This is a pricing form (Form A-2) for ITB #12278/OregonBuys Bid #S-63400-00012818 issued for the Collier Memorial State Park Campground Entrance Improvement Project. The project encompasses various construction activities including site preparation, demolition, asphalt work, concrete installation, utilities, and building improvements. Key quantities include 2,218 tons of base/shoulder rock, 911 tons of asphalt paving, 200 linear feet of concrete curb, 295 square yards of concrete sidewalks, and 320 linear feet of site waterline.
The pricing structure is divided into three main sections: Base Bid Items (A1-A17), Building Related Items (B1-B3), and Bid Alternates (C1). Base bid items cover various aspects from mobilization to landscape restoration, while building-related items focus on construction, mechanical, and electrical work. The form requires unit pricing for specific items and lump sum pricing for others, with all incidental work considered included in the bid price. The state reserves the right to adjust quantities at the same unit prices or remove items to meet budgetary constraints.
View the file
Other files
Show all 12
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sheet1
| ATTACHMENT A | |||||
| FORM A-2 - PRICING FORM | |||||
| ITB# 12278 OregonBuys Bid# S-63400-00012818 | |||||
| Collier Memorial State Park Campground Entrance Improvement Project | |||||
| PRICING SUBMITTAL INSTRUCTIONS: | |||||
| Bidder shall enter pricing and other required information for all Bid Items listed in this Pricing Form. If this Pricing Form is replaced by Addendum, Bidders shall use the Addendum form to provide pricing and other required information. If the Pricing Form is only modified by Addendum, Bidders shall follow the instructions in the Addendum for making modifications to the Pricing Form. Failure to supply the required information in the Pricing Form, as modified by subsequent Addenda, may result in Bid rejection as nonresponsive. | |||||
| All Work described in the Contract Documents but not specifically itemized in the Pricing below is considered incidental to the Work, and Bidder agrees to furnish all necessary plant, labor, equipment, accessories, materials, permits, and perform all incidental Work at no additional cost to the Agency. Contractor shall furnish all temporary facilities such as power, lights, heat, telephone, potable water, portable toilets, and job office as needed to perform the Work at no additional charge to the Agency. | |||||
| BASE BID ITEMS | |||||
| No. | Bid Item | Qty | Unit | Unit Price | Total Price |
| A1 | Permits and Mobilization | 1 | LS | NA | $ |
| A2 | Site Preparation and Demolition | 1 | LS | NA | $ |
| A3 | Asphalt Excavation | 1 | LS | NA | $ |
| A4 | General Excavation and Earthwork | 1 | LS | NA | $ |
| A5 | Base Rock or Shoulder Rock | 2218 | TN | $ | $ |
| A6 | Asphalt Paving - Leveling and Wearing Courses Combined: | 911 | TN | $ | $ |
| A7 | Pavement Markings & Striping | 1 | LS | NA | $ |
| A8 | Cast-in Place Concrete Curb | 200 | LF | $ | $ |
| A9 | 4" Concrete Sidewalks | 295 | SQ YD | $ | $ |
| A10 | 6" Concrete Slabs | 271 | SQ YD | $ | $ |
| A11 | Concrete Culvert | 1 | LS | NA | $ |
| A12 | RV Dump Station and Washdown Area | 1 | LS | NA | $ |
| A13 | Site Waterline - 1 inch | 320 | LF | $ | $ |
| A14 | Site Electrical | 1 | LS | NA | $ |
| A15 | Trash Compactor Enclosure | 1 | LS | NA | $ |
| A16 | Landscape - Restoration to Pre-construction State | 1 | LS | NA | $ |
| A17 | Installation of Owner Provided Items | 1 | LS | NA | $ |
| BID ITEMS- BUILDING RELATED | |||||
| No | Bid Item | Qty | Unit | Unit Price | Total Price |
| B1 | Building Construction and Improvement | 1 | LS | NA | $ |
| B2 | Building Mechanical | 1 | LS | NA | $ |
| B3 | Building Electrical | 1 | LS | NA | $ |
| TOTAL BID (Combined Cost Amount of Items Listed under A1 through A17 and B1 through B3) | $ | ||||
| BID ALTERNATES | |||||
| # | ITEM | QUANTITY | UNIT | UNIT COST | TOTAL COST |
| C1 | Roadway Improvements to Well House Building | 1 | LS | NA | $ |
NOTE: Bid price is total contract price including contractor’s profit and overhead. Items not explicitly listed in the bid schedule above are considered incidental.
| The undersigned understands that the State reserves the right to increase or decrease the above quantities at the same unit prices as shown or to remove items as necessary to meet budgetary constraints. The undersigned has carefully examined the Contract Documents and the site of the work, and agrees to furnish all necessary plant, labor, equipment, accessories, materials, permits, and perform all operations shown and specified in accordance with the Contract Documents for the price(s) set herein. |
| Bid submitted by: |
(Legal Business Name)
(Authorized Representative Name) Title
(Authorized Representative Signature) Date
File details come from the government source that posted it. Updated .