6 of 8 - 589A7-21-702 Mech Dwgs.pdf
PDF 4 MB Posted
- Attached to
- Y1DA--589A7-21-702 EHRM Training and Admin Support Space (TASS) Construction - Wichita, KS
- Solicitation number
- 36C77622B0033
About this file
This document provides mechanical drawings and specifications for Project # 589A7-21-702: EHRM Training and Admin Support Space at the Robert J. Dole VA Medical Center in Wichita, Kansas. The project involves renovating approximately 12,000 square feet on the ground level of Building 61, and includes demolishing and replacing mechanical systems such as air handling units, ductwork, piping, terminal units, and associated accessories. Drawings show demolition plans, new layouts, sections and details. Specifications list requirements for items like duct construction, diffusers, terminal units, exhaust fans, air handling units, chillers, and other mechanical equipment. The general contractor will be responsible for furnishing all labor, materials, and equipment to complete the mechanical scope of work in accordance with the drawings and specifications provided.
View the file
Other files
Show all 34
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ABBREVIATIONS
THIS LEGEND DEFINING TYPICAL ABBREVIATIONS AND SYMBOLS IS INTENDED TO BE AN OVERALL LEGEND FOR ALL PROJECTS.
HVAC PIPING TYPES
GENERAL DUCT SYMBOLS
A/E ARCHITECT / ENGINEER
AAHX AIR TO AIR HEAT EXCHANGER
AB AIR BLENDER
AAV AUTOMATIC AIR VENT
ACC AIR COOLED CONDENSER
ACU AIR CONDITIONING UNIT
AF AFTER FILTER
AFCV AIR FLOW CONTROL VALVE
AFF ABOVE FINISHED FLOOR
AFW AIR FOIL WHEEL (FAN)
AHU AIR-HANDLING UNIT
AMP AMPERAGE
AP ACCESS PANEL
APD AIR PRESSURE DROP
ARI AIR CONDITIONING AND REFRIGERATION
INSTITUTE
AS AIR SEPARATOR
ASME AMERICAN SOCIETY OF MECHANICAL
ENGINEERS
AW AIR WASHER
AXF AXIAL FLOW
B
B BOILER
BD BUTTERFLY DAMPER
BDD BACKDRAFT DAMPER
BFP BACKFLOW PREVENTER
BHP BRAKE HORSEPOWER
BHX BOILER BLOWDOWN HEAT EXCHANGER
BIW BACKWARD INCLINED WHEEL (FAN)
BSC BIOLOGICAL SAFETY CABINETS
BT BLOWOFF TANK
BTU BRITISH THERMAL UNIT
BTUH BRITISH THERMAL UNIT PER HOUR
C
C CENTIGRADE (CELSIUS)
CC COOLING COIL
CCD COOLING COIL CONDENSATE DRAIN
CENT CENTRIFUGAL
CFH CUBIC FEET PER HOUR
CFM CUBIC FEET PER MINUTE
CFT CUBIC FEET
CFP CHEMICAL FEED PUMP
CH CHILLER
CHP CHILLED WATER PUMP
CHW CHILLER WATER
CHR CHILLED WATER RETURN
CHS CHILLED WATER SUPPLY
CI CAST IRON
CM CUBIC METER
CM/S CUBIC METER PER SECOND
CO CARBON MONOXIDE
CO2 CARBON DIOXIDE
COMP COMPRESSOR UNIT
COP COEFFICIENT OF PERFORMANCE
CP CONDENSATE PUMP
CS CONDENSATE STORAGE TANK
CSG CLEAN STEAM GENERATOR
CT COOLING TOWER
CU CONDENSING UNIT
CUH CABINET UNIT HEATER
CV CONSTANT VOLUME
CW COLD WATER (POTABLE)
CC CHILLED WATER COOLING COIL
CWP CONDENSER WATER PUMP
CWR CONDENSER WATER RETURN
CWS CONDENSER WATER SUPPLY
A
F
F FAHRENHEIT
F&T FLOAT AND THERMOSTATIC
FA FREE AREA
FC FLEXIBLE CONNECTION
FCU FAN COIL UNIT
FCUC FAN COIL UNIT COOLING ONLY
FCUH FAN COIL UNIT HEATING ONLY
FCW FORWARD CURVED WHEEL (FAN)
E
EA EXHAUST AIR
EAT ENTERING AIR TEMPERATURE
EC EVAPORATIVE COOLER
ECC ENGINEERING CONTROL CENTER
ECU EVAPORATIVE CONDENSER UNIT
EDH ELECTRIC DUCT HEATER
EER ENERGY EFFICIENCY RATIO
EF EXHAUST FAN
EGS EMERGENCY GAS SHUTOFF
EGT ENTERING GLYCOL TEMPERATURE
EH EXHAUST HOOD
EJ EXPANSION JOINT
EMD END OF MAIN DRIP (STEAM)
ENT ENTERING
ERC ELECTRIC REHEAT COIL
ERP ELECTRIC RADIANT PANEL
ESP EXTERNAL STATIC PRESSURE
ET EXPANSION TANK
ETO ETHYLENE OXIDE
ETR EXISTING TO REMAIN
EUH ELECTRIC UNIT HEATER
EWC EVAPORATIVE WATER COOLER
EWT ENTERING WATER TEMPERATURE
EX. EXISTING
D
DB DECIBELS
Db DRY-BULB TEMPERATURE
DDC DIRECT DIGITAL CONTROLS
DEG DEGREE
DIA DIAMETER
DIW DEIONIZED WATER
DP DEW POINT TEMPERATURE
DPA DIFFERENTIAL PRESSURE ASSEMBLY
DPS DIFFERENTIAL PRESSURE SENSOR
DX DIRECT EXPANSION
FD FIRE DAMPER
FF FINAL FILTER
FHX FLUE GAS/FEEDWATER HEAT EXCHANGER
FM FLOW METER
FOP FUEL OIL PUMP
FOT FUEL OIL TANK
FOHX FUEL OIL HEAT EXCHANGER
FPM FEET PER MINUTE
FPS FEET PER SECOND
FPTU FAN POWERED TERMINAL UNIT
FRP FIBER REINFORCED POLYESTER
FS FLOW SWITCH
FSTAT FREEZESTAT
FT FEET
FT-LB FOOT-POUND
FTR FIN TUBE RADIATION
FV FACE VELOCITY
FSD COMBINATION FIRE / SMOKE DAMPER
G
GA GAUGE
GAL GALLONS
GH GRAVITY HOOD
GPD GALLONS PER DAY
GPH GALLONS PER HOUR
GPM GALLONS PER MINUTE
GPR GAS PRESSURE REGULATOR
GS GALVANIZED STEEL
K kg KILOGRAM kg/HR KILOGRAM PER HOUR kPa KILOPASCAL kW KILOWATT kWh KILOWATT HOUR
J
J INTENTIONALLY LEFT BLANK
I/O INPUT/OUTPUT
IAQ INDOOR AIR QUALITY
IBT INVERTED BUCKET TRAP
ICF IN-LINE CENTRIFUGAL FAN
ID INSIDE DIAMETER
IFB INTEGRAL FACE AND BYPASS
IN INCHES
IN HG INCHES OF MERCURY
IN WC INCH WATER COLUMN
IN WG INCH WATER GAUGE
IN-LB INCH-POUND
IPLV INTEGRATED PART LOAD VALUE
IRH INFRARED HEATER
IS INSECT SCREEN
IU INDUCTION UNIT
IV INLET VANES
H
H HUMIDIFIER
H&CW HOT & COLD WATER
HAC HOUSEKEEPING AID CLOSET
HB HOSE BIBB
HC HEATING COIL
HD HEAD
HOA HAND/OFF/AUTOMATIC
HP HEAT PUMP
HP HORSEPOWER
HPDT HIGH PRESSURE DRIP TRAP
HPR HIGH PRESSURE RETURN
(STEAM CONDENSATE)
HPS HIGH PRESSURE SUPPLY (STEAM)
(61-300 PSIG)
HRC HEAT RECOVERY COIL
HRD HEAT RECOVERY DEVICE
HRP HYDRONIC RADIANT (CEILING) PANEL
HRW HEAT RECOVERY WHEEL
HSTAT HUMIDISTAT
HTM HUMIDIFIER TERMINAL
HUM HUMIDIFIER UNIT MOUNTED
HVU HEATING AND VENTILATING UNIT
HW HOT WATER
HC HOT WATER HEATING COIL
HHP HEATING HOT WATER PUMP
HHR HEATING HOT WATER RETURN
HHS HEATING HOT WATER SUPPLY
HHUH HOT WATER UNIT HEATER
HX HEAT EXCHANGER
HZ HERTZ
I
L
L LITER
L/h LITERS PER HOUR (OR LITERS/HOUR) L/m LITERS PER MINUTE (OR LITERS/MINUTE) L/s LITERS PER SECOND (OR LITERS/SECOND)
LAT LEAVING AIR TEMPERATURE
LBS/HR POUNDS PER HOUR
LF LINEAR FOOT (FEET)
LGT LEAVING GLYCOL TEMPERATURE
LH LATENT HEAT
LPG LIQUID PROPANE GAS
LPR LOW PRESSURE RETURN (STEAM
CONDENSATE)
LPRC LOW PRESSURE STEAM RETURN (CLEAN)
LLHX LIQUID TO LIQUID HEAT EXCHANGER
LPS LOW PRESSURE SUPPLY (STEAM)
(0-15 PSIG)
LPSC LOW PRESSURE STEAM (CLEAN)
LSD LINEAR SLOT DIFFUSER
LTCP LOCAL TEMPERATURE CONTROL PANEL
LVG LEAVING
LVR LOUVER
LWT LEAVING WATER TEMPERATURE
NOM NOMINAL
NPLV NON-STANDARD PART LOAD VALUE
NPSH NET POSITIVE SUCTION HEAD
NTS NOT TO SCALE
N
NA NOT APPLICABLE
NC NOISE CRITERIA
NG NATURAL GAS
NGFM NATURAL GAS FLOWMETER
NOAA NATIONAL OCEANIC & ATMOSPHERIC
ADMINISTRATION
M
M METER, SI UNIT
M/s METERS PER SECOND
(OR METERS/SECOND)
MA MIXED AIR
MAT MIXED AIR TEMPERATURE
MAU MAKE-UP AIR UNIT
MAV MANUAL AIR VENT
MAX MAXIMUM
MB MIXING BOX
MBH 1000 BTUH
MCA MINIMUM BRANCH CIRCUIT AMPACITY
MERV MINIMUM EFFICIENCY REPORTING VALUE
MH MANHOLE
MHP MOTOR HORSEPOWER
MIN MINIMUM
MM MILLIMETER
MOV MOTOR OPERATED VALVE
MPR MEDIUM PRESSURE RETURN
(STEAM CONDENSATE)
MPS MEDIUM PRESSURE SUPPLY (STEAM)
(16-60 PSIG)
MTD MEAN TEMPERATURE DIFFERENCE
MVD MANUAL VOLUME DAMPER
MZ MULTI-ZONE
P
P PUMP
PA PASCAL
PC PUMPED CONDENSATE
PCF POUNDS PER CUBIC FOOT (FEET)
PD PRESSURE DROP
PF PRE-FILTER
PG PRESSURE GAGE
PGW PROPYLENE GLYCOL-WATER (SOLUTION)
PHC PREHEAT COIL
PPM PARTS PER MILLION
PRS PRESSURE REGULATING (VALVE) STATION
PRV PRESSURE REGULATING VALVE
PSI POUNDS PER SQUARE INCH
PSIA POUNDS PER SQUARE INCH – ABSOLUTE
PSIG POUNDS PER SQUARE INCH – GAGE
PSS PRIMARY SECONDARY SYSTEM
PSV PRESSURE SAFETY VALVE
PTAC PACKAGED TERMINAL AIR CONDITIONER
O
OA OUTSIDE AIR
OAI OUTSIDE AIR INTAKE
OD OUTSIDE DIAMETER
OFM OIL FLOWMETER
OSD ORGANIC SOIL FILTER
Q
Q INTENTIONALLY LEFT BLANK
T&PCV TEMPERATURE AND PRESSURE
CONTROL VALVE
TAB TESTING, ADJUSTING, BALANCE
TD TEMPERATURE DIFFERENCE
TDH TOTAL DYNAMIC HEAD
TDS TOTAL DISSOLVED SOLIDS
TG TRANSFER GRILLE
TP TRAP
TSP TOTAL STATIC PRESSURE
TSTAT THERMOSTAT
TU TERMINAL UNIT
TWU THRU-WALL UNIT
SA SUPPLY AIR
SAD SOUND ATTENUATING DEVICE
SAT SUPPLY AIR TEMPERATURE
SC SHADING COEFFICIENT
SCFM STANDARD CUBIC FEET PER MINUTE
SCR SILICON CONTROLLED RECTIFIER
DSD DUCT SMOKE DETECTOR
SD SMOKE DAMPER
SEN SENSIBLE HEAT
SF SUPPLY FAN
SH STEAM HUMIDIFIER
SHC STEAM HEATING COIL
SI SQUARE INCHES
SP STATIC PRESSURE
SP GR SPECIFIC GRAVITY
SPS STATIC PRESSURE SENSOR
SQ FT SQUARE FOOT (FEET)
SS STAINLESS STEEL
SSHX STEAM TO STEAM HEAT EXCHANGER
SSR SOLID SEPARATOR
ST STEAM TRAP
SUH STEAM UNIT HEATER
SVS STEAM VENT SILENCER
SWHX STEAM TO WATER HEAT EXCHANGER
R
R/E RETURN OR EXHAUST
RA RETURN AIR
RAD REFRIGERANT AIR DRYER
RAF RADIO FREQUENCY
RAHX ROTARY AIR HEAT EXCHANGER
RAT RETURN AIR TEMPERATURE
RCCH REMOTE CONDENSER CHILLER
RCU RECIPROCATING CHILLER UNIT
RD REFRIGERANT DISCHARGE
REA RELIEF AIR
RF RETURN FAN
RH RELATIVE HUMIDITY
RHC REHEAT COIL
RHG REFRIGERANT HOT GAS
RL REFRIGERANT LIQUID LINE
RLA RUN LOAD AMPERE
RO REVERSE OSMOSIS
RPM REVOLUTIONS PER MINUTE
RS REFRIGERANT SUCTION
RTU ROOF TOP UNIT
RV RELIEF VALVE
T
UC UNDER CUT
UH UNIT HEATER
UL UNDERWRITERS LABORATORY
URV UPBLAST UNIT VENTILATOR
U
X INTENTIONALLY LEFT BLANK
W
W WATTS
WAG WASTE ANESTHESIA GAS
Wb WET-BULB (TEMPERATURE)
WC WATER COOLED
WCCH WATER COOLED CHILLER
WCCU WATER COOLED CONDENSING UNIT
WCHP WATER COOLED HEAT PUMPS
WCPU WATER COOLED PACKAGED UNIT
WF WATER FILTER
WFM WATER FLOWMETER
WG WATER GAGE
WPD WATER SIDE PRESSURE DROP
V VALVE
VAF VANE-AXIAL FAN
VAV VARIABLE AIR VOLUME
VD VOLUME DAMPER (MANUAL OPPOSED BLADE)
VFD VARIABLE FREQUENCY DRIVE
VI VIBRATION ISOLATOR
VIV VARIABLE INLET VANES
VP VACUUM PUMP
VPS VARIABLE PRIMARY SYSTEM
VR VACUUM (STEAM CONDENSATE) RETURN
VSD VARIABLE SPEED DRIVE
VUH VERTICAL UNIT HEATER
X
V
GENERAL NOTES:
A. MECHANICAL PLANS AND SECTIONS ARE INTENDED TO ACCURATELY ILLUSTRATE THE
SCOPE OF WORK BUT ARE STILL DIAGRAMMATIC IN NATURE.
B. MECHANICAL DRAWINGS DO NOT SHOW ALL ACCESSORIES TO BE INSTALLED. THE
CONTRACTOR IS RESPONSIBLE FOR ENSURING THAT ALL SYSTEMS ARE FULLY
FUNCTIONAL AND COMPLIANT WITH APPLICABLE CODES.
C. THE EXISTING CONDITIONS DEPICTED IN THESE PLANS ARE BASED ON AS-BUILT
DOCUMENTATION AND INFORMATION OBTAINED FROM FIELD SURVEYS AND ARE AS
ACCURATE AS POSSIBLE. DUE TO OBSTRUCTIONS, CEILINGS, ETC., NOT ALL CONDITIONS
COULD BE VERIFIED. THE CONTRACTOR SHALL SURVEY THE SITE PRIOR TO BID AND
NOTIFY THE ARCHITECT/ENGINEER OF ANY CONFLICTS, OBSTRUCTIONS, OR
INCONSISTENCIES PREVENTING INSTALLATION OF THE MECHANICAL SYSTEM.
D. ALL EXPOSED UNINSULATED PIPING SHALL BE PAINTED PER THE SPECIFICATION SECTION
"PAINTING".
E. COORDINATE FAN COIL (FCU) AND TERMINAL UNIT (TU/VAV/CV) REHEAT COIL RIGHT OR
LEFT HAND COIL CONNECTIONS WITH PIPING PLANS.
F. ALL FLUE AND COMBUSTION AIR PIPING FROM GAS-FIRED EQUIPMENT SHALL BE SIZED BY
THE GAS-FIRED EQUIPMENT MANUFACTURER BASED ON THE SPECIFIC PIPE ROUTING AND
ELEVATIONS FOR THIS PROJECT. REFER TO MANUFACTURERS INSTALLATION MANUAL AND
LOCAL CODE REQUIREMENTS FOR REQUIRED FLUE AND COMBUSTION AIR PIPING
MATERIALS.
G. PROVIDE VIBRATION ISOLATION FOR ALL MECHANICAL EQUIPMENT TO PREVENT
TRANSMISSION OF VIBRATION TO BUILDING STRUCTURE.
H. PROVIDE VIBRATION ISOLATORS FOR ALL PIPING SUPPORTS CONNECTED TO AND WITHIN
50' OF ISOLATED EQUIPMENT (EXCEPT AT BASE ELBOW SUPPORTS AND ANCHOR POINTS)
THROUGHOUT MECHANICAL EQUIPMENT ROOMS. DO THE SAME FOR SUPPORTS OF STEAM
MAINS WITHIN 50' OF BOILER OR PRESSURE REDUCING VALVES.
I. COORDINATE CONSTRUCTION OF ALL MECHANICAL WORK WITH ARCHITECTURAL,
STRUCTURAL, CIVIL, ELECTRICAL WORK, ETC., SHOWN ON OTHER CONTRACT DOCUMENT
DRAWINGS.
J. MAINTAIN A MINIMUM OF 6′-8″ CLEARANCE TO UNDERSIDE OF PIPES, DUCTS, CONDUITS,
SUSPENDED EQUIPMENT, ETC., THROUGHOUT ACCESS ROUTES IN MECHANICAL ROOMS.
K. ALL TESTS SHALL BE COMPLETED BEFORE ANY MECHANICAL EQUIPMENT OR PIPING
INSULATION IS APPLIED.
L. LOCATE ALL TEMPERATURE, PRESSURE, AND FLOW MEASURING DEVICES IN ACCESSIBLE
LOCATIONS WITH STRAIGHT SECTION OF PIPE OR DUCT UP AND DOWNSTREAM AS
RECOMMENDED BY THE MANUFACTURER FOR GOOD ACCURACY.
M. COORDINATE ALL EQUIPMENT CONNECTIONS WITH MANUFACTURERS CERTIFIED
DRAWINGS. COORDINATE AND PROVIDE ALL DUCT AND PIPING TRANSITIONS REQUIRED
FOR FINAL EQUIPMENT CONNECTIONS TO FURNISHED EQUIPMENT. FIELD VERIFY AND
COORDINATE ALL DUCT AND PIPING DIMENSIONS BEFORE FABRICATION.
CWR
CWS
CD
LPC
LPS
MPC
MPS
HPC
HPS
CONDENSATE DRAIN
CONDENSER WATER SUPPLY
CONDENSER WATER RETURN
HIGH PRESSURE STEAM CONDENSATE
HIGH PRESSURE STEAM SUPPLY
MEDIUM PRESSURE STEAM CONDENSATE
MEDIUM PRESSURE STEAM SUPPLY
LOW PRESSURE STEAM CONDENSATE
LOW PRESSURE STEAM SUPPLY
VACUUM RETURN
FEEDWATER PUMP DISCHARGE
FEEDWATER PUMP SUCTION
VR
CONTINUOUS BLOWDOWN
CHEMICAL FEED
BOILER BLOWOFF BO
CF
CBD
FWPD
FWPS
A. PROVIDE ALL MATERIALS AND EQUIPMENT AND PERFORM ALL LABOR REQUIRED TO
INSTALL COMPLETE AND OPERABLE PIPING SYSTEMS AS INDICATED ON THE DRAWINGS, AS
SPECIFIED AND AS REQUIRED BY CODE.
B. ELEVATIONS AS SHOWN ON THE DRAWINGS ARE TO THE CENTERLINE OF ALL PRESSURE
PIPING AND TO THE INVERT OF ALL GRAVITY PIPING.
C. UNLESS OTHERWISE NOTED, ALL CHILLED WATER AND HEATING WATER PIPING SHALL BE
3/4" SIZE (EDIT SYSTEM TYPE OR PIPE SIZE TO SUIT PROJECT REQUIREMENTS).
D. PROVIDE AN AIR VENT AT THE HIGH POINT OF EACH DROP IN THE HEATING WATER, CHILLED
WATER, AND OTHER CLOSED WATER PIPING SYSTEMS (EDIT SYSTEM TYPES TO SUIT
PROJECT REQUIREMENTS). ALL PIPING SHALL GRADE TO LOW POINTS. PROVIDE HOSE END
DRAIN VALVES AT THE BOTTOM OF ALL RISERS AND LOW POINTS.
E. UNLESS OTHERWISE NOTED, ALL PIPING IS OVERHEAD, TIGHT TO UNDERSIDE OF
STRUCTURE OR SLAB, WITH SPACE FOR INSULATION IF REQUIRED.
F. INSTALL PIPING SO THAT ALL VALVES, STRAINERS, UNIONS, TRAPS, FLANGES, AND OTHER
APPURTENANCES REQUIRING ACCESS ARE ACCESSIBLE.
H. ALL VALVES SHALL BE INSTALLED SO THAT VALVE REMAINS IN SERVICE WHEN EQUIPMENT
OR PIPING ON EQUIPMENT SIDE OF VALVE IS REMOVED.
I. ALL BALANCING VALVES AND BUTTERFLY VALVES SHALL BE PROVIDED WITH POSITION
INDICATORS AND MAXIMUM ADJUSTABLE STOPS (MEMORY STOPS).
J. PROVIDE CHAINWHEEL OPERATORS FOR ALL VALVES IN EQUIPMENT ROOMS MOUNTED
GREATER THAN 7′-0″ ABOVE FLOOR LEVEL; CHAIN SHALL EXTEND TO 7′-0″ ABOVE FLOOR
LEVEL.
K. ALL VALVES (EXCEPT CONTROL VALVES) AND STRAINERS SHALL BE FULL SIZE OF PIPE
BEFORE REDUCING SIZE TO MAKE CONNECTIONS TO EQUIPMENT AND CONTROLS.
L. UNIONS AND/OR FLANGES SHALL BE INSTALLED AT EACH PIECE OF EQUIPMENT, IN
BYPASSES, AND IN LONG PIPING RUNS (100' OR MORE) TO PERMIT DISASSEMBLY FOR
ALTERATION AND REPAIRS.
M. PITCH STEAM PIPING DOWNWARD IN THE DIRECTION OF FLOW 1/4" IN 10' (1" IN 40') MINIMUM.
PITCH ALL STEAM RETURN LINES DOWNWARD IN THE DIRECTION OF CONDENSATE FLOW
1/2" PER 10' (1" IN 20') MINIMUM. WHERE LENGTH OF BRANCH LINES ARE LESS THAN 8', PITCH
BRANCH LINES TOWARD MAINS 1/2" PER FOOT MINIMUM.
N. PITCH UP ALL STEAM AND CONDENSATE RUNOUTS TO RISERS AND EQUIPMENT 1/2" PER
FOOT. WHERE THIS PITCH CANNOT BE OBTAINED, RUNOUTS OVER 8' IN LENGTH SHALL BE
ONE SIZE LARGER THAN NOTED.
O. TAP ALL BRANCH LINES FROM TOP OF STEAM MAINS (45° PREFERRED, 90° ACCEPTABLE).
A. PROVIDE ALL MATERIALS AND EQUIPMENT AND PERFORM ALL LABOR REQUIRED TO
INSTALL COMPLETE AND OPERABLE HVAC SYSTEMS AS INDICATED ON THE DRAWINGS, AS
SPECIFIED AND AS REQUIRED BY CODE.
B. CERTAIN ITEMS SUCH AS RISES AND DROPS IN DUCTWORK, ACCESS DOORS, VOLUME
DAMPERS, ETC., ARE INDICATED ON THE CONTRACT DOCUMENT DRAWINGS FOR CLARITY
FOR A SPECIFIC LOCATION REQUIREMENT AND SHALL NOT BE INTERPRETED AS THE
EXTENT OF THE REQUIREMENTS FOR THESE ITEMS.
C. IN CORRIDORS WHERE CEILING SPEAKERS AND AIR DIFFUSERS ARE INDICATED BETWEEN
THE SAME LIGHT FIXTURES, INSTALL BOTH DEVICES AT THE QUARTER POINTS BETWEEN
THE SAME FIXTURE.
D. UNLESS OTHERWISE SHOWN, LOCATE ALL ROOM THERMOSTATS AND HUMIDISTATS 4′-0″
(CENTERLINE) ABOVE FINISHED FLOOR.
E. ALL DUCTWORK SHALL CLEAR DOORS AND WINDOWS.
F. ALL DUCTWORK DIMENSIONS, AS SHOWN ON THE DRAWINGS, ARE INTERNAL CLEAR
DIMENSIONS AND DUCT SIZE SHALL BE INCREASED TO COMPENSATE FOR DUCT LINING
THICKNESS.
G. PROVIDE ALL 90° SQUARE ELBOWS WITH DOUBLE RADIUS TURNING VANES UNLESS
OTHERWISE INDICATED. ELBOWS IN DISHWASHER, KITCHEN, AND LAUNDRY EXHAUST
SHALL BE UNVANED SMOOTH RADIUS CONSTRUCTION WITH A RADIUS EQUAL TO 1.5 TIMES
THE WIDTH OF THE DUCT. PROVIDE ACCESS DOORS UPSTREAM OF ALL ELBOWS WITH
TURNING VANES.
H. COORDINATE DIFFUSER, REGISTER, AND GRILLE LOCATIONS WITH ARCHITECTURAL
REFLECTED CEILING PLANS, LIGHTING, AND OTHER CEILING ITEMS AND MAKE MINOR DUCT
MODIFICATIONS TO SUIT.
I. FIELD ERECTED AND FACTORY ASSEMBLED AIR HANDLING UNIT COILS SHALL BE
ARRANGED FOR REMOVAL FROM THE UPSTREAM SIDE WITHOUT DISMANTLING SUPPORTS.
PROVIDE GALVANIZED STRUCTURAL STEEL SUPPORTS FOR ALL COILS (EXCEPT LOWEST
COIL) IN BANKS OVER TWO COILS HIGH TO PERMIT INDEPENDENT REMOVAL OF ANY COIL.
J. ALL AIR HANDLING UNITS SHALL OPERATE WITHOUT MOISTURE CARRYOVER.
K. LOCATE ALL MECHANICAL EQUIPMENT (SINGLE DUCT, DUAL DUCT, VARIABLE VOLUME,
CONSTANT VOLUME AND FAN POWERED BOXES, FAN COIL UNITS, CABINET HEATERS, UNIT
HEATERS, UNIT VENTILATORS, COILS, STEAM HUMIDIFIERS, ETC.) FOR UNOBSTRUCTED
ACCESS TO UNIT ACCESS PANELS, CONTROLS AND VALVING.
L. PROVIDE FLEXIBLE CONNECTIONS IN ALL DUCTWORK SYSTEMS (SUPPLY, RETURN, AND
EXHAUST) CONNECTED TO AIR HANDLING UNITS, FANS, AND OTHER EQUIPMENT WHICH
REQUIRE VIBRATION ISOLATION. FLEXIBLE CONNECTIONS SHALL BE PROVIDED AT THE
POINT OF CONNECTION TO THE EQUIPMENT UNLESS OTHERWISE INDICATED.
PIPING GENERAL NOTES: HVAC/SHEET METAL GENERAL NOTES:
EXISTING TO BE DEMOLISHED
LIMIT OF DEMOLITION
CONNECT NEW TO EXISTINGEXISTING TO REMAIN
NEW DUCT (INSIDE DIMENSIONS: W" X D")
RS
RL
REFRIGERANT SUCTION
REFRIGERANT LIQUID
SUPPLY AIR DUCT UP
SUPPLY AIR DUCT DOWN
H
T
H
T
26-P-3
MH-100
PUMP NO. 3 IN BUILDING NO. 26
EQUIPMENT ABBREVIATION (PUMP)
DETAIL NUMBER
SHEET NUMBER
SHEET NUMBER
SECTION NUMBER
THERMOSTAT
HUMIDISTAT
TEMPERATURE SENSOR
HUMIDITY SENSOR
BUILDING NUMBER WHERE EQUIPMENT
IS LOCATED
26-TU-1-1
ITEM NUMBER (TERMINAL UNIT NO. 1)
ITEM (TERMINAL UNIT)
BUILDING NUMBER WHERE EQUIPMENT
IS LOCATED
SERVED BY AIR HANDLER UNIT NO. 1
TERMINAL UNIT TAG
MECHANICAL EQUIPMENT TAG
1 OWNER FURNISHED, CONTRACTOR
INSTALLED EQUIPMENT DESIGNATION
EXISTING TO BE DEMOLISHED
EXISTING TO REMAIN
NEW PIPE
CONNECT NEW TO EXISTING
LIMIT OF DEMOLITION
GENERAL PIPING SYMBOLS
GENERAL ANNOTATIONS
AV
STRAINERFLOAT & THERMOSTATIC
STEAM TRAP
INVERTED BUCKET
STEAM TRAP
FLANGE CONNECTION PIPE DROP
PIPE RISER TEE DOWN
TEE UP
UNION
PRESSURE REDUCING
VALVE
BALL VALVE
ANGLE GLOBE VALVE
SAFETY RELIEF VALVE
GLOBE VALVE
MANUAL OR
AUTOMATIC AIR VENT
EXPANSION JOINT
EJ
PRESSURE AND
TEMPERATURE TEST PLUG
QUICK-COUPLE HOSE
CONNECTOR
FLOW METER
HVAC PIPING SYMBOLS
CHILLED WATER RETURN
CHILLED WATER SUPPLY
CHR
CHS
HEATING HOT WATER RETURN
HEATING HOT WATER SUPPLY
HHR
HHS QV CRYOGEN VENT
DR DRIP RETURN
CAP
REDUCER (ECCENTRIC)
TYPE
AIRFLOW (CFM)
SD-1
TYPE
AIRFLOW (CFM)
RG-1
TYPE
AIRFLOW (CFM)
EG-1
SQUARE TO ROUND TRANSITION
ELBOW WITH TURNING
VANES
ROUND ELBOW
EXHAUST, RELIEF, MAKE UP, OR
OUTSIDE AIR DUCT DOWN
EXHAUST, RELIEF, MAKE UP, OR
OUTSIDE AIR DUCT UP
RETURN DUCT DOWN
RETURN DUCT UP
BRANCH DUCT WITH HIGH EFFICIENCY
TAKE-OFF (HETO) BRANCH FITTING &
MANUAL VOLUME DAMPER
BRANCH DUCT WITH CONICAL
FITTING & MANUAL VOLUME
DAMPER
DAMPERS: (BD, FD, FSD, MD, SD, VD)
BD
XX-XX
ANCHOR
TEEDIRECTION OF FLOW
S
N. CONCRETE HOUSEKEEPING PADS TO SUIT MECHANICAL EQUIPMENT SHALL BE SIZED AND
LOCATED BY THE MECHANICAL CONTRACTOR. MINIMUM CONCRETE PAD THICKNESS SHALL
BE 4". PAD SHALL EXTEND BEYOND THE EQUIPMENT A MINIMUM OF 4" ON EACH SIDE.
CONCRETE HOUSEKEEPING PADS SHALL BE PROVIDED BY THE GENERAL CONTRACTOR. IT
SHALL BE THE RESPONSIBILITY OF THE MECHANICAL CONTRACTOR TO COORDINATE SIZE
AND LOCATION OF CONCRETE HOUSEKEEPING PADS.
O. WHEN MECHANICAL WORK (HVAC, PLUMBING, SHEET METAL, ETC.) IS SUB-CONTRACTED, IT
SHALL BE THE MECHANICAL CONTRACTOR’S RESPONSIBILITY TO COORDINATE
SUBCONTRACTORS AND THE ASSOCIATED CONTRACTS. WHEN DISCREPANCIES ARISE
PERTAINING TO WHICH CONTRACTOR PROVIDES A PARTICULAR ITEM OF THE MECHANICAL
CONTRACT OR WHICH CONTRACTOR PROVIDES FINAL CONNECTIONS FOR A PARTICULAR
ITEM OF THE MECHANICAL CONTRACT, IT SHALL BE BROUGHT TO THE ATTENTION OF THE
MECHANICAL CONTRACTOR, WHOSE DECISION SHALL BE FINAL.
P. THE LOCATIONS OF ALL ITEMS SHOWN ON THE DRAWINGS OR CALLED FOR IN THE
SPECIFICATIONS THAT ARE NOT DEFINITELY FIXED BY DIMENSIONS ARE APPROXIMATE
ONLY. THE EXACT LOCATIONS NECESSARY TO SECURE THE BEST CONDITIONS AND
RESULTS MUST BE DETERMINED BY THE PROJECT SITE CONDITIONS AND SHALL HAVE THE
APPROVAL OF THE ENGINEER BEFORE BEING INSTALLED. DO NOT SCALE DRAWINGS.
Q. ALL MISCELLANEOUS STEEL REQUIRED TO ENSURE PROPER INSTALLATION AND AS SHOWN
IN DETAILS FOR PIPING, DUCTWORK, AND EQUIPMENT (UNLESS OTHERWISE NOTED) SHALL
BE FURNISHED AND INSTALLED BY THE MECHANICAL CONTRACTOR.
R. PROVIDE ACCESS PANELS FOR INSTALLATION IN WALLS AND CEILINGS WHERE REQUIRED
TO SERVICE DAMPERS, VALVES, SMOKE DETECTORS, AND OTHER CONCEALED
MECHANICAL EQUIPMENT.
S. ALL DUCTWORK, PIPING AND EQUIPMENT SUPPORTED FROM STRUCTURAL STEEL SHALL
BE COORDINATED WITH GENERAL CONTRACTOR. ALL ATTACHMENTS TO STEEL BAR
JOISTS, TRUSSES, OR JOIST GIRDERS SHALL BE AT PANEL POINTS. PROVIDE BEAM CLAMPS
MEETING MSS STANDARDS.WELDING TO STRUCTURAL MEMBERS SHALL NOT BE
PERMITTED. THE USE OF C-CLAMPS SHALL NOT BE PERMITTED.
T. ALL ROOF MOUNTED EQUIPMENT CURBS FOR EQUIPMENT PROVIDED BY THE MECHANICAL
CONTRACTOR SHALL BE FURNISHED BY THE MECHANICAL CONTRACTOR. COORDINATE
INSTALLATION WITH GENERAL CONTRACTOR.
U. LOCATIONS AND SIZES OF ALL FLOOR, WALL, AND ROOF OPENINGS SHALL BE
COORDINATED WITH ALL OTHER TRADES INVOLVED.
V. ALL OPENINGS IN FIRE WALLS DUE TO DUCTWORK, PIPING, CONDUIT, ETC., SHALL BE FIRE
STOPPED WITH AN APPROVED FIRE STOPPING MATERIAL.
W. ALL AIR CONDITIONING CONDENSATE DRAIN LINES FROM EACH AIR HANDLING UNIT AND
ROOFTOP UNIT SHALL BE PIPED FULL SIZE OF THE UNIT DRAIN OUTLET, WITH P-TRAP, AND
PIPED TO NEAREST DRAIN. SEE DETAILS AND SPECIFICATIONS FOR DEPTH OF AIR
CONDITIONING CONDENSATE TRAP.
X. REFER TO TYPICAL DETAILS FOR DUCTWORK, PIPING, AND EQUIPMENT INSTALLATION.
P. PROVIDE AN END OF MAIN DRIP AT EACH RISE IN THE STEAM MAIN. PROVIDE CONDENSATE
DRIPS AT THE BOTTOM OF ALL STEAM RISERS, DOWNFED RUNOUTS TO EQUIPMENT,
RADIATORS, ETC., AT END OF MAINS AND LOW POINTS, AND AHEAD OF ALL PRESSURE
REGULATORS, CONTROL VALVES, ISOLATION VALVES, AND EXPANSION JOINTS.
Q. ON STRAIGHT STEAM PIPING RUNS WITH NO NATURAL DRAINAGE POINTS, INSTALL DRIP
LEGS AT INTERVALS NOT EXCEEDING 200' WHERE PIPE IS PITCHED DOWNWARD IN THE
DIRECTION OF STEAM FLOW AND A MAXIMUM OF 100' WHERE THE PIPE IS PITCHED UP SO
THAT CONDENSATE FLOW IS OPPOSITE OF STEAM FLOW.
R. STEAM TRAPS SHALL BE MINIMUM 3/4″ IN SIZE.
S. INSTALL ALL PIPING WITHOUT FORCING OR SPRINGING.
T. ALL PIPING SHALL CLEAR DOORS AND WINDOWS.
U. ALL VALVES SHALL BE ADJUSTED FOR SMOOTH AND EASY OPERATION.
V. ALL PIPING WORK SHALL BE COORDINATED WITH ALL TRADES INVOLVED. OFFSETS IN
PIPING AROUND OBSTRUCTIONS SHALL BE PROVIDED AT NO ADDITIONAL COST TO THE
OWNER.
W. PROVIDE FLEXIBLE CONNECTIONS IN ALL PIPING SYSTEMS CONNECTED TO PUMPS,
CHILLERS, COOLING TOWERS, AND OTHER EQUIPMENT WHICH REQUIRE VIBRATION
ISOLATION EXCEPT WATER COILS. FLEXIBLE CONNECTIONS SHALL BE PROVIDED AS CLOSE
TO THE EQUIPMENT AS POSSIBLE OR AS INDICATED ON THE DRAWINGS.
X. PROVIDE LINE SIZE STRAINER UPSTREAM OF EACH AUTOMATIC VALVE. PROVIDE SHUTOFF
VALVE ON EACH SIDE OF STRAINER.
Y. PROVIDE PERMANENT FILTER DRYERS IN LOW TEMPERATURE SYSTEMS AND SYSTEMS
USING HERMETIC COMPRESSORS.
Z. PROVIDE REPLACEABLE CARTRIDGE FILTER DRYERS WITH THREE-WAY VALVE BYPASS A
ASSEMBLY FOR SOLENOID VALVES, ADJACENT TO RECEIVERS.
M. RUNS OF FLEXIBLE DUCT SHALL NOT EXCEED 5' MAXIMUM LENGTH.
N. UNLESS OTHERWISE NOTED, ALL DUCTWORK IS OVERHEAD, TIGHT TO
THE UNDERSIDE OF THE STRUCTURE, WITH SPACE FOR INSULATION IF
REQUIRED.
O. ALL DUCTWORK SHALL BE COORDINATED WITH ALL TRADES INVOLVED.
OFFSETS IN DUCTS, INCLUDING DIVIDED DUCTS AND TRANSITIONS
AROUND OBSTRUCTIONS, SHALL BE PROVIDED AT NO ADDITIONAL COST
TO THE OWNER.
P. PROVIDE ACCESS DOORS IN DUCTWORK TO PROVIDE ACCESS FOR ALL
SMOKE DETECTORS, FIRE DAMPERS, SMOKE DAMPERS, VOLUME
DAMPERS, HUMIDIFIERS, COILS, AND OTHER ITEMS LOCATED IN THE
DUCTWORK WHICH REQUIRE SERVICE AND/OR INSPECTION.
Q. PROVIDE ACCESS DOORS IN DUCTWORK FOR OPERATION,
ADJUSTMENT, AND MAINTENANCE OF ALL FANS, VALVES, AND
MECHANICAL EQUIPMENT.
R. ALL DUCTS SHALL BE GROUNDED ACROSS FLEXIBLE CONNECTIONS
WITH FLEXIBLE COPPER GROUNDING STRAPS. GROUNDING STRAPS
SHALL BE BOLTED OR SOLDERED TO BOTH THE EQUIPMENT AND THE
DUCT.
S. SMOKE DETECTORS SHALL BE FURNISHED AND WIRED BY THE
ELECTRICAL CONTRACTOR. THE MECHANICAL CONTRACTOR SHALL BE
RESPONSIBLE FOR MOUNTING THE SMOKE DETECTOR IN DUCTWORK
AS SHOWN ON THE DRAWINGS AND IN ACCORDANCE WITH
MANUFACTURER’S PRINTED INSTRUCTIONS.
T. SEE SPECIFICATIONS FOR DUCTWORK GAUGES, BRACING, HANGERS,
AND OTHER REQUIREMENTS.
DIRECTION OF PIPE
PITCH (DOWN)
FM
MV
HVAC VALVE SYMBOLS
PC PUMPED CONDENSATE
ROOM TAG
FLEXIBLE CONNECTOR
PUMP
REDUCER (CONCENTRIC)
GATE VALVE
BUTTERFLY VALVE
CHECK VALVE
THERMOMETER
PRESSURE GAUGE
STRAINER WITH BLOWOFF
AND HOSE CONNECTION
YR YEAR
Y
Z INTENTIONALLY LEFT BLANK
Z
M
CONTROL VALVE
CONTROL VALVE, THREE WAY
MOTOR CONTROLLED
VALVE
M
M
Name
DEMOLITION GENERAL NOTES:
A. VERIFY EXISTING CONDITIONS PRIOR TO BEGINNING WORK. NOTIFY
GENERAL CONTRACTOR REGARDING CONFLICTS BEFORE
PROCEEDING WITH WORK.
B. VERIFY SIZE AND LOCATION OF EXISTING UTILITIES PRIOR TO START
OF DEMOLITION. RELOCATE, REMOVE AND ADJUST MECHANICAL AND
ELECTRICAL ITEMS AS NECESSARY TO COORDINATE WITH NEW WORK.
C. AFTER DEMOLITION IS COMPLETE, PATCH AND REPAIR FINISHES TO
MATCH EXISTING CONDITIONS.
D. COORDINATE DEMOLITION WITH GENERAL CONTRACTOR. NOTIFY
GENERAL CONTRACTOR AND OWNER IF A SHUDTOWN OF UTILITIES IS
REQUIRED.
E. PROTECT EXISTING UTILITIES TO REMAIN FROM DAMAGE DURING
DEMOLITION.
F. TEMPORARILY MOVE OR TAKE EQUIPMENT OUT OF SERVICE AS
NECESSARY TO COMPLETE WORK.
G. CONTRACTOR SHALL VERIFY EXISTING AIRFLOW CONDITIONS OF ALL
TERMINAL UNITS PRIOR TO PROJECT START. RETURN 'NOT IN SCOPE'
PROJECT AREAS TO PRE EXISTING CONDITIONS UPON COMPLETION
OF PROJECT.
th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t o n e e ig h th in c h o n e fo o t
A
B
C
D
E
F
Veterans Health
Administration
VA FORM 08-6231
Drawing Title Project Title
Location
Date Checked Drawn
Project Number
CONSULTANTS:
Drawing # OF
VA Health Care System Approval:
ARCHITECT:
SPUR DESIGN, LLC
312 SW 25TH STREET
Oklahoma City, OK 73109
(405) 842-6100
SPUR DESIGN
11020 KING STREET, SUITE 350
OVERLAND PARK, KS 66210
(913) 369-7200
The information on this document is preliminary or incomplete, not for construction, recording purposes, or implementation.
FULLY SPRINKLERED
1 2 3 4 5 6 7 8 9
1 2 3 4 5 6 7 8 9
A
B
C
D
E
F
STAMP:
Drawing Number
Building Number
KS
KS
ARCH REG. NO.
ENGR REG. NO.
EXP. 12/31/2021
EXP. 12/31/2021
A-930, E-2586, CIVIL ENGINEER
H2B, INC.
1225 N. LOOP WEST, SUITE 800
HOUSTON, TX 77008
(713) 864-2900
MECHANICAL ENGINEER
ELECTRICAL ENGINEER
PLUMBING ENGINEER
FIRE PROTECTION ENGINEER
POOLE FIRE PROTECTION
19910 WEST 161ST STREET
OLATHE, KANSAS 66062
(913) 829-8650 ROBERT J. DOLE VA MEDICAL CENTER
SPUR #: 1794.08
/2
/2
:2
:4
P
M
MECHANICAL LEGEND AND ABBREVIATIONS
RDC 48 88CSC
ISSUED FOR CONSTRUCTION
ELECTRONIC HEALTH RECORD
MODERNIZATION (EHRM)
ADMINISTRATIVE SPACE
01/28/2022
589A7-21-702
5500 EAST KELLOGG AVENUE
WICHITA, KANSAS 67218
M-000
No. REVISION DESCRIPTION DATE
61-FTU-1-16
61-FTU-1-12
61-FTU-1-20
61-FTU-1-28
61-FTU-1-22
61-FTU-1-26
61-FTU-1-17
61-FTU-1-8
61-FTU-1-18
61-FTU-1-21
61-FTU-1-19
61-FTU-1-29
61-FTU-1-6
61-FTU-1-10
61-FTU-1-5
61-FTU-1-9
61-FTU-1-15
61-FTU-1-11
61-FTU-1-23
61-FTU-1-24
61-FTU-1-13
61-FTU-1-14
61-FTU-1-7
61-FTU-1-1
61-FTU-1-2
61-FTU-1-3
61-FTU-1-4
2" HHR
2" HHS
2" HHR
1" HHS
3/4" HHS
3/4" HHR
1" HHR
1" HHS
61-FTU-1-253/4" HHR
3/4" HHS
2" HHS
1" HHR
1" HHR1" HHS
2" HHS
1 1/4" HHR
2" HHS
1 1/4" HHR
2" HHS
1 1/2" HHR
2" HHS
2" HHR
61-FTU-1-27
3/4" HHS
3/4" HHR
3/4" HHS 3/4" HHR
3/4" HHR
3/4" HHS
3/4" HHS3/4" HHR
3/4" HHS3/4" HHR
3/4" HHS
3/4" HHR
3/4" HHS
3/4" HHR
3/4" HHR 3/4" HHS
3/4" HHS
3/4" HHR3/4" HHR
3/4" HHS
3/4" HHS 3/4" HHR
3/4" HHS 3/4" HHR3/4" HHS
3/4" HHR
3/4" HHR
3/4" HHS
3/4" HHS
3/4" HHR3/4" HHR
3/4" HHS
3/4" HHS
3/4" HHR
3/4" HHR
3/4" HHS
3/4" HHS
3/4" HHR
3/4" HHS
1" HHR
3/4" HHR
3/4" HHS
3/4" HHR
3/4" HHS
3/4" HHR
3/4" HHS
2" HHR
2" HHS
2" HHR
2" HHS
2" HHR
1 1/2" HHS
2" HHR
2" HHS
3/4" HHR
3/4" HHS
3/4" HHS
3/4" HHR
3/4" HHR
3/4" HHS
3/4" HHR
3/4" HHS
3/4" HHS
3/4" HHR
3/4" HHS
3/4" HHR
3/4" HHR 3/4" HHS
3/4" HHR
3/4" HHS
1" HHR
3/4" HHS
3/4" HHS
3/4" HHR
3/4" HHR
3/4" HHS
3/4" HHR
3/4" HHS
A
B C D E F G
D4
D4
D4
D4 D4
D4
D4
D4
D4
D4
D4
D4
D4
61 AHU-1
3" CHR
3" CHS
6" CHR
3" LPC
3" LPS
3" HHS 3" HPS
3" HHR
FILTER RACK TO
BE DEMOLISHED
3" LPC
3" LPS
5" CHS
AFM-2
AFM-1
AFM-3
3" LPS
1 1/2" LPC
D13
D14
BUILDING 61 KEY PLAN - GROUND FLOOR
PHASE 2
RENOVATED
TRAINING AND
OFFICE SPACE
N
PHASE 2
RENOVATED
OFFICE SPACE
OUT OF SCOPE
PHASE 1
RESTROOMS
th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t o n e e ig h th in c h o n e fo o t
A
B
C
D
E
F
Veterans Health
Administration
VA FORM 08-6231
Drawing Title Project Title
Location
Date Checked Drawn
Project Number
CONSULTANTS:
Drawing # OF
VA Health Care System Approval:
ARCHITECT:
SPUR DESIGN, LLC
312 SW 25TH STREET
Oklahoma City, OK 73109
(405) 842-6100
SPUR DESIGN
11020 KING STREET, SUITE 350
OVERLAND PARK, KS 66210
(913) 369-7200
The information on this document is preliminary or incomplete, not for construction, recording purposes, or implementation.
FULLY SPRINKLERED
1 2 3 4 5 6 7 8 9
1 2 3 4 5 6 7 8 9
A
B
C
D
E
F
STAMP:
Drawing Number
Building Number
KS
KS
ARCH REG. NO.
ENGR REG. NO.
EXP. 12/31/2021
EXP. 12/31/2021
A-930, E-2586, CIVIL ENGINEER
H2B, INC.
1225 N. LOOP WEST, SUITE 800
HOUSTON, TX 77008
(713) 864-2900
MECHANICAL ENGINEER
ELECTRICAL ENGINEER
PLUMBING ENGINEER
FIRE PROTECTION ENGINEER
POOLE FIRE PROTECTION
19910 WEST 161ST STREET
OLATHE, KANSAS 66062
(913) 829-8650 ROBERT J. DOLE VA MEDICAL CENTER
SPUR #: 1794.08
/2
/2
:3
:0
P
M
MECHANICAL PIPING DEMOLITION PLAN -
GROUND LEVEL
RDC 49 88CSC
ISSUED FOR CONSTRUCTION
ELECTRONIC HEALTH RECORD
MODERNIZATION (EHRM)
ADMINISTRATIVE SPACE
01/28/2022
589A7-21-702
5500 EAST KELLOGG AVENUE
WICHITA, KANSAS 67218
MD101
N
1/8" = 1'-0"
MECHANICAL PIPING DEMOLITION PLAN - GROUND LEVEL1
DEMOLITION KEYNOTES
D4 DEMOLISH EXISTING HEATING WATER SUPPLY AND RETURN BRANCH PIPING BACK TO DEMARCATION POINT AND CAP TEE AT MAIN. REFER TO MD101
FOR DEMOLITION OF TERMINAL UNIT.
D13 DEMOLISH EXISTING AHU-1, ASSOCIATED SUPPLY AIR DUCT, CONDENSATE PUMP, FILTERS, AND ASSOCIATED ACCESSORIES TO PREPARE SPACE FOR
INSTALLATION OF NEW AHU.
D14 DEMOLISH EXISTING CHILLED WATER, STEAM, VENT, CONDENSATE LINES AND ACCESSORIES ASSOCIATED WITH EXISTING GROUND FLOOR AIR HANDLING UNIT AS NECESSARY. REROUTE CONNECTIONS TO FROM MAINS TO LINES SERVING FIRST FLOOR AIR HANDLING UNIT AS NECESSARY.
PREPARE SPACE FOR INSTALLATION OF NEW GROUND FLOOR AIR HANDLING UNIT.
SD
VD
VD
VD
VD
VD
VD
VD
SD
SD
61-FTU-1-8
61-FTU-1-21
61-FTU-1-18
61-FTU-1-17
61-FTU-1-20
61-FTU-1-28
61-FTU-1-22
61-FTU-1-23
61-FTU-1-27
61-FTU-1-26
"x
S A
"x
S A
18"x5" RA18"x5" RA
"x
R A
"x
R A
24"x10" RA
"x
R A
"x
R A
"x
R A
"x
S A
12"ø SA
16"x12" SA
10"x8" RA 10"x8" RA10"x8" RA 24"x4" RA
10"ø SA
10"ø SA
6"ø SA
8"ø SA
16"x12" SA
10"ø SA
10"ø SA
61-FTU-1-24
"x
S A
"x
S A
16"x12" SA
12"ø SA
7"ø SA
6"ø SA
12"x5" RA
12"x5" RA
"x
R A
"x
R A
61-FTU-1-19
61-FTU-1-29
30"x12" SA
48"x14" RA
"x
8" R
A
"x
S A48
"x
R
A
48"x14" RA
30"x12" SA
84"x16" RA
"x
R A
"x
S A
6"ø SA
61-FTU-1-6
61-FTU-1-10
10"ø SA
10"ø SA
6"ø SA
10"ø SA
12"ø SA
61-FTU-1-12
24"x4" RA
8"ø SA
7"ø SA
61-FTU-1-14
61-FTU-1-13
12"x14" RA
24"x4" RA
7"ø SA
61-FTU-1-5
24"x8" RA
24"x4" RA
6"ø SA
61-FTU-1-9
7"ø SA
61-FTU-1-4
14"x7" RA
14"x7" RA
12"x7" RA
12"x7" RA
61-FTU-1-3
8"ø SA
7"ø SA
61-FTU-1-2
61-FTU-1-1
8"ø SA
"x
S A
72"x24" OA
61-FTU-1-25
61-FTU-1-15
12"ø SA
10"ø SA
61-FTU-1-7
61-FTU-1-11
44"x32" RA UP TO
FIRST FLOOR
MECHANICAL ROOM
61-FTU-1-16
A
B C D E F G
D1
D1
D1
D1
D1 D1
D1
D1
D1
D1
D1
D1
D1
D1
D2
EXISTING AIR DEVICE TO
BE DEMOLISHED (TYP)
D3
FILTER RACK
TO BE
DEMOLISHED
MIXED AIR DUCT
DOWN FROM
FLOOR ABOVE
SUPPLY AIR
PLENUM TO BE
DEMOLISHED
61 AHU-1
10"ø SA
8"ø SA
8"ø SA
6"ø SA
6"ø SA
D2
OFFICE
005B
OFFICE
OFFICE
OFFICE
005A
STORAGE
OFFICE
008E
OFFICE
008D
REGIONAL
OFFICE
DIRECTOR
DIRECTOR
OFFICE
008B
CONFERENCE
ROOM
OFFICE 006
[FUTURE TELECOM]
OFFICE
008D
OFFICE
005C
STORAGE
CANTEEN
STORAGE
ELECTRICAL
LOADING DOCK
MECHANICAL
015A
015B
CUH-2
CUH-1
CUH-3
UH-2
6"ø SA
AFM-2
AFM-3AFM-1
8"x10" SA
12"x12" SA 10"ø SA
24"x14" RA
8"x10" SA 10"x14" SA
8"x8" SA
12"x10" SA
12"x10" SA
8"x10" SA
14"x12" SA
8"x10" SA
12"x10" SA
24"x8"
8"x10" SA
6"x10" SA
12"x10" SA
10"x10" SA
14"x10" SA
"x
8" R
A
8"x10" SA
8"x10" SA
10"x10" SA
24"x10" RA
12"x12" SA
10"x10" SA
10"x10" SA
22"x10" SA
8"x10" SA
14"x10" SA
8"x10" SA
8"x10" SA 8"x10" SA
6"x8" SA
12"x10" SA
12"x8" SA
12"x5" RA
6"x8" SA
12"x10" SA
14"x12" EA
8"x4" EA
8"x6" EA
6"ø SA
12"x12" SA6"ø SA
24"x14" RA
10"x12" SA
14"x12" SA
20"x14" SA
10"x12" SA
12"x12" SA 10"x10" SA
8"x8" SA
8"x8" SA
10"x10" SA
"x
8" R
A
"x
8" R
A
"x
8" R
A
24"x8" RA
"x
8" R
A
"x 8"
R A
"x
8" R
A
24"x10" RA
10"x10" SA
10"ø RA
24"x12" RA
8"x8" SA
D5
D5
D5
D5
D5 D8
D7
D7
D7
D7
D7
D7
D7
D7
D7
D7
D7
D7
D6
D6
D6
D6
D6
D6
D6
D6
D6
D6
D6
D6
D6
D6
D6
8"x10" SA
6"x6" SA
6"x6" SA
6"x8" SA
10"x8" SA
14"x10" SA12"x10" SA
8"x10" SA
10"x12" SA
10"x12" SA
22"x10" RA
10"x10" SA
10"x10" SA
10"ø SA
"x
8" R
A
10"x10" SA
6"x6" SA
6"x10" SA
6"x4" SA
48"x14" RA
10"x10" SA
8"x6" SA
8"x10" SA
14"x10" SA 8"ø SA
6"ø SA
8"x10" SA
20"x6" SA
14"x12" SA
6"x6" EA
10"x6" SA
12"x10" EA
10"x12" SA
"x
8" R
A
24"x4" RA
M-401
BUILDING 61 KEY PLAN - GROUND FLOOR
PHASE 2
RENOVATED
TRAINING AND
OFFICE SPACE
N
PHASE 2
RENOVATED
OFFICE SPACE
OUT OF SCOPE
PHASE 1
RESTROOMS
th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t o n e e ig h th in c h o n e fo o t
A
B
C
D
E
F
Veterans Health
Administration
VA FORM 08-6231
Drawing Title Project Title
Location
Date Checked Drawn
Project Number
CONSULTANTS:
Drawing # OF
VA Health Care System Approval:
ARCHITECT:
SPUR DESIGN, LLC
312 SW 25TH STREET
Oklahoma City, OK 73109
(405) 842-6100
SPUR DESIGN
11020 KING STREET, SUITE 350
OVERLAND PARK, KS 66210
(913) 369-7200
The information on this document is preliminary or incomplete, not for construction, recording purposes, or implementation.
FULLY SPRINKLERED
1 2 3 4 5 6 7 8 9
1 2 3 4 5 6 7 8 9
A
B
C
D
E
F
STAMP:
Drawing Number
Building Number
KS
KS
ARCH REG. NO.
ENGR REG. NO.
EXP. 12/31/2021
EXP. 12/31/2021
A-930, E-2586, CIVIL ENGINEER
H2B, INC.
1225 N. LOOP WEST, SUITE 800
HOUSTON, TX 77008
(713) 864-2900
MECHANICAL ENGINEER
ELECTRICAL ENGINEER
PLUMBING ENGINEER
FIRE PROTECTION ENGINEER
POOLE FIRE PROTECTION
19910 WEST 161ST STREET
OLATHE, KANSAS 66062
(913) 829-8650 ROBERT J. DOLE VA MEDICAL CENTER
SPUR #: 1794.08
/2
/2
:3
:0
P
M
MECHANICAL DUCT DEMOLITION PLAN -
GROUND LEVEL
RDC 50 88CSC
ISSUED FOR CONSTRUCTION
ELECTRONIC HEALTH RECORD
MODERNIZATION (EHRM)
ADMINISTRATIVE SPACE
01/28/2022
589A7-21-702
5500 EAST KELLOGG AVENUE
WICHITA, KANSAS 67218
MD102
N
1/8" = 1'-0"
MECHANICAL DUCT DEMOLITION PLAN - GROUND LEVEL1
DEMOLITION KEYNOTES
D1 DEMOLISH EXISTING TERMINAL UNIT, ASSOCIATED MEDIUM AND LOW PRESSURE DUCTWORK, SUPPLY AND RETURN AIR DEVICES, PNEUMATIC CONTROLS, AND ASSOCIATED ACCESSORIES BACK TO INDICATED LOCATION. CAP SUPPLY AIR DUCT AT MAIN.
D2 DEMOLISH EXISTING EXHAUST AIR DUCT, DEVICES, AND ACCESSORIES UP TO EXHAUST FAN ON ROOF. DISCONNECT EXHAUST SYSTEM ON FIRST
FLOOR AND PREPARE TO CONNECT TO NEW EXHAUST RISER IN THE SAME LOCATION.
D3 DEMOLISH EXISTING AIR HANDLING UNIT, FILTERS, MIXED AIR PLENUM, FAN, AND SUPPLY AIR PLENUM AS SHOWN. PREPARE SPACE FOR INSTALLATION
OF NEW AIR HANDLING UNIT AND ACCESSORIES.
D5 DEMOLISH EXISTING RETURN AIR DEVICE AND ASSOCIATED DUCT AND ACCESSORIES BACK TO LOCATION INDICATED. CAP AND SEAL AIR-TIGHT AT
MAIN DUCT TAP.
D6 TEST AND BALANCE CONTRACTOR SHALL CAPTURE AIRFLOWS OF ALL EXISTING TO REMAIN TERMINAL UNITS PRIOR TO PROJECT START. UNITS SHALL
BE RETURNED TO EXISTING CONDITIONS UPON PROJECT COMPLETION.
D7 DISCONNECT EXISTING SUPPLY AIR BRANCH CONNECTION AT POINT INDICATED. PREPARE FOR RECONNECTION TO NEW SUPPLY AIR DUCT MAIN.
D8 RELOCATE RETURN GRILLE TO CONFERENCE ROOM AND PROVIDE NEW RETURN AIR DUCTWORK. REBALANCE UNIT AS NECESSARY.
A
B C D E F G
61 RF-2
61-FTU-2-58
61-FTU-2-59
61-FTU-2-5761-FTU-2-56
61-FTU-2-60
61 AHU-2
61-AC-1
61-FTU-2-61
61-FTU-2-62
61-FTU-2-63
61-FTU-2-64
61-FTU-2-65
61-FTU-2-66
61-FTU-2-53
61-FTU-2-54
61-FTU-2-67
61-FTU-2-68
61-FTU-2-55
2 1/2" HHR2 1/2" HHS
1 1/4" HHR
1 1/4" HHS
1" HHR
1" HHS
1" H
H R
1" H
H S
3/4" HHS
3/4" HHR
1/
2" H
H R
1/
4" H
H S
3/4" HHR
3/4" HHS
1/
2" H
H S
1/
2" H
H R
1" HHS
1" HHR
3/4" HHS
3/4" HHR 1
1/ 2"
H H
S
1/
2" H
H R
2" H
H S
1/
2" H
H R
1" HHR
1" HHS
3/4" HHR
3/4" HHS
1" HHR
1" HHS
3/4" HHR
3/4" HHS
1/
2" H
H R
2" H
H S
1/
4" H
H R
1/
4" H
H S
3/4" HHR
3/4" HHS
1" HHR
1" HHS
3/4" HHR
3/4" HHS
2" HHS
2" HHR
2 1/2" HHS
2" HHR
3/ 4"
H H
S
3/ 4"
H H
R
1/
2" H
H S
2" H
H R
1/
2" H
H S
1/
4" H
H R
3/ 4"
H H
R
D4
D4
D4
D4
61-FTU-2-46
61-FTU-2-45
61-FTU-2-47
61-FTU-2-48
61-FTU-2-34
61-FTU-2-35
61-FTU-2-36
61-FTU-2-38
61-FTU-2-37
61-FTU-2-50
61-FTU-2-49
61-FTU-2-51
61-FTU-2-39
61-FTU-2-40
61-FTU-2-41
61-FTU-2-42
61-FTU-2-43 61-FTU-2-52
61-CUH4
61-FCU-1
61-FTU-2-44
61-FTU-2-33
61-FTU-2-32
61-FTU-2-31
61-FTU-2-30
1/
2" H
H S
1" HHR
1" HHS
1" HHS
1" HHR
1/
2" H
H R
1/
2" H
H S
2" H
H R
1/
2" H
H S
1 1/4" HHS
1 1/4" HHR
1" HHR
1" HHS1" HHS
D4
61-CUH-3
61 RF-1
1" HHR
1/
2" H
H R
2 1/2" HHS
CORRIDOR
VFW
VETERAN'S OF AMERICA
PARALYZED OFFICE
KANSAS COMMISSION
VETERAN'S AFFAIRS
QUALITY ASSURANCE
TLT
TLT
VESTIBULE
103B
103A
103 103C
103D
103F103E
110E
110A 110B
110C
110D
110F 110G
129B
127129A
126D
126E
126B126C 126A
123D123C
123A
123E
124A
124B
111 -
111A
111B
111C
113116
126F
115A
1" HHS
1" HHR
61-FDPR-1
BUILDING 61 KEY PLAN - FIRST FLOOR
PHASE 1
RENOVATED
TRAINING AND
OFFICE SPACE
NOUT OF SCOPE
th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t o n e e ig h th in c h o n e fo o t
A
B
C
D
E
F
Veterans Health
Administration
VA FORM 08-6231
Drawing Title Project Title
Location
Date Checked Drawn
Project Number
CONSULTANTS:
Drawing # OF
VA Health Care System Approval:
ARCHITECT:
SPUR DESIGN, LLC
312 SW 25TH STREET
Oklahoma City, OK 73109
(405) 842-6100
SPUR DESIGN
11020 KING STREET, SUITE 350
OVERLAND PARK, KS 66210
(913) 369-7200
The information on this document is preliminary or incomplete, not for construction, recording purposes, or implementation.
FULLY SPRINKLERED
1 2 3 4 5 6 7 8 9
1 2 3 4 5 6 7 8 9
A
B
C
D
E
F
STAMP:
Drawing Number
Building Number
KS
KS
ARCH REG. NO.
ENGR REG. NO.
EXP. 12/31/2021
EXP. 12/31/2021
A-930, E-2586, CIVIL ENGINEER
H2B, INC.
1225 N. LOOP WEST, SUITE 800
HOUSTON, TX 77008
(713) 864-2900
MECHANICAL ENGINEER
ELECTRICAL ENGINEER
PLUMBING ENGINEER
FIRE PROTECTION ENGINEER
POOLE FIRE PROTECTION
19910 WEST 161ST STREET
OLATHE, KANSAS 66062
(913) 829-8650 ROBERT J. DOLE VA MEDICAL CENTER
SPUR #: 1794.08
/2
/2
:3
:1
P
M
MECHANICAL PIPING DEMOLITION PLAN -
FIRST FLOOR
RDC 51 88CSC
ISSUED FOR CONSTRUCTION
ELECTRONIC HEALTH RECORD
MODERNIZATION (EHRM)
ADMINISTRATIVE SPACE
01/28/2022
589A7-21-702
5500 EAST KELLOGG AVENUE
WICHITA, KANSAS 67218
MD103
N
1" = 10'-0"
MECHANICAL PIPING DEMOLITION PLAN - FIRST FLOOR1
DEMOLITION KEYNOTES
D4 DEMOLISH EXISTING HEATING WATER SUPPLY AND RETURN BRANCH PIPING BACK TO DEMARCATION POINT AND CAP TEE AT MAIN. REFER TO MD101
FOR DEMOLITION OF TERMINAL UNIT.
V D
V D
V D
VD
V D
V D
V D
V D
V D
V D
V D
V D
V D
A
B C D E F G
M-401
14"x14" EA UP
TO EF-2 TO BE
DEMOLISHED
61-FTU-2-62
24x24
2x2-6"
24x24
24x24
24x12
24x12
2x2-10"
2x2-10"
2x2-10"
61-FTU-2-63
61-FTU-2-64
2x2-12"
2x2-6"
2x2-10"
24x12
24x12
24x12
61-FTU-2-65
2x2-6"
2x2-12"
2x2-12"
1,600 24x24
61-FTU-2-66
2x2-12"
2x2-12"
1,600 24x24
2x2-10"
2x2-10"
2x2-10"
2x2-8"
61-FTU-2-68
24x24
1,200 24x24
2x2-8"
2x2-8"
61-FTU-2-67
2x2-12"
1,000 24x24
1,000 24x24
61-FTU-2-55
61-FTU-2-53
61-FTU-2-54
2x2-8"
2x2-6"
2x2-6"
24x12
24x12
24x12
24x12
2x2-6"
24x12
24x12
2x2-6"
24x12
2x2-8" 300
24x12
24x12
24x12
D1
34"/18" SA
S A
36"x8" RA
"x
8" R
A
S A
"x
R A
40"x18" RA
18"ø SA
S A
34"/18" SA
S A
24"x6" RA
S A
"x
R A
24"x8" RA
19"/13" SA
"x
R A
"x
R A
24"x12" RA
24"x6" RA
"x
8" R
A
S A
S A
S A
S A
"x
S A
60"x18" RA
"x
R A
"x
8" R
A
"x
R A
"x
R A
16"/12" SA
14"x11" SA
10"x12" SA
8"x12" SA
12"x12" SA
8"x8" SA
16"x14" SA
16"x12" SA
10"x12" SA
61-FTU-2-61
61-FTU-2-48
61-FTU-2-49
61-FTU-2-51
61-FTU-2-50
61-FTU-2-40
61-FTU-2-41
61-FTU-2-38
61-FTU-2-37
61-FTU-2-36
61-FTU-2-35
61-FTU-2-34
61-FTU-2-32
61-FTU-2-33
61-FTU-2-31
61-FTU-2-30
61-FTU-2-45
61-FTU-2-60
61-FTU-2-59
61-FTU-2-57
61-FTU-2-56
14"ø SA
61-FTU-2-46
61-FTU-2-47
61-FTU-2-43
61-FTU-2-44
61-FTU-2-52
D6
D6
D6
D6
D6
D6
D6
D6
D6
D6
D6
D6
D6
D6 D6
D6
D6
D6
D6
D6
D6 D6
D6
D6
D6
D6
D6
D6
D6
24"x8" RA24"x10" RA
24"x10" RA
"x
8" R
A
12"x8" RA
8"x8" SA
10"x10" SA
8"x10" SA
12"x10" SA8"ø SA 8"x10" SA
24"x8" RA
24"x8" RA
"x
8" R
A
24"x12" RA
"x
6" R
A
14"x10" SA
10"x10" SA
8"ø SA
8"ø SA
24"x8" RA
24"x10" SA
10"x8" SA 10"x10" SA
8"x6" EA8"x6" EA
12"x10" EA
24"x8" RA
10"x12" SA
10"x10" SA
8"x10" SA 7"ø SA
7"ø SA
14"x14" RA
8"x10" SA
6"ø SA10"x10" SA
12"x10" SA
8"ø SA
8"ø SA
8"x8" SA
10"x10" SA
10"x10" SA 61-FTU-2-39
24"x8" RA
8"x12" SA
12"x12" SA
15"/13" SA
61-FTU-2-42
14"x11" SA
8"x10" SA8"x10" SA
10"x12" SA
10"x12" SA
14"x12" SA
8"ø SA
10"x12" SA
8"x10" SA
12"x10" SA
10"x10" SA
10"x10" SA
14"x11" SA
8"ø SA 8"ø SA
8"x10" SA
8"x10" SA 8"x10" SA
6"x6" SA
8"x8" SA
6"x6" SA
8"ø SA
8"ø SA
24"x12" RA
10"x10" SA
10"x12" SA
8"x12" SA
10"x10" SA
6"ø SA
6"ø SA
14"x6" SA12"ø SA
12"x10" SA
12"x10" SA
16"x12" SA
12"x10" SA
12"x10" SA
12"ø SA
16"x16" SA
10"x10" SA12"x12" SA
24"x8" RA
10"x10" SA
12"x12" SA
8"x10" SA6"x6" SA
12"ø SA
8"x10" SA8"x8" SA
14"x10" SA
10"ø SA
14"x12" SA
24"x8" RA
24"x8" RA
"x
R A
"x
R A
24"x8" RA
14"x5" RA
CORRIDOR
VFW
VETERAN'S OF AMERICA
PARALYZED OFFICE
KANSAS COMMISSION
VETERAN'S AFFAIRS
QUALITY ASSURANCE
TLT
TLT
VESTIBULE
103B
103A
103 103C 103D
103F 103E
110E
110A 110B
110C
110D
110F 110G
129B
129A
126D
126E
126B 126C
126A
123D 123C
123A
123E
118-
124A
124B
111A
111B
111C
113116
126F
120 114115A115
61-CUH4
D7
A
B C D E F G
EXISTING SOLAR
PANELS TO REMAIN IN
PLACE
EXHAUST FAN TO
BE REPLACED
61 EF-2
61 EF-3
61 EF-4
INTAKE HOOD
TO REMAIN
BUILDING 61 KEY PLAN - FIRST FLOOR
PHASE 1
RENOVATED
TRAINING AND
OFFICE SPACE
NOUT OF SCOPE
th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t o n e e ig h th in c h o n e fo o t
A
B
C
D
E
F
Veterans Health
Administration
VA FORM 08-6231
Drawing Title Project Title
Location
Date Checked Drawn
Project Number
CONSULTANTS:
Drawing # OF
VA Health Care System Approval:
ARCHITECT:
SPUR DESIGN, LLC
312 SW 25TH STREET
Oklahoma City, OK 73109
(405) 842-6100
SPUR DESIGN
11020 KING STREET, SUITE 350
OVERLAND PARK, KS 66210
(913) 369-7200
The information on this document is preliminary or incomplete, not for construction, recording purposes, or implementation.
FULLY SPRINKLERED
1 2 3 4 5 6 7 8 9
1 2 3 4 5 6 7 8 9
A
B
C
D
E
F
STAMP:
Drawing Number
Building Number
KS
KS
ARCH REG. NO.
ENGR REG. NO.
EXP. 12/31/2021
EXP. 12/31/2021
A-930, E-2586, CIVIL ENGINEER
H2B, INC.
1225 N. LOOP WEST, SUITE 800
HOUSTON, TX 77008
(713) 864-2900
MECHANICAL ENGINEER
ELECTRICAL ENGINEER
PLUMBING ENGINEER
FIRE PROTECTION ENGINEER
POOLE FIRE PROTECTION
19910 WEST 161ST STREET
OLATHE, KANSAS 66062
(913) 829-8650 ROBERT J. DOLE VA MEDICAL CENTER
SPUR #: 1794.08
/2
/2
:3
:1
P
M
MECHANICAL DUCT DEMOLITION PLAN -
FIRST FLOOR AND ROOF
RDC 52 88CSC
ISSUED FOR CONSTRUCTION
ELECTRONIC HEALTH RECORD
MODERNIZATION (EHRM)
ADMINISTRATIVE SPACE
01/28/2022
589A7-21-702
5500 EAST KELLOGG AVENUE
WICHITA, KANSAS 67218
MD104
N
1" = 10'-0"
MECHANICAL DUCT DEMOLITION PLAN - FIRST FLOOR2
N
1/16" = 1'-0"
MECHANICAL HVAC DEMOLITION PLAN - ROOF1
DEMOLITION KEYNOTES
D1 DEMOLISH EXISTING TERMINAL UNIT, ASSOCIATED MEDIUM AND LOW PRESSURE DUCTWORK, SUPPLY AND RETURN AIR DEVICES, PNEUMATIC CONTROLS, AND ASSOCIATED ACCESSORIES BACK TO INDICATED LOCATION. CAP SUPPLY AIR DUCT AT MAIN.
D6 TEST AND BALANCE CONTRACTOR SHALL CAPTURE AIRFLOWS OF ALL EXISTING TO REMAIN TERMINAL UNITS PRIOR TO PROJECT START. UNITS SHALL
BE RETURNED TO EXISTING CONDITIONS UPON PROJECT COMPLETION.
D7 DISCONNECT EXISTING SUPPLY AIR BRANCH CONNECTION AT POINT INDICATED. PREPARE FOR RECONNECTION TO NEW SUPPLY AIR DUCT MAIN.
A
B C D E F G
61 VAV-02A
61 VAV-02B
61 VAV-01A 61 VAV-03A
61 VAV-03B
61 VAV-04A
61 VAV-04B
61 VAV-0TF
61 VAV-0C
61 VAV-0-6
61 VAV-01E
61 VAV-07
61 VAV-08
61 VAV-05B
61 VAV-05A
61 VAV-0TM
61-FTU-1-14
61-FTU-1-9
61-FTU-1-15
61 VAV-09
61-FTU-1-5
61-FTU-1-3
61-FTU-1-2
61-FTU-1-4
61-FTU-1-1
61-FTU-1-13
61-FTU-1-25
61-FTU-1-11
61-FTU-1-7
2" H
H S
1/
4" H
H R
1" H
H R
3/4" HHR
3/4" HHS
3/4" HHR 3/4" HHS
CUH-1
CUH-2
UH-2
3/4" HHS
3/4" HHR
2" H
H R
1" H
H S
2" H
H R
1/
4" H
H S
2" H
H R 1 1/
4" H
H S
2" H
H R
2" H
H S
2" H
H R
2" H
H S
2" H
H R
1/
2" H
H S
2" H
H R
1/
2" H
H S
2" H
H R
2" H
H S
2" H
H R 2"
H H
S2" HHR
2" HHS
2" HHR
2" HHS
2" H
H R
2" H
H S
1/
2" H
H R
2" H
H S
1/
2" H
H R
2" H
H S
1/
4" H
H R2"
H H
S
3/4" HHR
3/4" HHS
3/4" HHR
3/4" HHS
3/4" HHR
3/4" HHS
3/4" HHS
1" HHR
3/4" HHS
3/4" HHR
3/4" HHR
3/4" HHS
3/4" HHS 3/4" HHR
3/4" HHS
3/4" HHR
3/4" HHR 3/4" HHS
3/4" HHR 3/4" HHS
3/4" HHR
3/4" HHS
3/4" HHS 3/4" HHR
3/4" HHR 3/4" HHS
3/4" HHS 3/4" HHR
3/4" HHS 3/4" HHR
3/4" HHS
3/4" HHR
3/4" HHR
3/4" HHS
3/4" HHR
3/4" HHS
3/4" HHR
3/4" HHS
3/4" HHS
3/4" HHR
3/4" HHS
3/4" HHR
3/4" HHS 3/4" HHR
TRAINING
002B
TRAINING
002A
OFFICE
MEETING
003B
TRAINING
004A
TRAINING
004B
TRAINING
005A
OFFICE
TELECOM
008A
TOILET (F)
TOILET (M)
ELEC
005D
STOR.
CORRIDOR
C3
COFFEE
CORRIDOR
C2
OFFICE
WAITING
TRAINING
005B
61-FTU-1-16
CUH-3
MEETING
003A
T
VAV-04B
T
VAV-05A
T
VAV-05B
T
VAV-04A
T
VAV-03B
T
VAV-03A
T
VAV-01A
T
VAV-02B
T
VAV-02A
T
VAV-09
T
VAV-01E
T
VAV-07
T
VAV-08
T
VAV-06
T
VAV-0-C
T
VAV-0TM
T
VAV-0TF
61-FTU-1-17
AFH-6
61-FTU-69
61-FTU-1-6
AFH-5
3/4" HHR
3/4" HHS
TYP
M-501
TYP
M-501
M-501
M-401
BUILDING 61 KEY PLAN - GROUND FLOOR
PHASE 2
RENOVATED
TRAINING AND
OFFICE SPACE
N
PHASE 2
RENOVATED
OFFICE SPACE
OUT OF SCOPE
PHASE 1
RESTROOMS
th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t o n e e ig h th in c h o n e fo o t
A
B
C
D
E
F
Veterans Health
Administration
VA FORM 08-6231
Drawing Title Project Title
Location
Date Checked Drawn
Project Number
CONSULTANTS:
Drawing # OF
VA Health Care System Approval:
ARCHITECT:
SPUR DESIGN, LLC
312 SW 25TH STREET
Oklahoma City, OK 73109
(405) 842-6100
SPUR DESIGN
11020 KING STREET, SUITE 350
OVERLAND PARK, KS 66210
(913) 369-7200
The information on this document is preliminary or incomplete, not for construction, recording purposes, or implementation.
FULLY SPRINKLERED
1 2 3 4 5 6 7 8 9
1 2 3 4 5 6 7 8 9
A
B
C
D
E
F
STAMP:
Drawing Number
Building Number
KS
KS
ARCH REG. NO.
ENGR REG. NO.
EXP. 12/31/2021
EXP. 12/31/2021
A-930, E-2586, CIVIL ENGINEER
H2B, INC.
1225 N. LOOP WEST, SUITE 800
HOUSTON, TX 77008
(713) 864-2900
MECHANICAL ENGINEER
ELECTRICAL ENGINEER
PLUMBING ENGINEER
FIRE PROTECTION ENGINEER
POOLE FIRE PROTECTION
19910 WEST 161ST STREET
OLATHE, KANSAS 66062
(913) 829-8650 ROBERT J. DOLE VA MEDICAL CENTER
SPUR #: 1794.08
/2
/2
:3
:2
P
M
MECHANICAL PIPING PLAN - GROUND LEVEL
RDC 53 88CSC
ISSUED FOR CONSTRUCTION
ELECTRONIC HEALTH RECORD
MODERNIZATION (EHRM)
ADMINISTRATIVE SPACE
01/28/2022
589A7-21-702
5500 EAST KELLOGG AVENUE
WICHITA, KANSAS 67218
MP101
N
1/8" = 1'-0"
MECHANICAL PIPING PLAN - GROUND LEVEL1
A
B C D E F G
61 RF-2
61-FTU-2-58
61-FTU-2-59
61-FTU-2-5761-FTU-2-56
61-FTU-2-60
61 AHU-2
61-AC-1
61-FTU-2-61
2 1/2" HHR2 1/2" HHS
1 1/4" HHR
1 1/4" HHS
1" HHR
1" HHS
1" H
H R
1" H
H S
1/
2" H
H R
1/
4" H
H S
1/
2" H
H S
1/
2" H
H R
1/
2" H
H S
1/
2" H
H R
2" H
H S
1/
2" H
H R
1/
2" H
H R
2" H
H S
1/
4" H
H R
1/
4" H
H S
2" HHS
2" HHR
3/ 4"
H H
S
3/ 4"
H H
R
1/
2" H
H S
2" H
H R
1/
2" H
H S
1/
4" H
H R
3/ 4"
H H
R
61-FCU-1
61 AHU-3
61-FTU-2-52
61-FTU-2-44
61-FTU-2-41
61-FTU-2-42
61-FTU-2-43
61-FTU-2-40
61-FTU-2-39
61-FTU-2-50
61-FTU-2-38
61-FTU-2-37
61-FTU-2-36
61-FTU-2-34
61-FTU-2-32
61-FTU-2-33
61-FTU-2-47
61-FTU-2-45
61-FTU-2-31
61-FTU-2-30
61-FTU-2-46
61-FTU-2-48
61-FTU-2-49
61-FTU-2-51
61-FTU-2-35
61-CUH4
STORAGE
103-C
CONFERENCE
LOBBY
103-A
CLASSROOM
CLASSROOM
106A
CLASSROOM
106B
CLASSROOM
107A
CLASSROOM
107B
CLASSROOM
CORRIDOR
103-B
1" HHR
1" HHS
2 1/2" HHS
1 1/2" HHR
2 1/2" HHS 2" HHR
1 1/4" HHR
1 1/4" HHS
2 1/2" HHS
2" HHR
1" HHS
1" HHR
1" HHR
1" HHS
1" HHR
1" HHS
1" HHR
1" HHS
1 1/2" HHR
2 1/2" HHS
2 1/2" HHS
1 1/2" HHR
1" HHR 1" HHR
1" HHS1" HHS
2 1/2" HHS
2" HHR
2" HHS
2" HHR
2" HHS
2 1/2" HHR
1 1/2" HHS
2 1/2" HHR
1 1/2" HHR
2 1/2" HHS
2 1/2" HHS
2" HHR
61 VAV-105
61 VAV-107
61 VAV-106 61 VAV-108
61 VAV-104
61 VAV-103
61 VAV-102
61 VAV-101
1 1/4" HHS
1/
4" H
H R
61-CUH-3
T
VAV-101
T
VAV-102
T
VAV-103
T
VAV-104
T
VAV-108
T
VAV-107
T
VAV-105
T
VAV-106
3/4" HHR3/4" HHS
3/4" HHS
3/4" HHR
3/4" HHR
3/4" HHS
3/4" HHR
3/4" HHS
3/4" HHS
3/4" HHR
3/4" HHR 3/4" HHS
3/4" HHR3/4" HHS
3/4" HHR 3/4" HHS
3-WAY
VALVE
TYP
M-501
TYP
M-501
M-501
M-401
BUILDING 61 KEY PLAN - FIRST FLOOR
PHASE 1
RENOVATED
TRAINING AND
OFFICE SPACE
NOUT OF SCOPE
th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t o n e e ig h th in c h o n e fo o t
A
B
C
D
E
F
Veterans Health
Administration
VA FORM 08-6231
Drawing Title Project Title
Location
Date Checked Drawn
Project Number
CONSULTANTS:
Drawing # OF
VA Health Care System Approval:
ARCHITECT:
SPUR DESIGN, LLC
312 SW 25TH STREET
Oklahoma City, OK 73109
(405) 842-6100
SPUR DESIGN
11020 KING STREET, SUITE 350
OVERLAND PARK, KS 66210
(913) 369-7200
The information on this document is preliminary or incomplete, not for construction, recording purposes, or implementation.
FULLY SPRINKLERED
1 2 3 4 5 6 7 8 9
1 2 3 4 5 6 7 8 9
A
B
C
D
E
F
STAMP:
Drawing Number
Building Number
KS
KS
ARCH REG. NO.
ENGR REG. NO.
EXP. 12/31/2021
EXP. 12/31/2021
A-930, E-2586, CIVIL ENGINEER
H2B, INC.
1225 N. LOOP WEST, SUITE 800
HOUSTON, TX 77008
(713) 864-2900
MECHANICAL ENGINEER
ELECTRICAL ENGINEER
PLUMBING ENGINEER
FIRE PROTECTION ENGINEER
POOLE FIRE PROTECTION
19910 WEST 161ST STREET
OLATHE, KANSAS 66062
(913) 829-8650 ROBERT J. DOLE VA MEDICAL CENTER
SPUR #: 1794.08
/2
/2
:3
:3
P
M
MECHANICAL PIPING PLAN - FIRST FLOOR
RDC 54 88CSC
ISSUED FOR CONSTRUCTION
ELECTRONIC HEALTH RECORD
MODERNIZATION (EHRM)
ADMINISTRATIVE SPACE
01/28/2022
589A7-21-702
5500 EAST KELLOGG AVENUE
WICHITA, KANSAS 67218
MP102
N
1" = 10'-0"
MECHANICAL PIPING PLAN - FIRST FLOOR1
KEYNOTES
4 PROVIDE NEW 3-WAY VALVE INSTEAD OF 2-WAY VALVE AT FARTHEST VAV BOX IN THE LOCATION SHOWN. REFER TO M-201 AND M-501 FOR MORE
INFORMATION.
V
V D
V D
V D
V D
V D
VD
V D
A
B C D E F G
61-FTU-1-25
61-FTU-1-13
61-FTU-1-1
61-FTU-1-2
61-FTU-1-3
61-FTU-1-4
61-FTU-1-9
61-FTU-1-5
61-FTU-1-15
61-FTU-1-11
61-FTU-1-7
61-FTU-1-14
CLASSROOM
005A
CLASSROOM
004B
CLASSROOM
004A
CLASSROOM
003B
CLASSROOM
003A
CLASSROOM
005B
WAITING
006A
BREAK
006B
WAITING
001E
OFFICE
001D
CORRIDOR
001-3
TOILET (W)
TOILET (M)
ELEC
001B
STOR.
001C
OFFICE
001A
CLASSROOM
002A
CLASSROOM
002B
CORRIDOR
001-1
STAIR
NORTH
OFFICE
61 VAV-03A
61 VAV-01A
61 VAV-03B
61 VAV-04A
61 VAV-04B
61 VAV-05A
61 VAV-05B
61 VAV-08
61 VAV-07
61 VAV-01E
61 VAV-0-6
61 VAV-0C
61 VAV-0TF
61 VAV-0TM
61 VAV-02B
61 VAV-02A
V
A V
-0
36"x14" SA
"x
S A
36"x16" SA
SD-4
SD-4
SD-4
SD-4
SD-4
SD-4
SD-4
SD-4
SD-4
SD-4
10"x10" SA
SD-4
SD-4
SD-4
SD-4
SD-4
SD-4
SD-4
SD-4
SD-4
SD-4
SD-4
10"x10" SA
14"x14" SA
10"ø SA
18"ø SA
"x
S A
"x
S A
"x
S A
"x
S A
"x
S A
"x
S A
12"x10" SA
8"x10" SA
14"x10" SA8"x10" SA 12"x12" SA
SD-4
SD-4
SD-4
SD-4
SD-5
SD-5
SD-5
SD-5
12"x12" SA
16"x14" SA
12"ø SA
"ø
S A
"x
S A
"x
S A
"x
R A
26"x14" RA 30"x12" RA
"x
R A
"x
R A
"x
R A
"x
R A
20"x10" RA
"x
8" R
A
10"ø SA
16"x14" SA 14"x10" EA
12"x10" SA
18"x6" RA
SD-3
SD-3
SD-3
8"x10" SA
SD-4
205 SD-4
SD-4
200SD-4
10"ø SA
SD-4
SD-4
SD-4
SD-4
SD-4
SD-4
10"ø SA
10"ø SA
SD-4
SD-4
SD-4
SD-4
SD-4
SD-4
12"x14" SA
10"ø SA
12"x14" SA
SD-4
SD-4
SD-4
SD-4
SD-4
SD-4
12"x12" SA 10"x10" SA
52"x8" RA
"x
8" R
A
10"ø SA
SD-3
SD-3
SD-3
SD-3
6"ø SA
6"ø SA
8"x10" SA
20"x10" RA
EG-2
6"ø SA
RG-2
SD-5
SD-5
SD-4
SD-4
8"x10" SA 12"x8" EA
SD-4
SD-4
SD-4
SD-4
10"x10" SA
10"x8" RA
10"x8" RA
RG-2
SD-4
10"x10" SA
RG-2
14"x12" SA
12"x12" SA
RG-2
RG-2
RG-2
1,035
RG-2
1,020
RG-2
RG-2
RG-2
RG-2
"x
S A
24"x4" RA
6"ø SA
RG-2
1,110
RG-2
1,285
RG-2
RG-2
20"x10" RA
RG-2
14"x12" SA
10"ø SA
EG-2
M-401
SD-4
SD-4
61-FTU-1-16
"x
R A
"x
R A
"x
R A
22"x10" RA
22"x10" RA
12"ø SA
24"x14" RA
10"ø SA
10"ø SA
10"ø SA
10"ø SA6"ø SA
10"ø SA
24"x8" RA
20"x8" RA
20"x10" RA
20"x8" RA
20"x10" RA
24"x8" RA
COFFEE
48"x14" RA
12"x12" SA
EG-1
61-FTU-69
61-FTU-1-17
10"ø SA
61-CUH-3
8"x8"
12"ø SA
10"ø SA
10"x6" EA
61-FTU-1-6
RELOCATED
RETURN GRILL
SD-4
14"x10" SA
SD-5
18"x12" SA
10"x10" SA
84"x16" RA
48"x14" RA
"x
R A
"x
R A
"x
8" R
A
24"x8" RA
"x
R A
10"x12" SA
10"x12" SA
22"x10" RA
10"ø SA
8"ø SA
10"x8" RA
6"x6" SA8"x6" SA
7"ø SA
7"ø SA12"x12" SA
8"ø SA
8"x6" SA
8"x10" SA
12"x7" RA
7"ø SA
10"x10" SA
20"x6" SA
8"ø SA
14"x12" SA
10"x6" SA
6"x6" EA
12"x10" EA
12"x12" EA
10"x10" SA
6"ø SA
8"ø SA 10"x10" SA
6"x10" SA
6"x4" SA
6"x6" SA
12"x14" RA24"x4" RA
8"ø SA
8"x8" SA
6"ø SA
7"ø SA
8"x10" SA
6"x6" SA
8"x10" SA 7"ø SA
10"x10" SA
6"x6" SA
6"x8" SA
10"x8" SA
12"ø SA14"x10" SA12"x10" SA
8"x10" SA 24"x8" RA
6"ø SA
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .