Exhibit E - Example Site Survey Headstone Realignment and Grading Plans.pdf

PDF 3 MB Posted

Attached to
Y1PZ--863-NSP26-003 National Shrine Project at Mound City National Cemetery
Solicitation number
36C78626B0016
Issued by

About this file

This document is a set of technical site survey and planning drawings for a National Cemetery National Shrine Project, specifically for Section 2D.

The file consists of three detailed engineering plans presented as site survey exhibits: a 2D Site Survey showing existing conditions with headstone locations, site features, and ground contours; a 2D Headstone Realignment Layout depicting the planned repositioning of headstones in organized rows with specific spacing and alignment parameters; and a 2D Grading Plan illustrating contour lines and elevation changes required for site preparation. The drawings cover the area bounded by North Loop Drive and Fork Drive, with sections labeled 2D, 2E, and E. Each plan includes a comprehensive legend identifying existing and proposed features such as existing upright headstones, flat headstones, benches, control monuments, section borders, survey grid references, trees, paved areas, fences, and storm infrastructure. The plans appear designed to support cemetery modernization efforts, indicating requirements for precise headstone repositioning to achieve orderly alignment and proper grading to accommodate the new layout while managing site drainage and topography.

View the file

Other files

Show all 17

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

NATIONAL CEMETERY

NATIONAL SHRINE PROJECT

2D

SITE SURVEY

cemGaussM Typewritten Text

Example Site Survey, Headstone Realignment and Grading Plans cemGaussM Typewritten Text Exhibit ‘E’

2D

HEADSTONE REALIGNMENT LAYOUT

2D

GRADING PLAN

File details come from the government source that posted it. Updated .