IFB Cost Estimate Worksheet.xlsx

XLSX spreadsheet 14 KB Posted

Attached to
Y1PZ--863-NSP26-003 National Shrine Project at Mound City National Cemetery
Solicitation number
36C78626B0016
Issued by

About this file

This is an IFB (Invitation for Bid) Cost Estimate Worksheet template for construction services at federal cemetery facilities. The worksheet is designed to capture contractor cost estimates organized by the 16 standard construction divisions under the Uniformat classification system, requiring lump sum pricing for each division utilized in the project, with provisions for contractors to add additional line items as appropriate. Contractors must submit estimates in CLIN 001 (Contract Line Item Number), and the template includes spaces for bonds, overhead, and profit calculations, culminating in a grand total.

The worksheet is associated with two related National Shrine Projects at Department of Veterans Affairs National Cemetery Administration facilities: the primary project referenced in the file is the Wood National Cemetery project (Solicitation Number 36C78626B0015, Project Number 823-NSP25-003), while the related federal contract opportunity involves the Mound City National Cemetery project (Solicitation Number 36C78626B0016, Project 863-NSP26-003). Both projects are traditional sealed bid solicitations for construction services, with the Mound City facility located at 141 State Hwy 37, Mound City, IL 62963-9998. The cost estimate structure encompasses all major construction disciplines including general requirements, concrete, masonry, metals, HVAC, electrical, plumbing, site work, and utilities.

View the file

Other files

Show all 17

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Sheet1

IFB Contractor Cost Estimate Worksheet
Lump Sums are required for each Division that will be utilized in this project to total the final lump sum number.

If a Division is not being used put N/A in that field.

You can Add additional items you feel are appropriate.

Solicitation Number36C78626B0015
Project Nunber823-NSP25-003
Project NameNational Shrine Project at Wood National Cemetery
DivisionUnitCLIN 001Total
Division 0
Special Sections
Division 01
General Requirements
Division 02
Existing Conditions
Division 03
Concrete
Division 04
Masonry
Division 05
Metals
Division 06
Wood, Plastic, and Composites
Division 07
Thermal and Moisture Protection
Division 08
Openings (Doors, Windows, etc...)
Division 09
Finishes
Division 10
Specialties
Division 11
Equipment
Division 12
Furnishings
Division 13
Special Construction
Division 14
Fire Suppression
Division 22
Plumbing
Division 23
Heat, Ventilating, and Air Conditioning
Division 25
Integrated Automation
Division 26
Electrical
Division 27
Communications
Division 28
Electronic Safety and Security
Division 31
Earthwork
Division 32
Exterior Improvements
Division 33
Utilities
Bonds

Overhead

Profit

GRAND TOTALS $ $

File details come from the government source that posted it. Updated .