Attachment 9 - Contractors Daily Log of Construction.pdf

PDF 165 KB Posted

Attached to
Y1PZ--863-NSP26-003 National Shrine Project at Mound City National Cemetery
Solicitation number
36C78626B0016
Issued by

About this file

This is a template for a Contractor's Daily Log of Construction, specifically an Inspector Quality Assurance Report (Q.A.R.) used to document daily construction activities and project status.

The form is designed to capture essential project information including the contract number, project title, location, contractor details, and key personnel (Contracting Officer, Contracting Officer's Representative, and site management). It documents daily weather conditions (temperature, precipitation, visibility, and wind speed) and identifies whether weather-related delays affected 50% or more of the critical path. The form tracks workforce composition by trade for contractors and sub-contractors, including project managers, site managers, QC managers, field engineers, and miscellaneous laborers, along with visitor information. It provides sections to record equipment on site, materials delivered, project comments, identified deficiencies, and potential causes for delays. The form includes space to document tests and observations conducted and work accomplished organized by construction divisions: Division 1 (General Conditions) covering shop drawings and testing laboratory services; Division 2 (Existing Conditions) for site surveying; Division 31 (Earthwork); and Division 32 (Exterior Improvements) including flat marker support systems, headstone setting, alignment, backfilling, headstone cleaning, and turf renovation. The form concludes with sections for weekly progress meetings, requiring signatures from the site manager and supervisor initials with corresponding dates, and space for project photographs.

View the file

Other files

Show all 17

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ATTACHMENT 9

CONTRACTOR’S DAILY LOG OF CONSTRUCTION

INSPECTOR QUALITY

ASSURANCE REPORT (Q.A.R.)

DAILY LOG OF CONSTRUCTION

REPORT NUMBER: 01

Project Completion at 00 %

DATE:

CONTRACT NUMBER:

Project Title:

Location:

Contractor:

Name:

Address:

Phone:

Contractor’s Site Manager:

Name:

Address:

Phone:

Contracting Officer:

COR:

Midwest District Project Managers:

WEATHER CONDITIONS:

Temperature:

Max: ° Min: °

Precipitation:

(24hour total)

Visibility:

Miles:

Wind Speed:

mph

WEATHER RELATED DELAYS:

(Affected 50% or more of critical path?)

YES OR NO

OFFICIAL WEATHER DELAY DATES:

WORK FORCE-CONTRACTORS & SUB-CONTRACTORS:

TRADE: # TRADE: # TRADE: #

Project Manager Site Manager QC manager PM assistant Field Admin- Misc. Laborers Field Engineer Construction Mgr.

VISITORS: COMPANY:

EQUIPMENT ON SITE:

1.

2.

3.

4.

5.

6.

MATERIALS DELIVERED TO JOB SITE:

PROJECT COMMENTS:

DEFICIENCIES:

POTENTIAL CAUSES FOR DELAY:

TESTS AND OBSERVATION:

WORK ACCOMPLISHED / PREP. MEETINGS CONDUCTED TODAY:

DIVISION 1: GENERAL CONDITIONS

01 33 23 - Shop Drawings, Product Data, and Samples

01 45 29 - Testing Laboratory Services

DIVISION 2: EXISTING CONDITIONS

02 21 00 – Site Surveying

DIVISION 31: EARTHWORK

31 00 00 - Earthwork

DIVISION 32: EXTERIOR

IMPROVEMENTS

32 39 20 - Flat Marker Support System, Headstone Setting, Alignment, Backfilling, and Headstone Cleaning

32 92 24 – Turf Renovation

WEEKLY PROGRESS MEETINGS:

Site Manager’s Signature: Date Supervisors Initials: Date

PHOTOS: