IFQ_1100_AGM1025_QUOTE_v1.xlsx
XLSX spreadsheet 38 KB Posted
- Attached to
- Relay Services
- Solicitation number
- RFP 1100 LLM3009
- Issued by
- Texas
About this file
This is a pricing submittal sheet template for a commodities solicitation issued by the City of Austin, Texas for pole line hardware. The solicitation, designated IFQ 1100 AGM1025, seeks pricing for turnbuckle assemblies (jaw-jaw configuration rated at 50,000 pounds ultimate load) with specific dimensions and galvanized finish, manufactured by Hubbell under part number TB1JJ24BNKLN. The solicitation identifies an estimated quantity of 30 units per the line item, though the City explicitly reserves the right not to guarantee purchase of listed quantities. Delivery is required to the Austin Energy Cameron Warehouse located at 14910 Cameron Road, Pflugerville, Texas 78660. The procurement specialist managing this solicitation is Ahide Garcia, and the solicitation number must be included in all email communications.
Offerors must submit unit pricing with no more than four decimal places and must provide extended price calculations. All pricing must be inclusive of handling, shipping charges, applicable discounts, and FOB destination delivery to the Austin, Texas area. Offerors are prohibited from charging separately for administrative costs, overhead, per diem, or transportation-related expenses such as fuel surcharges, mileage charges, or stop fees. The pricing submittal sheet template provided is unlocked and designed to be modified by the procurement specialist before issuance; cells should be protected and password-locked prior to publication. Offerors must specify their delivery method and provide authorized representative contact information including email address.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| RFP_1100_LLM3009_ATT_7_v1.pdf | ||
| RFP_1100_LLM3009_ATT_6_v2.xlsx | XLSX spreadsheet | |
| IFB_6100_CLMC1105_PLANS_v1.pdf | ||
| RFP_1100_LLM3009_ATT_10_v1.pdf | ||
| RFP_1100_LLM3009_ATT_8_v1.pdf | ||
| RFP_1100_LLM3009_ATT_4_v2.pdf | ||
| RFP_1100_LLM3009_ADD_4_v1.pdf | ||
| RFP_1100_LLM3009_ATT_5_v1.pdf | ||
| RFP_1100_LLM3009_ATT_3_v1.pdf | ||
| RFP_1100_LLM3009_ATT_2_v1.pdf | ||
| RFP_1100_LLM3009_ADD_3_v1.pdf | ||
| RFP_1100_LLM3009_ADD_2_v1.pdf | ||
| RFP_1100_LLM3009_ADD_1_v1.pdf | ||
| RFP_1100_LLM3009_ATT_5_v2.docx | DOCX document | |
| RFP_1100_LLM3009_ATT_11_v1.docx | DOCX document | |
| RFP_1100_LLM3009_ATT_6_v1.xlsx | XLSX spreadsheet | |
| RFP_1100_LLM3009_ATT_4_v1.pdf | ||
| RFP_1100_LLM3009_ATT_9_v1.pdf | ||
| RFP_1100_LLM3009_ATT_1_v1.pdf | ||
| RFP_1100_LLM3009_ATT_1_v4.pdf | ||
| RFP_1100_LLM3009_ATT_1_v5.pdf |
Show all 21
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
INSTRUCTIONS (Delete)
| Instructions for Excel Sheet Templates | These Price Sheets replace the old Bid Sheets. They are templates and can be modified to fit the solicitation, as needed. Procurement Specialist should adjust as needed and remove the additional sheets from the template before sending the solicitation out for publication (including the instruction sheet). | |
| The templates are unlocked. It is recommended that you lock the cells before issuing the solicitation. | In order to lock certain cells you need to protect the sheet under the format dropdown. From there you can enter a password (or not) to lock the cells. Then go back to the format cells dropdown and lock any needed cells. | |
| Please note that the buyer can pick and choose which categories will best apply for the solicitation. | Not every sheet has the same amount of rows and columns so you might have to format a bit. | |
| RED TEXT indicates areas that need your attention. Update, delete, or change the font color as necessary. | Ex: See Services bid sheet, Category 2. | |
| Taking out categories or cells may change the formulas, double check formulas before sending out. | In order to see the formulas select the cell and look at the bar under your ribbon. | |
| Read every section thoroughly and ensure each line is filled in completely and numbered correctly. | Ex: SERVICES in category 3 there are blanks for the buyer to fill out. |
COMMODITIES
Solicitation
PRICING SUBMITTAL
| SOLICITATION NAME | Pole Line Hardware – TB JJ 50K Assembly |
| SOLICITATION # | IFQ 1100 AGM1025 |
MUST INCLUDE THIS NUMBER IN THE SUBJECT LINE OF ALL EMAILS
PROCUREMENT SPECIALIST Ahide Garcia
Special Instructions: Offerors must use this Pricing Submittal Sheet to submit pricing.
Prices being submitted shall be inclusive of all costs, including handling and shipping charges, applicable discounts, FOB Destination. The Offeror shall not charge separately for administrative, overhead, per diem, and shipping or transportation costs (travel time, fuel surcharges, mileage, stop-fee, etc.) to deliver items to the Austin, Texas area.
Any quantities noted below are estimates. The City does not guarantee the purchase of the quantities listed.
| CATEGORY 1 - POLE LINE HARDWARE | ||||||||
| ITEM NO. | AE STOCK NO. | ITEM DESCRIPTION | UNIT OF MEASURE | LEAD TIME | QUANTITY | UNIT PRICE* | ||
| *Unit price should be no more than 4 decimal places | EXTENDED PRICE | |||||||
| 1 | 24553 | TURNBUCKLE, JAW-JAW, 50K ULT, 1"ø X 24" TAKE UP, 47.63" LENGTH AT MIDPOSITION, 1.19" OPENING, 0.88"ø PIN, 2.06" THROAT, BOLT-NUT-KEY, LOCKNUTS, HOT DIP GALV | EACH | 30 | ||||
| COA APPROVED MANUFACTURER / PART NO. | HUBBELL / TB1JJ24BNKLN | |||||||
| SUBTOTAL FOR CATEGORY 1 = |
Ship to Location:
Austin Energy - Cameron Warehouse 14910 Cameron Rd Pflugerville, TX 78660
| DELIVERY TERMS: DELIVERY IS TO BE FOB DESTINATION, PREPAID AND ALLOWED | |||
| NUMBER OF DAYS AFTER RECEIPT OF ORDER THE OFFEROR SHALL DELIVERY THE ITEMS TO THE CITY: | |||
| CHOOSE A DELIVERY METHOD : | COMMON CARRIER (FedEx,UPS) | *Insert Carrier Name | |
| VENDOR DELIVERY |
| COMPANY NAME: |
| AUTHORIZED REPRESENTATIVE NAME: |
| EMAIL ADDRESS: |
&"Arial,Regular"&9Section 0600 - Bid Sheet &"Arial,Regular"&9Page &P of &N image1.png
File details come from the government source that posted it. Updated .