Infection Control Risk Assessment.pdf

PDF 268 KB Posted

Attached to
Y1DA--589A7-21-702 EHRM Training and Admin Support Space (TASS) Construction - Wichita, KS
Solicitation number
36C77622B0033
Issued by

About this file

This document provides an Infection Control Risk Assessment template for hospital construction and renovation projects. The template outlines a 14-step process for assessing infection control risks at different stages of a construction project. It includes a matrix to determine the appropriate precautions class based on the project type and patient risk groups affected. Precaution classes range from I to IV and specify different infection control measures to be taken during and after construction. The template also provides sections to identify issues related to ventilation, plumbing, and electrical outages, containment measures, water damage risks, work hours, handwashing sinks, and responsibility for project monitoring.

The related federal contract opportunity is a solicitation from the Department of Veterans Affairs Technology Acquisition Center Austin seeking a general contractor to complete Project #589A7-21-702 for renovations of approximately 12,000 square feet on the ground level of Building 61 at the Robert J. Dole VA Medical Center in Wichita, KS. The solicitation number is 36C77622B0033. The project involves renovations to the EHRM Training and Admin Support Space and the contractor will be responsible for furnishing all labor, materials, equipment, and other items designated in the contract to complete the project in accordance with provided specifications and drawings.

View the file

Other files

File Type Posted
36C77622B0033 0006.pdf PDF
Tech Questions - Wichita TASS - 7-19-22.pdf PDF
Geotech Report - Wichita.pdf PDF
36C77622B0033 0005.pdf PDF
61_E-600_ADD1.pdf PDF
61_M-601-MECHANICAL SCHEDULES_ADD1.pdf PDF
DBA Wage Rates - Sedgwick County - 07-08-22.pdf PDF
Tech Questions - Wichita TASS - 7-14-22.pdf PDF
36C77622B0033 0004.pdf PDF
Spec Section 23 73 00_ADD1.pdf PDF
61_ES100_ADD1.pdf PDF
36C77622B0033 0003.pdf PDF
36C77622B0033 0002.pdf PDF
DBA Wage Rates - Sedgwick County - 06-17-22.pdf PDF
36C77622B0033 0001.pdf PDF
DBA Wage Rates - Sedgwick County - 06-03-22.pdf PDF
Pre-Bid Site Visit Sign-in Sheet - Wichita TASS.pdf PDF
V02 589A7-21-702 IFC Specifications.pdf PDF
1 of 8 - 589A7-21-702 General Dwgs.pdf PDF
V01 589A7-21-702 IFC Specifications.pdf PDF
8 of 8 - 589A7-21-702 Tech Dwgs.pdf PDF
589A7-21-702 Project Narratives.pdf PDF
5 of 8 - 589A7-21-702 Plumbing Dwgs.pdf PDF
3 of 8 - 589A7-21-702 Arch Dwgs.pdf PDF
2a of 8 - 589A7-21-702 Civil Dwgs.pdf PDF
2b of 8 - 589A7-21-702 Civil Dwgs.pdf PDF
6 of 8 - 589A7-21-702 Mech Dwgs.pdf PDF
Limitations on Subcontracting.docx DOCX document
Contractor Safety and Environmental Form.docx DOCX document
VHA Supp Contract Reqs COVID-19 - 12-14-21.pdf PDF
Wichita IFB 36C77622B0033 - 6-2-22.pdf PDF
DBA Wage Rates - Sedgwick County - 04-08-22.pdf PDF
4 of 8 - 589A7-21-702 Fire Dwgs.pdf PDF
7 of 8 - 589A7-21-702 Elec Dwgs.pdf PDF
Show all 34

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Robert J. Dole VA Medical Center Infection Control Risk Assessment for Hospital Construction & Renovation

Please complete the form and return to Infection Prevention & Control.

Project Title & Number:

Project Contracting Officer Representative:

Job Site Supervisor:

Area of Work:

Estimated Start Date:

Estimated End Date:

Signatures:

Project COR

Job Site Supervisor

Infection Prevention & Control

Published in Environment of Care® News, Joint Commission Resources, 2021.

File Name: Infection Control Risk Assessment for Hospital Construction and Renovation

© 2021 The Joint Commission. May be adapted for internal use. Page 1 of 5

Infection Control Risk Assessment for Hospital Construction and Renovation

Health care facilities work to keep individuals healthy. When an organization begins a construction, renovation, or demolition project, it needs to assess the risks to its infection prevention and control efforts. This infection control risk assessment matrix can help organizations identify what steps need to be taken to ensure the health of the individuals served.

STEP 1 Using the following table, identify the type of construction project activity (Types A–D).

Write the type of activity on the line provided below.

TYPE A

Inspection and noninvasive activities Includes but is not limited to the following:

• Removal of ceiling tiles for visual inspection only (for example, limited to one tile per 50 square feet)

• Painting (but not sanding)

• Wall covering, electrical trim work, minor plumbing, and activities that do not generate dust or require cutting of walls or access to ceilings other than for visual inspection

TYPE B

Small-scale, short-duration activities that create minimal dust Includes but is not limited to the following:

• Installation of telephone and computer cabling

• Access to chase spaces

• Cutting of walls or ceiling where dust migration can be controlled

TYPE C

Work that generates a moderate to high level of dust or requires demolition or removal of any fixed building components or assemblies Includes but is not limited to the following:

• Sanding of walls for painting or wall covering

• Removal of floor coverings, ceiling tiles, and casework

• New wall construction

• Minor ductwork or electrical work above ceilings

• Major cabling activities

• Any activity that cannot be completed within a single work shift

TYPE D

Major demolition and construction projects Includes but is not limited to the following:

• Activities that require consecutive work shifts

• Activities that require heavy demolition or removal of a complete cabling system

• New construction

STEP 1. ___________________________________________________________________________________

STEP 2

Using the following table, identify the patient risk groups (low–highest risk) that will be affected.

If more than one risk group will be affected, select the higher-risk group. Write the group(s) on the line provided below.

LOW RISK MEDIUM RISK HIGH RISK HIGHEST RISK

• Behavioral therapy or counseling rooms

• Common areas

• Conference rooms

• Offices

• Cardiology

• Echocardiography

• Endoscopy

• Nuclear medicine

• Physical therapy

• Radiology/MRI

• Respiratory therapy

• Cardiac care units

• Emergency department

• Labor and delivery room

• Laboratories

(specimen)

• Medical units

• Any area caring for immunocompromised patients

• Burn units

• Cardiac catheterization labs

• Central sterile supply

• Intensive care units

© 2021 The Joint Commission. May be adapted for internal use. Page 2 of 5

• Recreational facilities

• Waiting rooms

• Newborn nurseries

• Outpatient surgery

• Pediatrics

• Pharmacy

• Postanesthesia care units

• Surgical units

• Negative-pressure isolation rooms

• Oncology

• Operating rooms

(including C-section rooms)

STEP 2. ___________________________________________________________________________________

STEP 3 Match the Patient Risk Group (Low, Medium, High, Highest) with the planned Construction Project Type (A, B, C, D) on the following matrix, to find the Class of Precautions (I, II, III or IV) or level of infection control activities required. Class I–IV Precautions are delineated below. Write the class or level in the line provided.

PATIENT RISK GROUP TYPE A TYPE B TYPE C TYPE D

Low-Risk Group I II II III/IV

Medium-Risk Group I II III IV

High-Risk Group I II III IV

Highest-Risk Group II III/IV III/IV IV Note: Infection Prevention and Control department approval will be required when the Construction Activity and Risk Level indicate that Class III or Class IV control procedures are necessary.

STEP 3. ___________________________________________________________________________________

DURING CONSTRUCTION PROJECT UPON COMPLETION

Class I

1. Execute work by methods to minimize raising dust from construction operations.

2. Immediately replace a ceiling tile displaced for visual inspection.

1. Clean work area upon completion of task.

Class II

1. Provide active means to prevent airborne dust from dispersing into atmosphere.

2. Water-mist work surfaces to control dust while cutting.

3. Seal unused doors with duct tape.

4. Block off and seal air vents.

5. Place dust mat at entrance and exit of work area.

6. Remove or isolate HVAC system in areas where work is being performed.

1. Wipe work surfaces with cleaner/disinfectant.

2. Contain construction waste in tightly covered containers before transport.

3. Wet mop and/or vacuum with HEPA– filtered vacuum before leaving work area.

4. Upon completion, restore HVAC system where work was performed.

© 2021 The Joint Commission. May be adapted for internal use. Page 3 of 5

DURING CONSTRUCTION PROJECT UPON COMPLETION

Class III

1. Remove or isolate HVAC system in area where work is being done to prevent contamination of duct system.

2. Complete all critical barriers (that is, sheetrock, plywood, plastic) to seal area from nonwork area or implement control cube method (cart with plastic covering and sealed connection to work site with HEPA vacuum for vacuuming prior to exit) before construction begins.

3. Maintain negative air pressure within work site using HEPA–equipped air-filtration units.

4. Contain construction waste in tightly covered containers before transport.

5. Cover transport receptacles or carts. Tape covering unless solid lid.

1. Wipe work surfaces with cleaner/disinfectant.

2. Contain construction waste in tightly covered containers before transport.

3. Wet mop and/or vacuum with HEPA– filtered vacuum before leaving work area.

4. Upon completion, restore HVAC system where work was performed.

Class IV

1. Isolate HVAC system in area where work is being done to prevent contamination of duct system.

2. Complete all critical barriers (that is, sheetrock, plywood, plastic) to seal area from nonwork area or implement control cube method (cart with plastic covering and sealed connection to work site with HEPA vacuum for vacuuming prior to exit) before construction begins.

3. Maintain negative air pressure within work site using HEPA–equipped air-filtration units.

4. Seal holes, pipes, conduits, and punctures appropriately.

5. Construct anteroom and require all personnel to pass through this room so they can be vacuumed using a HEPA vacuum cleaner before leaving work site, or they can wear cloth or paper coveralls that are removed each time they leave the work site.

6. All personnel entering work site are required to wear shoe covers. Shoe covers must be changed each time the worker exits the work area.

1. Do not remove barriers from work area until completed project is inspected by the organization’s Safety and IC departments or other leadership and is thoroughly cleaned by the Environmental Services department or other leadership.

2. Remove barrier material carefully to minimize spreading of dirt and debris associated with construction.

3. Contain construction waste in tightly covered containers before transport.

4. Cover transport receptacles or carts. Tape covering unless solid lid.

5. Vacuum work area with HEPA–filtered vacuums.

6. Wet mop area with cleaner/disinfectant.

7. Upon completion restore HVAC system where work was performed.

STEP 4 Identify the areas surrounding the project area, assessing potential impact.

UNIT BELOW UNIT ABOVE LATERAL LATERAL BEHIND FRONT

RISK GROUP RISK GROUP RISK GROUP RISK GROUP RISK GROUP RISK GROUP

© 2021 The Joint Commission. May be adapted for internal use. Page 4 of 5

STEP 5 Identify specific site of activity (for example, patient rooms and medication room).

STEP 6 Identify issues related to ventilation, plumbing, and electrical in terms of the occurrence of probable outages.

STEP 7

Identify containment measures, using prior assessment. What types of barriers (for example, solids walls)? Will HEPA filtration be required?

(Note: Renovation/construction area shall be isolated from the occupied areas during construction and shall be negative with respect to surrounding areas.)

STEP 8 Consider potential risk of water damage. Is there a risk due to compromising structural integrity (for example, wall, ceiling, and roof)?

STEP 9 Work hours: Can or will the work be done during non–patient care hours?

STEP 10 Do plans allow for adequate number of isolation/negative airflow rooms?

STEP 11 Do the plans allow for the required number and type of hand-washing sinks?

STEP 12

Does the infection prevention and control staff agree with the minimum number of sinks for this project? (Verify against Facility Guidelines Institute design and construction guidelines for types and area.)

STEP 13 Does the infection prevention and control staff agree with the plans relative to clean and soiled utility rooms?

STEP 14 Plan to discuss the following containment issues with the project team (for example, traffic flow, housekeeping, debris removal [how and when]).

© 2021 The Joint Commission. May be adapted for internal use. Page 5 of 5

APPENDIX Identify and communicate the responsibility for project monitoring that includes IC concerns and risks. The ICRA may be modified throughout the project. Revisions must be communicated to the project manager.

HEPA, high-efficiency particulate air; HVAC, heating, ventilating, and air-conditioning; IC, infection prevention and control; ICRA, infection control risk assessment

Source: Adapted from Judene Bartley, Epidemiology Consulting Services, Inc. Beverly Hills, MI. © 2002. Updated 2017. May be adapted for internal use.

Step 3 Response: [ ]
Step 1 Response: [ ]
Step 2 Response: [ ]
Step 6:
Step 5:
Step 7:
Step 8:
STEP 9:
Step 10:
Step 11:
Step 12:
Step 13:
Step 14:
Appendix:
UNIT BELOW:
UNIT ABOVE:
LATERAL:
LATERAL 2:
BEHIND:
FRONT:
Project Title & Number:
Job Site Supervisor:
Area of Work:
Project COR:
Start Date:
End Date: