17
.17
.17
.17
.17
.17
.17
.17.17
.13
INV: 4196.08 INLET
INV: 4195.48 OUT
.18
1/2" LEVEL 2 HMAC WEARING SURFACE, 3"
DEPTH, CONSTRUCT FINAL WEARING
COURSE IN A SINGLE LIFT
18" CMP
CULVERT
6" OF 3"-0" COMPACTED CRUSHED
AGGREGATE BASE
DESIGN (16" TO
24")
12" MIN. PIPE
COVER
COMPACTED SUBGRADE
N.T.S.
1 CMP CULVERT BEDDING
C9
16" MIN 16" MIN
R
EG I N
E
N
12, AM
81061PE
OREGON
E
EXPIRATION DATE: 06/30/26
REG
I STERED PROFESS IONAL
R.DA V ID W . T UT T LE
M
AT
C H
L
IN
E
SE
E
AB
O
VE
M
ATC
H
LIN
E SEE BELO
W
.17
LIMITS OF
WORK
6.5' 9.7'
6'
6'
EXISTING CMR
REMOVE AND
RELOCATE
ACCORDING TO
OWNER
.8
.13.17
.17
.11
AutoCAD SHX Text co
AutoCAD SHX Text co
AutoCAD SHX Text co
AutoCAD SHX Text co
AutoCAD SHX Text co
AutoCAD SHX Text co
AutoCAD SHX Text co
AutoCAD SHX Text co
AutoCAD SHX Text co
AutoCAD SHX Text co
AutoCAD SHX Text
NORTH
AutoCAD SHX Text
DESIGNED BY
AutoCAD SHX Text
APPROVED BY
AutoCAD SHX Text
CHECKED BY
AutoCAD SHX Text
DRAWN BY
AutoCAD SHX Text
DATE
AutoCAD SHX Text
REVISION
AutoCAD SHX Text
DATE
AutoCAD SHX Text
BY
AutoCAD SHX Text
OREGON PARKS AND RECREATION DEPARTMENT
AutoCAD SHX Text
SHEET:
AutoCAD SHX Text
OPRIS#:
AutoCAD SHX Text
OF
AutoCAD SHX Text
CONTRACT #:
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text C9
AutoCAD SHX Text
COLLIER MEMORIAL STATE PARK
AutoCAD SHX Text
2022 COLLIER PARK IMPROVEMENTS
AutoCAD SHX Text
ENTRANCE LOOP LAYOUT
AutoCAD SHX Text 08/29/2024
AutoCAD SHX Text
DT
AutoCAD SHX Text
DT
AutoCAD SHX Text
MR
AutoCAD SHX Text
MB
1. CONTRACTOR TO VERIFY ALL PROJECT LIMITS, DEMOLITION AND
CONSTRUCTION WITH THE PROJECT MANAGER PRIOR TO STARTING WORK.
2. CONTRACTOR IS RESPONSIBLE FOR ALL TRAFFIC CONTROL AND WORK ZONE
SAFETY.
3. CONTRACTOR IS RESPONSIBLE FOR ALL EROSION AND POLLUTION CONTROL
MEASURES. INSPECTION SERVICES FOR EROSION CONTROL WILL BE
PROVIDED BY THE OWNER.
4. CONTRACTOR IS RESPONSIBLE FOR LOCATING AND PROTECTION OF EXISTING
AND NEWLY CONSTRUCTED UTILITIES.
5. CONTRACTOR IS RESPONSIBLE FOR REMOVAL AND LEGAL DISPOSAL OF ALL
CONSTRUCTION DEBRIS, UNLESS OTHERWISE NOTED.
6. CONTRACTOR SHALL COORDINATE WORK ITEMS WITH KLAMATH COUNTY
BUILDING AND PUBLIC WORKS AND OBTAIN ALL REQUIRED PERMITS TO DO
THIS WORK.
GENERAL CONSTRUCTION NOTES:
1" = '
SCALE IN FEET
10 20
0/
1/
1:
A M
R
:\2
O re go n P ar ks a nd
R ec re at io n
D ep ar tm en t -
O P
R D
\2
2-
O
P R
D
C ol lie r M em or ia l S ta te
P ar k Im pr ov em en ts
2\
F in al
D es ig n\
D ra w in gs \D w g\
C
IV
IL
S
H E
E
TS
.d w g
- D av id
T ut tle
P:
-2
-8
O 'H
AR
E
PA
R
KW
AY
, S U
IT
E
M
ED
FO
R
D , O
R
EG
O N
CONTRACTOR SHALL REMOVE EXISTING PAVEMENT, COMPACT EXISTING BASE
MATERIALS AND REPAVE WITH NEW ASPHALT PAVING HAVING A THICKNESS OF 3” (12,450
SQFT) MATCH EXISTING GRADING. SEE DETAIL 5, SHEET C18.
CONTRACTOR TO UTILIZE EXISTING BASE MATERIALS IN THIS AREA. ADD NEW 3 4" MINUS
ROCK TO ACHIEVE GRADE AND COMPACT TO 90% RELATIVE COMPACTION. INSTALL NEW
3" ASPHALT PAVING (4,240 SQFT), SEE DETAIL 5, SHEET C18. FOR GRADING SEE SHEET
C13. (ALTERNATE 1)
CONTRACTOR TO INSTALL NEW SINGLE ARM MAINTENANCE GATE AND GATE ARM
HOLDER TO BE PROVIDED BY OWNER. COORDINATE EXACT LOCATION AND OPENING
DIRECTION WITH OWNER. FOR DETAILS SEE SHEET C22. (ALTERNATE 1)
CONTRACTOR TO PROVIDE SMOOTH TRANSITION TO EXISTING GRADE. (ALTERNATE 1)
CONTRACTOR TO UTILIZE BUTT JOINT DETAIL, SEE DETAIL 6 SHEET C18.
CONTRACTOR TO EXPAND ENTRANCE AND EXIT LANES TO A WIDTH OF 14' MINIMUM.
TREES OR ROOT SYSTEM ARE TO BE PROTECTED. CONTRACTOR TO COORDINATE
IMPROVEMENTS IN THIS AREA PRIOR TO THE BEGINNING OF WORK WITH THE OPRD
CONSTRUCTION MANAGER.
IMPROVEMENT NOTES:
.3
.2
.1
.4
.5
.1 EXISTING CMT'S WITHIN ISLAND
.1 EXISTING CURB ISLAND
.1 EXISTING COMMUNICATION INFRASTRUCTURE
.1(ALL) EXISTING TREES AND ROOT STRUCTURES
KEY NOTES
PROTECT IN PLACE AS NOTED1
.1 EXISTING CMT
.1EXISTING CMT
.6
.1WELL HOUSE
BUILDING
51'
.1 ELECTRICAL
CONDUIT
HATCH LEGEND:
NEW PAVEMENT
COMPACTED EXISTING GRAVEL BASE MATERIAL WITH NEW 3" PAVING
ACCESS ROAD NOT PART
OF SCOPE OF WORK
R
EG I N
E
N
12, AM
81061PE
OREGON
E
EXPIRATION DATE: 06/30/26
REG
I STERED PROFESS IONAL
R.DA V ID W . T UT T LE
AL
TE
R N
AT
E
AutoCAD SHX Text co
AutoCAD SHX Text co
AutoCAD SHX Text
NORTH
AutoCAD SHX Text
DESIGNED BY
AutoCAD SHX Text
APPROVED BY
AutoCAD SHX Text
CHECKED BY
AutoCAD SHX Text
DRAWN BY
AutoCAD SHX Text
DATE
AutoCAD SHX Text
REVISION
AutoCAD SHX Text
DATE
AutoCAD SHX Text
BY
AutoCAD SHX Text
OREGON PARKS AND RECREATION DEPARTMENT
AutoCAD SHX Text
SHEET:
AutoCAD SHX Text
OPRIS#:
AutoCAD SHX Text
OF
AutoCAD SHX Text
CONTRACT #:
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text C10
AutoCAD SHX Text
COLLIER MEMORIAL STATE PARK
AutoCAD SHX Text
2022 COLLIER PARK IMPROVEMENTS
AutoCAD SHX Text
ENTRANCE ROAD LAYOUT
AutoCAD SHX Text 08/29/2024
AutoCAD SHX Text
DT
AutoCAD SHX Text
DT
AutoCAD SHX Text
MR
AutoCAD SHX Text
MB
1. CONTRACTOR TO VERIFY ALL PROJECT LIMITS, DEMOLITION AND
CONSTRUCTION WITH THE PROJECT MANAGER PRIOR TO STARTING WORK.
2. CONTRACTOR IS RESPONSIBLE FOR ALL TRAFFIC CONTROL AND WORK ZONE
SAFETY.
3. CONTRACTOR IS RESPONSIBLE FOR ALL EROSION AND POLLUTION CONTROL
MEASURES. INSPECTION SERVICES FOR EROSION CONTROL WILL BE
PROVIDED BY THE OWNER.
4. CONTRACTOR IS RESPONSIBLE FOR LOCATING AND PROTECTION OF EXISTING
AND NEWLY CONSTRUCTED UTILITIES.
5. CONTRACTOR IS RESPONSIBLE FOR REMOVAL AND LEGAL DISPOSAL OF ALL
CONSTRUCTION DEBRIS, UNLESS OTHERWISE NOTED.
6. CONTRACTOR SHALL COORDINATE WORK ITEMS WITH KLAMATH COUNTY
BUILDING AND PUBLIC WORKS AND OBTAIN ALL REQUIRED PERMITS TO DO
THIS WORK.
GENERAL CONSTRUCTION NOTES:
EXISTING AC
1" = '
SCALE IN FEET
2.5 5
/2
3/
:4
P M
R
:\2
O re go n P ar ks a nd
R ec re at io n
D ep ar tm en t -
O P
R D
\2
2-
O
P R
D
C ol lie r M em or ia l S ta te
P ar k Im pr ov em en ts
2\
F in al
D es ig n\
D ra w in gs \D w g\
C
IV
IL
S
H E
E
TS
.d w g
- D av id
T ut tle
P:
-2
-8
O 'H
AR
E
PA
R
KW
AY
, S U
IT
E
M
ED
FO
R
D , O
R
EG
O N
CONSTRUCT BUTT JOINT TRANSITION INTO EXISTING PAVEMENT SEE DETAIL 6, SHEET C18.
CONTRACTOR TO CONSTRUCT NEW CURB AND SIDEWALK. SEE DETAIL 3, SHEET C18.
CONTRACTOR TO CONSTRUCT NEW CURB. SEE DETAIL 2, SHEET C18.
NOT USED.
INSTALL NEW OWNER PROVIDED "WASHDOWN" SIGN. COORDINATE LOCATION WITH PROJECT MANAGER
BEFORE INSTALLING.
INSTALL NEW OWNER PROVIDED "DUMP INSTRUCTIONS" SIGN. COORDINATE LOCATION WITH PROJECT
MANAGER BEFORE INSTALLING.
INSTALL NEW OWNER PROVIDED "POTABLE WATER" SIGN. COORDINATE LOCATION WITH PROJECT MANAGER
BEFORE INSTALLING.
CONTRACTOR TO CONSTRUCT NEW WASHDOWN TOWER. SEE DETAIL 3, SHEET C17.
CONTRACTOR TO CONSTRUCT POTABLE WATER YARD HYDRANT. SEE DETAIL 4, SHEET C17.
CONTRACTOR TO CONSTRUCT SEWER CAP AND INLET. SEE DETAIL 1 AND 2, SHEET C17.
NEW ASPHALT CONCRETE. SEE SHEET C18 FOR DETAILS. FOR GRADING SEE SHEET C14.
IMPROVEMENT NOTES:
.1
.8
KEY NOTES
PROTECT IN PLACE AS NOTED1
CONSTRUCT VEHICULAR CONCRETE PAD. SEE DETAILS 7 AND 8, SHEET C18. FOR GRADING SEE SHEET C14.
CONSTRUCT 4' SIGN POST WITH STRUT SLEEVE, AND HOOK TO HANG POTABLE WATER HOSE. HOSE
PROVIDED BY ORPR. SEE DETAIL 4 SHEET C17
CONSTRUCT 4' BOLLARD, SEE DETAIL 3 SHEET C24
LIMITS OF WORK
LIMITS OF WORK
.1
EXISTING SS STRUCTURES 1
EXISTING SS CLEANOUT 1
.2
.13
.14
.14
.14
R
EG I N
E
N
12, AM
81061PE
OREGON
E
EXPIRATION DATE: 06/30/26
REG
I STERED PROFESS IONAL
R.DA V ID W . T UT T LE
R:
\2
O re go n
Pa rk s a nd
R ec re at io n
D ep ar tm en t -
O
PR
D \2
2-
O
PR
D
Co lli er M em or ia l S ta te
P ar k Im pr ov em en ts
2\
F in al
D es ig n\
D ra w in gs \D w g\
CI
VI
L
SH
EE
TS
.d w g, /2 3/
:4
9:
P M
AutoCAD SHX Text S
AutoCAD SHX Text S
AutoCAD SHX Text co
AutoCAD SHX Text co
AutoCAD SHX Text
NORTH
AutoCAD SHX Text
DESIGNED BY
AutoCAD SHX Text
APPROVED BY
AutoCAD SHX Text
CHECKED BY
AutoCAD SHX Text
DRAWN BY
AutoCAD SHX Text
DATE
AutoCAD SHX Text
REVISION
AutoCAD SHX Text
DATE
AutoCAD SHX Text
BY
AutoCAD SHX Text
OREGON PARKS AND RECREATION DEPARTMENT
AutoCAD SHX Text
SHEET:
AutoCAD SHX Text
OPRIS#:
AutoCAD SHX Text
OF
AutoCAD SHX Text
CONTRACT #:
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text C11
AutoCAD SHX Text
COLLIER MEMORIAL STATE PARK
AutoCAD SHX Text
2022 COLLIER PARK IMPROVEMENTS
AutoCAD SHX Text
RV DUMP SITE LAYOUT
AutoCAD SHX Text 08/29/2024
AutoCAD SHX Text
DT
AutoCAD SHX Text
DT
AutoCAD SHX Text
MR
AutoCAD SHX Text
MB
4196.62 FS
4197.50 FS
4197.28 FS 4203.34 FS
4201.63 FS
4202.83 FS
4203.84 FS
4204.99 FS
4204.89 FS
4204.29 FS
4203.88 FS
4204.48 FS
4204.36 FS
4204.53 FS
4204.47 FS
4204.39 FS
4204.64 FS
4204.85 FS
4204.90 FS
4205.17 FS
(4206.42 FS)
MATCH EXTG.
(4206.05 TOP DITCH)
MATCH EXTG.
4205.02 FS
4205.00 FS
4204.28 FS
4205.81 FS
4205.68 FS
(4203.89 FS)
MATCH EXTG.
(4203.73 FS)
MATCH EXTG.
4204.90 FS
4204.83 FS
4205.28 FS
03 4204
42014200
.0
.0
.0
4197.5
4197.0 41
.0
4205.0
4204.0
4204.59 FS
4203.74 FS
4206.0
4204.44 FS
4204.95 FG
BOTTOM OF DITCH
4204.48 FS
4204.0
4203.5
.0
4204.0
4205.5
4204.39 FS
4204.62 FS
4204.23 FG
BOTTOM OF DITCH
4204.16 FG
BOTTOM OF DITCH4202.95 FG
BOTTOM OF DITCH
4202.68 FG
BOTTOM OF DITCH
4202.03 FG
BOTTOM OF DITCH
4201.81 FG
BOTTOM OF DITCH
4201.33 FG
BOTTOM OF DITCH
(4206.49 FS)
MATCH EXTG.
(4206.37 FS)
MATCH EXTG.
4204.48 FS4204.48 FS
4204.48 FS
4204.44 FS
4204.48 FS
4204.44 FS
4205.20 FS
4205.27 FS
4205.27 FS
4205.33 FS
4204.46 FS
4204.20 FS
4205.28 FS
4205.34 FS
4205.40 FS
4205.49 FS
4205.72 FS
4206.15 FS
4206.23 FS
4205.74 FS
4205.06 FS
4205.57 FS
4205.84 FS
4205.72 FS
4205.77 FS
4205.54 FS
4205.52 FS
4205.28 FS
4205.15 FS
4205.52 FS
4205.20 FS
4205.70 FS
4204.39 FS
.0
.0
4205.0
.0
4199.04198.04197.0
97 41
.0
4204.0 4206.04205.0
4202.0
4202.0
(4199.39 FS)
MATCH EXTG.
4197.63 FS
4198.0
4197.5
(4199.30 FS)
MATCH EXTG.
4199.0
4196.08 INV IN
4195.48 INV OUT
4197.0
C33
C34
1" = '
SCALE IN FEET
10 20
HATCH LEGEND:
NEW ASPHALT PAVING
NEW LANDSCAPE (BY OTHERS)
NEW CONCRETE
/3
0/
:1
P M
R
:\2
O re go n P ar ks a nd
R ec re at io n
D ep ar tm en t -
O P
R D
\2
2-
O
P R
D
C ol lie r M em or ia l S ta te
P ar k Im pr ov em en ts
2\
F in al
D es ig n\
D ra w in gs \D w g\
C
IV
IL
S
H E
E
TS
.d w g
- D av id
T ut tle
P:
-2
-8
O 'H
AR
E
PA
R
KW
AY
, S U
IT
E
M
ED
FO
R
D , O
R
EG
O N
LIMITS OF
WORK
LIMITS OF
WORK
LIMITS OF
WORK
LIMITS OF
WORK
1' LEVEL
GRAVEL
SHOULDER
TYP
1' LEVEL
GRAVEL
SHOULDER
1' LEVEL
GRAVEL
SHOULDER
EXISTING TREES1
KEY NOTES
PROTECT IN PLACE AS NOTED1
EXISTING CMR
REMOVE AND
RELOCATE
ACCORDING TO
TRIBES/OWNER
LIMITS OF
GRADING
LIMITS OF
GRADING
GENERAL NOTES:
1. ALL SUBGRADE WITHIN THE LIMITS OF WORK SHALL BE PROCESSED
AND RECOMPACTED TO 90% RELATIVE COMPACTION. IT IS THE
CONTRACTOR'S RESPONSIBILITY TO OBTAIN FIELD TESTING FOR
DOCUMENTATION OF COMPACTION REQUIREMENT.
2. FOR SIGNING AND STRIPING SEE SHEET C19.
3:1 TYP
SLOPE
24.6'
27.3'
FF=4204.48
R
EG I N
E
N
12, AM
81061PE
OREGON
E
EXPIRATION DATE: 06/30/26
REG
I STERED PROFESS IONAL
R.DA V ID W . T UT T LE
M
ATC
H
LIN
E SEE BELO
W
M
AT
C H
L
IN
E
SE
E
AB
O
VE
EXISTING TREES1
AutoCAD SHX Text
NORTH
AutoCAD SHX Text
DESIGNED BY
AutoCAD SHX Text
APPROVED BY
AutoCAD SHX Text
CHECKED BY
AutoCAD SHX Text
DRAWN BY
AutoCAD SHX Text
DATE
AutoCAD SHX Text
REVISION
AutoCAD SHX Text
DATE
AutoCAD SHX Text
BY
AutoCAD SHX Text
OREGON PARKS AND RECREATION DEPARTMENT
AutoCAD SHX Text
SHEET:
AutoCAD SHX Text
OPRIS#:
AutoCAD SHX Text
OF
AutoCAD SHX Text
CONTRACT #:
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text C12
AutoCAD SHX Text
COLLIER MEMORIAL STATE PARK
AutoCAD SHX Text
2022 COLLIER PARK IMPROVEMENTS
AutoCAD SHX Text
GRADING PLAN - ENTRANCE LOOP
AutoCAD SHX Text 08/29/2024
AutoCAD SHX Text
DT
AutoCAD SHX Text
DT
AutoCAD SHX Text
MR
AutoCAD SHX Text
MB
Line Table
Line #
L59
L60
L61
L62
L63
L64
L65
L66
L67
L68
L69
L70
L71
L72
L73
L74
L75
L76
L77
L78
Length
230.5'
55.7'
120.8'
71.7'
12.4'
15.0'
12.5'
96.4'
15.4'
70.6'
31.7'
88.8'
192.6'
38.6'
41.9'
7.3'
20.0'
22.0'
123.0'
22.9'
Direction
S90°00'00"E
N49°02'23"E
S90°00'00"E
S77°52'44"E
N41°50'32"E
S50°48'23"E
S41°50'32"W
S89°59'56"W
N81°21'17"W
N90°00'00"W
S19°35'18"W
N00°00'00"E
N90°00'00"W
N00°00'00"E
N49°02'23"E
S00°00'00"E
S90°00'00"E
S00°00'04"E
S89°59'59"E
N00°06'25"W
Line Table
Line #
L79
L80
L81
L82
L83
L84
L85
L86
L89
L90
L91
L92
L93
L94
L95
L96
L97
L98
L99
L100
Length
23.4'
28.1'
29.7'
70.7'
28.0'
54.0'
6.0'
6.0'
8.0'
8.0'
100.0'
8.0'
36.6'
84.5'
21.0'
20.0'
51.0'
16.0'
6.0'
48.0'
Direction
N38°22'44"W
S52°20'37"W
N44°59'43"W
N90°00'00"W
S00°00'17"W
N90°00'00"W
N89°59'58"W
N00°00'00"W
N90°00'00"E
N00°00'00"E
N90°00'00"E
S40°05'59"E
S51°20'25"W
N90°00'00"W
N00°00'00"E
S90°00'00"W
N00°00'18"E
N89°59'43"W
S00°00'00"E
N00°00'00"E
Line Table
Line #
L101
L102
L103
L104
L105
L106
L107
L108
Length
40.1'
7.5'
59.7'
19.9'
19.7'
40.3'
7.4'
22.6'
Direction
S38°29'47"E
S00°06'25"E
S38°41'23"E
S51°30'14"W
N38°39'35"W
N51°20'25"E
S19°47'45"W
N60°24'38"E
Curve Table
Curve #
C33
C34
C35
C36
C37
C38
C39
C40
C41
C42
C43
C44
C45
C46
C47
C48
C49
C50
C51
C52
Length
67.3'
85.9'
17.9'
21.4'
5.3'
26.3'
34.7'
132.9'
31.6'
163.1'
7.3'
4.5'
4.5'
12.6'
39.3'
18.4'
55.0'
21.4'
16.8'
11.8'
Radi…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .